BUS STOP DESIGN & PLANNING GUIDE

Similar documents
Greater Cleveland Regional Transit Authority. Bus Stop Design Guidelines

Chicago Transit Authority Service Standards and Policies

ADA Became Law In 1990

Update on Bus Stop Enhancements

ANDERSON PROPERTY SITE ANALYSIS

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Corridor Management Committee. March 7, 2012

APPENDIX B TRAINING MANUAL

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

City Council Report. Mayor and City Council

Waco Rapid Transit Corridor (RTC) Feasibility Study

Oakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County

St. Catharines Transit Commission Accessibility Plan. St. Catharines Transit Commission Accessibility Plan

An Asset Management Plan for Transit And Access Transit Fleet

PASCO COUNTY Transit Infrastructure Design Manual

Strategic Plan Performance Metrics & Targets

Bus Stop Optimization Study

KEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 AGENDA

BUS STOP LOCATION AND TRANSIT AMENITIES DEVELOPMENT GUIDELINES

Transit Passenger Environment Plan

SPACE COAST AREA TRANSIT BUS STOP ACCESSIBILITY STUDY. Final Report

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board.

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

CHAPTER 5 CAPITAL ASSETS

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

MBTA Key Bus Route. Community Meeting Route 1 - Boston

LOCAL BUS SERVICE GUIDELINES

Presentation Overview. Stop, Station, and Terminal Capacity

Appendix C. Parking Strategies

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Presentation A Blue Slides 1-5.

Service Quality: Higher Ridership: Very Affordable: Image:

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

Community Outreach Meetings

City of Pacific Grove

Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines

More than $9 Million coming to Central Valley for transportation

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

COMOX TRANSPORTATION STUDY 2011

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

DRIVEWAY ENTRANCES GENERAL. 1. Description

Sustainability SFMTA Path to Platinum

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Revised Evaluation Scores. System Preservation

Sean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016

VEHICLE PREVENTIVE MAINTENANCE PROGRAM PURPOSE AND COMPONENTS OF A VEHICLE MAINTENANCE PROGRAM

5. OPPORTUNITIES AND NEXT STEPS

Guidelines for the Design and Placement of Transit Stops

Bus Rapid Transit: Basic Design for Non-Transit Planners

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

TRANSIT DESIGN MANUAL

Transit Hub Case Study: Owings Mills Metro Station. By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler

Bi-County Transitway/ Bethesda Station Access Demand Analysis

DRAFT Evaluation Scores. Transit

JOINT SHORT RANGE TRANSIT PLANS FOR SLO AND RTA TRANSIT Working Paper Six (RTA): Capital Improvement Program

CORE AREA SPECIFIC PLAN

I-26 Fixed Guideway Alternatives Analysis

APPENDIX VMT Evaluation

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

MIDWAY CITY Municipal Code

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Improving Accessibility of Regional Bus Stops and Pathways

Innovation and Transformation of Urban Mobility Role of Smart Demand Responsive Transport (DRT) service

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

LEED v4 Building Design and Construction Quiz #3 LT

A Transit Plan for the Future. Draft Network Plan

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

Program Overview. February 2018

SIDEWALK CAFE GUIDELINES

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

PEDESTRIAN TO TRANSIT ACCESSIBILITY PRIORITIZATION

Transportation Demand Management Element

Congestion Management. SFMTA Board Annual Workshop January 29, 2019

Fresno County. Sustainable Communities Strategy (SCS) Public Workshop

Findings from the Limassol SUMP study

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

Three ULTra Case Studies examples of the performance of the system in three different environments

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Community Design Standards

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

EXCEPTION TO STANDARDS REPORT

Downtown Transit Connector. Making Transit Work for Rhode Island

SERVICE DESIGN GUIDELINES

State Avenue Corridor Bus Rapid Transit (BRT)

MBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Bus Stop and Bus Shelter Master Plan For City of Falls Church, Virginia Adopted October 28, 2013

FIRE DEPARTMENT ACCESS Based on the 2012 edition of the International Fire Code

Purpose: General Provisions:

PARTIAL PROGRAM OF PROJECTS FFY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Parking Areas and Driveways for Single and Two Family Dwellings

MBTA Key Bus Route Improvement Program. Community Meeting Route 57 - Boston. January 31, 2011 Boston Arts Academy, 174 Ipswich St.

Efficient Transportation Six Case Stories

Street Lighting Policy. Revision

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Transcription:

BUS STOP DESIGN & PLANNING GUIDE Prepared by the Operations and Planning Departments 2011

PURPOSE OF GUIDE The design of passenger waiting areas plays a significant role in a person s decision of whether and how often to use transit. Comfort, security, access, facility attractiveness and several other factors should be considered when establishing bus stops. RVTD has varying levels of authority to install and construct bus stops throughout the Rogue Valley. The district s goal is to provide a comfortable and accessible waiting area at each stop however limitations exist that prevent this goal from being reached. The purpose of this guide is to provide: policies for the type of stop amenities that should be provided an existing conditions report as of 2010 of all bus stops design guidelines for various types of bus stops an inter-agency framework for how bus stops are improved a reference on the varying levels of authority RVTD has in each city a budget and timeline for making bus stop improvements

POLICIES The following are excerpts from the 2007 Ten-Year Long Range Plan: Support Equitable Access to Transportation When locating bus stops place nearest to safe pedestrian crossing or facility if the infrastructure exists. Ensure the Efficient Use of Transit Investments All new facilities that are built will consider installation of energy and water conservation technologies. Improve Public Outreach/ Marketing Install transit schedule and route information in all bus shelters. Enhance RVTD s Financial Stability Establish a long-term capital replacement program to allow for the planned replacement of buses, paratransit vehicles and other capital assets on a scheduled basis. Reduce Water and Other Pollution Install solar powered technologies for stops, facilities and buildings when price difference does not exceed more than 25% conventional equipment. Bus Stop Hierarchy Designations Class A Class B Class C Class D > 60 Boardings/ day 31-60 Boardings/ day 11-30 Boardings/ day 0-10 Boardings/ day

Class A These are the most frequently used bus stops in the system based on the number of boardings, transfers, bus frequency and routes served. These stops should have the highest level of amenities including a large and comfortable waiting area with multiple shelters if serving more than one route at a time and consideration for bus pull out areas. Additional amenities should include systemwide route and schedule information, a bicycle rack, an attractive trash receptacle, and consideration for restroom and food/drink nearby. Class B These are the stops with high boardings per day that should have at a minimum a shelter, map and route information, a trash receptacle and a bicycle rack. These stops may also need a bus pull out area if there are long dwelling times. Class C These stops have moderate boardings per day and should be equipped with a Simme seat or a bench. Additional amenities could include map and route information, a trash receptacle and a bicycle rack depending on the location. Nearby awnings or trees should be considered to allow for nearby shelter during harsh weather. Consideration should be given in areas with higher than average elderly and disabled populations for the installation of a shelter. Class D These are the stops with the lowest use and should have at least a sign posted with consideration for nearby shelter during harsh weather. All stops should have: Adequate lighting at the stop or nearby ADA accessibility and consider pedestrian safety A bus stop sign with stop number designation

PASSENGER AMENITIES & FEATURES The list below captures the amenities and features that are used to evaluate passenger waiting areas. LOCATION: AMENITIES: Stop Number Routes Served Inbound/Outbound Corner location of stop in reference to nearest intersection (NE, SE, etc) On Street At Street LAT/LON Municipality (Medford, Ashland, etc.) Status (active/inactive) Nearest Landmark Number of Shelters Vendor of shelter Condition Type of Shelter Width, Depth Wheelchair Access Lighting (none, working, present but not working) Graffiti Seating Capacity Number of Benches Vendor of Bench Condition Type of Bench (semi-seat, etc) Seating Capacity Graffiti ADA: MISC. Sidewalk (none, width 5ft+, < than 5ft width) Loading pad Obstructions Curb Cut Nearby Pedestrian Crossing Terrain (Flat, minor slope, major slope) Surface (Concrete, dirt, etc) ADA (Accessible, Functional, not accessible) Bike Parking Bike Lane Time point Stop Sign Sign (new, old, unclear) Sign post type Posted speed Trees Bus Bay FLAGGED for attention

EXISTING CONDITIONS OF STOP FACILITIES Staff evaluated bus stop conditions in 2010 using the passenger amenities and features list on the previous page. This information is combined with passenger activity data that was collected in 2008 to provide the following report. Shelter Simmi-Seat Other Seating None Figure 1. Overall breakdown in seating amenities for all stops Figure 2. This map s purpose is to show areas in RVTD s system where there are significant gaps in signage. Red dots signify stops without signs.

Figure 3. RVTD currently has very limited rider information in bus stop facilities. Red dots signify locations where information currently exist. Accessibility RVTD collected data on the accessibility of the stops. Using accessibility criteria outlined in the toolkit provided by Easter Seals Project Action, RVTD was able to make general accessibility determinations of the bus stops. Recorded accessibility data includes:= Presence, condition, and width of sidewalk Presence of curbcuts and obstructions Presence, position, and size of loading pad Surface of terrain, and slope of landing area 113 67 199 Completely Accessible Somewhat Accessible Not Accessible

The biggest factor in determining stop accessibility is the presence, condition, and size of a loading pad. The data shows that over 70 RVTD stops do not have sufficient loading pads. In some cases, there are several stops in succession that are without loading pads. Identifying these areas and strategically targeting stops for the installation of loading pads could be beneficial. Figure 4. Area identified where over 3 stops in succession exist without loading pad. Safety In April of 2003, the California Supreme Court ruled that a transit agency could be held liable for placing a bus stop in a hazardous location. In the case of California, the factors that make up the bus stop safety are not limited to the stop facilities and the surrounding area, but also include external factors, such as sidewalks, traffic patterns, and pedestrian amenities. In general, all transit trips begin and end with a walk trip, and for this reason, RVTD collected data on the safety of its bus stops, and some external data. The data includes: Bus dwelling area Posted Speed Stop Hazards Lighting Conditions Nearest Ped Crossing/Ped Crossing Amenities Landscaping Issues

Figure 5. Photograph of stop with safety issues. Passengers, in order to be seen by the bus driver, must stand dangerously close to a high speed traffic area. Figure 6. Pie Chart showing the ratio of stops that have pedestrian crossings within sight of the bus stop. Pedestrians are much more likely to use pedestrian amenities if the amenities are in sight. 111 No Ped Crossing Ped Crossing 268 Figure 7. Pedestrian collision map developed for Vancouver BC. Bus stops in areas where collision density is highest could be targeted for safety improvements.

DESIGN GUIDELINES RVTD preferred shelter design includes an 18 length by 8 width pad that is 4 deep. This provides space adequate for one shelter, one trash receptacle and one bicycle rack. Variations are possible depending on the conditions. The shelter pad must have at least 4 of solid surface in front of the seating area to comply with ADA and an area for the ADA lift landing pad. Figure 8. Typical shelter size Figure 8. Typical shelter pad dimensions

Figure 9. Surface and sub surface guide Figure 10. Shelter anchoring system Figure 11. La Clinica shelter

RVTD uses a Simme seat for moderately used bus stops. The Simme seat uses a single post and has two seats on either side with a sign attached to the top. The space needed is a 4 by 2 concrete pad. To comply with ADA a 4 clearance is required in front, typically the sidewalk. Often the Simme seat pad is still poured behind the sidewalk. After installation, the Simme seat stands at just over 10 tall and is 4 feet wide. See Figures 9 and 10 for surface and sub surface preparation. RVTD will consider providing a trash receptacle and bicycle rack at Simme seat locations. Figure 12. E. Main Simme seat The final stop type is a sign post. RVTD uses either a wooden pole or metal pole.

Based on the passenger activity collected in 2008 it was found that only minor improvements to stop facilities are needed. The primary improvements are the installation of Simme seats. The table below shows the number and type of improvements for each stop based on the hierarchy designations. More accurate information will be collected in 2011 with the Automatic Passenger Counting system, however this needs analysis is still very reliable. Class A Class B Class C Class D ROUTE 1 0 0 0 3 ROUTE 2 0 0 0 0 ROUTE 10 0 3 22 16 ROUTE 30 0 0 2 12 ROUTE 40 1 0 3 3 ROUTE 60 1 0 4 19 TOTALS 2 3 31 53 The table below is based on the hierarchy designations in addition to major populations nearby and other stop characteristics such as a major commercial or school. Class A Class B Class C Class D ROUTE 1 0 15 2 3 ROUTE 2 0 0 7 0 ROUTE 10 0 10 38 10 ROUTE 30 0 3 16 8 ROUTE 40 1 6 8 3 ROUTE 60 1 7 8 16 TOTALS 2 41 81 40

INTERAGENCY FRAMEWORK FOR STOP ENHANCEMENTS The Operations, Transportation and Planning Departments are responsible for bus stop enhancements. The following describes the role of each department: Operations- Provides the construction and installation of stops, provides the ongoing maintenance of stops and oversees storage of stop materials. Transportation- Advises on stop location to ensure safe vehicle access including traffic issues, vehicle ingress and egress and assisting with stop amenity decision making. Planning- Coordinates with City and County staff, developers and property owners to request stop facilities, prepares easements with property owners, evaluates pedestrian and bicycle connectivity, manages grant funding to purchase stop materials, evaluates stop activity to enhance stops as needed. A Stop Request Form will be used to provide greater communication between the three departments and ensure there is consistency with how stops are evaluated. An example form is provided in Appendix A.