SIEMENS. XJ-L Busway Systems. Storage, Installation and Maintenance Instructions for... Piece No. 32-J Rev 3

Similar documents
Installation Instructions For Motor Control Center (MCC) Units

Type 2 Arc Resistant WL Low Voltage Metal-Enclosed Switchgear

Vacuum Circuit Breaker (Vehicle)

Vacuum Circuit Breakers (Vehicle)

RGZESDI Inverter Duty AC Induction Motors

SIGNAL WORDS QUALIFIED PERSON

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

Instruction and Installation Guide

ibusway for Data Center

COOPER POWER SERIES. UltraSIL polymer-insulated D-73P disconnect switches installation instructions. Switches MN008004EN

Vacuum Circuit Breakers (Vehicle) Type HKR 7.5kV to 15kV. Instructions Installation Operation Maintenance SGIM-9928C

Vacuum Circuit Breakers (Vehicle)

IB PowlVac ITE-HK Remote Racking Device

Selection and Application Guide. busway system. Cost-effective Power Distribution Compact Design

Cradle Mounted Key Interlock Guide Frame Accessory

Effective November 2016 Supersedes February 2012 (S )

SecoVac * Ground & Test Device

Effective June 2016 New Issue

COOPER POWER SERIES. High-voltage primary bushings installation instructions. OEM Equipment MN800008EN

COOPER POWER SERIES. Edison Modular Fuse (EMF) Installation Instructions. Fusing Equipment MN132031EN

COOPER POWER SERIES. HX-CB loadbreak fuse cutout installation instructions. Fusing Equipment MN132011EN

GE Industrial Solutions. DEH Installation and Maintenance Manual AKD-20 AR / Entellisys AR Exhaust Plenum System

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle) Type MSV 5kV. Instructions Installation Operation Maintenance SGIM-9988

COOPER POWER SERIES. K-Limiter back-up current-limiting fuse installation instructions. Fusing Equipment MN132010EN

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

Hubbell has a policy of continuous product improvement. Please visit hubbellpowersystems.com to confirm current design specifications.

High-voltage primary bushings installation instructions

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

Effective November 2016 Supersedes September 1998 (S )

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

Galaxy Receiving and Unpacking 09/

Effective March 2015 Supersedes S August 2012

Vacuum Circuit Breakers (Vehicle) Type FSV 5kV to 15kV. Instructions Installation Operation Maintenance SGIM-9968

COOPER POWER SERIES. QD5 Quik-Drive tap-changer reversing neutral stationary contact asssembly kit A26 installation instructions

COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

Vacuum Circuit Breakers (Vehicle)

COOPER POWER SERIES. Screened Separable Connectors MN650024EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions. Fusing Equipment MN132014EN

COOPER POWER SERIES. S.T.A.R. type LVR faulted circuit indicator installation instructions. Fault Indicators MN320005EN

Vacuum Circuit Breakers (Vehicle)

S Voltage Regulators GENERAL. PRODUCT INFORMATION Introduction. Contents. Acceptance and Initial Inspection. Handling and Storage.

COOPER POWER SERIES. Pad-mounted Switchgear MN285019EN. Effective March 2017 Supersedes February 2007 (S )

Installation and Operation

Vacuum Circuit Breakers (Vehicle)

Figure 1. Kearney Type HX cutout.

READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION

COOPER POWER SERIES. Testing a motor capacitor on a voltage regulator procedure instructions. Voltage Regulators MN225064EN

NorthStar. brand. Instruction Manual. SLIM Tach SL Thru-Shaft Diameter. Magnetoresistive Encoder Designed for GE Wind Energy

1250 LB. CAPACITY MECHANICAL WHEEL DOLLY

Quik-Spec Coordination Panelboard

S Voltage Regulators GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage. Standards

TIASTAR Motor Control Center Installation And Maintenance Instructions For Units Only

COOPER POWER SERIES. 600 A 15/25 kv class T-OP II connector assembly installation instructions. Deadbreak Apparatus Connectors MN650048EN

Installation Instructions for TMQV Circuit Breakers and Molded Case Switches

Model 436 V-Head Pipe Stand

GWI Rev. 1 October 2007 Supersedes Rev. 0 Dated February 2004

LED IMPORTANT SAFETY INSTRUCTIONS

Installation Sheet January, 2016 Supersedes February, 2013

Transformer Installation, Operation, and Maintenance Manual

IMPORTANT SAFETY INSTRUCTIONS

SIEMENS. Combination Starter Enclosure Kit Classes 49EC17 & 49EC18 Instruction Guide E87010-A0151-T003-A1-49EC. August, 2012

Installation Instructions for KPS and KPH Circuit Breakers and Molded Case Switches

General Installation Instructions LED

COOPER POWER SERIES. KA1169R Closing Coil Transfer-Switch Accessory Operation. Reclosers MN280069EN

COOPER POWER SERIES. Dielectric grease application to recloser cable instructions. Reclosers MN280070EN

MODEL SCA Installation and Operation Manual Important:

Instruction sheet WARNING. October, 2014

February 28 th, 2018 UPDATE: Important Product Safety Bulletin Immediate Action Required INSTRUCTIONS FOR FIELD RISK MITIGATION

Power Break Circuit Breakers

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

OPERATOR S MANUAL SINGLE PORT UNIVERSAL CAR CHARGER

Installation Instructions Electric Heaters 5 20 kw

Installation, Operation, and Maintenance Manual

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

GE CONSUMER & INDUSTRIAL

Electrobar Elite. Instruction Manual. Conductor Bar System. ELITE-03A October 2011 Part Number: R3 Copyright 2011 Electromotive Systems

Instructions for 2-row monitoring only

EV-2051-M Electric Motor. Operation and Maintenance Manual

Installation Instructions Electric Heaters 5 20 kw

Installation Instructions

Replacement of 600-Ampere Bushing and 200-Ampere Bushing-Well Adapters

COOPER POWER SERIES. RTE EL-BAY-O-NET FUSE Re-Fusing Instructions. Fusing Equipment MN132024EN

Test Cabinet (Inspection Box) Instructions. for Testing Accessories on Manually and Electrically Operated EntelliGuard G Low Voltage Circuit Breakers

Instructions for 2-row monitoring only

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S )

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

COOPER POWER SERIES. Surge arrester interchangeable fuse cutout combination installation instructions. Surge Arresters MN235004EN

Installation, Operation, and Maintenance

Factory Authorized Mechanism Enhancement (FAME)

Operator s Manual and Assembly

COOPER POWER SERIES. S.T.A.R. Hot line voltage indicator installation instructions. Fault Indicators MN320011EN. Indicator boot.

p.t.o. Slip clutch Read this material before using this product. Failure to do so can result in serious injury. Save this manual.

BUSWAY Low Voltage (Pow-R-Flex)

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage.

COOPER POWER SERIES. ELSG Full-Range Current-Limiting Fuse Re-Fusing Instructions. Fusing Equipment MN132017EN

VEGETABLE OIL DISPOSAL UNIT (MSDU) OPERATOR & SERVICE MANUAL

INSTALLATION GUIDE AND USER MANUAL

Transcription:

SIEMENS XJ-L Busway Systems Storage, Installation and Maintenance Instructions for... Piece No. 32-J-1010-01 Rev 3

~DANGER Hazardous voltages and exposed electrical conductors will cause death, serious injury, or property damage. De-energize before working inside busway system. Only qualified personnel should work on or around this equipment after becoming thoroughly familiar with all warnings, safety notices, and maintenance procedures contained herein. 1.0 Definitions 1.1 QUALIFIED PERSONNEL FOR THE PURPOSE OF THIS MANUAL AND PRODUCT LABELS, QUALIFIED PERSONNEL IS ONE WHO IS FAMILIAR WITH THE INSTALLATION, CONSTRUCTION AND OPERATION OF THE EQUIPMENT AND THE HAZARDS INVOLVED. IN ADDITION, HE OR SHE HAS THE FOLLOWING QUALIFICA- TIONS: (a) Is trained and authorized to energize, de-energize, clear, ground and tag circuits and equipment in accordance with established safety practices. (b) Is trained in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses or face shields, flash clothing, etc., in accordance with established safety practices. (c) Is trained in rendering first aid. 1.2 DANGER FOR THE PURPOSE OF THIS MANUAL AND PRODUCT LABELS, DANGER INDICATES AN IMMINENTLY HAZ- ARDOUS SITUATION WHICH, IF NOT AVOIDED, WILL RESULT IN DEATH OR SERIOUS INJURY. 1.3 WARNING FOR THE PURPOSE OF THIS MANUAL AND PRODUCT LABELS, WARNING INDICATES A POTENTIALLY HAZARDOUS SITUATION WHICH, IF NOT AVOIDED, COULD RESULT IN DEATH OR SERIOUS INJURY. 1.4 CAUTION FOR THE PURPOSE OF THIS MANUAL AND PRODUCT LABELS, CAUTION INDICATES A POTENTIALLY HAZARDOUS SITUATION WHICH, IF NOT AVOIDED, MAY RESULT IN MINOR OR MODERATE INJURY. 2 2.0 Storage Instructions Upon receipt, immediately inspect busway components for possible concealed damage from shipping and/or handling. If damage has occurred, file a claim with the carrier. If there is no damage, restore the packing to its original condition to prepare for job site storage. Store busway indoors in a clean and dry area. Protect against mechanical damage and exposure to lime dust (concrete), water, corrosive fumes or liquids and salts. Failure to properly store and protect the busway can cause damage and will void the warranty. 3.0 Preparing for Installation Deliver busway to installation location before unpacking. Shipping crates/cartons contain exterior identification of the packaged busway components. Each busway component is further identified by an item number located on the nameplate, which corresponds to that same item number on the busway installation drawing(s). Inspect each busway component for possible damage. Consult the factory. Confirm that contact surfaces are not damaged and are clean and dry. Abrasives should not be used on these surfaces because contact surfaces are electroplated. Inspect joint insulators for cracking or any sign of damage. Megger each busway component at 1000 volts, phase to phase and phase to ground, to verify insulation integrity. Minimum readings should be no less than: Megohms = 200 / length of run in feet Or = 66 / length of run in meters If readings are below this minimum, do not apply power to the installed busway and contact Siemens.

4.0 XJ-L Busway Plug-In-Duct (X100, X200, X400) INSTALLATION INSTRUCTIONS 4.0.1 TO JOIN 2 SECTIONS OF XJ-L BUSWAY: 4.0.1.1 For normal edgewise mounting, the word "TOP" (A) is up. (See Fig.1) 4.0.1.2 Loosen screws "B" and remove the external housing connectors. (See Fig. 1) 4.0.1.3 Assemble the plain end to the insulator end by aligning the holes in the housing ends. Slide the two sections together until the housing holes are in line. (See Fig. 2) The joint inspection cover must be rotated open. Press the bus bars completely into the spring clips. 4.0.1.4 Re-install the external housing connectors so that the guide pins engage the holes in the housings and tighten screws "B" to 20 IN-LBS. 4.0.1.5 Verify that the bus bars are fully seated in the spring clips. 4.0.1.6 For X400 busway, install the removable joint clip assembly by aligning the assembly over the joint inspection opening and pushing it on to the bus bars until it is just below the surface of the housing. TIP: Apply pressure to either side of the assembly, left hand and then right hand until fully seated. 4.0.1.7 Close joint inspection cover and secure it with provided hardware. The joint is now complete. 4.1 Hanger Instructions (XH2, XH3) X400 Joint Clip Insulator Figure 1 External Housing Connector Insulator CJ ep ep CJ End f I i i I i i TOP ~ 0 ~ ~I " Dia. (Max.) Drop Rod Supplied by Others Figure 2 I i i Plain End (No Insulator) i" Dia. (Max.) Drop Rod Supplied by Others ~11rJ~~~L:;fIIl- fo - 18 Hardware 4.1.1 TO HANG XJ-L BUSWAY FROM DROP RODS: 4.1.1.1 Position drop rods as required. (Max 10' Spacing). 4.1.1.2 Using a double nut configuration, assemble the hanger halves to each drop rod as shown. (See Fig. 3) 4.1.1.3 Spread the hanger open at the bottom and slip the duct up into the hanger. For normal edgewise mounting, the word "TOP" is up. Secure the hanger with the 1/4-20 hardware. 1/4-20 Hardware ~i~~~-1/4-20 Hardware XH2 XH3 Figure 3 4.1.2 TO WALL-MOUNT XJ-L BUSWAY: 4.1.2.1 Attach one hanger half to wall as shown. (See Fig. 4) 4.1.2.2 Insert duct into hanger. For normal edgewise mounting, the word "TOP" is up. 4.1.2.3 Assemble the hanger complete as shown using the 5/16-18 hardware on top and the 1/4-20 hardware on the bottom.,\ -18 Hardware Hardware Supplied By Others 4.2 Wall Flange Instructions (WF1, WF2, WF3) 4.2.1 Place the flange halves around the duct where it passes through the wall, floor, or ceiling. Using appropriate hardware, attach flanges to wall, floor, or ceiling. (See Fig. 6) ~ - 20 Hardware Figure 4 ~ x ~ Mounting Holes Figure 6 3

4.3 End Closer Instructions (XE100, XE200, XE400) 4.3.1 Remove external housing connectors if present. Loosen last housing screws on top and bottom of duct. Slip end closer over duct, engaging loosened screws. Tighten screws to retain end closer. (See Figure 5) X100, X200 X400 Figure 5 5.0 XJ-L Bus Plug Installation and Removal Instructions &DANGER Hazardous voltages and exposed electrical conductors will cause death, serious injury, or property damage. De-energize before working inside busway system. Only qualified personnel should work on or around this equipment after becoming thoroughly familiar with all warnings, safety notices, and maintenance procedures contained herein. 5.1 General Information 5.1.1 XJ-L Bus plugs are available with molded case circuit breakers or Vacu-Break fusible switches. Bus plugs may be operated with a pull-chain or hookstick from the floor. Lightweight and portable, plugs are easily moved from one location to another. Captive hardware allows for easy removal and re-installation. 5.1.2 The bus plug contact fingers are lubricated with an oxide inhibiting grease at the factory. This grease should not be removed. 5.1.3 Types of XJ-L Bus Plugs: XQ Series XQ-R Series XEC Series XLEC Series XLVB Series 4

5.2 Bus Plug Installation Procedures Note: The following are general procedures for installing all XJ-L Series bus plugs. 5.2.1 Ensure that the bus plug handle or breaker (if so equipped) is in the OFF position. 5.2.2 Back out all mounting screws. This will ease installation of the bus plug. XQ Series Plugs have 2 mounting screws, one at the top left and the other at the bottom right. XQ-R, XEC, XLEC, and XLVB have 3 mounting screws, 2 on the left side and one at the bottom right. 5.2.3 Remove the XOC outlet cover (if so equipped). Locate the bus plug alignment finger slot in the lower left hand corner of the busway outlet opening. 5.2.4 Locate the bus plug housing alignment tabs on the top of the bus plug. Position the bus plug over the outlet opening with the bus plug housing alignment tabs resting on the top of the busway. 5.2.5 Guide the bus plug into the outlet opening, ensuring that the bus plug alignment finger and bus plug conductor fingers enter their corresponding openings in the outlet. 5.2.6 Push the bus plug firmly into the busway plug-in outlet. 5.2.7 Make sure the bus plug is fully seated on the busway housing, and then tighten all mounting screws. 5.3 Bus Plug Removal Procedures Note: The following are general procedures for removing all XJ-L Series bus plugs. 5.3.1 Ensure that the bus plug handle or breaker (if so equipped) is in the OFF position. 5.3.2 Unplug all power cables from receptacles (if so equipped). 5.3.3 Loosen all mounting screws. XQ Series Plugs have 2 mounting screws, one at the top left and the other at the bottom right. XQ-R, XEC, XLEC, and XLVB have 3 mounting screws, 2 on the left side and one at the bottom right. 5.3.4 Grasp both sides of the bus plug along the bottom edge, pull out, and then lift off of the busway. 5.3.5 Re-install the XOC outlet cover (if so equipped). ALiGNMENTTABS-\ _ MOUNTING SCREWS Typical XJ-L Bus Plug 5

6.0 Maintenance Procedures 6.0.1 Keep busway free of dust, dirt and/or foreign matter. Moisture from roof leaks or dripping pipes should be eliminated. Should the busway become contaminated with water contact the local Siemens sales office. 6.0.2 Inspect the busway system periodically. An infrared thermometer may be used to thermally scan the run to identify potential hot spots. 6.0.3 For general information regarding handling, installation, operating and maintenance of busway systems, refer to NEMA Publication No. BU1.1. 6.1 De-energize the busway before performing any of the following operations: 6.1.1 If there are signs of overheating, visually check for deterioration or contamination of insulation and contact surfaces. Check tightness of nuts, bolts, etc. 6.1.2 Check for missing or broken parts, corrosion, wear, dirt or signs of arcing. Clean or replace parts as required. After any repair or rework, isolate the busway and megger the busway system. Minimum readings should be no less than: Megohms = 200 / length of run in feet or = 66 / length of run in meters Contact Siemens if readings are below this minimum. ADANGER Hazardous voltages and exposed electrical conductors will cause death, serious injury, or property damage. De-energize before working inside busway system. Only qualified personnel should work on or around this equipment after becoming thoroughly familiar with all warnings, safety notices, and maintenance procedures contained herein. THESE PROCEDURES DO NOT REPRESENT AN EXHAUSTIVE SURVEY OF MAINTENANCE STEPS NECESSARY TO ENSURE SAFE OPERATION OF THE EQUIPMENT. PARTICULAR APPLICATIONS MAY REQUIRE ADDITIONAL PROCEDURES. SHOULD ADDI- TIONAL INFORMATION BE DESIRED OR SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COVERED SUFFICIENTLY FOR THE PURCHASER'S PURPOSES, THE MATTER SHOULD BE REFERRED TO THE LOCAL SIEMENS SALES OFFICE, OR CALL 1-800-241-4453 FOR EMERGENCY CUSTOMER SERVICE. NOTE: THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT, NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN CONNECTION WITH THE INSTALLATION, OPERATION OR MAINTENANCE OF A SIEMENS BUSWAY SYSTEM. SHOULD ADDITIONAL INFORMATION BE DESIRED OR SHOULD PARTICULAR PROBLEMS ARISE WHICH ARE NOT COVERED SUFFICIENTLY FOR THE PURCHASER'S PURPOSES, THE MATTER SHOULD BE REFERRED TO THE LOCAL SIEMENS SALES OFFICE. THE CONTENTS OF THIS INSTRUCTION MANUAL SHALL NOT BECOME PART OF OR MODIFY ANY PRIOR OR EXISTING AGREEMENT, COMMITMENT OR RELATIONSHIP. THE SALES CONTRACT CONTAINS THE ENTIRE OBLIGATION OF SIEMENS. THE WARRANTY CONTAINED IN THE CONTRACT BETWEEN THE PARTIES IS THE SOLE WARRANTY OF SIEMENS. ANY STATEMENTS CONTAINED HEREIN DO NOT CREATE NEW WARRANTIES OR MODIFY THE EXISTING WARRANTY. Siemens Energy & Automation Inc. Spartanburg, S.C. 29304 USA 6

Piece No. 32-J-1010-01 Rev 3