Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Similar documents
Part 70 Operating Permit Amendment

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

VALMET IBMACT & Utility MATS. Boiler Tune-ups

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Area Source NESHAPS and Air Permits

Example Notification of Compliance Status Report a

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

DEP7007CC Compliance Certification

Permit Holder. Permitted Equipment

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-017A) For

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

RICE NESHAP Frequently Asked Questions (FAQ)

SECTION.1400 NITROGEN OXIDES

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

Industrial, Commercial and Institutional Boilers Maximum Achievable Control Technology ( IB-MACT) 5/28/15 Katie Cunningham

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

Part 70 Operating Permit Amendment

State of New Jersey. General Permit (GP-009A)

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

Draft Air Individual Permit Part 70 Reissuance

Applicable Requirements - NSPS Subpart JJJJ

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

Permit Holder. Permitted Equipment

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

Appendix K. Final DOC Conditions

DISCUSSION DOCUMENT. New standards for off-road small spark-ignition engines under consideration

Appendix K. DOC Conditions

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

GUIDE National Emissions Standard for Hazardous Air Pollutants (NESHAP) MISCELLANEOUS SURFACE COATING OPERATIONS AT AREA SOURCES IN IOWA

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

San Joaquin Valley Unified Air Pollution Control District Permit Services Division

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

PERMIT TO INSTALL. Table of Contents

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

Internal Combustion Engines Air Updates 2010

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

Example Petition for Exemption

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

AUTHORITY TO CONSTRUCT

Facility Name: Packaging Corporation of America City: Clyattville County: Lowndes County AIRS #: Application #: 22133

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

Streamlining Multiple Applicable Requirements

State of New Jersey. Department of Environmental Protection Division of Air Quality

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

Air Individual Permit Permit Limits to Avoid NSR

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

TRANSFER OF ORGANIC COMPOUNDS INTO MOBILE TRANSPORT TANKS (Effect: 5/6/77: Rev. Effect. 7/26/00)

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

Fuel Oil Conversions. Association of Energy Engineers (AEE) September 20, 2011

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

State of New Jersey. Department of Environmental Protection Air Quality Permitting

PERMIT TO INSTALL. Table of Contents

Facility Name: Anheuser-Busch, LLC City: Cartersville County: Bartow AIRS #:

Draft Air Individual Permit Part 70 Reissuance

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

ST. VINCENT AND THE GRENADINES

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK 201 BEASLEY DRIVE, FREDERICK, MD PART 70 PERMIT NO.

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

New Federal Regulations for Internal Combustion Engines. Doug Parce

A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering

PERMIT TO INSTALL. Table of Contents

Georgia Drycleaner Compliance Calendar

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

RICE NESHAP RECORD KEEPING Stationary Engines

Registration, Recordkeeping, and Reporting Requirements

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.

OUTOKUMPU STAINLESS USA, LLC CALVERT, AL FACILITY NO.: MAJOR SOURCE OPERATING PERMIT INITIAL TITLE V DRAFT

Transcription:

Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up ( 63.11214)? Owners and operators of new and existing coal-fired area source boilers having a heat input capacity of less than 10 million Btu per hour. Owners and operators of all biomass-fired and oil-fired area source boilers. By when must I complete the initial tune-up ( 63.11196)? Existing Sources: No later than March 21, 2012. New Sources: No later than May 20, 2011 or upon start-up of the boiler, whichever is later. If the unit is not operating on the required date for a tune-up (because it is a seasonal boiler, or because it is down for maintenance, for example), the tune-up must be conducted within one week of startup ( 63.11223(b)(7)). Each subsequent biennial tune-up must be conducted no more than 25 months after the previous tune-up ( 63.11223(a)). How do I meet the tune-up requirements? For Initial Tune-up: You must conduct a performance tune-up according to 63.11223(b) and you must submit a signed statement in the Notification of Compliance Status report ( 63.11225(a)(4)(i)) that indicates that you conducted a tune-up of the boiler. a For Subsequent Tune-up: You must conduct a performance tune-up according to 63.11223(b) and you must prepare a biennial compliance certification that indicates you complied with all the relevant standards and requirements of this subpart. You do not need to submit this report, but it can be requested by your delegated authority ( 63.11225(b)). For All Tune-ups, you must keep records of the dates and procedures of each boiler tune-up, and the fuel used by the boiler. You should begin keeping fuel records on May 20, 2011. The record must be maintained on site and submitted to the delegated authority if requested ( 63.11225(c)(2)(i)).You may use the enclosed forms to document the tune-up, keep records, and meet the reporting requirement. For More Information: The complete regulatory text for the National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers final rule, 40 CFR part 63, subpart JJJJJJ, can be found at http://edocket.access.gpo.gov/2011/pdf/2011-4493.pdf. a An example Notification of Compliance form for boilers subject to tune ups is available at http://www.epa.gov/ttn/atw/boiler/boilerpg.html under Implementation Tools. 1 P age

EXAMPLE Tune-up Record and Biennial Compliance Certification National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ This form shows examples of what on site records should be maintained to document your tune-up. Your regulated boiler may require additional detail, depending on your boiler design. This list is not all-inclusive, because it is not modeled after a particular system, but instead gives only general information that is applicable to most systems. What is the purpose of this form? You may use this form to meet the requirements for completing and documenting a tune-up under the National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers. However, you may also record the information in another form or format. SECTION I: INSTRUCTIONS Check the applicable box below: My boiler is subject to a tune-up requirement. If you did not check the box above, do not use this example record. There is a separate set of records and compliance certification form that may apply to you. See http://www.epa.gov/ttn/atw/boiler/boilerpg.html for additional implementation tools. When is this form due ( 63.11225(b))? Existing Sources: New Sources: For each tune-up conducted, Sections I-V of this form are records that you should keep to demonstrate compliance with this rule. The first tune-up should be completed by March 21, 2012. The next biennial tune-up should be completed no later than 25 months after the initial tune-up. The first biennial compliance certification (Section VI of this form) must be prepared by March 1, 2015. Later certifications must be prepared every other year by March 1. The first biennial compliance certification must be prepared by March 1, 2012 or on March 1 of the year immediately following start up of the new or reconstructed boiler, whichever is later. Later certifications must be prepared every other year by March 1. Where do I send this form ( 63.11225(b))? 2 P age

This certification does not need to be submitted, but it must be maintained on site as a record and may be requested by the delegated authority. SECTION II: RECORD OF GENERAL BOILER INFORMATION Date: Reporting Period: Boiler Operator: Boiler Emission Unit ID b : Tune-Up Conducted By: Please Print SECTION III: RECORD OF TUNE-UP PROCEDURES ( 63.11225(c)(2) and ( 63.11223(b)(6)(i) and (ii)) Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate not applicable or NA in the comments column. Requirement Description Inspector Comments/ Corrective Actions Taken Inspect the burner c Clean or replace any components of the burner, as necessary Inspect the flame pattern Inspect air-to-fuel ratio control system Optimize emissions of carbon monoxide (CO) Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer s specifications, if available. Ensure system is calibrated and functioning properly, if such a system is installed on the boiler Optimize emissions consistent with the manufacturer s specifications, if available. Measure CO and O 2 levels in exhaust, before and after tune-up d Parameter Before After Basis (wet or dry) b Use the boiler emission unit ID consistent with the ID provided in the Initial Notification Report. c You may delay the burner inspection until the next scheduled unit shutdown, but you must inspect each burner at least once every 36 months. d Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O 2 ) concentration measurements must be made as percent by volume. 3 Page

CO (ppmv) O 2 (% by volume) 4 P age

SECTION IV: RECORD OF MANUFACTURER SPECIFICATIONS ( 63.11225(c)(2)) If your boiler has manufacturer specifications for adjusting the flame patterns or optimizing total emissions of carbon monoxide, maintain a copy of these specifications in your records. SECTION V: RECORD OF FUEL TYPE ( 63.11223(b)(6)(iii)) Amount of fuel used or delivered for the 12 months f preceding the tune-up g Fuel Type e Delivery Date Or Period of Consumption Example: 5/20/2011 Example: 5/20/2011 8/31/2011 Units of measure h [Add rows to the table for additional fuels, as necessary.] If you have more than one boiler that must conduct a tune-up, please repeat Sections II, III, IV, and V for each boiler. Otherwise, proceed to Section VI below. Keep Sections II through V in your records for 5 years. You do not submit this information unless requested by your delegated authority. e Report all fuels used in each of the units subject to the standard (e.g., bituminous coal, #6 fuel oil, #2 fuel oil, natural gas, bark, lumber, etc.). See the definition of fuel type in 63.11237. f For the first tune up, this fuel consumption record begins on May 20, 2011, the effective date of the rule. Thus, the first tune up record will not reflect an entire 12 months of consumption data. g EPA recognizes that not all facilities have fuel metering capabilities. Records of fuel delivery instead of fuel consumption will also meet the rule requirements. Affected sources have discretion on the periods of fuel records maintained on site. The records may be annual, monthly, or periodic, depending on fuel delivery frequencies. h e.g., Gallons, tons, standard cubic feet (scf), etc. 5 Page

SECTION VI: FACILITY INFORMATION AND CERTIFICATION ( 63.11225(b)(1) and (2)) While the sections I-V records are required for ALL tune-ups, this section is only required for the biennial compliance report. Facility Name: Facility Street Address: City State Zip I certify that my facility has complied with the tune up requirement for boiler(s) per 63.11123 of 40 CFR part 63, subpart JJJJJJ. Name (please print) Title Phone Number Email Address Date: Signature 6 P age