Aluminum Boat House Lift 8K and 4K Side mount INSTALLATION MANUAL

Similar documents
Boat Hoist USA. General information and guides for installing a hoist lift system onto an existing overhead structure.

Installation Manual. For. PWC 3000 Boat Lifts

Installation Manual. For. Alumavator / Platinum Boathouse Lifts

Installation Manual. For. Alumavator and Platinum. Vertical Installation. Elevator Boat Lifts

Installation Manual. For. Trident Boat Lifts

Installation Manual. For. High Speed Alumavator and Platinum. 10 and 23 Degree. Elevator Boat Lifts

vertical cradle lifts installation instructions

EQUIPMENT GUIDE 84002PR RVSD 9/2017

Installation Manual. For. Hi-Speed Alumavator / Platinum Vertical Boat Lifts

Rotating PWC Lift Installation Guide

EQUIPMENT GUIDE. Rvsd THIS GUIDE IS INTENDED FOR THE END USER. GEAR PLATE ASSEMBLY ELECTRIC MOTOR WIRING DIAGRAM DRUM SWITCH GFCI WARRANTY

EQUIPMENT GUIDE. Rvsd THIS GUIDE IS INTENDED FOR THE END USER. GEAR PLATE ASSEMBLY ELECTRIC MOTOR WIRING DIAGRAM DRUM SWITCH GFCI WARRANTY

PW Cantilever Lift: Part Number: Instructions and Safety Tips 1200 Ibs Capacity

INSTALLATION INSTRUCTIONS

Midwest Industries, Inc. Ida Grove, IA Page 1

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Installation Instructions Table of Contents

155A 2500 LB. Gear Drive Winch ALUMINUM NARROW PONTOON LIFT

KWSL2000RM ! CAUTION!! READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF THIS PRODUCT. DO NOT RETURN THIS PRODUCT TO SELLER.

Owner s Manual: PS4000 4,000 LB. WINCH

accidents which arise due to nonobservance and the safety information herein.

ES-6500V ES-6500P ES-6500W 915 W.

42A FLB WOOD BUNKS 43A FLB ALUMINUM BUNKS ALUMINUM CANTILEVER BOAT LIFT

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

A B C D E F. Tools Required (supplied by others)

HL4K PONTOON LIFT INSTRUCTIONS

Pontoon and Tri-Toon Bunk Assembly Instructions

ELECTRIC HOIST DC12V. Operating Instructions

Recovery Winch Owner s Manual 1

CAUTION - PUT SAFETY FIRST

Smooth Roll Advantage Side Dump

WHEN IT'S DONE RIGHT... IT'S GOLDEN

All images and other materials are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published

Owner s Manual: PS SERIES WINCHES

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Proudly Made in Michigan By NuCraft Metal Products 402 Southline Rd. Roscommon, MI 48653

MOTORIZED INSTALLATION INSTRUCTIONS

PORTA-DOCK, INC. 100A 1200 LB. 84 WIDE ALUMINUM CANTILEVER BOAT LIFT 102A 1200 LB. 113 WIDE ALUMINUM CANTILEVER BOAT LIFT

PORTA-DOCK, INC. 100A 1284 ALUMINUM CANTILEVER BOAT LIFT

TABLE OF CONTENTS 3-7. Exploded View Assembly Cable Location and Adjustment Installation and Operation

SIDEWINDER 350 INSTALLATION INSTRUCTIONS & OPERATION MANUAL NOVEMBER 2011

Inteli-Lift GEN II DUMBWAITER

MODEL TB-8, TB-10, TB-12, & TB-14 TRAILER HOIST INSTALLATION AND OPERATION MANUAL

Owner s Manual. ELECTRIC WIRE ROPE HOIST and TROLLEY RH SERIES

Raptor Rear Frame Support, Air Bump and Leaf Spring Kit Installation Guide Rev 1C

Operating Instructions and Parts Manual AHR-50 Auto Rewind Hose Reel

This guide is intended to be given to the end user of the equipment. Professional installers, please leave this guide with your customer!

EasyStart 364 (ASY-364-X20-IP) Installation Instructions for the Coleman / Airxcel Air Conditioners

Lbs Kgs Ft M

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1

Patriot Portable Material Hoist 850/1000/2000. Operator s Manual

Operator Manual. The most important component is you. This operator manual. has information for. all models of series. B plus some options and

WARNING WARNING WARNING. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD FALLING OR CRUSHING HAZARD

AXLES BRAKES TIRE SIZE 'TOON CENTER MIN / MAX. 3,000 Torsion 21' 6" 24' 2 1, 2 ST175/13C 66.5" - 78" 98" 28' 7"

Installation of Transom Ladder on Montgomery 15 Sailboat By David Grah Winter 2012 / 2013

ELECTRICAL WINCH 60SPS12 60SPS24

BUNK TYPE AXLES BRAKES TIRE SIZE OVERALL WIDTH 8,400 24' 1" 20' 11" C 2 2 ST225/15D 102" 82" 28' 11"

LIFT N LOAD INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS (800)

Rugby Manufacturing TB-8/10/12/14 Hoist Manual. Preface INSTALLATION & OPERATION MANUAL

OPERATION AND INSTRUCTION MANUAL. EP Series. Battery Chargers and Power Supplies

Start-up and Operation

440/880LB ELECTRIC HOIST STF-4488EH

Remove the 3-11mm nuts holding mirror on. Don t drop the nuts!

Cranes. OSHA Office of Training & Education 1

Instructions for MB832 Manual Barrier Ver0614

MODEL LR-2066 & LR-2866A HOIST INSTALLATION AND OPERATION MANUAL

ELECTRIC WINCHES. No. 712 and 713 INSTALLATION INSTRUCTIONS. Illustration 1 WRONG! WRONG! CORRECT

Pontoon Assembly Instructions and manual. Read before using hoist.

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

INTRODUCTION / TABLE OF CONTENTS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Rugby Manufacturing SR-Series Hoist Manual. Preface INSTALLATION & OPERATION MANUAL

GR 4.0 Liter To Chevy Trans Adapter Kit GR 4.0 Liter Bell Housing Adaptor GR 4.0 Liter Flexplate Adaptor

HL5-7K PLATFORM LIFT INSTRUCTIONS

For Review Only No Copying No Saving No Lending No Posting Online

Side Dump Tarp System Driver or Passenger Stowing Non-Sealed applications

MY-TE Winch and Hoist

P O N T O O N T R A I L E R S

00000 Series Clevis Pin Slotted Hexagon Hex Key Recommended Corresponding Part No. Part No. Size Torque Preload SLT* SLT* HEX

LIFT MATE BOAT LIFT MOTOR ASSEMBLY. Assembly and Operating Manual.

INSTALLATION MANUAL SHALLOW WATER. Models. 915 W. Blue Starr Dr. Claremore, OK (918) Pub. 11/29/17

5 STARR ALUMINUM BUNK MODEL #5S-AC25T LTB1

Specification Pad-Mounted Capacitor Bank with Dual Fusing Integral Load-Interrupter on Line-Side Fuse Mountings

TRAIL CHARGER with EXTENDER and COMBO NOSE BOX

HL4K PLATFORM LIFT INSTRUCTIONS

WARNING WARNING CAUTION. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD

TRAILER WINCH MODELS ST315 AND ST712. General Safety (Continued) Description. Unpacking. General Safety Information.

Simple and swift from launch to lift. the ease of speed

Alpha Series Front Bumper Installation Manual

Tailgate Light Bar Installation by Flopster Feb 2015

LOLER REGULATIONS INTRODUCTION

Installation Information 2009 Model 300 Dumbwaiter

MY-TE. OPERATION and MAINTENANCE. Winch and Hoist. Provided by: Model AC 36B OF MAX AC VOLT AC

LOS ANGELES UNIFIED SCHOOL DISTRICT

OPERATING MANUAL. centrifugal fan SAFETY PRACTICES

Overview of EIS Installation

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

GENERAL SAFETY PRECAUTIONS

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG CEG

SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM

Transcription:

Aluminum Boat House Lift 8K and 4K Side mount INSTALLATION MANUAL Made in the USA! Beltless Drives! All Aluminum! No Weld Cradles! BH-USA - Longview Texas 800-259-8175 Fax (903) 758-3646 www.bh-usa.com

BH-USA Coastal Series Lifts BH-USA has been manufacturing hoist and boat lifts since 1979 in Longview Texas, as one of the nations oldest and most trusted hoist and lift manufacture, we know that your selection of the BH-USA Coastal Series overhead lift is the right choice. The BH-USA overhead coastal lift is the most advanced, easy to use and most minimal maintenance overhead lift available. The light weight simple design makes this the number one choice for installers and do-it-yourself installers in the nation. Before you begin. The BH-USA Coastal Series overhead lift is intended to be mounted on top of wood stringers attached to pilings. The wood stringers and pilings must be able to carry the load of the lift and boat to be lifted. Consult your local boat house builder for recommended minimum pile sizes and stringer sizes. BH-USA used 8 pilings with single 2 x 12 stringers for engineering and testing. The BH-USA Coastal Series Lifts come with Aluminum Overhead beams. Pilings and Stringers are responsibility of builder or customer. Shipping BH-USA Coastal Series overhead lifts ship complete in a single 13ft by 2ft x 2ft wood crate that is heat shrink wrapped. All Lifts ship freight and will be the customers responsibility to unload lift from truck. Before you sign for the lift insure that the white heat shrink wrap has not been broken or torn and that the BH-USA part number label with UPC code is still present. This will insure that all items needed for your installation are present. Each item is listed in the back of this guide for each lift as a reference. Lifts covered in this guide 8,000 lb Coastal Series Side Mount with V-Hull Cradle 8,000 lb Coastal Series Side Mount with Pontoon Boat Cradle* 8,000 lb Coastal Series Side Mount with Tri-Toon Boat Cradle* 8,000 lb Coastal Series Side Mount with slings 4,000 lb Coastal Series Side Mount with V-Hull Cradle 4,000 lb Coastal Series Side Mount with Pontoon Boat Cradle* 4,000 lb Coastal Series Side Mount with Tri-Toon Boat Cradle* 4,000 lb Coastal Series Side Mount with slings Pontoon boat cradles do not include the wood for the bunks. V-Hull cradles come with aluminum bunks standard. All lifts come standard with galvanized drive pipes.

STEP 1: Setting up beams and brackets Install Beams and Brackets as shown Beams come 12-6 long and are easily cut for better fitment in slip. 9 For 8000 lb compounded kits you will have (4) slide on dead man brackets, straight line 4000 lb kits will not use these. 8K (2) slide on pulley brackets followed by (2) dead man brackets. Pulley brackets on inside. Slide on dual pipe support opposite of motor mount bracket. Do not permanently attach until pipe is installed and straight. Slide 13ft drive pipe through both motor mount and dual pipe support. Motor Mount slide on bracket. Use the guides then drill holes when set. For 8K, dead man brackets on outside as close to bracket as possible. Lower Beams: 8K beams will have sheaves and axle bolts, slide on each end and permanently mount after cradle is cut to fit slip. 4K beams will use the same pulley brackets but will not have sheaves. Top Beam will rest on stringers. You must attach top beam to stringed by drilling through flange and bolting or purchasing the optional top beam attachment brackets. Note: It is recommended that you scaffold the pilings to assist in installing the lower cradle beams. No alterations should be made to this lift other than cutting the beams to fit better Top beams should not be placed any further than 9ft apart, placing beams further apart will effect overall rating Sheave housing assembly Pipe must be straight and plum and easily turned by hand when installed between the two brackets Don t forget to insert cable winder before you slide pipe in! Pipe is pre-drilled for hoist but will have to be drilled for cable Dead man brackets should be placed as close to sheave housings and pipe supports as possible. Cable on compounded lifts should not form a V but be as horizontal to other cable as possible.

STEP 2: Cable Routing and Hardware 4K Kits include two 60ft sections of 316 Stainless Steel 7x19 Aircraft Cable with loop and swedge on one end 8K Kits include two 100ft sections of 316 Stainless Steel 7 x 19 Aircraft Cable with loop and swedge on one end 4,000 lb Cable Routing Drill min 5/16 hole for cable, using pre drilled hole in cable winder as Attach loop end of cable to one side of cradle using 5/8 stainless bolt. Rout cable through sheave, over to pipe, through hole and down to other side of cable. Use stainless steel clamps and thimbles to mount to other side of cradle. You will use the clamp side to adjust cradle to be straight and level. For Sling lifts, use included shackle to attach loop end of cable. 8,000 lb Cable Routing Start loop end of cable at dead man Drill min 3/8 hole for cable, using pre drilled hole in cable winder as guide. Attach loop end of cable slide on dead man bracket on one side of beam then run cable to sheave on cradle back up to pulley on beam then over and through pipe, back to sheave on cradle then back to dead man When wrapping cable on cable winder, must insure that one direction of cable spools in opposite direction as other side. Up direction Dead man attach Use 5/8 Bolts to attach cable to dead man bracket.

STEP 3: Attaching Gearbox & Motor A B 1. Insert drive shaft into pipe and secure with GRADE 5 hardened bolt (included)* 2. Attach Gear Box assembly (no motor) to A-drive hanger. Make sure A drive hanger is secured permanently to beam using the stainless steel hardware included. The Drive shaft inserts into the A- Drive, there is no set screw. 3. Line the motor up with capacitors facing in the up position, never capacitors facing down as they can fill with water. Bolt motor to A-drive with included hardware. Verify that the drain holes are removed from the bottom of the motor. STEP 4: Attaching Bunks or Slings Attaching V-Hull aluminum bunks to cradle beam Cradles come with 4 brackets not 8 As picture shows Attaching Pontoon Bunk bracket to cradle Please note that only the outside Aluminum L-Bracket is supplied with cradles now, the inside L- Bracket is not needed. The image shows both, but only one is used. Attaching Weighted Compounding bracket to sling Attaching sling to cable for 4K lifts Use shackle provided on

Proper Boat Placement on Cradle Guide post stanchion assembly Helpful Hints 1. Mark your guide posts as to when the cradle is low enough to float the boat. This will be a good indicator for tides while you are out enjoying your boat. 2. Get the optional Boat Lift remote control so you can raise your cradle or slings back out of the water to prolong their life. 3. Set your front guide posts in to the curvature of your boat. This will make a good stop when docking. 4. Measure the distance of the inside runners of your boat trailer to get the bunk spread placement needed for your boat It is the responsibility of the installer and or end user to ensure: 1. The installation is complete and no alterations were made to this lift 2. That all moving pieces have been lubricated 3. Adequate power is supplied to the lift and not using an extension cord or generator 4. GFCI has been tested and is working 5. Cable has been inspected and has no broken strands and shows no signs of distress 6. Cable has been attached properly using proper cable attachment as outlined in this guide 7. Center of gravity of the boat is located by equal deflection of the lift beams or slings. 8. Cable is wrapping on cable winder correctly 9. Switch is permanently mounted and NOT hanging, no electrical cords touching water 10. User understands proper operating and to never be in the boat while on lift or swim around lift.

Boat Lift Electrical Requirements. Supplying the proper electrical service to you boat lift is required for the lift to operate correctly. Inadequate service will keep the lift from lifting its maximum load and will damage your motor. Your Coastal Series lift has been supplied with a pre-wired and tested Elite Motor. 4000 lb lift 1 hp Elite Stainless motor 120 VOLT 20 AMP circuit 8000 lb lift 1.5 hp Elite Stainless motor 240 VOLT 20 AMP circuit Each motor comes standard with a lock-on drum switch. The switch has been factory wired and tested. The motor has 16ft 14/5 wire from motor to switch and 5 ft GFCI cord from switch to plug. For more information about the motors and switches including IP and UL ratings, visit www.bh-usa.com and visit the motors product page. The electric motor on this lift was wired and tested at BH-USA. If your motor starts to lift the boat then stops, check your voltage and confirm your wire to the chart above. This is NOT a motor issue. If you un-wire the BH-USA drum switch and re-wire the motor to an existing switch or remote and the motor does not work, check the wiring guides to the manufacture remote or switch you wired too. If in doubt, re-wire the switch you removed the way it was to see if the motor works. If your electrician decides to re-wire any of our equipment and feels like our directions are wrong, they assume all liability and warranty ( follow our directions please ) Don't forget to remove the drain plugs on the motor, motors that fill up with water are NOT covered under warranty. Using an extension cord or generator will damage the motor and will not be covered under warranty.

BH-USA supplies a hardened GR5 bolt with all hoists and A-drives, to attach the drive pipe to the hoist. It is the end-users responsibility to ensure that the installer did use the GR5 bolt supplied by BH-USA, using a weaker grade bolt can cause the weaker bolt to fail and drop the boat. Hoists are not designed, nor intended to lift human beings, or to lift loads over areas where humans might be. Precautions, such as using NEMA and UL components and installing GFCIs on systems and wiring should not be relied upon when the risk of electrocution is possible. Components can fail. For this reason it is NEVER a good idea to swim around a lift. Be vigilant about safety, submerged cables can conduct electricity to the water if your system is not properly grounded, or you have developed a voltage leak. During the threat of exceptionally bad weather, such as a tropical depression or storm, hurricane or gale force winds, a boat should be removed from the lift and stored on a trailer in a safer place. Before use, review the BH-USA overhead lift guide and BH-USA equipment guide.