JR EAST, a passenger railway company, is the largest railway company in JAPAN

Similar documents
Special feature article

Development of the gauge change EMU train system in Japan

Shinkansen- Japanese High Speed Railway Network Shinkansen- Japoński System Kolei Dużych Prędkości. Hitachi Rail Europe

Series EV-E301 Rolling Stock Catenary and Battery-Powered Hybrid Railcar

Special edition paper

Shinkansen Technology Exportation

BRIEF ON ELETRICAL MULIPLE UNITS (EMU)

Special edition paper Measurement and Analysis of the Driving Energy of Shinkansen Rolling Stock

Special edition paper Overview of Series EV-E301 Catenary and Battery-powered Hybrid Railcar

Special edition paper

Special edition paper

Railway Systems. Class 385 for the International Market

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

Central Japan Railway Company, Komaki, Japan 1 ; Central Japan Railway Company, Tokyo Japan 2

Emerging Technologies for new generation EMUs

Battery-powered Drive Systems: Latest Technologies and Outlook

The AGV, a cutting-edge technology integrator

Regional and Suburban Transport

TS2017 DLC. Western Sichuan Pass V1.0. By Liu Fei. Simtech Vision Product

Development of Catenary and Batterypowered

- friction and heat free braking of moderately

Annual Environmental Report 2000

JR East Efforts to Prevent Global Warming

Introduction of the N700-I Bullet

Special edition paper

The evaluation of endurance running tests of the fuel cells and battery hybrid test railway train

Specifications and schedule of a fuel cell test railway vehicle. T. Yoneyama, K. Ogawa, T. Furuya, K. Kondo, T. Yamamoto

Experience in the construction of the HS trains and the newest train AGV

High speed diesel powered trains: An efficient approach to existing and future diesel freight lines

High Speed Rail Seminar in Washington D.C.

Automatic train operation system for the high speed Shinkansen train

Nencki Bogie test stand NBT

Advanced Railway System Development Center, Research & Development Center of the JR East Group Hiroshi Nomoto

Energy map. City gas, kerosene, class C heavy oil. Fossil fuels, etc. Light oil, kerosene, class A heavy oil. Energy consumption volume

CHAPTER 8 ROLLING STOCK 8.1 INTRODUCTION 8.2 OPTIMIZATION OF COACH SIZE 8.3 PASSENGER CARRYING CAPACITY 8.4 WEIGHT 8.5 PERFORMANCE PARAMETERS

Prevention of Global Warming

SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK

High Speed Trains. General overview. Dr. Eng.&MBA José A. Jiménez Rolling Stock Director Renfe - Alta Velocidad. Paris, 19 th 23 th June 2006

WELCOME TO LOCOMOTIVE DESIGN CENTRE RDSO

A study of the train performance simulation for Korean next Generation high-speed train. high-speed train.

Deliverable 2.3: Identification of samples and available rolling stock for testing

Future of High-Speed Railways

Our mission is. to fulfil the current and future expectations of. domestic and foreign owners of rolling stock. through

Measures to Prevent Global Warming

Special edition paper

Annual Environmental Report 2001

Railway Dynamics Studies at CITEF with SIMPACK

28/09/2006. ALSTOM Transport. The TGV trainsets

Simulation of railway track maintenance trains at MATISA

TSG15B Pantograph technical document. Pantograph 25 kv TSG15B

Overview of Mitsubishi Electric's Transportation Business & Power Device Technology January, 2017 Mitsubishi Electric Corporation

Qingdao Zener Electric Co., Ltd

Improving Onboard DS-ATC Equipment Functions in Response to Shinkansen Service Expansion

Special edition paper Development of an NE train

voith.com Your ticket to ride Gear units for rail vehicles

Riding Comfort relating to Maglev Guideway

Your Ticket to Ride. Gear Units and Complete Wheelsets for Rail Vehicles

ALS (Active Lateral Suspension) By Bernard GAUTIER SNCF

Special edition paper

Establishment of Japan Transport Engineering Company (J-TREC)

FRESIA F2000 MULTI-FUNCTION SNOW SWEEPER

Introduction of Overseas Technologies to JR East Track Maintenance

Train traffic control system on the Yamanashi Maglev test line

A Study on the Measurement of Contact Force of Pantograph on High Speed Train

HST/VHST Products. October 2006

Rail Systems and Rail Vehicles

EFG 540k S50. Electric Four-Wheel Counterbalanced Trucks (8,000 11,000 lbs.) Broad capacity range for enhanced flexibility

A Guide to Key Railroad Terminology for the Northeast Corridor

Development of Assist Steering Bogie System for Reducing the Lateral Force

VOLVO SINGLE DRUM COMPACTORS SD t 97kW

ARTICULATED LOADERS FULL LINE

Kawasaki s Approach to US High Speed Rail. Masashi Ishizuka Kawasaki heavy Industries, LTD. Associate Officer Kobe, Japan

THE AUXILIARY EQUIPMENT OF THE CHICAGO, MILWAUKEE AND ST. PAUL LOCOMOTIVES

Ballast Usually stone chippings, or similar material, which support the sleepers and hold them in place on the ground.

ELECTRIC TRACTION.

Development of Motor-Assisted Hybrid Traction System

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA

1 BACKGROUND Deltic Prototype History Deltic Prototype Operation Technical Specification ROLLING STOCK...

ALSTOM High Speed Trains: State of the art & perspectives

LANCER LQ Standard equipment

Energy ITS: What We Learned and What We should Learn

The outline of our management for environment. Takahito Sunohara East Japan Railway Company, Tokyo, Japan

FB14RJ-2R. h3 h 2 h 1 h 4 mm mm mm mm.

Hydrogen Fuel Cells as Motive Power for Industrial Switcher Locomotives

Railway Technical Web Pages

FULL LINE ARTICULATED LOADERS

Why the original concept of HSL adopted in different countries has. differentiated situation.

S.C. " RULMENTI" S.A. GROUP BARLAD -ROMANIA. Cylindrical roller bearings for railway axleboxes WJ + WJP design

FULL LINE ARTICULATED LOADERS

PEFC/ Compact Excavators

VIBRATORY SOIL COMPACTOR 1107EX I 1107EX-D I 1107EX-PD A SOLID BASE

3.1 General equations

II. HYBRID TEST TRAIN A.

GARIA UTILITY THE UTILITY PARK AND CITY BROCHURE

Abstract In this paper, we developed a lateral damper to improve the running safety of railway vehicles

Accredited competence for measurements in railway operations: Aerodynamics Test Laboratory. DB Systemtechnik

Track friendly vehicles - principles, advantages. Sebastian Stichel August 8, 2007

Italian standards. Andrea Nardinocchi Scientific Director Italferr, Rome, Italy

Clean Rail Transit Vehicle--HyperTram


Transcription:

JR EAST, a passenger railway company, is the largest railway company in JAPAN Network: 7,512.6km No. of Passengers: 16.8 million/day No. of Trains: 12,784/day No. of Employees: 59,370 No. of Rolling stock: 13,469 Greater Tokyo area *Numbers are as of FY ended March 31, 2013

Nagano Niigata Yamagata Akita Shin-Aomori Morioka Sendai High speed network Tokyo Dedicated lines Gauge-converted conventional lines for through service Network Gauge Power supply Max Speed 1134.7 km Standard Tokyo urban network 2536.2 km Narrow Local network AC 25kv 50Hz 275.6 km (1435mm) AC 20kv 50Hz 3566.1 km (1067mm) DC 1.5kv / AC 20kv 50Hz or Non-electrified 320km/h 130km/h on electrified 100km/h on non-electrified

Shinkansen EMU *1 Number of rolling stock : 1,290 EMU *1 for conventional lines Number of rolling stock: 11,063 DMU *2 for conventional lines Number of rolling stock: 519 Others Passenger coach:141, Locomotives:104 Steam locomotives:3, Freight cars:349 *1 EMU: Electric multiple unit *2 DMU: Diesel multiple unit *Numbers are as of FY ended March 31, 2013

Standard For longer trips 320km/h 275km/h Large capacity Double decker Large capacity for commuting 240km/h Through service For through service with coupling/uncoupling functions 320km/h 275km/h

80 '90 '91 '93 '94 '95 '97 '99 '02 '08 '09 '10 13 14 Series 200 Standard Series 200 with coupling system Series E2-0 Series E2-1000 Series E7 Series 200 double decker High speed Series E5 Large capacity Double decker Series E1 Series E4 Series 400 Through service Series E3 Series E3-1000 Series E3-2000 High speed Series E6

Speed (km/h) 450 400 350 300 250 200 210km/h (1982) JNR 319km/h (Series 961,1979) JR 240km/h (1985) 345.8km/h(Series 400,1991) 275km/h(1990) 425km/h(STAR21,1993) Trial Run Commercial Operation 320km/h(2013) 300km/h(2011) 150 100 50 0 Tohoku and Joetsu line opened 1985 1990 1995 2000 2005 Tohoku Line Extended to Ueno Yamagata Line Opened Tohoku Line Extended to Tokyo Nagano Line Opened Tohoku Line Extended to Hachinohe Akita Line Opened Tohoku Line Extended to Shin-Aomori 2010 2015 (Year)

Bogies Car body Train Basic trainset : 5M2T Max operation speed Dedicated line : 320km/h Conventional line sections: 130km/h Car type E611-0/Mc E628-0/T E625-0/M E625-100/M E627-0/M E629-0/T E621-0/Mc Passenger seating capacity Weight Length Width 22 34 60 60 68 60 32 Total capacity : 336 First class :22 Ordinary class : 314 45.1 t 44.4 t 41.7 t 41.8 t 42.1 t 44.2 t 43.4t Total : 302.7t 23,075mm 20,500mm 23,075mm Total : 148,650m 2,945mm Height 3,650mm 4,490mm 3,650mm 4,490mm 3,650mm Bogie center distance Structure Gauge Type Wheel base Wheel diameter Drive system 14,150mm Aluminum alloy airtight shell 1,435mm Bolsterless : Active suspension system, Tilting system 2,500mm 860mm Parallel cardan system

Electric system Dedicated line : AC 50Hz 25,000V Conventional line sections: AC 50Hz 20,000V Current collection Power control system Traction motor Brake system Air conditioning equipment Safety device Train radio Single-arm pantograph : Raised by spring force, lowered by pneumatic pressure VVVF inverter control Induction motor : Continuous rated output : 300kW Electric command air brakes with regenerative braking Central system ; Cooling 54.66kW Hearing 32kW Dedicated line ; DS-ATC : Automatic train control pattern system + RS-ATC : Radio ATC Conventional line ; ATS-P : Automatic train stop - pattern type Dedicated line ; LCX radio + yard protection radio Conventional line sections; ; Train radio + Train protection radio

Double Decker Series E4 3,700mm 4,080mm 4,485mm Standard Series E2 2,500mm 17,500mm 25,000mm 2,944mm 3,380mm Seat arrangement in Ordinary Car Series E6 Series E2, E5 seat aisle Width of car body Through service Series E6 door platform step on the doors 2,500mm 14,150mm 20,000mm

First class Ordinary class - Lights for reading - Electric leg rests - Adjustable head rests First class - Adjustable head rests Ordinary class Seat pitch 1,160mm 980mm Height of seats 1,170mm 1.150mm Width of seats 465mm 450mm

- Able to use with motorized wheel chairs - Able to wash pouch for ostomy Motorized wheel chairs System for ostomy Barrier-free restroom Large annunciator with full-color LEDs Grab handle with blinking lights when open/close

- Structure : Aluminum alloy, Double skin panel, Airtight shell - Airtight load : 8.2kPa Obstacle deflector and snowplow Scenario Mass :100kg Height 250mm V=320km/h Crashworthiness design Scenario 40 ton truck V=70 km/h Force :18.2t V=240km/h

- Traction motor : Induction motor 300kW 20 = 6,000kW - Control system : VVVF inverter control - Acceleration : 0.474m/s 2, 25,000V/50Hz 0.556m/s 2, 20,000V/50Hz - Balancing speed: 360km/h, Open section, 3 25,000V/50Hz Over 120km/h, Open section, 25 20,000V/50Hz running direction Pantograph Catenary Pantograph Car 11 (M1sc) Car 12 (Tk) Car 13 (M1) Car 14 (M1) Car 15 (M1) Car 16 (T) Car 17 (M1c) CI MTr CI CI CI MTr CI VCB VCB High voltage equipment box Ultra high voltage wiring : AC 25,000V/20,000V 50Hz MTr secondary wiring : AC 1,500V 50Hz High voltage equipment box Separation CI : Converter/Inverter MTr : Main transformer VCB : Vacuum circuit breaker

Speed Check Pattern Train Speed Digital-ATC (Dedicated line) Cab signal Automatic speed control ATS-P : Automatic Train Stop P-type (Conventional line) Brakes are Speed Check Pattern applied automatically Train Speed 0 75 110 160 210 275 315 255 265 275 285 km/h 空線 本線 ATC 定速 Digital Signal on Rail Ground Equipment Proceeding Train - Ground equipment provides cab signals through rail. - Ground equipment provides stop location in real time based on location of proceeding train. Signal Signal Transponder - Transponder provides wayside signal. - Transponder provides data about distance to wayside stop signal.

- Compact air conditioning unit both forced ventilation system and air conditioning Power source : AC 400V/50Hz Cooling : 54.66kW Heating : 32kW Ventilation volume : 17m 3 /min Pressure variation in cabin : Under 0.8kPa/4s

- Active suspension for good riding comfort - Air suspension tilting system for good riding comfort on the curve - Stability on dedicated line at high speed and curving performance on conventional line Driving bogie Trailer bogie Oil lubricating journal bearing + Induction-hardened axle Break gear Driving bogie Wheel - break disk Trailer bogie Wheel - brake disk + One axle - brake disk Minimum brake distance : About 4,000m from 320km/h on emergency brake

Ride quality level - Detect the oscillation of car body by sensor - Absorb the lateral oscillation by actuator Operation speed : Over 100km/h, Dedicated line Over 50km/h, Conventional line db 93 88 83 actuator 78 With active Without active

Tilting System - On dedicated line, by using air suspension tilting system, curving performance is improved. - Air suspension tilting has advantage in cost and maintenance. Maximum inclination angle : 1.5 degree. Steady lateral acceleration : under 0.9m/s 2 Yaw dumper switching system R4000, C 155mm - On conventional lines, by switching off one dumper, the load to the track can be reduced. Radius : m Speed : km/h Dedicated line : Yaw dumper 1+2 Conventional Line : Yaw dumper 2 1 2 400 R < 450 90 500 R < 600 100 600 R < 700 110 R 1000 130

Noise Reduction : Noise generated by a brand new 320 km/h railcar, E5,E6 = Noise generated by a previous 275 km/h railcar, E2 Noise sources Aerodynamic noise from upper part of cars Pantograph noise Aerodynamic noise from train nose Structure-borne noise Noise from lower part of cars

Aerodynamic noise from upper part : Circumferential diaphragm Aerodynamic noise from train nose : Snowplow fins Noise from lower part : Bogie cover Shroud panels with sound-absorbing panel Snowplow fins Bogie Cover Case of Series E5 dedicated bullet train Circumferential diaphragm Shroud panels with sound-absorbing panel We have developed suitable aerodynamic shapes to achieve the stringent noise standards of Japan within limitations such as small body.

Pantograph noise : One pantograph power collect Pantograph wit multi-segmented contact strip Low noise insulator Insulation panel multi-segmented contact strip running direction Low noise insulator Pantograph Case of Series E5 dedicated bullet train Pantograph and insulation panel Pantograph One pantograph power collect

1 6 こま Tunnel Silencer Hood Micro-Pressure Wave The high portion of air pressure Long nose shape for reduction of Micro-Pressure Wave Series E6 Length of nose: 13m Cross-section: 9.34m 2 13m Series E3 Length of nose: 6m Cross-section: 10.29m 2 Series E5 Length of nose: 15m Cross-section: 10.8m 2 6m 15m

In winter, there is a lot of snow in the Akita district. - Heaters around bogie section - Removing snow of bogie and bogie covers at Morioka station Heaters Removing snow at Morioka station See from this angle With heater Without heater MAX 8 minutes

JR EAST has three types of Shinkansen trains. The Series E6 is Through service type, began its commercial service between Tokyo and Akita in March 2013. Operation speed of Series E6 is 320km/h on dedicated line and 130km/h on conventional line sections. Series E6 is a vehicle with many state-of-the-art technologies for noise reduction and passengers riding comfort.