Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power. Central Electricity Authority. New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Executive Summary on Power Sector. Jul-18

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Government Of India Ministry of Power Central Electricity Authority New Delhi

Chapter 1 POPULATION

POPULATION. Chapter 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

Description Rural Urban Combined. Weights June 18 Index (Final) July 18 Index (Prov.) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)

Chapter 2 HEALTH. Women & Men In India

INDIAN HORTICULTURE PRODUCTION - AT A GLANCE ( and to )

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

The Electric Power System

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009

14.Storage Infrastructure

Remote Village Electrification

Population and decadal change by residence -India: 2011 (Persons)

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

India Solar Market Update Q Executive Summary.

Gujarat Power Sector A Statistical Profile

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

ECONOMIC SURVEY STATISTICAL APPENDIX

HVDC Systems in India

Status Review Report on Implementation of Batteries (Management and Handling) Rules, 2001 (as amended thereof)

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy


CONTENTS. Table Subject. I Area under Rubber and Average Yield per hectare

India Power Generation March 2018

Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution

Ph. No: Fax No: Website:


भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम

Title of the Presentation

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

Solutions for Full Length Test - 4

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

Power Distribution Tariffs in India 2016 Discom Wise & Consumer Wise Comprehensive Track

Ph. No: Fax No: Website:

Issue 12. micrometer. data as of 31 st December 2014

Indian Power System Framework

Report. the feasibility of

Bangladesh s Power Sector : At a Glance

Ph. No: Fax No: Website:

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.35 ANSWERED ON

INDUSTRY SALES REVIEW. July 2017

Industry Performance Review Report of PPAC: May18

SOLAR PLANT PERFORMANCE IN INDIA

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Target October (Month) April-October (Cumulative) (Apr- Mar)

Enhancing Grid Stability in India

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

Power Sector Trends: Focus on States

Unit-wise production details with reasons for shortfall have been given in following subsections:

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

Industry Consumption Review. July Industry Performance Review Report of PPAC: July18

ETHANOL BLENDED PETROL PROGRAMME

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

INDRA MARSHAL POWER TILLER

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

INDUSTRY SALES REVIEW. October 2017

Indian Energy Exchange December For Public Use

Target December (Month) April-December (Cumulative) (Apr- Mar)

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

(URL: F /KV Damoh/ / Date:

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

SOUTHERN REGIONAL POWER COMMITTEE

Thereafter, the agenda items were taken up.

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

Industry Sales Review March 2018

Ministry of Petroleum & Natural Gas

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

ईट ड 11/ ट

ANNUAL REPORT

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Overview of Indian Power Sector. February 29, 2008

Different Techniques of Loss Minimization in Distribution System

Unorganised Manufacturing Sector in India Its Size, Employment and Some Key Estimates

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

Transcription:

Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector March-217

Executive Summary for the Month of Mar 217 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation for March 217 (BU) 1A & 1B 2 Generating Capacity Addition for March 217 (MW) 2 3 List of Projects Commissioned in March 217 3 4 All India Installed Capacity (MW) Region-wise as on 31.3.217 3 5 All India Installed Capacity (MW) Sector-wise as on 31.3.217 4 6 Transmission Lines Added during March 217 (Ckms) 5 7 Transformation Capacity Addition during March 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in March 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for March 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 31.3.217 13 Average cost of Power & Average Realisation 11 14 All India per capita consumption of Electricity (KWh) 15 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during March 217 13 3 Installed Capacity in various Regions including their shares. 14-19 Section C - Transmission Lines 1 Programme and Achievements of Transmission Lines in March 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during March 217 Section D - Sub Stations 1 Programme and Achievements of Sub-Stations in March 217 21 2 List of Sub Stations commissioned/ready for commisssioning during March 217 Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for 216-17 22 Section F - Power supply position 1 Power Supply Position (Provisional) for March 217 23 2 Peak Demand and Peak Met (Provisional) for March 217 24 3 Power Supply Position (Revised) for Feb 217 25 4 Peak Demand and Peak Met (Revised) for Feb 217 26 5 Notified Power cuts / Restrictions on Industries during March 217 27 6 Power Supply to Agricultural Sector during March 217 28 Section G - Growth of Power Sector 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since 26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA upto March 217 Section H - Rate of sale of power for the year 214-215 1 Rate of sale of power for the year 214-215 33-41

Section A - Highlights of Power Sector SN Contents Page 1 Electricity Generation (Conventional Sources) for March 217 (BU) Electricity Generation (Conventional & Renewable Sources) for April 216 to Feb. 217 (BU) 1A 1B 2 Generating Capacity Addition for March 217 (MW) 2 3 List of Projects Commissioned in March 217 3 4 All India Installed Capacity (MW) Region-wise as on 31.3.217 3 5 All India Installed Capacity (MW) Sector-wise as on 31.3.217 4 6 Transmission Lines Added during March 217 (Ckms) 5 7 Transformation Capacity Addition during March 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in March 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for March 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 31.3.217 13 Average cost of Power & Average Realisation 14 All India per capita consumption of Electricity (KWh) 11 15 All India Coal consumption for Power Generation (MT)

1. Electricity Generation for Mar, 217 (BU) Type Achievement Targets Achievement % Change Mar-16 Mar-17 Mar-17 w.r.t. 216 Thermal 85.885 88.775 9.315 Hydro 6.985 9.75 7.847 Nuclear 3.588 3.573 3.526 Bhutan Import.53.141.95 All India 96.511 11.564 11.783 5.46 BU 12. 11. 1. 99. 98. 97. 96. 95. 94. 93. 96.511 Mar-16 11.564 Mar-17 Electricity Generation During April 215 to Mar 216 & April 216 to Mar. 217 (BU) Type Thermal Hydro Nuclear Bhutan Import All India Apr '15 - Mar'16 Apr '16 - Mar '17 % Change 943.787 994.215 5.34 121.377 122.312.77 37.414 37.664.67 5.244 5.644 7.63 117.822 1159.835 4.7 14. 12. 117.822 1159.835 1. BU 8. 6. 4. 2.. Apr '15 - Mar'16 Apr '16 - Mar '17 1A

Month Generation (April-Febuary, 217) Generation Generation from from Conventional Sources Renewable Sources Electricity Generation (Conventional & Renewable Sources) April-Febuary, 217 vis-à-vis April- Febuary, 216 Total Generation (April- Febuary, 216) Generation from Conventional Sources Generation from Renewable Sources Total Growth in Conventional Generation % Growth Growth in Renewable Generation Growth in Total Generation (MU) (MU) (MU) (MU) (MU) (MU) (%) (%) (%) Apr-16 99,345 5,74 14,419 86,695 4,553 91,247 14.59 11.45 14.44 May-16 99,93 6,82 16,723 95,42 5,143 1,545 4.72 32.61 6.15 Jun-16 97,326 8,11 15,436 89,98 6,9 95,998 8.25 33.17 9.83 Jul-16 94,66 9,545 14,151 93,142 8,872 12,13 1.57 7.59 2.1 Aug-16 95,237 9,634 14,871 95,122 7,529 12,651.12 27.96 2.16 Sep-16 98,72 8,328 16,4 95,741 5,485 11,226 2.43 51.82 5.11 Oct-16 99,71 6,287 15,997 98,631 4,354 12,985 1.9 44.4 2.92 Nov-16 93,569 5,2 98,589 85,96 4,141 9,47 8.92 21.23 9.49 Dec-16 95,252 5,463 1,715 95,123 4,976 1,99.14 9.79.62 Jan-17 95,69 5,86 11,496 92,129 4,377 96,56 3.87 32.65 5.17 Feb-17 92,63 5,862 98,492 9.722 4,994 5,85 123.13 17.38 1837.2 Total 1,61,341 75,949 1,137,29 74,546 6,513 786,713 43.32 25.51 44.56 Source-Wise All India Generation from Renwables Wind Solar Biomass Bagasse Small Hydro Others Total Electricity Generation From Renewable (source wise) April-Febuary, 217 vis-à-vis April-Febuary, 216 Feb., 217 For the Month of Feb., 216 2485.97 1649.16 1355.28 754.22 336.1 342.49 1192.25 1849.65 414.99 372.61 77.36 25.84 5861.95 4993.97 Apr., 216 to Feb., 217 43645.88 11855. 3855.97 8613.54 7564.65 413.89 75948.93 Commulative for the period All Figure in MU Apr., 215 to Feb.,216 31136.13 648.76 3383.71 1148.72 7857.72 245.24 6512.28 1B

2. Generating Capacity Addition for Mar, 217(MW) Type Achievement Targets Achievement Mar-16 Mar-17 % Change w.r.t. 216 Thermal 9715 3455-64.44 Hydro 8 15-1. Nuclear 5 1 All India 9795 65 4455-54.52 12 1 9,795. 8 6 4 4,455. 2 Mar-16 1 Mar-17 Generating Capacity Addition during April '15 to Mar 16 & April '16 to Mar 17 (MW) Apr '15 - Mar '16 Apr '16 - Mar '17 % Change Thermal 2246.6 1155.8-49 Hydro 1516 1659 9 Nuclear 1 NA All India 23976.6 1429.8-41 3 25 23976.6 2 15 1429.8 1 5 1 Apr '15 - Mar '16 Apr '16 - Mar '17 2

(i) Thermal Mauda STPP-II U-4 ( 66) MW was Commisioned on 18.3.217 Bongaigaon TPP U-2 (25) MW was Commisioned on 22.3.217 Kudgi TPP U-2 (8) MW was Commisioned on 23.3.217 Bhavnagar TPP U-2 (25) MW was Commissioned on 27.3.217 3. List of Projects Commissioned During Mar 217 Kanti TPS ST-II U-4 (195) MW was Commissioned on 24.3.217 Yermarus TPP U-2 (8) MW was Commisioned on 29.3.217 Unchahar TPS ST-IV U-6 (5) MW was Commissioned 31.3.217 (ii) (iii) Hydro NIL Nuclear Kudankulam U-2 1 (MW) was Commissioned on 31.3.217 4. All India Installed Capacity (MW) Region-wise as on 31.3.217 Thermal Nuclear Hydro RES Grand Total Region Coal Gas Diesel Total Northern 51329.2 5781.26. 5711.46 162. 19311.77 11539.36 89581.59 Western 68293.62 1123.41. 79497.3 184. 7447.5 1834.43 1788.96 Southern 43382.2 6473.66 761.58 5617.26 332. 11739.3 26132.7 9188.36 Eastern 28578.2 1.. 28678.2. 4738.12 99.74 3446.87 North-East 58.2 1771.5 36. 2387.7. 1242. 281.12 391.19 Islands.. 4.5 4.5.. 12.52 52.57 ALL INDIA 192162.88 25329.38 837.63 218329.88 678. 44478.42 5726.23 326848.53 35. 3. Total = 326848.53 326848.53 25. 2. 218329.88 15. 1. 5.. 44478.42 5726.23 4726 678. Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive Note: Captive Genaration is not included in the total. RES as on 31.12.216. 3

5. All India Installed Capacity (MW) Sector-wise as on 31.3.217 Sector THERMAL Coal Gas Diesel Total Nuclear Hydro RES Grand Total State 64685.5 7257.95 363.93 7237.38. 29683. 1976.9 13967.28 Private 73142.38 158.6 473.7 84196.68. 3144. 55283.33 142624.1 Central 54335. 749.83. 61825.83 678. 11651.42. 8257.25 All India 192162.88 25329.38 837.63 218329.88 678. 44478.42 5726.23 326848.53 RES as on 31.12.216 All India Installed Capacity(MW) as on 31-3-217 (Sector-Wise) Central, 8257.25, 24% State, 13967.28, 32% State 13967.28 Private 142624.1 Central 8257.25 Private, 142624.1, 44% 4

6. Transmission Lines Added during Mar, 217 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Mar-16 Mar-17 44 172 129 1122 645 199 738 2393 2717 3 25 2 2393 2717 ckms 15 1 5 Mar-17 Mar-16 Mar-17 Transmission Lines Added during Apr '15 to Mar '16 & Apr '16 to Mar'17 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Apr '15 - Mar '16 Apr '16 - Mar '17 356 2618 561 6995 11181 1657 7826 63 28114 263 34 29 24 28114 263 ckms 19 14 9 Apr '15 - Mar '16 Apr '16 - Mar '17 5

7. Transformation Capacity Addition During Mar, 217 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India Mar-16 Mar-17 3 6 6 526 672 7633 4551 18893 2271 Transformation Capacity Addition during Mar 217 25 2271 MVA 2 195 19 185 18 18893 Mar-16 Mar-17 All India Transformation Capacity Addition during Apr '15 to Mar '16 & Apr '16 to Mar'17 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India April' 15 to Mar '16 April '16 to Mar'17 15 45 195 265 1745 3134 2484 19476 62849 81816 1494 MVA 7452 62849 81816 April' 15 to Mar '16 1 April '16 to Mar'17 6

8. Power Supply Position (Energy & Peak) in Mar 217 Region Energy (MU) Deficit (%) Requirement Availability Mar'16 Mar '17 Mar '16 Feb'17 Mar.16 Mar '17 Northern 25357 26,586 24244 26,399-4.4 -.7 Western 3637 3,579 3618 3,571 -.1. Southern 27819 28,847 27521 28,829-1.1 -.1 Eastern 11138 1,698 1179 1,691 -.5 -.1 North Eastern 1197 1,211 1163 1,178-2.8-2.8 All India 96148 97,923 94625 97,669-1.6 -.3 Power (MW) Region Deficit (%) Peak Demand Peak Met Mar 16 Mar 17 Mar '16 Mar '17 Mar16 Mar. '17 Northern 42396 42393 4282 41915-5. -1.1 Western 44424 48516 44225 48298 -.4 -.4 Southern 43 4229 39875 42277 -.4. Eastern 18169 18781 1856 18781 -.6. North Eastern 2442 2236 2367 22-3.1-1.6 All India 144934 15182 142556 15187-1.6 -.5 7

9. Peak Shortage of Power Supply (MW) in Different Regions Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP Utrakhand Mar '16 1 37 631 Mar '17 8 2 Northern States (MW) 59 Mar '17 Mar '16 1 4 59 37 631 Chandiga rh Delhi 2 1 Haryana MW 1 HP J&K Punjab Rajasthan UP Utrakhan d 4 Chattisgarh Gujarat MP Western States Maharashtra (MW) Daman & Diu Dadar Nagar Haveli Goa Mar '17 Mar '16 Mar 3 '16 17 29 6 35 1 Mar 2 '17 65 5 18 39 16 1 MW 65 Chattisgarh 17 5 Gujarat 29 18 MP 6 39 Maharashtra 35 Daman & Diu Dadar Nagar Haveli 16 Goa 1 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep Mar '16 9 5 694 Southern 121 State (MW) 3 1 Mar '17 3 49 49 3 Mar '17 8 694 Mar '16 6 4 2 3 9 5 49 121 49 3 3 1 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep 8

Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N Island Mar '16 69 Eastern States (MW) 48 8 Mar '17 Mar '16 Mar '17 8 8 6 4 2 MW Bihar 69 DVC Jharkhan d Odisha 48 West Bengal Sikkim 8 8 A&N Island North-Eastern States (MW) 3 Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura Mar '16 2 2 27 2 3 Mar '17 1 1 1 2 2 1 MW 1 2 Arunach al 1 Assam 2 Manipur Meghala ya 2 Mizoram 2 1 Nagalan d Tripura 3 9

1. All India PLF* Sector-wise for Mar. 217 %PLF Sector Mar '16 Mar '17 Central 74.59 78.47 State 56.65 55.98 Private 61.81 58.73 ALL INDIA 63.74 63.33 Sector-Wise Plant Load Factor for Mar, 216 and Mar, 217 % PLF 9. 8. 7. 6. 5. 4. 3. 2. 1.. 74.59 78.47 56.65 55.98 61.81 58.73 63.74 63.33 Central State Private ALL INDIA Mar '16 Mar '17 All India PLF Month-wise Month 215-16 216-17 April 62.5 67.83 May 64.16 62.24 June 59.43 6.87 July 58.36 54. August 58.1 52.3 September 64.18 58.13 October 66.86 6.9 November 6.75 6.74 December 61.75 6.46 January 63.2 6.37 February 64.95 61.83 March 63.89 63.33 All India PLF Month-wise 8 6 4 2 62.5 67.83 64.16 62.24 59.43 6.87 58.36 54. 58.1 52.3 64.18 58.13 66.86 6.9 6.75 6.74 61.75 6.46 63.2 6.37 64.95 61.83 63.89 63.33 April May June July 215-16 216-17 August September October November December January February March * For Coal and Lignite based Power Plants 1

11. T & D and AT&C Losses (%) 21-11 211-12 212-13 213-15 214-15 T&D Losses 23.97 23.65 23.4 21.46 22.77(P) AT&C Losses 26.35 26.63 25.48 22.58 24.62(P) Note: As per PFC for utilities selling directly to consumers P: Provisional 12. All India Village Electrification & Pumpsets Energised as on 31.1.217 Total Number of Villages Villiages Electrified (Nos.) as on 31.3.17 597464 5928 * Pump sets Energised Pump sets Energised as on 31-3-17 as on 31-3-216 243418 264568 Figures are based on the data available in DDUGJY website. % Villages electrified 98.75 *Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports. The data in the report prior to October, 215 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also been adjusted for changes observed from Census 211 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports Note: From the year 24-5 onwards Definition of Village Electrification:- A village would be declared Electrified if i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer may not be necessary) ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and iii) The number of households electrified should be at least 1% of the total number of households in the village iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained. 13. Average cost of Power & Average Realisation Average Revenue Realization(paise/unit) Gap ACS- Year Gap ACS- ARR (on Gap ACS- Average cost of supply(acs) ARR( subsidy ARR (on (paise/unit) Without booked subsidyrece Without Subsidy Subsidy) Paise/unit basis) paise/unit ived basis) paise/unit 213-14 518 4 118 76 77 214-15 52 412 18 58 6 Source:- PFC Reports on the performance of State Power Utilities 14. All India per capita consumption of Electricity ( KWh) # 214-15 11 215-16 175* # (Gross Generation+Net Import) / Mid Year Population, * Provisional 15. All India Coal consumption for Power Generation (MT) 213-14 489.4 214-15 53.4 215-16 545.9* * Actual 11

Section B - Capacity Addition SN Contents Page 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during March 217 and April 216 to March 217 13 3 Installed Capacity in various Regions including their shares. 14-19

1. Capacity Addtion Targets and Achievements in the 12th Plan (i) Targets (MW) Type/Sector Central State Private Total Thermal 14,878. 13,922. 43,54. 72,34. Hydro 6,4. 1,68. 3,285. 1,897. Nuclear 5,3... 5,3. Total 26,182. 15,53. 46,825. 88,537. (ii) Achievements upto Mar, 217 during the 12th Plan (MW) Type/Sector Central State Private Total Thermal 15,868.6 22,21.35 53,66.5 91,73.45 Hydro 2,584.2 2,276. 619. 5,479.2 Nuclear 2,... 2,. Total 2,452.62 24,477.35 54,279.5 99,29.47 Acievement % 78.12 157.61 115.92 112.5 Achievement of Capacity Addition during the Current Plan upto Mar 217 12th Plan Target 88,537 MW, Achieved so far 94689.47 MW 9,. 8,. 7,. 6,. 5,. 4,. 3,. 2,. 1,.. 72,34. 1,897. 5,479.2 5,3. 2,. Thermal Hydro Nuclear Target Achievement 12

2. Capacity Addition Targets / Achievements During Mar 217 & April 216 to Mar 217 Schemes Sector (MW) Target Mar-17 April '16 - Mar '17 Deviation 216-17 Target* Achievement Target* Achievement (+) / (-) Central 273.5 245 275 323.5 525.5 Thermal State 391 15 85 382 2952 Pvt. 68 339 4698 138 Total 1344.5 3455 6945 1173.5 4785.5 Central 49 15 45 8-37 Hydro State 395 85 149 64 Pvt. 829 169 24-145 Total 1714 15 1469 1594 125 Nuclear Central 15 5 1 15 1-5 Central 472.5 65 345 4655 431.5-344.5 All India State 435 15 17 5292 3592 Pvt. 7629 3559 4722 1163 Total 16654.5 65 4455 9914 14324.5 441.5 Targets and Achievement during 216-17 Target MW 16 14 12 1 8 6,945 11,731 9,914 14,325 Achievement 6 4 2 1,469 1,594 1,5 1, Thermal Hydro Nuclear Total Capacity Addition Targets/Achievements during the Month of Mar 217 Targets and Achievement during Mar 217 Target Achievement MW 1 9 8 7 6 5 4 3 2 1 3455 15 5 1 65 4455 Thermal Hydro Nuclear Total 13

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31.3.217) (UTILITIES) Modewise breakup Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Ownership/ Sector Thermal Coal Gas Diesel Total Nuclear RES * (MNRE) Grand Total State 16598. 2879.2. 19477.2. 8543.55 663.56 28684.31 Private 221.83 558.. 22658.83. 252. 1875.8 3636.63 Central 1263.37 2344.6. 14974.43 162. 8266.22. 2486.65 Sub Total 51329.2 5781.26. 5711.46 162. 19311.77 11539.36 89581.59 State 2317. 2993.82. 26163.82. 548.5 311.19 31955.51 Private 31465.67 4676.. 36141.67. 447. 17993.24 54581.91 Central 13657.95 3533.59. 17191.54 184. 152.. 2551.54 Sub Total 68293.62 1123.41. 79497.3 184. 7447.5 1834.43 1788.96 State 17832.5 791.98 287.88 18912.36. 11739.3 512.55 31163.94 Private 12124.5 5322.1 473.7 1792.3.. 25619.52 43539.82 Central 13425.2 359.58. 13784.6 332... 1714.6 Sub Total 43382.2 6473.66 761.58 5617.26 332. 11739.3 26132.7 9188.36 State 725. 1.. 7125.. 3537.92 225.11 1888.3 Private 7451.38.. 7451.38. 195. 765.63 8412. Central 1411.64.. 1411.64. 15.2. 1516.84 Sub Total 28578.2 1.. 28678.2. 4738.12 99.74 3446.87 State 6. 492.95 36. 588.95. 382. 259.25 123.2 Private. 24.5. 24.5.. 21.88 46.38 Central 52.2 1253.6. 1773.62. 86.. 2633.62 Sub Total 58.2 1771.5 36. 2387.7. 1242. 281.12 391.19 State.. 4.5 4.5.. 5.25 45.3 Private...... 7.27 7.27 Central........ Sub Total.. 4.5 4.5.. 12.52 52.57 State 64685.5 7257.95 363.93 7237.38. 29683. 1976.9 13967.28 Private 73142.38 158.6 473.7 84196.68. 3144. 55283.33 142624.1 Central 54335. 749.83. 61825.83 678. 11651.42. 8257.25 Total 192162.88 25329.38 837.63 218329.88 678. 44478.42 5726.23 326848.53 Hydro Figures at decimal may not tally due to rounding off Abbreviation:- Note : - SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources 1.RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on 31.3.217 (As per latest information available with MNRE) *Break up of RES all India as on 31.3.217 is given below (in MW) : Small Hydro Power Wind Power BM Power/Cogen. Bio-Power Waste to Energy Solar Power Total Capacity 4379.86 32279.77 8181.7 13.8 12288.83 5726.23 1. ENNORE TPS U-1,2,3&4 (6,6,11&11 MW) have been retired from the State Sector of Tamil Nadu. 2. MAUDA TPS U-4 (66 MW) has been commissioned and added to the Central Sector of WR states as per their allocation. 3. BONGAIGAON TPP U-2 (25 MW) has been commissioned and added to the Central Sector of NER states as per their allocation. 4. KUDGI STPP U-2 (8 MW) has been commissioned and added to the Central Sector of SR states as per their allocation. 5. MUZAFFARPUR TPS U-4 (195 MW) has been commissioned and added to the Central Sector of ER states as per their allocation. 6. KUDANKULAM U-2 (1 MW) has been commissioned and added to the Central Sector of SR states as per their allocation. 7. UNCHAHAR TPS U-6 (5MW) has been commissioned and added to Central Sector of NR states as per their tentative allocation. 8. BHAVNAGAR TPP U-2 (25MW) has been commissioned and added to State Sector of Gujarat. 9. YERMARUS TPP U-2 (8MW) has been commissioned and added to State Sector of Karnataka. 1. KASHANG INTEGRATED HEP U-3 (65 MW) has been commissioned in January, 217 and added to State Sector of Himachal Pradesh. 11. State Sector of Andhra pradesh and Telangana have been revised as per their respective state generating companies. 12. Share from Central Sector generating stations has been revised as per latest allocation available. 13. Share of Power Grid, Railways etc. in Power Plants has been added to respective states. 14. Share from Private Sector generating stations has been added to beneficiary states as per PPA information available. 15. Untied capacity of Private Power Plant has been considered in the home state.

REVISED State Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttrakhnad Chandigarh Central - Unallocated Total (Northern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.3.217) RES (MNRE) Grand Total State 135. 18.4. 1935.4... 1935.4 Private 869.22 18.. 977.22.. 72.27 149.49 Central 3821.18 27.1. 428.19 12.83 723.9. 4854.11 Sub-Total 4825.4 2115.41. 694.81 12.83 723.9 72.27 7839. State 272. 15.. 287.. 184.51 59.3 413.81 Private 48.78.. 48.78. 2. 192. 4472.78 Central 1269.32 535.61. 184.94 1.94 663.7181. 2569.58 Sub-Total 87.1 685.61. 8755.72 1.94 1948.21 251.3 1156.16 State..... 594.6 256.61 851.21 Private..... 98. 575.93 1555.93 Central 17.74 62.1. 232.75 28.95 1223.88. 1485.58 Sub-Total 17.74 62.1. 232.75 28.95 2798.48 832.54 3892.72 State. 175.. 175.. 123. 18.3 1513.3 Private...... 51.36 51.36 Central 463.15 129.7. 592.23 67.98 148.98. 179.19 Sub-Total 463.15 34.7. 767.23 67.98 2278.98 159.39 3273.58 State 263. 15.. 278.. 257.23 127.8 5478.3 Private 5115.5.. 5115.5. 288. 125.3 6428.8 Central 871.8 264.1. 1135.9 196.81 923.42. 2255.32 Sub-Total 8616.58 414.1. 93.59 196.81 3781.65 1153.1 14162.15 State 519. 63.8. 5793.8. 187.96 23.85 695.61 Private 3882... 3882.. 14. 6213.95 1199.95 Central 1153.91 221.1. 1375.1 556.74 739.1. 267.76 Sub-Total 1225.91 824.9. 115.81 556.74 193.97 6237.8 19776.32 State 5923... 5923.. 724.1 25.1 6672.2 Private 854.33.. 854.33. 842. 2274.73 11171.6 Central 3315.25 549.49. 3864.74 289.48 1664.93. 5819.15 Sub-Total 17292.58 549.49. 17842.7 289.48 3231.3 2299.83 23662.41 State..... 1252.15 62.87 1315.2 Private 99. 45.. 549.. 88. 452.94 189.94 Central 332.5 69.66. 41.71 31.24 475.54. 98.49 Sub-Total 431.5 519.66. 95.71 31.24 1815.69 515.81 3313.45 State........ Private...... 17.32 17.32 Central 34.86 15.3. 49.88 8.1 11.71. 159.6 Sub-Total 34.86 15.3. 49.88 8.1 11.71 17.32 176.92 1198.83 291.5. 1489.88 237.3 71.95. 2428.87 State 16598. 2879.2. 19477.2. 8543.55 663.56 28684.31 Private 221.83 558.. 22658.83. 252. 1875.8 3636.63 Central 1263.37 2344.6. 14974.43 162. 8266.22. 2486.65 Grand Total 51329.2 5781.26. 5711.46 162. 19311.77 11539.36 89581.59

REVISED State Goa Daman & Diu Gujarat Madhya Pradesh Chhattisgarh Maharashtra Dadra & Nagar Naveli Central - Unallocated Total (Western Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.3.217) RES (MNRE) Grand Total State.......5.5 Private. 48.. 48....71 48.71 Central 443.6 22.2. 465.8 26... 491.8 Sub-Total 443.6 7.2. 513.8 26...76 54.56 State........ Private...... 1.46 1.46 Central 115.7 48.4. 164.1 7... 171.1 Sub-Total 115.7 48.4. 164.1 7.. 1.46 181.56 State * 523. 2321.82. 7551.82. 772. 8. 8331.82 Private 7765.67 396.. 11725.67.. 6663.89 18389.56 Central 312.9 424.. 3436.9 559... 3995.9 Sub-Total 167.76 675.82. 22713.58 559. 772. 6671.89 3716.47 State 48... 48.. 173.66 83.96 5867.62 Private 5574. 1.. 5674... 3453.93 9127.93 Central 2572.73 257.. 2829.73 273. 152.. 4622.73 Sub-Total 12226.73 357.. 12583.73 273. 3223.66 3537.89 19618.28 State 328... 328.. 12. 11.5 3411.5 Private 663... 663... 421.81 751.81 Central 1548.98.. 1548.98 48... 1596.98 Sub-Total 11458.98.. 11458.98 48. 12. 432.86 1259.84 State 158. 672.. 11252.. 2884.84 28.13 14344.97 Private 11496. 568.. 1264.. 447. 7439.47 1995.47 Central 3911.4 2513.. 6424.4 69... 7114.4 Sub-Total 25987.4 3753.. 2974.4 69. 3331.84 7647.6 4149.84 State........ Private...... 2.97 2.97 Central 158.45 71.4. 229.85 9... 238.85 Sub-Total 158.45 71.4. 229.85 9.. 2.97 241.82 1895. 197.59. 292.59 228... 232.59 State 2317. 2993.82. 26163.82. 548.5 311.19 31955.51 Private 31465.67 4676.. 36141.67. 447. 17993.24 54581.91 Central 13657.95 3533.59. 17191.54 184. 152.. 2551.54 Grand Total 68293.62 1123.41. 79497.3 184. 7447.5 1834.43 1788.96

REVISED State Andhra Pradesh Telangana Karnataka Kerala Tamil Nadu NLC Puducherry Central - Unallocated Total (Southern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.3.217) RES (MNRE) Grand Total State 441. 235.4. 4645.4. 1747.93 89.5 6482.83 Private 3673.88 4295. 36.8 85.68.. 674.92 148.6 Central 167.6.. 167.6 127.27.. 1734.87 Sub-Total 9691.48 453.4 36.8 14258.68 127.27 1747.93 6164.42 22298.3 State 482.5.. 482.5. 236.6. 6389.1 Private 1189.45 35.. 1539.45.. 1545.88 385.33 Central 1878.12.. 1878.12 148.73.. 226.85 Sub-Total 715.7 35.. 75.7 148.73 236.6 1545.88 1151.28 State 52.. 127.92 5147.92. 3599.8 155.33 893.5 Private 1958.5. 25.2 1983.7.. 732.64 9286.34 Central 2429.2.. 2429.2 698... 3127.2 Sub-Total 947.7. 153.12 956.82 698. 3599.8 7457.97 21316.59 State.. 159.96 159.96. 1881.5 145.2 2186.48 Private 615. 174.. 789... 193.7 982.7 Central 118.18 359.58. 1467.76 362... 1829.76 Sub-Total 1723.18 533.58 159.96 2416.72 362. 1881.5 338.72 4998.94 State 432. 524.8. 4844.8. 223.2 122.7 7169.98 Private 4687.67 53.1 411.7 562.47.. 152.3 1614.77 Central 4389.52.. 4389.52 1448... 5837.52 Sub-Total 13397.19 127.18 411.7 14836.7 1448. 223.2 1625. 29112.27 State........ Private........ Central 1... 1.... 1. Sub-Total 1... 1.... 1. State. 32.5. 32.5... 32.5 Private.......8.8 Central 248.4.. 248.4 86... 334.4 Sub-Total 248.4 32.5. 28.9 86...8 366.98 1664... 1664. 45... 2114. State 17832.5 791.98 287.88 18912.36. 11739.3 512.55 31163.94 Private 12124.5 5322.1 473.7 1792.3.. 25619.52 43539.82 Central 13425.2 359.58. 13784.6 332... 1714.6 Grand Total 43382.2 6473.66 761.58 5617.26 332. 11739.3 26132.7 9188.36

REVISED State Bihar Jharkhand West Bengal DVC Odisha Sikkim Central - Unallocated Total (Eastern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.3.217) RES (MNRE) Grand Total State 21... 21... 7.7 28.7 Private 281... 281... 221.52 52.52 Central 2714.33.. 2714.33. 11.. 2824.32 Sub-Total 325.33.. 325.33. 11. 292.22 367.54 State 875... 875.. 13. 4.5 19.5 Private 85... 85... 23.27 873.27 Central 293.74.. 293.74. 61.. 354.74 Sub-Total 218.74.. 218.74. 191. 27.32 2237.6 State 552. 1.. 562.. 986. 91.95 6697.95 Private 2181.38.. 2181.38.. 332.69 2514.7 Central 76.77.. 76.77. 41.. 117.77 Sub-Total 8462.15 1.. 8562.15. 1396. 424.64 1382.78 State........ Private........ Central 7535.4.. 7535.4. 186.2. 7721.24 Sub-Total 7535.4.. 7535.4. 186.2. 7721.24 State 42... 42.. 261.92 6.3 2488.22 Private 4139... 4139... 188.15 4327.15 Central 1633.9.. 1633.9. 89.. 1722.9 Sub-Total 6192.9.. 6192.9. 215.92 194.45 8538.27 State..... 36. 52.11 412.11 Private..... 195.. 195. Central 87.3.. 87.3. 64.. 151.3 Sub-Total 87.3.. 87.3. 619. 52.11 758.14 176.83.. 176.83. 85.1. 1161.84 State 725. 1.. 7125.. 3537.92 225.11 1888.3 Private 7451.38.. 7451.38. 195. 765.63 8412. Central 1411.64.. 1411.64. 15.2. 1516.84 Grand Total 28578.2 1.. 28678.2. 4738.12 99.74 3446.87 INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION REVISED State Assam Arunachal Pradesh Meghalaya Tripura Manipur Nagaland Mizoram Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.3.217) RES (MNRE) Grand Total State 6. 323.45. 383.45. 1. 3.1 513.46 Private. 24.5. 24.5.. 15.88 4.38 Central 279.2 435.56. 714.58. 331.23. 145.81 Sub-Total 339.2 783.51. 1122.53. 431.23 45.89 1599.65 State...... 14.61 14.61 Private.......27.27 Central 24.7 46.82. 71.52. 97.45. 168.97 Sub-Total 24.7 46.82. 71.52. 97.45 14.87 273.84 State..... 282. 31.3 313.3 Private.......1.1 Central 3.4 19.69. 14.9. 65.19. 25.28 Sub-Total 3.4 19.69. 14.9. 347.19 31.4 518.32 State. 169.5. 169.5.. 16.1 185.51 Private...... 5.9 5.9 Central 37.4 436.95. 474.35. 62.38. 536.73 Sub-Total 37.4 66.45. 643.85. 62.38 21.1 727.33 State.. 36. 36... 5.45 41.45 Private.......3.3 Central 31.4 71.57. 12.97. 88.93. 191.9 Sub-Total 31.4 71.57 36. 138.97. 88.93 5.48 233.38 State...... 3.67 3.67 Private.......5.5 Central 21.4 48.93. 7.33. 53.37. 123.7 Sub-Total 21.4 48.93. 7.33. 53.37 31.17 154.87 State...... 41.47 41.47 Private.......1.1

Mizoram Central - Unallocated Total (North- Eastern Region) Central 2.7 4.46. 61.16. 34.19. 95.35 Sub-Total 2.7 4.46. 61.16. 34.19 41.57 136.92 75. 63.62. 138.62. 127.26. 265.88 State 6. 492.95 36. 588.95. 382. 259.25 123.2 Private. 24.5. 24.5.. 21.88 46.38 Central 52.2 1253.6. 1773.62. 86.. 2633.62 Grand Total 58.2 1771.5 36. 2387.7. 1242. 281.12 391.19

REVISED State Andaman & Nicobar lakshadweep Total (Islands) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.3.217) RES (MNRE) Grand Total State.. 4.5 4.5.. 5.25 45.3 Private...... 6.56 6.56 Central........ Sub-Total.. 4.5 4.5.. 11.81 51.86 State........ Private.......71.71 Central........ Sub-Total.......71.71 State.. 4.5 4.5.. 5.25 45.3 Private...... 7.27 7.27 Central........ Grand Total.. 4.5 4.5.. 12.52 52.57

Section C - Transmission Lines SN Contents Page 1 Programme and Achievements of Transmission Lines in Mar. 217 and during April 216 to Mar. 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during Mar. 217

(Figs. in ckms) Voltage Level Programme Mar '17 Apr '16 to Mar17 /Sector 216-17 Programme Achievement Programme Achievement +/- 8 kv HVDC Central Sector 2597 44 2597 2618 State Sector +/- 5 kv HVDC Total 2597 44 2597 2618 Central Sector JV/Private Sector 765 kv Total Central Sector 3123 129 3123 5331 State Sector 75 75 337 JV/Private Sector 1313 1133 1327 4 kv 1. Programme and Achievementsof Transmission Lines in Mar 217 and during April 216 to Mar 217 Total 5186 129 56 6995 Central Sector 3953 258 31 3953 3687 State Sector 5799 76 335 5873 3799 JV/Private Sector 762 942 3171 Total 1514 334 645 1768 1657 22kV Central Sector 78 78 5 78 33 State Sector 59 456 733 4935 5917 JV/Private Sector 8 Total 587 534 738 513 63 Grand Total 23384 868 2717 23384 263 Transmission Works (22 kv and above) for Transmission Lines Commissioned/Ready for commissioning During MAR-17 Voltage Level (kv) Name of the Transmission Line Type Executing Agency Line Length (CKM) CENTRAL Sector: 8 LILO of Bishwanath Chariali - Agra at Alipurduar HVDC 765 Raipur Pooling station - Wardha line -II D/C 765 Wardha - Nizamabad line (Part of Wardha - Hyderabad line) D/C 4 Farakka-Gokarna Portion of Raharhat-Purnea Lin, alongwith LILO at Farakka & Gokarna to form Farakka - Gokarna line 4 LILO of Bongaigaon - Siliguri at Alipurduar D/C 4 LILO of Dadri - Malerkotla at Kaithal D/C 4 Nizamabad Dichpalli line -Ckt-I D/C 22 LILO of Birpara - Salakati line at Alipurduar (New Pooling Station) D/C STATE Sector: 4 Charanka - Veloda Line D/C 4 Kirori - Jind line (Ckt-II) D/C 4 4 LILO of 4kV Gajwel - Yeddumailaram (Shankarpally) ckt-i at 4 kv Narsapur SS. LILO of Chandrapur-Parli S/C line for 4KV Nanded (Khumbhargaon) 23 LILO of Eachangadu - Thatchankurichi at Poiyur 23 KV SS D/C 23 LILO of Korattur- Alamathy line at Ambattur 3rd Main Road 23 KV SS 23 Palladam - Kurukathi Line S/C 22 Balimela - Malkangiri line S/C 22 Botad - Parabadi (Ajmer) line (Ckt-1) D/C 22 Dehradun (PTCUL) - Dehradun (PGCIL) line D/C 22 Gwalior (Malanpur) - Morena line D/C 22 Kharghar- Boriwali line D/C 22 LILO of one ckt Bhigwan-Walchandnagar at Loni Deokar s/s (Ckt-1) D/C D/C D/C D/C S/C on D/C 22 LILO of 22 kv Sambhal-Badaun Line at Chandausi S/s D/C 22 LILO of I-Ckt. of Panki - Bhauti PG(4) line at Rania s/s D/C 22 LILO of Jeerat - Rishra 22 kv S/C Line at Dharampur D/C 22 LILO of Jodhpur(4 kv)-jodhpur 22 kv interconnector-ii line for 22 kv GSS Barli 22 LILO of Somanahalli - Malur at Vikas Tech Park D/C 22 LILO of one ckt of 22KV Indore II(Jaitpura) to Indore 4KV at 22KV S/s NZ Indore D/C D/C PGCIL 44 PGCIL 714 PGCIL 576 PGCIL 238 PGCIL 13 PGCIL 5 PGCIL 9 PGCIL 5 GETCO 199 HVPNL 5 TSTRANSCO 6 MSETCL 8 TANTRANSCO 22 TANTRANSCO 1 TANTRANSCO 78 OPTCL 22 GETCO 64 PTCUL 12 MPPTCL 6 MSETCL 76 MSETCL 19 UPPTCL 33 UPPTCL 33 WBSETCL 2 RVPNL 3 KPTCL 16 MPPTCL 2

Section D - Sub Stations SN Contents Page 1 Programme and Achievements of Sub-Stations in Mar. 217 and during Apr 216 to Mar. 217 2 List of Sub Stations commissioned/ready for commisssioning during Mar. 217 21

1. Programme & Achievement of sub- stations in Mar 217 and during April 216 to Mar 217 (Fig. in MVA) Voltage Level /Sector Programme Mar-17 Apr '16 - Mar '17 216-17 Programme Achievement Programme Achievement ± 8 kv HVDC Central Sector 15 3 15 45 State Sector JV/Private Sector Total 15 3 15 45 765 kv Central Sector 15 6 15 195 State Sector 15 15 45 JV/Private Sector 2 2 25 Total 14 6 14 265 4 kv Central Sector 989 315 1 989 11435 State Sector 1315 15 572 1315 16645 JV/Private Sector 2 2 326 Total 2495 1815 672 2495 3134 22 kv Central Sector State Sector 4783 4551 4783 19276 JV/Private Sector 2 Total 4783 4551 4783 19476 Grand Total 45188 1815 2271 45188 81816

Transmission Works (22 kv and above) for Sub-Stations Commissioned/Ready for commissioning During MAR-17 As on 31-MAR-217 Voltage Level (kv) Name of Sub-Station Type Executing Agency Capacity Added (MW/MVA) CENTRAL Sector: Alipurduar & Agra 8 (Extn.) HVDC s/s 8 PGCIL 15 (Pole-3) Champa & 8 Kurukshetra 8 PGCIL 15 HVDC s/s (Pole-1) 765 Extn. Raigarh S/S 765/4 PGCIL 765 Nizamabad Sub station (ICT-I) 765/4 PGCIL 15 765 Raipur (Extn.) 765/4 PGCIL 15 765 Vemagiri PS (ICT- II ) 765/4 PGCIL 15 4 Aug. Vijayawada s/s 4/22 PGCIL 5 4 Aug. at Pugalur s/s 4/22 PGCIL 5 STATE SECTOR: 4 4/22/132kV SS at 4/22 TSTRANSCO 315 Narsapur(ICT-I) 4 Akola (Addl.) 4/22 MSETCL 315 4 Amreli s/s(aug.) 4/22 GETCO 5 4 Augmentation at 4/22kV Dichpally (3rd 4/22 TSTRANSCO 315 PTR) 4 Dharmapuri (Palavadi) 4/23 TANTRANSCO 515 4 Ghani s/s (PTR-I) 4/22 APTRANSCO 5 4 Gokarna S/S 4/22 WBSETCL 63 4 Kamavarapukota s/s (ICT-2) 4/22 APTRANSCO 315 4 Kharagpur s/s 4/22 WBSETCL 315 4 Rajpura (New) (2x5) (ICT-II) 4/22 PSTCL 5 4 Thaptitanda S/s (Aurangabad - II) 4/22 MSETCL 5 (ICT- II) 4 Veloda s/s 4/22 GETCO 1 23 Ambattur 3dr Main Road 23/11 TANTRANSCO 2 23 Kurukathi 23/11 TANTRANSCO 8 23 Poiyur 23/11 TANTRANSCO 2 Ablowal (Patoala) 22 22/66 PSTCL 16 s/s (Addl.) 22 Amalner (2-1) 2nd ICT 22/132 MSETCL 1 22 Anjangaon S/S 22/132 MSETCL 1 22 Ballarshah s/s (2nd ICT) 22/33 MSETCL 25 22 Bhari s/s 22/66 PSTCL 16 22 Bhateri s/s (Aug.) (16-1) 22/66 PSTCL 6 22 Bhatia (Aug.) 22/132 GETCO 1 22 Bhawanimandi s/s 22/132 RVPNL 16 22 Bhoktoo S/S 22/66 HPPTCL 31 22 Bhugaon (Aug.) 2 x (5-25) 22/33 MSETCL 5 22 Chakan s/s (ICT - II) 22/132 MSETCL 1 22 Chandaka - B GIS S/S 22/132 OPTCL 32 22 Chandausi, Shambhal (2x16 22/132 UPPTCL 16 MVA) 22 Cuttack s/s (Poporada) 22/132 OPTCL 16 15

22 Daloda 22 KV S/s (Addl.) 22/132 MPPTCL 16 (1x16 MVA) 22 Domjur s/s 22/132 WBSETCL 16 22 Gotri s/s (Aug.) 22/66 GETCO 16 22 Gowribidanur (Aug.) 22/66 KPTCL 1 22 Gr. Noida (4) (Aug) (2-16) 22/132 UPPTCL 4 22 Infocity-II GIS 22/33 OPTCL 8 22 Jamnagar ICT- II 22/132 GETCO 5 22 Jhalamand s/s 22/132 RVPNL 16 22 Kandalgaon (Aug.) (1-5) 22/132 MSETCL 5 22 Loni Deokar S/S (2x1 MVA ICT- 22/132 MSETCL 2 I&II 22 Lote s/s (Aug.) (5-25) 22/33 MSETCL 25 22 Malkangiri S/S 22/33 OPTCL 4 22 Partur S/S (2x1+2x5) 22/132 MSETCL 15 22 Phojal GIS 22/33 HPPTCL 1 22 Preet Vihar GIS (ICT-II) 22/33 DTL 1 22 Rania s/s 22/132 UPPTCL 2 22 Ranjangaon (Addl.) 22/22 MSETCL 5 22 Sarni (Aug.) (16-1) 22/132 MPPTCL 6 22 Sartanpar (Aug.) 22/132 GETCO 1 22 Vairag s/s (2x25) 22/33 MSETCL 5 22 Vikas Tech Park 22/66 KPTCL 3 22 Wathar (Addl.) 22/33 MSETCL 5

Section E - Electricity Generation SN Contents Page 1 Electricity Generation (MU) Targets and Achievements for 216-17 22

1. Electricity Generation (MU) Targets and Achievememts for 216-17 Thermal Programme Achievement* % Ach. Programme Achievement* % Ach. Central Sector 33,632. 29,228. 31,665.69 18.34 33,632. 337,855.52 12.18 State Sector 316,697. 28,59. 26,849.99 93.91 316,697. 299,515.44 94.57 Pvt.IPP Sector 331,859. 29,2. 3,126.47 13.17 331,859. 337,893.73 11.82 Pvt.UTL Sector 19,812. 1,757. 1,673.33 95.24 19,812. 18,95.64 95.65 Hydro Total 999,. 88,775. 9,315.48 11.74 999,. 994,215.33 99.52 Central Sector 53,4. 3,413. 3,5.3 89.37 53,4. 57,97.68 18.44 State Sector 67,751. 5,21. 4,378.26 84.18 62,55. 51,284.6 81.99 Pvt.IPP Sector 11,399. 341. 299.11 87.72 11,399. 11,655.46 12.25 Pvt.UTL Sector 1,45. 12. 12.43 1.36 19,812. 1,465.53 7.4 Nuclear Sector Target (216-17) Mar '17 April '16 to Mar '17 Total 758,71.9 9,75. 7,847.83 361.62 147,161. 122,312.73 83.11 Central Sector 4,. 3,573. 3,526.41 98.7 4,. 37,663.73 94.16 Total 4,. 3,573. 3,526.41 98.7 4,. 37,663.73 94.16 Bhutan Import 5,. 141. 95.82 67.96 5,. 5,643.96 112.88 Central Sector 424,32. 36,214. 38,242.13 15.6 424,32. 433,426.93 12.22 State Sector 384,448. 33,791. 31,228.25 92.42 379,247. 35,799.5 92.5 Pvt. Sector 364,52. 31,418. 32,219.34 12.55 382,882. 369,965.36 96.63 Total 1,178,. 11,564. 11,785.54 1.22 1,191,161. 1,159,835.75 97.37 * Provisional based on actual-cum-assesment All India Energy Generation During April 216 to Mar 217 (MU) 14 Programme Achievement 12 1191161 1159836 1 999 994215 8 6 4 2 147161 122313 4 37664 Thermal Hydro Nuclear Total Renewable Energy Generation Figs in MU Achievement Cummulative Cummulative Achievement Achievement Feb-17 Feb-16 Upto Feb-17 Upto Feb-16 5862 4994 75948.93 6512 22

Section F - Power supply position SN Contents Page 1 Power Supply Position (Provisional) for Mar. 217 and April 217 to Mar. 217 23 2 Peak Demand and Peak Met (Provisional) for Mar. 217 and April 216 to Mar 217 24 3 Power Supply Position (Revised) for Feb 216 25 4 Peak Demand and Peak Met (Revised) for Feb 216 26 5 Notified Power cuts / Restrictions on Industries during Mar 217 27 6 Power Supply to Agricultural Sector during Mar 217 28

ऊज व य त आप त थ त रप ट (प व वल कन) /Energy Power Supply Position Report (Provisional) (Page 1 of 2) र य/State आ कड़ म लयन य नट न ट / Figures in MU net म च, 217 /March,217 अ ल,216 - म च,217/ April,216 to March,217 ऊज आव यकत ऊज उपल धत ऊज प त म कम ऊज आव यकत ऊज उपल धत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 14 14. 1,645 1,645. द ल / Delhi 1,965 1,964-1. 3,828 3,796-32 -.1 ह रय ण / Haryana 3,571 3,571. 48,895 48,895. हम चल द श / Himachal Pradesh 75 748-2 -.3 8,831 8,779-52 -.6 ज म क म र / Jammu & Kashmir 1,469 1,37-162 -11. 17,398 14,194-3,24-18.4 प ज ब / Punjab 3,361 3,361. 53,9 53,9. र ज थ न / Rajasthan 5,547 5,545-2. 67,836 67,413-423 -.6 उ र द श / Uttar Pradesh 8,765 8,751-14 -.2 17,448 15,631-1,817-1.7 उ र ख ड / Uttarakhand 1,56 1,49-7 -.7 13,69 12,986-83 -.6 उ र / Northern Region 26,586 26,399-188 -.7 349,39 343,432-5,67-1.6 छ सगढ़ / Chhattisgarh 2,122 2,122. 23,558 23,55-53 -.2 ग जर त / Gujarat 9,34 9,34. 13,76 13,75-1. म य द श / Madhya Pradesh 5,363 5,363. 65,758 65,757-1. मह र / Maharashtra 12,754 12,746-8 -.1 139,275 139,28-67. दमन और दउ / Daman & Diu 188 188. 2,372 2,372. द दर व नगर हव ल / Dadra & Nagar 469 469. 5,983 5,983. Haveli ग व / Goa 343 343. 4,315 4,313-2. प चम / Western Region 3,579 3,571-8. 344,966 344,846-12. आ द श / Andhra Pradesh 5,62 5,6-2. 54,34 54,261-43 -.1 त ल ग न / Telangana 5,541 5,538-2. 53,118 53,15-13. कन टक / Karnataka 6,744 6,738-7 -.1 67,63 66,72-361 -.5 क रल / Kerala 2,17 2,168-2 -.1 24,239 24,23-36 -.1 त मल न ड / Tamil Nadu 9,116 9,111-5. 14,391 14,367-24. प ड च र / Puducherry 214 214 -.1 2,537 2,534-3 -.1 ल - प / Lakshadweep # 4 4 48 48 द ण / Southern Region 28,847 28,829-18 -.1 35,655 35,173-482 -.2 बह र / Bihar 1,987 1,982-5 -.3 25,639 25,129-51 -2. द म दर घ ट नगम / DVC 1,8 1,799-1. 18,92 18,767-135 -.7 झ रख ड / Jharkhand 676 676-1 -.1 7,951 7,91-5 -.6 ओ डश / Odisha 2,331 2,331. 26,74 26,738-2. प चम ब ग ल / West Bengal 3,851 3,851. 47,576 47,442-134 -.3 स कम / Sikkim 53 53. 483 483. अ डम न- नक ब र/ Andaman- Nicobar # 2 15-5 -25 24 18-6 -25. प व / Eastern Region 1,698 1,691-7 -.1 127,293 126,461-832 -.7 अ ण चल द श / Arunachal Pradesh 63 62-1 -1.4 727 712-15 -2.1 असम / Assam 681 654-27 -4. 9,43 8,717-326 -3.6 म णप र / Manipur 67 66-1 -1.5 764 74-24 -3.1 म घ लय / Meghalaya 27 27. 1,755 1,755. मज़ रम / Mizoram 45 44-1 -2. 513 5-13 -2.5 न ग ल ड / Nagaland 57 56-1 -1.7 753 74-13 -1.7 प र / Tripura 9 88-2 -2.5 1,586 1,564-22 -1.4 उ र-प व / North-Eastern Region 1,211 1,178-33 -2.8 15,138 14,719-419 -2.8 स प ण भ रत / All India 97,923 97,669-254 -.3 1,142,92 1,134,631-7,461 -.7 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability.

अ धकतम व य त आप त थ त रप ट (प व वल कन) /Peak Power Supply Position Report (Provisional) आ कड़ म ग व ट न ट / Figures in MW net र य/State म च, 217 /March,217 अ ल,216 - म च,217/ April,216 to March,217 अ धकतम म ग अ धकतम उपल ध म ग क प त म कम अ धकतम म ग अ धकतम उपल ध म ग क प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 212 212. 361 361. द ल / Delhi 4,141 4,139-2. 6,342 6,261-81 -1.3 ह रय ण / Haryana 6,668 6,668. 9,262 9,262. हम चल द श / Himachal Pradesh 1,499 1,499. 1,499 1,499. ज म क म र / Jammu & Kashmir 2,542 2,33-59 -2. 2,675 2,14-535 -2. प ज ब / Punjab 6,526 6,526. 11,48 11,48. र ज थ न / Rajasthan 9,859 9,859. 1,613 1,348-265 -2.5 उ र द श / Uttar Pradesh 14,728 14,718-1 -.1 17,183 15,51-1,682-9.8 उ र ख ड / Uttarakhand 1,843 1,843. 2,37 2,37. उ र / Northern Region 42,393 41,915-478 -1.1 53,372 52,612-76 -1.4 छ सगढ़ / Chhattisgarh 3,78 3,642-65 -1.8 3,875 3,851-25 -.6 ग जर त / Gujarat 14,699 14,694-5. 14,724 14,78-16 -.1 म य द श / Madhya Pradesh 9,848 9,831-18 -.2 11,512 11,51-11 -.1 मह र / Maharashtra 22,516 22,27-39 -1.4 22,516 22,27-39 -1.4 दमन और दउ / Daman & Diu 334 334. 334 334. द दर व नगर हव ल / Dadra & Nagar 671 671. 784 784. Haveli ग व / Goa 546 53-16 -2.9 546 531-14 -2.6 प चम / Western Region 48,516 48,298-218 -.4 48,516 48,298-218 -.4 आ द श / Andhra Pradesh 7,664 7,661-3. 7,969 7,965-4 -.1 त ल ग न / Telangana 9,138 9,138. 9,138 9,138. कन टक / Karnataka 1,22 1,17-49 -.5 1,261 1,242-19 -.2 क रल / Kerala 3,851 3,851. 4,132 3,996-135 -3.3 त मल न ड / Tamil Nadu 14,272 14,223-49 -.3 14,823 14,823. प ड च र / Puducherry 353 35-3 -.8 371 368-3 -.7 ल - प / Lakshadweep # 8 8 8 8 द ण / Southern Region 42,29 42,277-13. 42,29 42,277-13. बह र / Bihar 3,636 3,636. 3,883 3,759-125 -3.2 द म दर घ ट नगम / DVC 2,68 2,68. 2,721 2,721. झ रख ड / Jharkhand 1,171 1,171. 1,498 1,498. ओ डश / Odisha 4,69 4,69. 4,69 4,69. प चम ब ग ल / West Bengal 7,862 7,862. 7,931 7,886-45 -.6 स कम / Sikkim 91 91. 112 112. अ डम न- नक ब र/ Andaman- Nicobar # 4 32-8 -2 4 32-8 -2 प व / Eastern Region 18,781 18,781. 18,79 18,781-9. अ ण चल द श / Arunachal Pradesh 139 138-1 -.7 148 14-8 -5.4 असम / Assam 1,392 1,391-1 -.1 1,673 1,633-4 -2.4 म णप र / Manipur 16 158-2 -1.3 163 163 -.2 म घ लय / Meghalaya 298 298. 331 331. मज़ रम / Mizoram 96 94-2 -2.1 98 98. न ग ल ड / Nagaland 123 122-1 -.8 148 147-1 -.7 प र / Tripura 228 228. 284 284. उ र-प व / North-Eastern Region 2,236 2,2-36 -1.6 2,487 2,475-12 -.5 स प ण भ रत / All India 151,82 151,87-734 -.5 159,542 156,934-2,68-1.6 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability

ऊज व य त आप त थ त रप ट (स श धत) /Energy Power Supply Position Report (Revised) र य/State आ कड़ म लयन य नट न ट / Figures in MU net फ़रवर, 217 /February,217 अ ल,216 - फ़रवर,217/ April,216 to February,217 ऊज आव यकत ऊज उपल धत ऊज प त म कम ऊज आव यकत ऊज उपल धत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 93 93. 1,541 1,541. द ल / Delhi 1,711 1,71-1. 28,863 28,832-31 -.1 ह रय ण / Haryana 3,253 3,253. 45,324 45,324. हम चल द श / Himachal Pradesh 695 693-2 -.3 8,81 8,31-5 -.6 ज म क म र / Jammu & Kashmir 1,469 1,188-281 -19.1 15,929 12,887-3,42-19.1 प ज ब / Punjab 2,985 2,985. 49,729 49,729. र ज थ न / Rajasthan 5,696 5,669-26 -.5 62,289 61,868-421 -.7 उ र द श / Uttar Pradesh 7,85 7,788-62 -.8 98,683 96,88-1,83-1.8 उ र ख ड / Uttarakhand 985 979-6 -.6 12,13 11,937-76 -.6 उ र / Northern Region 24,736 24,358-378 -1.5 322,453 317,33-5,42-1.7 छ सगढ़ / Chhattisgarh 1,924 1,924. 21,436 21,383-53 -.2 ग जर त / Gujarat 8,55 8,55. 94,366 94,365-1. म य द श / Madhya Pradesh 5,482 5,482. 6,395 6,394-1. मह र / Maharashtra 1,972 1,968-3. 126,521 126,462-59. दमन और दउ / Daman & Diu 188 188. 2,184 2,184. द दर व नगर हव ल / Dadra & Nagar 469 469. 5,514 5,514. Haveli ग व / Goa 39 39. 3,972 3,97-2 -.1 प चम / Western Region 27,399 27,395-3. 314,387 314,275-112. आ द श / Andhra Pradesh 4,41 4,41. 49,242 49,21-41 -.1 त ल ग न / Telangana 4,728 4,728. 47,577 47,567-1. कन टक / Karnataka 5,713 5,713. 6,319 59,964-355 -.6 क रल / Kerala 1,921 1,92-1 -.1 22,69 22,35-34 -.2 त मल न ड / Tamil Nadu 7,735 7,735. 95,275 95,256-19. प ड च र / Puducherry 182 182 -.1 2,323 2,32-3 -.1 ल - प / Lakshadweep # 4 4 44 44 द ण / Southern Region 24,689 24,688-1. 276,88 276,344-464 -.2 बह र / Bihar 1,79 1,741-49 -2.7 23,652 23,147-55 -2.1 द म दर घ ट नगम / DVC 1,573 1,573. 17,12 16,968-134 -.8 झ रख ड / Jharkhand 612 612. 7,275 7,225-5 -.7 ओ डश / Odisha 1,985 1,985. 24,49 24,47-2. प चम ब ग ल / West Bengal 2,762 2,756-6 -.2 43,725 43,591-134 -.3 स कम / Sikkim 41 41. 43 43. अ डम न- नक ब र/ Andaman- Nicobar # 2 15-5 -25 22 165-55 -25. प व / Eastern Region 8,762 8,77-55 -.6 116,595 115,77-825 -.7 अ ण चल द श / Arunachal Pradesh 62 61-1 -1.4 664 65-14 -2.1 असम / Assam 6 586-14 -2.4 8,362 8,63-299 -3.6 म णप र / Manipur 64 63-1 -1.4 697 674-23 -3.3 म घ लय / Meghalaya 142 142. 1,548 1,548. मज़ रम / Mizoram 44 43-1 -1.5 468 456-12 -2.6 न ग ल ड / Nagaland 58 57-1 -1.4 696 684-12 -1.7 प र / Tripura 169 168-1 -.4 1,496 1,476-2 -1.3 उ र-प व / North-Eastern Region 1,137 1,119-18 -1.6 13,927 13,541-386 -2.8 स प ण भ रत / All India 86,723 86,267-455 -.5 1,44,169 1,36,962-7,27 -.7 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability.

अ धकतम व य त आप त थ त रप ट (स श धत) /Peak Power Supply Position Report (Revised) आ कड़ म ग व ट न ट / Figures in MW net र य/State फ़रवर, 217 /February,217 अ ल,216 - फ़रवर,217/ April,216 to February,217 अ धकतम म ग अ धकतम उपल ध म ग क प त म कम अ धकतम म ग अ धकतम उपल ध म ग क प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 217 217. 361 361. द ल / Delhi 3,882 3,882. 6,342 6,261-81 -1.3 ह रय ण / Haryana 6,556 6,556. 9,262 9,262. हम चल द श / Himachal Pradesh 1,479 1,479. 1,492 1,492. ज म क म र / Jammu & Kashmir 2,622 2,98-524 -2. 2,675 2,14-535 -2. प ज ब / Punjab 6,475 6,475. 11,48 11,48. र ज थ न / Rajasthan 1,527 1,322-25 -1.9 1,613 1,348-265 -2.5 उ र द श / Uttar Pradesh 14,133 14,133. 17,183 15,51-1,682-9.8 उ र ख ड / Uttarakhand 1,973 1,973. 2,37 2,37. उ र / Northern Region 43,827 43,98-729 -1.7 53,372 52,612-76 -1.4 छ सगढ़ / Chhattisgarh 3,397 3,389-8 -.2 3,875 3,851-25 -.6 ग जर त / Gujarat 13,359 13,354-5. 14,724 14,78-16 -.1 म य द श / Madhya Pradesh 1,915 1,94-12 -.1 11,512 11,51-11 -.1 मह र / Maharashtra 21,281 21,24-76 -.4 21,281 21,24-76 -.4 दमन और दउ / Daman & Diu 281 281. 327 327. द दर व नगर हव ल / Dadra & Nagar 671 671. 784 784. Haveli ग व / Goa 515 515. 531 531. प चम / Western Region 47,994 47,821-173 -.4 47,994 47,844-15 -.3 आ द श / Andhra Pradesh 7,541 7,522-19 -.3 7,969 7,965-4 -.1 त ल ग न / Telangana 8,948 8,944-4. 8,948 8,944-4. कन टक / Karnataka 1,261 1,242-19 -.2 1,261 1,242-19 -.2 क रल / Kerala 3,696 3,688-7 -.2 4,132 3,996-135 -3.3 त मल न ड / Tamil Nadu 13,647 13,64-7. 14,823 14,823. प ड च र / Puducherry 344 344. 371 368-3 -.7 ल - प / Lakshadweep # 8 8 8 8 द ण / Southern Region 41,188 41,155-33 -.1 42,52 41,61-442 -1.1 बह र / Bihar 3,81 3,543-267 -7. 3,883 3,759-125 -3.2 द म दर घ ट नगम / DVC 2,57 2,57. 2,721 2,721. झ रख ड / Jharkhand 1,165 1,165. 1,498 1,498. ओ डश / Odisha 3,847 3,847. 4,12 4,12. प चम ब ग ल / West Bengal 7,41 7,36-5 -.1 7,931 7,886-45 -.6 स कम / Sikkim 91 91. 112 112. अ डम न- नक ब र/ Andaman- Nicobar # 4 32-8 -2 4 32-8 -2 प व / Eastern Region 17,898 17,636-263 -1.5 18,79 18,596-194 -1. अ ण चल द श / Arunachal Pradesh 139 135-4 -3. 148 14-8 -5.4 असम / Assam 1,398 1,396-3 -.2 1,673 1,633-4 -2.4 म णप र / Manipur 163 162-1 -.8 163 163 -.2 म घ लय / Meghalaya 3 3-1 -.2 331 331. मज़ रम / Mizoram 95 93-2 -2.3 98 98. न ग ल ड / Nagaland 148 147-1 -.7 148 147-1 -.7 प र / Tripura 223 223. 284 284. उ र-प व / North-Eastern Region 2,243 2,234-9 -.4 2,487 2,475-12 -.5 स प ण भ रत / All India 15,121 149,322-799 -.5 159,542 156,934-2,68-1.6 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability

म च, 217 म इ ड ज पर व य त कट त क ववरण / Notified Power Cuts/Restrictions on Industries during March,217 र य / / State/ Region ऊज /म ग कट त / Energy/Demand Cut उ र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi ह रय ण / Haryana हम चल द श / Himachal Pradesh No Notified Cuts No Notified Cuts No Notified Cuts ज म क म र / Jammu & Kashmir* प ज ब / Punjab र ज थ न / Rajasthan उ र द श / Uttar Pradesh* उ र ख ड / Uttarakhand No Notified Cuts No Notified Cuts No Notified Cuts प चम / Western Region छ सगढ़ / Chhattisgarh ग जर त / Gujarat म य द श / Madhya Pradesh मह र / Maharashtra ग व / Goa No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts द ण / Southern Region आ द श / Andhra Pradesh त ल ग न / Telangana कन टक / Karnataka क रल / Kerala त मल न ड / Tamil Nadu प ड च र / Puducherry प व / Eastern Region बह र / Bihar झ रख ड / Jharkhand ओ डश / Odisha प चम ब ग ल / West Bengal No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts * Data not received.

म च, 217 क ष क व त आप त क ववरण / Power Supply to Agricultural Sector during March,217 र य / / State/ Region औसत व त आप त घ ट म / Average Hours of Supply उ र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi ह रय ण / Haryana There is no agricultural load in Delhi. 9:54 hrs/day हम चल द श / Himachal Pradesh HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector ज म क म र / Jammu & Kashmir* प ज ब / Punjab र ज थ न / Rajasthan 4:54 hrs/day 6:45 hrs/day उ र द श / Uttar Pradesh* उ र ख ड / Uttarakhand 23:43 hrs/day प चम / Western Region छ सगढ़ / Chhattisgarh 18 hrs/day ग जर त / Gujarat 8 hrs/day म य द श / Madhya Pradesh मह र / Maharashtra ग व / Goa Three-Phase Supply(Irrigation)- 9:49 hrs /day, Three-Phase (Mixed) Supply - 23:16 hrs /day 9 hrs/day No restriction द ण / Southern Region आ द श / Andhra Pradesh 7 hrs/day. त ल ग न / Telangana 9 hrs/day. कन टक / Karnataka क रल / Kerala त मल न ड / Tamil Nadu प ड च र / Puducherry 6 hrs/day No Restrictions 9 hrs/day (6 hrs during day time and 3 hrs during night time) No Restrictions प व / Eastern Region बह र / Bihar झ रख ड / Jharkhand ओ डश / Odisha प चम ब ग ल / West Bengal About 18 hrs/day About 2 hrs/day 24 hrs/day About 23 hrs/day * Data not received.

Section G - Growth of Power Sector SN Contents Page 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since -26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA in Mar. 217

Plan / Year 1. Growth of Installed Capacity Since 6th Plan (In MW) Thermal Nuclear Hydro RES (MNRE) Total Coal Gas Diesel Total End of 6th Plan 2631.83 541.5 177.37 2729.7 195 1446.2 42584.72 End of 7th Plan 41237.48 2343. 165.9 43745.57 1565 1837.63 18.14 63636.34 End of 8th Plan 54154.48 6561.9 293.9 611.28 2225 21658.8 92.1 85795.37 End of 9th Plan 6213.88 11163.1 1134.83 74428.81 272 26268.76 1628.39 1545.96 End of 1th Plan 71121.38 13691.71 121.75 8614.84 39 34653.77 776.6 132329.21 End of 11th Plan 11222.38 18381.5 1199.75 13163.18 478 3899.4 2453.45 199877.3 End of 12th Plan 192162.88 25329.38 837.629 218329.88 678 44478.42 5726.23 326848.53 Captive Generation Capacity in Industries having demand of 1 MW and above, grid interactive (as on 31-3-16) = 48279 MW* *Provisional All India Generating Installed Capacity ( MW ) (As on 31.3.217 ) Total Installed Capacity 31966.3 MW Coal Gas Diesel Nuclear Hydro Res Coal Gas Diesel Nuclear Hydro Res Total 192162.88 25329.38 837.629 678. 44478.4 5726.23 229251.74 29