LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK

Similar documents
MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

Standard Operating Procedure

Title: Lifting Operations Involving Crane or Gantry Offshore

SAFE WORK ENVIRONMENTAL METHOD STATEMENT SWEMS 0002 INSTALLATION & DISMANTLING OF 3 PLANK HANGERS PERIMETER RAIL

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Policy Sponsor: Assistant Vice President. Responsible Unit: Facilities Management

Safe Work Instructions Tools and Equipment

CAL/OSHA ELECTRICAL LOW VOLTAGE

1. Cranes. 3. Hazardous Chemicals. 4. Signs. 2. Trenching and Excavations

Revision Date Reviewed By Authorised By. V1 18/07/2017 C Reynolds P FitzPatrick Review Date 20/07/2018 Change Details Task

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

AVOIDING ELECTROCUTION HAZARDS

Assembly of the Multi Applicational Safety System

BIG BEND STATION PROCEDURE FOR DESLAGGING BOILER WITH EXPLOSIVES

WIELAND-DAVCO CORPORATION CRITICAL LIFT PERMIT. Subcontractor: Subcontractor Lift Supervisor: (This individual must be present during the lift)

SSMP ELEMENT 4 O & M Program APPENDIX 4.3. Sewer Pipe Cleaning Standard Operating Procedures (SOPs)

Responsible Unit: Facilities Management

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Installation Instructions for Aux 101 Kit A044Z055

Job Title: Apprentice Technician

SAFETY GUIDANCE MATERIAL

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

Waste & Litter Collection utilizing the Rear Loading Compactor

MUNICIPAL SOLID WASTE OPERATIONS SAFETY AUDIT/SURVEY TOOL. Injury prevention during solid waste operations

Work Zone Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

GUADALUPE POWER PARTNERS, LP Section MAINTENANCE GT1 CI WORK SCOPE

OVERHEAD & GANTRY CRANE / RIGGING

LEARNER GUIDE. Directional Borer. PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

CPCS renewal test factsheet

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

SAFE WORK PROCEDURE LOCATION OF WORK WRITTEN BY: APPROVED BY: DATE: LAST REVISION

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Initial Issue Date Revision Date: Revision No. Next Revision Date: Reliant Holdings Ltd Safety Management System. Issuing Dept: Safety

Jersey Harbour Authority Maritime House, St Helier, Jersey, JE1 1HB Tel: +44 (0) Website:

TOOL BOX TALKS. Municipality General Safety Rules SAFE (7233)

ESSENTIAL SAFETY RESOURCES

While handling materials, employees must abide by the following requirements:

MAINTENANCE PLAN FOR RLB20 RAIL BEAM

Use of Manbox. To identify and formalise the risks and control processes involved in use of personnel in workboxes.

Shoulder Ballast Cleaner Work Method Statement

MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel:

Safe Operating Procedure ELECTRIC FORKLIFT

1 CLEAN BELT TABLES Apr CLEAN UNDER MOVING CONVEYOR Apr CLEAN PRODUCT CHUTES Apr CLEAN TRUCK PITS Apr-08

BP-Husky Refinery Toledo, OH

PAGE # SHIPPING UNITS # 2 # 3 REVISED. 1 CLEANING BELT TABLES UNITS # 2 & # 3 Apr CHANGING PRODUCTS IN SYSTEM UNIT # 2 Apr-08

120-ELECTRICAL SAFETY PROGRAM

Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206

UNION PACIFIC RAILROAD 1 Safety Book Transition Guide July 2, 2013

BP OIL -- TOLEDO REFINERY

CPM Technical Guide / Load Configuration. Safety for Life

DGMS (Tech.) Circular No. 10 Dated Dhanbad the 19 th July, Safe use of mobile Cranes Code of practice

Doc #: 2100-AD Revision: - 4 Meter White Spot Panel Replacement. Author(s): David Sprayberry, Larry Reddell, Tammie Lavoie, Miranda Saucedo

PPE General Guidelines Inspection Handbrakes Switches and Derails Couplers and Coupling Mounting and Dismounting Hand Signals Pedestrians/Traffic

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

Ladders LADDER 2 WARNINGS:

Installation, Operation, and Maintenance Manual

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

CPCS renewal test factsheet

Star Swivel-Arm Hoist Installation and Operating Instructions

Rubbish Chutes Operating & Assembly Instructions

LEARNER GUIDE. Roller - LR. PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

TargetSolutions ONLINE COURSE CATALOG

TUNDRA 2017 Dual Black Tip Performance Exhaust Part Number: Code: EX3000 Conflicts Kit Contents Item # Qty. Reqd.

MODCO TM FIGURE 500 CLOSURE

AD45 Front Strut Handling Tool George Fisher Mine, Mount Isa Mines, a Glencore Company

Heavy Equipment & Rigging Specialist Training

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Technical Test Theory Lorry Loader A36

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

Chameleon Touring Systems Pty Limited SOP Updated 8 September 2011 Page 1

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Wind and Temperature Tip Over Hazard Do not add notice boards or similar

Cranes. OSHA Office of Training & Education 1

DUST COLLECTOR (BOTTOM REMOVAL BAG & CAGE) INSTALLATION AND OPERATING INSTRUCTIONS

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Safe Work Instruction

TUG HD BELT CLAMP. Safety and Operation Manual WARNING

Ballast Water Management Surveyor checklist

Automotive Lifting Equipment

NEXT REVIEW DATE NAME

Element C7.2 Lifting Work Equipment

Control, Safe Use and Operation of Road-Rail Plant

Code of Practice for Vessel Bunkering Operations & Transfer of Waste Liquids by Road Tanker within Jersey Harbours

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

BUCKET TRUCK SAFETY EQUIPMENT

Technical test - Theory. No. Question Answers Max. Mark

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

V2 02/11/15 D Newton P FitzPatrick. Changes to coupling and uncoupling processes Task. Coupling and Uncoupling Coupling. Uncoupling.

IMPORTANT SAFETY NOTICE

Instruction and Installation Guide

The Pump Matic Range

Implementation of Safety Initiatives

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

City Fleet Safety Policy Example

SEMPEO SQA Unit Code H Carrying out routine servicing of mechanical equipment

Installation Instructions for Load Management Kit A051C329

Service Truck Operator Ministry of Training, Colleges and Universities

Transcription:

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 STANDARD TASK INSTRUCTION: LKM10 and 11 LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK WORK O/No.: WORK PACK No.: ORIGINATOR: LKM10 and 11 NICAS SCOPE OF WORK: Remove and Overhaul Reversal Traps DATE: 01.08.08 EQUIPMENT DESCRIPTION: EQUIPMENT REGISTER No: K662-1 Reversal Trap and Stack ITEM TASK DESCRIPTION DETAILS TECHNICIAN SIGNATURE DATE 1. Obtain Permit to Work as per GPM 63.1 standard tagout procedure. Check and confirm Isolation(s). 2. Review Standard Task Instruction and sign. (Ensure all personnel are aware of tasks and risks.) 3. Erect barricade below the proposed work and lift areas to prevent personnel from entering. Erect sign to advise of danger. 4. Remove guard from Reversal Trap. 5. Instrumentation/Electrical personnel to disconnect all electrical connections to limit switches and electrical components to facilitate repairs to Reversal Trap. 6. Disconnect and Cap all hydraulic lines, fittings etc. 7. Inspect all Hydraulic lines and fittings. Replace as necessary. 8. Scaffold Personnel to erect scaffold as instructed by the Area co-ordinator. 9. Remove Saddle from stack as shown in figure 3.0. 10. Position 90 tonne crane and the 140 tonne crane and prepare for lift and Reversal Trap removal task. 90 tonne crane to be used with Mancage. 140 tonne crane to perform lifts. Note: personnel, techniques and Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 1 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task ITEM TASK DESCRIPTION DETAILS TECHNICIAN SIGNATURE DATE 11. Remove stack Flange Mounting Bolts. 12. Remove Stack and lower to ground. 13. Support Combustion Air Ducting as shown in Figure 3.0. Note: personnel, techniques and 14. Unbolt and remove Combustion Air Ducting section and lower to the top of SL662-3, 900 tonne burnt lime storage silo. 15. Ensure duct is safe, secure and not fouling walkway. 16. Support Trouser Leg as shown in Figure 4.0 using chain block and slings. 17. Unbolt Lower Flange at trouser leg. 18. Unbolt Lower Flange of reversal trap. 19. Remove Reversal Trap and lower to ground. Note: Insert a 17mm thick Marine Ply section over the opening left by the removal of the Reversal Trap. Note: personnel, techniques and 20. Arrange truck and rigging crew to collect Reversal Trap and transport to workshop for inspection and repair. 21. NDT personnel to carry out inspections to the Reversal Trap and advise of required welding repairs and procedures. All welding repairs to be undertaken in site fabrication shop. 22. At the completion of welding repairs, the Reversal Trap is to be transported to the Machine Shop. 23. Planned Maintenance to inspect reversal and closing trap Shaft Bearings. Replace as necessary. 24. Inspect and replace reversal and closing Trap Seals. Page: 2 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 ITEM TASK DESCRIPTION DETAILS TECHNICIAN SIGNATURE DATE 25. Inspect, repair, and replace as necessary, reversal and closing trap Sealing Plate and Pivot Arm. 26. Inspect reversal and closing trap counterweight for wear or damage. Repair or replace as necessary. 27. Inspect Access Door Hinges for wear or damage. Repair or replace hinges as necessary. 28. Pressure Test Reversal Trap in workshop. 29. Test correct operation and function of reversal trap. 30. Inspect Reversal Trap Stack Refractory for damage or wear. Note: The inspections and repairs should be carried out by suitably qualified Refractory Personnel 31. Inspect the Inverted Witches Hat for corrosion and wear. Repair Inverted Witches Hat as necessary. 32. Install Inspection Port in each of the Reversal Trap Stacks. (Modification) Details of modification to be provided by the Area Engineer. 33. Prepare and clean all parts, gasket surfaces, nuts and bolts etc for the installment of Reversal Traps to the Kiln. 34. HOLD POINT. Area Co-ordinator to confirm and authorise timing of reinstatement of Reversal Trap. 35. Position 90 tonne crane and the 140 tonne crane. Prepare for lift and reinstatement of Reversal Trap. 90 tonne crane to be used with Mancage. 140 tonne crane to perform lifts. Note: personnel, techniques and Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 3 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task ITEM TASK DESCRIPTION DETAILS TECHNICIAN SIGNATURE DATE 36. Raise Reversal Trap to correct level on Kiln. Note: personnel, techniques and 37. Rig and install Reversal Trap into correct position. 38. Install bolts to lower flange of Reversal Trap and tension. (Insert correct bolt tension here) 39. Install bolts to lower flange at Trouser Leg and tension. (Insert correct bolt tension here) 40. Remove chain block and sling support from Trouser Leg as shown in Figure 4.0. 41. Raise and affix Combustion Air Ducting section in correct position. Fit flange bolts and tighten. 90 tonne crane to be used with Mancage. 140 tonne crane to perform lifts. Note: personnel, techniques and 42. Reinstate Stack to reversal trap. Note: Use only Authorised rigging personnel, techniques and 43. Reinstate Stack Flange mounting bolts and tension. (Insert correct bolt tension here) 44. Inspect and repair/replace as necessary lubrication lines, purge lubrication points. Replace automatic lubricator pods as necessary. 45. Replace hydraulic cylinder with new or reconditioned unit. 46. Refit hydraulic hoses to hydraulic cylinder. 47. Scaffold Personnel to remove scaffold as instructed by the Area Co-ordinator. 48. Instrumentation/Electrical personnel to re-connect all electrical connections and test/check correct function of limit switches. 49. Reinstate guard to reversal trap. Page: 4 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 ITEM TASK DESCRIPTION DETAILS TECHNICIAN SIGNATURE DATE 50. All areas worked in to be left clean and safe. 51. Remove Personal Danger Tag and sign off Standard Clearance Certificate. RECORD TOTAL HOURS TAKEN TO COMPLETE TASK. HOURS Print Name: Signature: Date: POSITION JOB TECHNICIAN JOB SUPERVISOR CO-ORDINATOR IN EVENT OF EMERGENCY PHONE OR 222 1 RADIO CHANNEL Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 5 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task Fitter s Comments: Name: Supervisor s Comments: Name: Page: 6 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 Reversal Trap K662-1 There are two reversal traps, one located on either side of the Lime Kiln as shown in Figure 1.0 below. Figure 1.0: Showing the location of the Reversal Traps Caution Erect barricade below the proposed work and lift area s Erect sign to advise of Danger. Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 7 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task Remove the guard from the Reversal Trap. Instrumentation/Electrical personnel to disconnect all limit switches and electrical connections to facilitate removal of the Reversal Trap. Disconnect and cap all hydraulic lines and fittings. Figure 2.0: Showing the Reversal Trap Guard, Hydraulic Cylinder and Electrical Equipment Page: 8 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 Remove the saddle from the stack as shown in Figure 3.0 below. Position the 90 tonne crane and the 140 tonne crane to prepare for lift and task. Figure 3.0: Showing the Reversal Trap, Trap Stack and Combustion Air Ducting Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 9 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task Support the Trouser Leg as shown in Figure 4.0 below using chain block and slings. Unbolt the lower flange at the trouser leg. Figure 4.0: Showing Reversal Trap and Trouser Leg Page: 10 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 Unbolt lower flange mounting bolts of reversal trap as shown below in Figure 5.0. Rig and prepare to remove the Reversal Trap. Remove the trap using the 140 tonne crane and lower to the ground. Figure 5.0: Showing Reversal Trap Lower Mounting Support Bolts Caution Insert a 17mm thick Marine Plywood section over the opening left by the removal of the Reversal Trap. Secure the plywood to prevent falling or the possibility of it being blown away and to prevent personnel, tools or other items falling into the opening. Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 11 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task Page: 12 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 STANDARD TASK INSTRUCTION STI NUMBER: STI-LKM10 TASK: Remove and Overhaul Reversal Trap and Stack CRITICAL TASK? (YES/NO) WORK GROUP: Production Maintenance PREPARED BY: REVISON NUMBER: Initial Issue AREA: Lime Plant 662 DATE: 01.08.2001 REVISION DATE: This STI shall be reviewed for correctness and understanding prior to commencement of this particular task and after each Revision. At these times, all members of the STI team shall sign off over the page. All new starters on this task shall review this STI with the Supervisor and sign off over the page. All revisions to this STI must be agreed to by all members of the STI team and recorded on this STI form with the Revision number date upgraded. SAFETY GEAR, TOOLS, EQUIPMENT, INSTRUCTIONS, PRE-REQUISITES AND COMPETENCIES SPECIFIC TO THIS TASK. Work Permit Requirements Personal Protective Equipment (PPE) Requirements Confined Space Vessel Entry Excavation Hot Work Face Shield Monogoggles Hearing Protection Electrical Isolation High Voltage Scaffolding Radiation Respirator Dust Masks Gloves Personnel Cage Safe Work Gas Test Isolation Safety Helmet Safety Harness Sun Protection Commissioning Life Vest Standard PPE Job Specific Resources Competencies Required Equip./Machinery Required (List) Barricading Signs Sentry & Sentry Board Operator Elect/Instr t Fitter 140 and 90 tonne Cranes with Mancage Facility Fire Blankets Extinguishers Two-way Radio/ Mobile Phone Boilermaker Crane Driver Rigger Running Water Life Ring Voltage Reducer USM Refractory Personnel Fitter Mechanic Rigging Equipment, Slings, Shackles, Chain blocks Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 13 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task No. SPECIFIC JOB STEPS HAZARDS CTA SCORING S EX P TOTAL HAZARD CONTROLS 1. Obtain Permit to Work as per GPM 63.1 standard tagout procedure. Check and confirm Isolation(s). Working on incorrect Check and confirm isolation(s), correct 2. Review Standard Task Instruction and sign. (Ensure all personnel are aware of tasks and risks.) Unaware of safety and task requirements. Understand safety and task requirements. 3. Erect barricade below the proposed work and lift areas to prevent personnel from entering. Erect sign to advise of danger. Sprain, strains. Use correct lifting techniques. 4. Remove guard from Reversal Trap. Cuts and abrasions. Correct area PPE, wear gloves. 5. Instrumentation/Electrical personnel to disconnect all electrical connections to limit switches and electrical components to facilitate removal of Reversal Traps. Electrocution. Ensure correct isolation before commencement of task. Test circuits to ensure isolation 6. Disconnect and cap all hydraulic lines, fittings etc. Oil spill Slip, fall. Clean and contain oil spillage immediately. 7. Inspect all hydraulic lines and fittings. Replace as necessary. Oil spill Slip, fall. Clean and contain oil spillage immediately. Page: 14 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 8. Scaffold personnel to erect scaffold as instructed from the Area co-ordinator. Working at heights Sprain, strains. Ensure area below is barricaded. Ensure no personnel enter barricaded area. Use correct lifting techniques. 9. Remove saddle from stack as shown in Figure 3.0. Working at heights Ensure area below is barricaded. Ensure no personnel enter barricaded area. 10. Position 90 tonne crane and the 140 tonne crane to prepare for lift and Reversal Trap removal task. Sprain, strains 90 tonne crane to be used with Mancage. 140 tonne crane to perform lifts. equipment 11. Remove stack flange mounting bolts. Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 15 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task 12. Remove stack and lower to ground using 140 tonne crane. Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. 13. Support combustion air ducting as shown in Figure 3.0. Note: Sprain, strains Use correct lifting techniques. 14. Unbolt and remove combustion air ducting section and lower to the top of SL662-3, 900 tonne burnt lime storage silo. Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. 15. Ensure duct is safe, secure and not fouling walkway. Sprain, strains Trip, fall. Use correct lifting techniques. Good housekeeping. Page: 16 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 16. Support trouser leg as shown in Figure 4.0 using chain block and slings. Sprain, strains. 17. Unbolt lower flange at trouser leg. Sprain, strains. Use correct lifting techniques. 18. Unbolt lower flange of reversal trap. Sprain, strains. Use correct lifting techniques. 19. Remove Reversal trap and lower to ground. Note: Insert a 17mm thick Marine Ply section over the opening left by the removal of the Reversal Trap. Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. 20. Arrange truck and rigging crew to collect Reversal Trap and transport to workshop for inspection and repair. Sprain, strains. 21. NDT personnel to carry out inspections to the Reversal Trap and advise of required welding repairs and procedures. All welding repairs to be undertaken in site fabrication shop. Cuts and abrasions Noise from grinder Welding flashes to eyes. Wear gloves. Wear hearing protection. Erect weld barricade if required. 22. At the completion of welding repairs, the Reversal Trap is to be transported to the Machine Shop. Sprain, strains. Use correct lifting techniques. Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 17 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task 23. 24. Planned Maintenance to inspect reversal and closing trap Shaft Bearings. Replace as necessary. Inspect and replace reversal and closing Trap Seals. Cuts and abrasions. Correct area PPE, wear gloves. Cuts and abrasions. Correct area PPE, wear gloves. 25. 26. 27. Inspect, repair, and replace as necessary, reversal and closing trap sealing plate and pivot arm. Inspect reversal and closing trap Counterweight for wear or damage. Repair or replace as necessary. Inspect access door hinges for wear or damage. Repair or replace hinges as necessary. Cuts and abrasions. Correct area PPE, wear gloves. Cuts and abrasions. Correct area PPE, wear gloves. Cuts and abrasions. Correct area PPE, wear gloves. 28. Pressure test Reversal Trap in workshop. Cuts and abrasions. Correct area PPE, wear gloves. 29. 30. 31. Test correct operation and function of reversal trap. Inspect Reversal Trap Stack Refractory for damage or wear. Inspect the inverted witches hat for corrosion and wear. Repair inverted witches hat as necessary. Cuts and abrasions. Correct area PPE, wear gloves. Cuts and abrasions. Correct area PPE, wear gloves. Cuts and abrasions. Correct area PPE, wear gloves. Page: 18 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 32. 33. 34. Install inspection port in each of the Reversal Trap Stacks. (Modification) Details of modification to be provided by the Area Engineer. Prepare and clean all parts, gasket surfaces, nuts and bolts etc for the installment of Reversal Traps to the Kiln. HOLD POINT Area Co-ordinator to confirm and authorise timing of reinstatement of Reversal Trap. Cuts and abrasions. Correct area PPE, wear gloves. Cuts and abrasions. Correct area PPE, wear gloves. 35. Position 90 tonne crane and the 140 tonne crane and prepare for lift and reinstatement of Reversal Trap. Sprain, strains Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. 36. Raise Reversal Trap to correct level on Kiln. Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 19 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task 37. Rig and install Reversal Trap into correct position. 38. Install bolts to lower flange of reversal trap and tension. (Insert correct tension) 39. Install bolts to lower flange at trouser leg and tension. (Insert correct tension) 40. 41. Remove chain block and sling support from trouser leg as shown in Figure 4.0. Raise and affix combustion air ducting section in correct position. Fit flange bolts and tighten. Note: 90 tonne crane to be used with Mancage. 140 tonne crane to perform lifts. Sprain, strains Cuts and abrasions Correct area PPE, wear gloves. Cuts and abrasions Correct area PPE, wear gloves. Sprain, strains Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. 42. Reinstate stack to Reversal Trap. Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. Page: 20 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 43. Reinstate stack flange mounting bolts and tension. (Insert correct tension) Working at heights Falling objects. Ensure area below is barricaded. Ensure no personnel enter crane working radius or barricaded area. 44. Inspect and repair/replace as necessary lubrication lines, purge lubrication points. Replace automatic lubricator pods as necessary. Sprain, strains Cuts and abrasions. Use correct lifting techniques. Correct area PPE, wear gloves 45. Replace hydraulic cylinder with new or reconditioned unit. Sprain, strains. Use correct lifting techniques. Correct area PPE, wear gloves. 46. Refit hydraulic hoses to hydraulic cylinder. Sprain, strains. Use correct lifting techniques. Correct area PPE, wear gloves. 47. Scaffold Personnel to remove scaffold as instructed by the Area co-ordinator. Working at heights Sprain, strains. Ensure area below is barricaded. Ensure no personnel enter barricaded area. Use correct lifting techniques. 48. Instrumentation/Electrical personnel to re-connect all electrical connections and test/check correct function of limit switches. Electrocution. Authorised personnel only. Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 21 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task 49. Reinstate guard to reversal trap. Cuts and abrasions. Use correct lifting techniques. Correct area PPE, wear gloves. 50. 51. All areas worked in to be left clean and safe. Remove Personal Danger Tag and sign off Standard Clearance Certificate. Trip, fall Good housekeeping. SCORING: S = Severity EX = Exposure P = Probability. Task steps are measured on a scale of 10 for Severity, Exposure and Probability. Critical steps are level 7 or higher. They are denoted by a red criticality rating within a red hexagon and the critical step is surrounded by double red thick and thin lines. Page: 22 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr

Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 I HAVE REVIEWED THIS STANDARD TASK INSTRUCTION This STI shall be reviewed for correctness and understanding prior to commencement of this particular task. All members of this task MUST SIGN in the presence of the Job Supervisor. I confirm that I have read and understand the Tasks, Risks and Hazards associated with this Maintenance Task. NAME DATE NAME DATE NAME DATE Issued: 01.08.2001 Filename: SAMPLE WORK PACK Page: 23 of 24 Document Owner: Area Mgr Authorised: DocID: GPM-xxx-xxx

Reversal Trap K662-1 Lime Plant Area 5 Maintenance and Shut-down Task Table 1.0: APL Listing for Reversal Trap K662-1 Page: 24 of 24 Filename: SAMPLE WORK PACK Issued: 01.08.2001 DocID: GPM-xxx-xxx Authorised: Document Owner: Area Mgr