Dublin s Revolutionary Transport Orbital Plan

Similar documents
Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November

SUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018

This is an easy to read report.

Submission to Greater Cambridge City Deal

TRAIN, BUS & TRANSIT

THE DUBLIN TRANSPORTATION INITIATIVE: HOW INTEGRATED TRANSPORTATION SOLUTIONS CHANGE A CITY

Abstract. Executive Summary. Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County

Background Information about the Metrobus 29 Lines Study

Onward travel. Insights from HS2 online panel

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

RUF capacity. RUF International, May 2010, A RUF DualMode system can obtain very high capacity by organizing the vehicles in small trains.

Integrating transport (buses)

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Swiftway BRT - Swords/ Airport to City Centre Proposed Scheme - FAQs

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

THE WAY WE MOVE LRT FOR EVERYONE

Regional Integration of Public Transit - From the Perspective of a Transit Company. April 2019 Thomas Werner MVG Munich

Halifax Commuter Rail: A Fresh Concept

London 2050 Infrastructure Plan

Service Guide & Passenger

Chapter 4 : THEME 2. Transportation

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

GO Transit s deliverable: the 2020 Service Plan

History of Fare Systems

The Smart Growth Countywide Transit Master Plan

Yonge Subway Extension Breakfast Meeting

Wellington City Bus Review. What are we going to do this evening? The Review so far. Welcome. Draft Timetable Presentation April & May 2013

Attachment 5 Eglinton West LRT Planning and Technical Update

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Findings from the Limassol SUMP study

PROPOSAL OF HIGH CAPACITY URBANAUT PUGET SOUND REGIONAL MONORAIL MASTERPLAN WASHINGTON STATE, USA

BROCHURE AND APPLICATION FORM

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Smart Green Transportation of LG CNS. Seoul Case

A PARADIGM FOR TRANSPORT REFORM JOHN GARDINER

Green Line Long-Term Investments

1 Downtown LRT Connector: Draft Concept

Chicago Transit Authority Service Standards and Policies

Getting Dublin Moving Labour proposals for ending the gridlock. November labour.ie

Mobility on Demand, Mobility as a Service the new transport paradigm. Richard Harris, Xerox

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

METRO STRATEGY

TORONTO TRANSIT COMMISSION REPORT NO.

Planning of the HSR Network

Develop ground transportation improvements to make the Airport a multi-modal regional

How to Create Exponential Decline in Car Use in Australian Cities. By Peter Newman, Jeff Kenworthy and Gary Glazebrook.

Mr. Vince Mauceri General Manager Transportation Operations and Technology

Bus The Case for the Bus

Application of Autonomous Vehicle Technology to Public Transit

FREQUENTLY ASKED QUESTIONS

ConnectGreaterWashington: Can the Region Grow Differently?

Transportation Highway Engineering Conference February 24, 2015

The Streamlined Public Transit Commute.

Executive Summary. Phase 2 Evaluation Report. Introduction

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour

How will high speed rail transform the sheffield city region

The Engineering Department recommends Council receive this report for information.

Sustainable Urban Transport Project (SUTP)

Three ULTra Case Studies examples of the performance of the system in three different environments

A TRANSPORT SYSTEM FOR MELBOURNE S EAST THAT WON T TAKE DECADES TO BUILD

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Blue Ribbon Committee

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

Bedford/Franklin Regional Rail Initiative (BFRRI) Rationale for a Bedford Amtrak Station June 30, 2015

Luas an accessible Light Rail system. Jim Quinlan, Chief Architect, Railway Procurement Agency

New Haven Hartford Springfield Rail

A report on unmet San Fernando Valley. Wednesday, January 2, 2013

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

Urban Land Use/Transport Policy, Metro and Its Impacts in Shanghai

SUMMARY OF COMMENTS AT PUBLIC OPEN HOUSES SCOPING OF ALTERNATIVES GATEWAY CORRIDOR ALTERNATIVES ANALYSIS

Expanding Capacity for the Northeast Corridor The Gateway Program

Kenosha-Racine-Milwaukee (KRM)

Janice Fortunato Senior Director Business Partnerships

MetroExpress Improvements

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Cambridge Rapid Mass Transit Options Appraisal

Green and Inclusive Urban Transport

Spatial planning and sustainable urban transport systems

Why Conventional Hi-Speed Rail Can t Solve Nation s Traffic Problems

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology

Opportunities to Leverage Advances in Driverless Car Technology to Evolve Conventional Bus Transit Systems

Downtown Transit Connector. Making Transit Work for Rhode Island

STUDY ON IMPLEMENTING THE EFFICIENT TRANSPORTATION SYSTEM

A Transit Plan for the Future. Draft Network Plan

5. OPPORTUNITIES AND NEXT STEPS

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Friends of WALKDEN station MANCHESTER HUB. Response to Network Rail Stakeholder Consultation

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

III. Public Transport Terminology

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

CONNECTING THE REGION

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Kendall Drive Premium Transit PD&E Study

HOT Lanes: Congestion Relief and Better Transit

Ohio Passenger Rail Development. Northwest Ohio Passenger Rail Association

Expansion Projects Description

Sprint. Tell us your views. Metro s little sister. We want your views on a modern, high-quality mode of public transport called Sprint.

Transcription:

3 Dublin s Revolutionary Transport Orbital Plan G-Link Standard GAUGE Fatima to Stephens Green more effective than Dart InterConnector, for Luas to disperse users around city nearer destinations, ideal for disability users, reduces overloading. 3 Orbital bus, rail, luas. Standard gauge vital to Airport for direct access from all areas. Trebles trains on Dundalk line. Bus, rail, luas work together with land use to reduce cars. Careful is the safety word of life. Tom Newton ACRA O3 TOP new approach in transport planning, shortest way to destination. O.N.E Rail Heuston to Airport with standard gauage, benefits all Ireland. 1. Public transport direct to all areas making it as good as C.A.R. 2. Land Use Location for future business, industry, colleges and hospitals. 3. Car pooling made feasible by direct access public transport. By fully utilising land use on outskirts (nearer countryside) with technology, service Road 51, standard rail gauge, Country & city buses Taxi, Luas, cars, cycling give O3 potential to reduce vehicles by 40% with electrified Orbital. Underground 20%, costly, Radial, inner city, less land use, takes bus users, overloads centre. O3 ONE Plan makes public transport efficient with Balance good for all areas at less than half the cost & double benefits. 3 main orbitals. O3 simple orbital plan in Dublin s low density sprawl city & 70-mile commuter belt. 60% cars come from outside city s 10-mile radius. In O3, Bus Luas & local rail serve wider inner city. Country Trains & buses can treble in O3 by using standard rail gauge to Airport. No extra country trains if Luas gauge is used to Airport as users go into city for train back to North Dublin, Malahide Howth & Belfast line. One link Solution Metro Dart rail, Heuston to Belfast line via Park Tunnel M50, Airport, Swords, with Cross KEY ELEMENTS OF O3 Doubles train capacity on all lines Docklands sation direct to Stephen s Green with LUAS No unnecessary costly underground maximizes land use with existing facilities Bus D.D.T. Orbital Network Plan G-Link from Fatima (serving new children s hospital) provides direct Luas access to all areas, and reduces return trip from Tallaght to St Stephen s Green by an hour 46A bus to Heuston Station Western rail corridor. Re-open Athlone Mullingar and Navan Drogheda rail. Upgrade Mullingar to Kells road Sligo-Cork rail link up. Reduces return trip by three hours Service road SR51 to aid M50. M50 road link to new Children s Hospital. Rail station Kinnegad (Coralstown Mary Lynch s). Navan rail line Cork trains stop at Portarlington Phoenix Park rail tunnel provides direct access to the airport, and to and from all parts of Ireland Luas stop at Fox & Geese Main bus interchange at Liffey Valley Bus Plaza on Aston Quay Dublin Tullamore train 21:05pm Reserve future rail space 1

Above: Rail City Orbital City Luas & Dublin bus link whole city with O3. G-Link Luas vital, disperses users, trebles usage, easier without car nearer for all great for disability users. No underground, ample space on Luas at Heuston & Connolly. Service Road SR 51 & Children s Hospital link complete plan in city. Outer links completed later. 10 new concepts in O3 with Technology & Outer Land Use, using road space fairly. O3 addresses Radial System all via centre 50% waste black hole. Don t dig Stephens Green for two tunnels as existing Park tunnel links Airport direct. Stephens Green will have 3 rails from Heuston & Luas to Airport via centre. City will have 2 more lines to Airport with Park rail. Dodder Luas Tallaght to Dundrum vital. O3 benefits all transport. Designed wisely with Balance, no ad hoc planning. Linking & Direct change Key, extra city main line rail, on-line work from home. The 03 plan is made up of three main orbitals with many more smaller or local orbitals. It keeps to the S.D.L.P. principles of public transport. S= Suitability for users. D= Direct as possible. L= Linkage, for adequate link ups and connections. P= Price at reasonable cost. the eight rail lines (four doubles) into the city. Each double rail line consists of local and long distance. Orbital One (Inner Orbital) These mainlines rails along with provincial and Dublin Buses feed into the Luas city BLOC orbital for easy dispersal around the city avoiding unnecessary street traffic congestion. This is a dual orbital network (above) in the city centre achieved by linking up the Phoenix Park rail tunnel (A on diagram) and the Luas system in red (B on diagram) just requiring the dotted section to be completed to link up the whole Luas system, a total distance of 3.5 miles, initially a short section the G (green) link, 1.25 miles of Luas from Fatima to Stephens Green. This maximizes the Luas lines in both directions making the system over three times more effective in the city area. This dual transport network takes users close to all areas of the city centre. It reduces overloading, addresses most problems for disabled users, is good for business, and makes it easy to get around a congested city. It is good for tourism and ideal in our wet climatic conditions. The Bloc This diagram (top of oposite page) shows 2 Orbital Two This Orbital (bottom of opposite page) shows the linking up on the outskirts of the rail network, the blue dotted section on the map. The thick dotted section is linking up the Luas line from Saggart to Lucan rail Station at Adamstown, a distance of 3.5 miles through open space. The thin dotted section is the linking up of the Kildare/ Cork main line rail to the Sligo/Maynooth main line from Lucan (Adamstown) station to Leixlip, just three (3) miles. This links up the rail network on the city s outskirts. It makes Lucan (Adamstown) station a Key linkup point in the 03 plan. All trains can stop at this station. This takes over an hour off travel time for many users.

The black line on the outskirts of this map is for Railbus, a new transport concept. Railbus is a bus system designed in rail colours that links two rail lines together to provide a suitable link in areas where the cost of rail is prohibitive, where there are too many obstacles or it can t be done now. This Railbus gives direct connections to all areas on the outskirts of the city. Airport Rail Orbital This Airport rail orbital (back page) uses the existing unused Phoenix Park rail tunnel, requiring a new length of rail track alongside land beside the M50 Motor way, a distance of seven miles to the Airport, two miles extra to Swords and just over another three miles to Donabate to complete the orbital. It allows the rail network direct access to and from all areas and direct from all areas to the Airport. It allows a direct link from Belfast to Cork. It avoids unnecessary city changing and reduces travel times. This direct link is very important to most rail users but more important for users Above: The BLOC. Below: Orbital 2 3

with disabilities. It makes rail transport more efficient and the Park rail tunnel avoids building another tunnel that would be very costly, inefficient and would take a long time to complete. This Phoenix Park tunnel is the most vital piece and valuable part of infrastructure in the capital for a successful transport plan. Bus Orbitals The main flaw with the bus network on the outskirts is the lack of integration or linking up. The routes are mainly designed for the city centre. This problem can be addressed with a new bus concept D.D.T. (Destination Direct Transport), this is a simple solution where buses link up at a suitable place or Hub and all depart at the same time every 30 minutes. A user availing of this system knows when they get a bus serving this Hub their connecting or follow on bus won t depart until they arrive. It is certainty that make this system a success. Similar Hubs on the outskirts of the city, with unified departure times. The M50 is an ideal layout for another bus orbital in the CORE plan with direct city links from each area. Above: Airport Orbital. Below: Bus Orbitals Conclusion & Costs City s layout, facilities & O3 efficiency selffinances, saving billions (10) trebles country trains doubles Dart & bus use. Metro N. takes potential bus users, ignores cars from outside city s 10-mile radius and higher fares. Roads work with linking orbitals so will Public Transport. O3 will revolutionise public transport, suits users 1/10 cost of T 21 as funds needed elsewhere. This One Link Park Tunnel to Airport a game changer. Electric Cars reduce carbon emissions. One travel card for all use. We need you to make plan work, available for presentations. NEWTON O3 Plan is TOP. NEWTON = National Energy Wise Transport, Orbital Network. Tom Newton ACRA Tu 086 3127364 www.dublinbus.biz www.acratu.com or team cony-road alternative metro E-mail circletransport@gmail.com Google - youtube tom newton 03 transport - then click Tom Newton youtube to see all short videos on one page. Pause to read text. Reasons why O3 is best on youtube. O3 Transport Plan finalised 12/12/12/-17 4

Orbital DART Benefits All Ireland Self-Finances Metro gauge flaw A-Z New approach, joined up thinking A to Z Orbital system fed by radial routes, ideal transport solution for shortest routes to destination, efficient, almost as good as car by Direct access. Green Luas to Shankill Station 1.5m. Extend Dodder Luas (Tallaght to Dundrum) to Barrow St. to join Luas BLOC via UCD. Anglesea Rd Ballsbridge & Shelbourne Rd. This with orbital bus on M50, Bus orbital on outskirts & orbital rail complete O3 network. Direct Linking Key. O3 a Revolutionary simple way at 1/10 cost of Transport 21 3.5B, recovered by efficiency savings over 20 years. Existing transport & land facilities linked by orbitals to access outer areas, ideal for Provincial Buses and Country rail. Standard rail gauge to Airport vital for all Ireland. Park Rail exists to M50 half way to Airport then beside M50. G-Link, Orbitals bus & Luas, Cross city Luas, ONE rail with extended Dodder Luas, Cabra BXD Luas to DCU & shared Luas to Croke Park completes O3 orbitals. Radial Underground costly covers a small area, draws more via centre & rises property values. Metro N. gauge will undermine rail network. O.N.E. rail to Airport essential, 5-minute frequency with direct access to all areas of Ireland. All transport modes link each other, to benefit all, essential for Disability users. O3 links the 3 orbitals of Bus Rail & Luas with outer Land Use. Double & Reverse usage, multi seat usage with technology essential for efficiency. Country users must be allowed to use Park Tunnel. I discovered flaws of Radial System in 1982 when I worked as a bus driver with Dublin Bus. At morning, peak bus full inwards, empty on way back out, 50% inefficient. My 2 nd trip bus was half full, almost empty on 2 nd trip out, extra 25% waste, total 75% inefficient. Same on all routes with some false improvements as more went out that came in already. Radial puts 2 hours or more on country trips, Example Cavan user for Swords etc. takes an extra hour each way to destination from centre. Direct link up avoids unnecessary changing that adds time & cost, harder for disability users, it avoids timetable connection delays from Airport to country areas. It has Travel Tolerance Time for public transport users, a key element in O3 to take users direct to destination avoiding overloading streets, junctions and footpaths. 3. main benefits of O.N.E. standard rail gauge, Heuston to Belfast line, benefiting all areas. 1. It gives direct access from all areas of Dublin and Ireland to Airport. Important as Dublin Airport is for all Ireland. Direct access is better for all. If Luas rail gauge is used to Airport, it will add to transport problems as users from Malahide, Blanchardstown, North Dublin and Dundalk line must go into city and back out again to Airport instead of accessing it directly. 2. With standard rail gauge to Airport allows trains to treble at peak time on Dundalk line, & a train link to Navan. Northern trains, can come in on this new Dart line via Airport & not be restricted by Dart trains. This allows east coast Darts, link Airport for new reverse usage. 3. ONE rail ensures not all Dublin, more trains & buses from countryside with outer land use. O3 also reduces inefficiencies in Luas due to duplication, re-carrying and taking bus users. Outer Land Use and G-Link maximises bus connections. In O3 Bus, Rail, Luas work together with orbital city Luas (BLOC) to disperse users coming in on all modes of transport taking them near destination. Cross City Luas is ideally routed with Dublin Bus Service to link up city network. Dublin an expanding city, 70-mile user belt, 60% cars and rising from outside city s 10-mile radius, addressed by land use, Park/ride and more trains & buses. Present proposals serve inside 10 miles with little land use. Broombridge vital interchange in O3.

Land Use Outer Corridor is essential for Balance, from Tallaght to Blanchardstown via Leixlip is centre of the Greater Dublin Area. Service Road SR51 from N7 to M1 is needed for three reasons 1. To service outer land Corridor 2. Direct link to all areas on this Corridor. 3. To reduce traffic congestion locally & on M50. Lucan Stn. vital for outer links. Safe cycle ways. O3 Transport plays its roll in climate change. Cars vital with electric and hydrogen fuelled. 3 big benefits of O3. 1. Overall saving of up to ten billion euro by not building costly Radial undergrounds, with efficient orbital links and G-Link vital new concept that creates enough tram capacity for all trains arriving at Heuston and maximises transport use. 2. Reduce cars to centre by almost 40%. With 20% country cars come to Outer Industrial Corridor and 10% of city cars go out to same Corridor. Car-pooling and public transport in O3 further reduce cars by 10%, a total of 40% car reduction. Underground reduces cars by 20% even lower than10% if Radial problems are not addressed. 3. Maximises and links existing facilities of Outer land use, Park Tunnel, Dockland rail station, Cross city & G-Link Luas and Dublin bus. Staggered starting times, later College starts. Buses link into both sides of orbital network. ONE rail Heuston to Belfast line gives Cork and Galway direct link to Belfast, trebles Dundalk trains, benefits all other rail lines with direct linking and reduces Cork to Belfast by one hour. Takes 3 hours off Cork to Sligo return trip or between stations on these lines. 1 hour off to other parts of countryside with country access from outer stations at Clonsilla Lucan, Airport & Shankill with link to Green line. O3 DART benefits Swords in 5 ways, 1. Two ways to city. 2. Direct to Blanchardstown area. 3. Direct to Malahide and Bray lines. 4. Direct to Northern areas. 5. Direct to all areas on Cork, Galway, Sligo trains. With Metro North, just city areas. 10 new transport concepts and 10 transport modes in O3 aids bus and transport network. Duplication. An underground and over ground tram from Stephens Green to centre, and from Ranelagh to Stephens Green as proposed. These two are wasteful duplication. Dublin Airport will have three-fold capacity to city. 1. Direct. 2. In via Malahide. 3. Capacity by not going via centre unnecessary, less bag changing. O3 caters for future growth and doubling Dublin s population. Plan now not 2050 as Dublin is a small city with 70-mile commuter belt. The few existing rail lines we have should be kept as they will be needed in the future. Taking buses out of College St. and Luas in Marlborough St. undermines rolling bus orbital terminals that s great benefit to all and Disability users. Footpath widened, Quay cycleway. Take traffic from College Green not buses leaves Disability users with a service to this area. If College St. area is to omit buses, a Bus Plaza on Aston Quay is needed to make up this loss. Route splitting (forks), isolated, secret or ad hoc planning undermines overall effectiveness. O3 provides a simple road link to New Children s Hospital from M50 for hospital use only, as this complex will have 4 hospitals and local expansion as South Circular Rd is overloaded. A Service Road SR51 from N7 to M1 via Adamstown and Leixlip. Luas Link to Platform 10 in Heuston with bus way &Taxis. Orbital O3 allows access in both directions doubling efficiency of bus rail Luas. Street Luas ideal for one main orbital, for high frequency. North-South inner corridor is needed for future rail transport, economic growth outside Dublin & to contain car growth over next 20 years. Bus vital in O3 for connectivity with essential bus interchange at Liffey Valley. Park/Ride vital in O3 for sharing with real time travel information. Available for discussions and presentations. 2016. Plan, click Youtube tom newton O3 transport-- or www.dublinbus.biz www.acratu.com T. Newton 086 3127364 E-circletransport@gmail.com