FLOATING PISTON CYLINDER FPC-250 OPERATION MANUAL M-V1.16 SW-V0.00

Similar documents
MINIVAP VP Vapor Pressure Tester

STANDARD COMPLIANT VAPOR PRESSURE

Vapor Pressure Measurement Of Gasoline, Crude Oil & LPG With New ASTM D5191 & D5188 Speed Test

MINI TONG (LITTLE JERK 2) MODEL 8071

#9040 FUEL TANK SWEEPER

Installation, Operation, and Maintenance Manual

HIGH PRESS. - HIGH TEMP. (HPHT) FILTER PRESS 4 - UNIT ASSEMBLY 175 ml Capacity - OFI No

Welker Gas Sampler Model MPS-2

Service Manual. Balanced Piston First Stage

PERMEABILITY PLUGGING TESTER - P.P.T. OFI Part No

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

Process Analyzer. Reid Vapor Pressure Analyzer Model P-700. Credible Solutions for the Oil and Gas Industry

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

GL Ludemann Y-Strainers

BLACKMER BYPASS VALVES

Welker Probe Instrument Regulator with Liquid Eliminator Cartridge

Direct Clutch Drum Assembly

Hydraulic Motors. Radial Piston Motors Precision drives with fixed displacement RM 80N... - RM 250N... series Vg = 80 ccm/rev ccm/ccm

IROX 2000 IROX DIESEL

Fuel Tank Sweeper #9049 OPERATOR S MANUAL

Service Manual Air Tech Second Stage

ANSI version. The valve closes when the differential pressure rises

Operating Instructions ProMinent. Backpressure and Pressure Relief Valves

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

TS1251 PRESSURE DISPENSER USER'S MANUAL

Hand Expansion Valves Built Stronger to Last Longer Sizes: 6mm (¼ ) to 305mm (4 )

PremAire Cadet Escape Respirator: Second Stage Regulator

Escape Cylinder and Valve

WATER SOFTENER SEMI AUTOMATIC INSTALLATION & OPERATING INSTRUCTIONS. Serial No :

Vessels and Distillation Equipment

Start Up & Troubleshooting Manual. Resfab Equipment Inc. St Jean Sur Richelieu Website: resfab.com

BULLETIN August 2009 PERMASEAL PLUG VALVE. ISO 9001:2008 Certified QMS. SMG Valves A Unit of Southern Manufacturing Group, Inc.

Installation, Operation, and Maintenance Manual

Standard Test Method for Determination of Vapor Pressure of Crude Oil: VPCR x (Expansion Method) 1

Instruction Manual. SMP-BCA Aseptic Mixproof Valve with PTFE Diaphragm IM70811-EN

This Service Bulletin replaces SB , Cooling System Service, dated (1.2007), publication no. PV Cooling System, Pressure Test

Series 867 Reduced Pressure Zone Assemblies

INSTALLATION INSTRUCTIONS

Type 2 Push-Through 37 Ton Log Splitter. Assembly Manual

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

3M V-Series Air Control Valves. Maintenance

3.1 DISPENSER BLACK SHADOW SERIES. Tools Needed for Mounting SCS Dispenser Hammer

HTHP Filter Press for Cement Testing with 175-mL, Double-Capped Test Cell and N 2 # : (115 V) # : (230 V) Instruction Manual

Sample gas pumps P2.x ATEX

1 MECHANICAL FUEL METER

ACHL Series Pump. Operation and Maintenance Manual Air Driven, Hand Operated High Pressure Liquid Pump

MAXIM 50D PUMP. Operation / Maintenance Manual

Trailer Brake System Bleeding Procedure:

MACH 1A HVLP (MACH 1AV HVLP) Automatic Airspray Gun

ASKA CORPORATION. Corporate Profile and Product Introduction

Service Kit C

OPERATION & MAINTENANCE INSTRUCTIONS

ERAVAP NEW! VAPOR PRESSURE TESTING AT ITS BEST. One Vapor Pressure Tester for All Applications:

W91/W94 Series TEMPERATURE REGULATORS. Self-Operated Temperature Regulators. Design & Operation W91 Non-Indicating W94 Dial Thermometer

Installation Guidelines

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER PROBE MOUNTED LIQUID ELIMINATOR

SV418 Series Bronze Safety Valves ASME Section VIII - NB Certified for Air, Gas, Steam, and Liquid

Pressure Regulators K Series

1451 Control Valve. General Instructions. Table of Contents

PAGE 1. TES Operation & Testing Guidelines: Tes Trouble shooting

Angle seat valve with piston actuator VZXA-...-K

Owner s Manual WARNING

Instruction Manual. SMP-BC Sanitary Mixproof Valve IIM70771-GB

High Accuracy Mechanical Fuel meter FM-100

Pressure Relief Valve Maintenance Manual

WATER SOFTENER SERIES DAY TIMER INSTALLATION & OPERATING INSTRUCTIONS. Serial No :

Service Manual Air Plus Second Stage

OPERATING AND MAINTENANCE MANUAL BATCH PRESSURE FILTER 3 GALLON CAPACITY

Part # Regulator Rebuild Kit for SuperFlow and SuperFlow 350 Regulators

CARE AND USE OF 384 BUBBLE PADDLE RESERVOIRS AND MOTOR/MAGNETIC CLUTCH UNIT. Setup & operation

PFA Needle Valves. 4RP Series

ONYX VALVE CO MODEL DAO-PFO Installation & Maintenance

Model Differential Sticking Tester Instruction Manual

DAKOTA INSTRUMENTS OPERATING MANUAL ACR ACRYLIC FLOW METERS

Figure DC03. Double check valves for medium hazard rated applications BSP screwed connections. Features

Tools Needed for Mounting Cleá Filling Station

BOHLENDER GmbH Phone: +49(0)9346 / Fax: +49(0)9346 / Internet:

INSTALLATION INSTRUCTIONS

Z1 Free Ride INSTRUCTIONS GENERAL RULES

Multiple disc brakes. pressure released and spring operated multiple disc brakes series LBD T brake. Installation- operating instructions

MODEL 905V OPERATING INSTRUCTIONS

Maintenance Manual Reduced Pressure Assembly Models 860 & 880V 2 1 /2" 10"

Ph: (07) Fax: (07) Pump Manual

HTHP Filter Press for Cement Testing with 175-mL, Double-Capped Test Cell and CO 2 # : (115 V) # : (230 V) Instruction Manual

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

Unique 7000 Series Valve - Standard and Reverse Acting

AIR PREPARATION PRODUCTS. Table of Contents

High Pressure Gradient System. User Manual. Version 1.0 ( )

Security device Non return valve

Stream Selector System For Process Analyzer Applications

Model: SK-61-4R 60 Gallon Skid Mounted Sprayer ASSEMBLY / OPERATION INSTRUCTIONS / PARTS

TEMPERATURE REGULATORS W91/W94 Series

ASSEMBLY INSTRUCTIONS FOR 30L & 50L JACKETED PROCESS REACTOR SYSTEMS

WARNING Carefully Read These Instructions Before Use

GROUP CONTENTS GENERAL DESCRIPTION RADIATOR SPECIAL TOOL THERMOSTAT ENGINE COOLING DIAGNOSIS...

LIQUIDYNAMICS Oil Extractors

M-5000TG/5700TG Steam and Cold Water Mixing Unit

CUSTOM COMBINATION AIR VALVE

KAM E-IAS ELECTRIC ISOKINETIC AUTOMATIC SAMPLER

SVM Stabinger Viscometer. ::: Viscometry at its best

Transcription:

FLOATING PISTON CYLINDER FPC-250 OPERATION MANUAL M-V1.16 SW-V0.00

TABLE OF CONTENTS GENERAL INFORMATION... 4 1.1. Main Features...4 1.2. Technical Data...4 2. DESIGN AND INSTALLATION... 5 2.1. Unpacking...5 2.2. MINIVAP FPC-250 Cross Section...6 2.3. Stirrer Lock...6 2.4. Manual Operation of Piston...7 2.5. Automatic Back Pressure at Pressurized Samples...7 2.6. Inlet- and Outlet Protection Cover...8 2.7. Disassembling of the FPC-250...8 2.8. 80% Filling Guide for safe transportation...8 3. FILLING OF THE FPC-250... 9 3.1. Filling with Pressurized Sample...9 3.2. Filling with non pressurized Sample... 15 3.3. Filling with High Back Pressure... 15 4. FPC-250 and MINIVAP VPXpert and VP Vision... 17 4.1. Filling MINIVAP with Pressurized Sample... 17 5. MAINTENANCE... 18 5.1. Exchange of O-Rings... 18 5.1.1. Piston:... 18 5.1.2. Filling head:... 18 5.1.3. Back pressure head:... 18 5.1.4. Valve stem: (Perlast 3.5 x 1.5 mm)... 18 5.2. Exchanging the Rupture Disc... 18 5.3. Exchanging a Valve Packing... 19 CUSTOMER SUPPORT AND INFORMATION... 20 Revision... 21

GENERAL INFORMATION The FPC-250 is a general purpose floating piston cylinder and was originally designed for crude oil sampling to comply with the new ASTM standard for vapor pressure of crude oil (ASTM D 6377). Incorporated PVDF valves avoid all extensions from the cylinder and a mechanical stirrer serves for uniform samples. If the FPC-250 is used with MINIVAP VPSH and/or MINIVAP VPXpert, please pay attention to the maximum pressure: MINIVAP VPSH and VPXpert maximum filling pressure is 300 kpa (44 psi). MINIVAP VP Vision maximum filling pressure is 2000 kpa (290 psi). 1.1. Main Features Integrated inlet and purge valve Integrated valve for back pressure Quick connectors for inlet, purge and back pressure Manual shifting of the piston with the integrated stirrer Automatic back pressure at pressurized samples Manometer for sample pressure integrated in mixing handle Easy to clean Integrated rupture disk Lightweight and compact 1.2. Technical Data Maximum working pressure Sample volume Connector for sample and back pressure Material of piston and cylinder Material of valves Material of O-rings Physical dimensions: Weight: 7000 kpa (1000 psi) 250 ml Swagelok Series QM stainless steel stainless steel and PVDF Perlast D x L = 48 x 415 mm D x L = 1.9 x 16.3 approx. 2.5 kg (5.5 pounds) 4

2. DESIGN AND INSTALLATION 2.1. Unpacking Please check contents of the delivery box: PI/END Floating piston cylinder (FPC 250) for samples of crude oil or LPG, sample volume: 250 ml, maximum operation pressure: 7000 kpa (950 psi), mechanical stirrer, manometer - stainless steel Required Accessories for VOLATILE crude oil (MINIVAP VPXpert) VPX-COUPLING VPSG/DRUCKFILL VPSG/QUICKFILL FILT-SIKA R200/D5.5X Proper instrument sample inlet for quick connector (mounted on the analyzer) filling tube with 2 quick connectors for pressurized samples filling tube with 1 quick connector for non-pressurized samples 200 µm metal filter for FPC (spare filters) PI/SCHLAUCH Filling tube for FPC 250 (connecting sample source and FPC 250), maximum pressure 20.000 kpa (3.000 psi), incl. 2 quick connectors PI/MANOMETER VPX-PRESSURE- REG Additional manometer for back pressure measurement, built-in relief valve Fixed pressure regulator to regulate the pressure for safe VPXpert use Required Accessories for VOLATILE crude oil up to 2000 kpa (MINIVAP VP VISION) PI/SCHLAUCH Filling tube for FPC 250 (connecting sample source and FPC 250), maximum pressure 20.000 kpa (3.000 psi), incl. 2 quick connectors VPV-SUB018 Inlet nut for quick connector Required Accessories for Pipeline Pressure from 2000 up to 7000 kpa (MINIVAP VP VISION) VPV-SUB020 High Pressure Pipeline Package Spare parts: BERST- B11KMR120-01 Rupture disc for FPC 250 (120 bar) 5

2.2. MINIVAP FPC-250 Cross Section 1. Piston with O-ring and free volume in the back. The small O-ring is for better gliding only. 2. Stirrer plate 3. Cylinder tube 4. Inlet head with inlet and purging valve 5. Inlet head with inlet and purging valve 6. Inlet and purging quick connector (SS-QM2-B-200MB [1/8 ]) 7. Protection plate and seal for quick connector 8. Stirrer rod with 1 mm bore 9. Back pressure head with back pressure valve 10. Manometer for sample pressure 11. Handle for manual stirrer 2.3. Stirrer Lock The hollow rod of the stirrer has a diameter of 6 mm. If the sample is filled with a maximum pressure of 7000 kpa (1000 psi), the stirrer would be pushed out with a force of 200 N. In order to prevent this, a lock for the stirrer is installed in the back pressure head. The lock is a 4.5 mm plate which can be shifted between two positions. When it is unlocked, it extends from the head. At the end of the stirring handle is a stainless steel ring attached to the thread. This ring fits through the big hole of the lock when it is released. Engaging the lock, the ring cannot shift through the lock lever. When the stirrer is pushed completely into the cylinder, the lock can be engaged. ATTENTION! ALWAYS LOCK THE STIRRER WHEN FILLING THE PISTON WITH PRESSURIZED SAMPLE. When the cylinder is filled with a pressurized sample, the lever is locked against unwanted opening. Press the stirrer handle against the cylinder to unlock the lever. 6

2.4. Manual Operation of Piston The stirring plate can be inserted into the front of the piston and turned approximately 45 degrees. Now it is locked in the piston and the piston can be moved forward without back pressure. Turn back the stirring plate to unhook it and move it forward another 3 mm. Now the stirrer is free again and can be locked. The manual shift can also be used after rinsing the system with sample. Open both valves and move the piston forward to expel all the sample. 2.5. Automatic Back Pressure at Pressurized Samples When the cylinder is filled with a pressurized sample and the back pressure valve is closed during the filling procedure, the air inside the cylinder behind the piston is compressed into the free volume of the piston to produce a back pressure of 1000 kpa (143 psi). This way, the sample is under the required back pressure without applying an external pressure. 7

2.6. Inlet- and Outlet Protection Cover The protection cover for the inlet and outlet quick connector is pushed over the connectors and fixed with the M4 screw to protect the connectors during transport but also to make an additional seal. Inside the protection cover are two respective O-rings which seal each connector in case a valve starts leaking. The protection cover also locks both valve levers against unwanted opening. 2.7. Disassembling of the FPC-250 Both heads with the integrated valves and quick connectors are thread-on. The front head with the inlet and outlet can be extracted by turning it off. The back pressure head with the back pressure inlet and the manual stirrer is turned off and extracted together with the piston. For complete disassembly, the M5 nut at the end of the stirring rod is opened to take off the stirring plate. Now the stirring rod can be extracted from the piston and the back pressure head. 2.8. 80% Filling Guide for safe transportation The 80% filling guide has been designed to allow safe transportation of crude oils in the floating piston cylinder. Connect the 80% filling guide with the screws delivered. Closed position 80% Full position Bore / Screw Option to attach the filling guide is only possible for FPC models that already have bores for mounting the filling guide. 8

3. FILLING OF THE FPC-250 3.1. Filling with Pressurized Sample ATTENTION! Ensure that the pressure in the sample source does not exceed the working pressure of the FPC-250. 1. Preparation Take the cap from the FPC. Open the inlet valve (x), the outlet valve (y) and the backpressure valve (z). Unlock the stirrer plate and pull out the piston. a. x y z b. Hook the stirrer plate into the piston. Once the stirrer plate is hooked, you will feel resistance when pushing the piston in. c. Push the piston to the front and lock the stirrer. By locking the stirrer, the piston cannot move during rinsing, and only the front end of the FPC is rinsed, to ensure safe use even for high filling pressures. d. Close the inlet valve (x), the outlet valve (y) and the backpressure valve (z). x y z e. 9

2. Rinsing Connect the high pressure tube to one of the inlet connectors and the other side to the pressurized sample source. Put a stainless steel tube over the other connector (drain) and lead it into a barometric drain. Open this valve (y). a. b. y Carefully open the sample inlet valve (x) and rinse the cylinder with sample. Make sure the FPC is securely fixed and does not move. x After rinsing, close the sample inlet valve (x). x c. d. 10

3. Filling Filling without Filling Guide a. Unhook the stirrer plate from the piston. a. b. Push the stirrer completely in and lock it. The FPC can now be filled, while the piston is securely locked. c. To create back pressure, make sure the back pressure valve is closed (z). z b. c. d. Close the drain valve (y). y d. e. Open the sample valve (x) carefully and let the sample flow into the FPC-250. The sample should enter the FPC-250 as slowly as possible in order to prevent outgassing. x e. f. After filling close the sample inlet valve (x). x f. g. Remove the high pressure inlet tube (x) and the outlet tube (y). x y g. 11

h. Attach the protection cover for the quick connectors and fix the M4 screw. The FPC is now safe for transport. h. Filling with 80% Filling Guide a. Hook the stirrer plate into the piston. Once the stirrer plate is hooked, you will feel resistance when pushing the piston in. a. b. Push the piston to the front. DO NOT LOCK THE STIRRER. b. c. The piston must be able to move freely. c. ATTENTION! When under pressure, the piston will automatically move out of the FPC! Make sure the FPC is securely fixed and nothing is in the way of the piston! d. To create back pressure, make sure the back pressure valve is closed (z). A closed back pressure valve ensures the piston is moving back slowly when under pressure. z d. 12

e. Close the drain valve (y). y e. f. Open the sample valve (x) carefully and let the sample flow into the FPC-250. x f. g. During filling extend the 80% Filling Guide. The 80% Full Level is reached when the piston knob is level with the max. extension of the Filling Guide. g. h. After reaching the 80% Full Level, close the sample inlet valve (x). x h. i. Attach the 80% Filling Guide to the FPC. i. j. Unhook the stirrer plate from the piston. j. k. Push the stirrer completely in and lock it. k. 13

l. Remove the high pressure inlet tube (x) and the outlet tube (y). x y l. m. Attach the protection cover for the quick connectors and fix the M4 screw. The FPC is now safe for transport. m. 4. Verifying If unsure about proper rinsing, keep FPC-250 in an upright position and open the drain valve a little until a small amount of sample is expelled. That allows for removal of kept air. Monitor the sample pressure on the gauge. It should read approximately 800 kpa (110 psi). Unlock the stirrer and move to verify the position of the piston. At 1000 kpa the force is only 30 N. Push back the stirrer and lock it. 14

3.2. Filling with non pressurized Sample If the sample is not under pressure use the following procedure: 1. Rinsing a. Unscrew the filling head. b. Open back pressure valve, unlock piston and pull piston back. c. Fill sample into the cylinder for rinsing. d. Screw back the filling head with at least one valve open. e. Close valves and shake piston. f. Open valves and discard sample by moving piston. 2. Filling (without unscrewing piston head) a. Connect tubing from sample to inlet valve and pull piston back. 3. Filling (with unscrewing piston head) 4. Verifying a. Unscrew the filling head. b. Open back pressure valve, unlock piston and pull piston back. c. Fill sample into the cylinder. d. Screw back the filling head with at least one valve open. a. Place FPC-250 in an upright position and push piston to expel entrained air until the sample appears at the quick connector. A plastic tube on the quick connector prevents the spilling of sample. b. Close the inlet valve. 5. Back pressure a. Apply 300 to 800 kpa (45 to 110 psi) of back pressure and close the back pressure valve. b. Attach the protection cover for the quick connectors and fix the M4 screw. 3.3. Filling with High Back Pressure To protect the sample gassing out, it is preferable to fill the FPC-250 with high pressure against a back pressure equivalent to the sample stream pressure. 1. Back pressure a. Make sure that the stirrer is in locked position and the piston is all the way in. b. Connect the back pressure valve against the back pressure line and fill with a back pressure of about 1/6 of the filling pressure. The filling pressure will compress the back pressure part of the cylinder, so the back pressure increases. c. Open back pressure valve to apply back pressure. d. Close back pressure valve and disconnect back pressure line. 2. Rinsing a. Remove protection plate and lock stirrer and the piston. b. Ensure that the pressure in the sample source does not exceed the working pressure of the FPC-250. c. Connect the high pressure in tube to one of the connectors (inlet) and the other connector (drain) to the back line of the pressurized sample source. 15

3. Filling d. Carefully open the inlet valve and outlet valve to rinse the cylinder with sample. a. Close the sample inlet and sample drain valve. b. Unlock piston c. Place FPC-250 in an upright position and open the inlet valve to fill. d. Monitor the sample pressure on the gauge. It should read approximately 800 kpa (110 psi). e. Close inlet valve. f. Disconnect lines from inlet and outlet valves. 4. Verifying a. Unlock the stirrer and move to verify the position of the piston. At 1000 kpa the force is only 30 N. Push back the stirrer and lock it. b. Attach the protection cover for the quick connectors and fix the M4 screw 16

4. FPC-250 and MINIVAP VPXpert and VP Vision 4.1. Filling MINIVAP with Pressurized Sample Optionally, MINIVAP VPXpert and VP Vision are equipped with a quick connector sample inlet. Make sure that the back pressure of the FPC-250 is lower than the maximum pressure of the tester. MINIVAP VPXpert maximum filling pressure is 300 kpa (45 psi) MINIVAP VP Vision maximum filling pressure is 2000 kpa (290 psi) Connect the FPC-250 to the inlet of the tester. The transparent PTFE tube is recommended to allow the observation of the sample flow. The stainless steel tube is recommended for high pressures. Follow the manual to make a vapor pressure determination. 17

5. MAINTENANCE 5.1. Exchange of O-Rings 5.1.1. Piston: Main O-ring: (Perlast 35 x 3 mm) Gliding O-ring (Perlst 34 x 2 mm) Remove the old O-ring and replace it with a new one. O-ring for the stirrer rod (Perlast 6 x 2) Remove the security ring and the washer Replace the O-ring and put back the washer and security ring. 5.1.2. Filling head: O-ring for the cylinder (Perlast 38 x 3) Remove the old O-ring and replace it with a new one. 5.1.3. Back pressure head: O-ring for the cylinder (Perlast 38 x 3) Remove the old O-ring and replace it with a new one. O-ring for the stirrer rod (Perlast 6 x 2) Remove the security ring and the washer Replace the O-ring and put back the washer and security ring. 5.1.4. Valve stem: (Perlast 3.5 x 1.5 mm) Remove the old O-ring and replace it with a new one. 5.2. Exchanging the Rupture Disc The rupture disc with a maximum working pressure of 7000 kpa (1000 psi) and a rupture pressure of 8000 kpa (1143 psi) is mounted in the front head. To exchange the disc, open the Allen screw and push the disc out from the head by inserting a thin stick into the rupture outlet. Replace the rupture disc with a new certified disc and tighten it with the Allen screw. 18

5.3. Exchanging a Valve Packing The valve packings are made of PVDF and can easily exchanged when they start leaking. 1. Open the small M3 Allen screw blocking the valve lever. 2. Open the respective M8 Allen screw on the inside of the head. 3. Take out the spring washers and the thick washer from the now open hole. Pull out the lever. 4. Take a small wood screw, turn it into the concentric hole of the now accessible valve and pull out the valve packing. If cannot pull out the valve packing, put the whole front head into a deep freeze. The PVDF packing shrinks and you should pull it out easily. 5. Push the new packing (use some lubricating fat for the packing) into the hole in a position that the hole for the valve stem is looking in the direction were the valve stem is inserted. 6. Push the valve stem into the respective hole and lock it with the M3 Allen screw. 7. Put back the thick washer and the spring washers. 8. Screw in the M8 Allen screw and tighten it very hard. Afterwards turn it back about 30 degrees. (This way, you put the valve packing very strong into the hole and then you release it again until the springs are properly loaded) Now the valve stem should need some force to be opened and the valve should be tight. 19

CUSTOMER SUPPORT AND INFORMATION GRABNER INSTRUMENTS Messtechnik GmbH A-1220 Vienna / Austria Dr. Otto Neurath Gasse 1 Tel: +43 / 1 / 282 16 27-0 Fax: +43 / 1 / 282 16 27 300 E- Mail: grabner.office@ametek.com Internet: www.grabner-instruments.com For technical support write to grabner.support@ametek.com or call us +43/1/282 16 27-200 Representatives and Distributors: www.grabner-instruments.com/contact/distributors/index.aspx 20