PETREVEN is a Drilling Contractor (established in 998 in Venezuela). The Company, being part of the TREVI Group, has a solid background in drilling rig engineering and management.
The main objective of PETREVEN is to provide drilling services in those areas where the use of our technology and expertise will be able to create increase of drilling performance, cost reduction, high safety standards and environmental protection. Our strategy is to develop a project, creating together with the Client a dedicated working team, able to design a fit for purpose drilling rig to enhance productivity and additional value to the field operations
PETREVEN WORLWIDE LOCATIONS ITALY Petreven Colombia G02 PETROBRAS Venezuela H200 PETRORITUPANO H30 PETRODELTA (PDVSA) Peru H07 H09 PETROBRAS 2 RIG HH220 SERIES Argentina 3 RIG HH02 SERIES H03 H04 PETROBRAS H05 H08 REPSOL-YPF H06 CHEVRON IN OPERATION RIG UP IN PROGRESS Saudi Arabia H30 H600 H60
RIG FLEET RIG FLEET HH02 HH220 HH300 HH600 Max Hook Load Capacity 220,000 lbs 440,000 lbs 600,000 lbs 200,000 lbs Drilling Depth 5500 ft 2000 ft 7000 ft 23000 ft Mud Pumps 2x000 HP 3x000 HP 2x600 HP 3x600 HP Top Drive Max Torque 26000 lbs/ft 26000 lbs/ft 32000 lbs/ft 50000 lbs/ft Clearance for BOP Stack 7.06 ft 7.70 ft 22.00 ft 30.00 ft
RIG FLEET PETREVEN achieved successful results in the Latin America, in term of drilling performance and safety standards, working for Major oil company. These results have allowed the constant increase of our rig fleet and the awarding of new important contracts 2 4 8 9 3 8 2004 2005 2006 2007 2008 2009
PETREVEN VENEZUELA Venezuela Operators: Petrobras, Lasmo-ENI, PDVSA Activity 999-2009 Oilfields: Lobo-Leona, Orocual, Concepcion, Kaki, Oritupano, Rigs: HH200 H30 Venezuela 2002-2009 Operational Days 665 Drilled wells 09 Depth average (ft) 794,06 Total feet drilled (ft) 865576 Actual time average (days) 9.62 Construction rate (ft/day) 59,79 Moving Average (days) 3,0 Down Time (%) 4,9
PETREVEN PERU Perù Operator: Petrobras Activity 2006-2009 Oilfield: Talara Rigs: H07 H09 Perù 2006-2009 Operational Days.538 Drilled wells 209 Depth average (ft) 3.880 Total feet drilled (ft) 80.944 Actual time average (days) 7,25 Construction rate (ft/day) 543,2 Moving Average (days) 0,77 Down Time (%) 2,90
PETREVEN COLOMBIA Colombia Operator: Petrobras, Hocol, Petromar, Ecopetrol, Petrominerales Activity 2002-2009 Oilfields: Guando, Mango, Rio Ceibas San Francisco, Antares, Lomalarga, Campo Dina Rig: G02 Colombia 2002-2009 Operational Days 2.363 Drilled wells 78 Depth average (ft) 3.664 Total feet drilled (ft) 652.28 Actual time average (days) 0,60 Construction rate (ft/day) 925,94 Moving Average (days),92 Down Time (%) 0,72
PETREVEN ARGENTINA Argentina Operators: Petrobras, Repsol-YPF, Chevron Activity 2005-2009 Oilfields: Medanito, Senal Picada, Puesto Hernandez, El Trapial, Las Heras Rigs: H03, H04, H05, H06, H08 Argentina 2005-2009 Operational Days 5.248 Drilled wells 65 Depth average (ft) 3.925 Total feet drilled (ft) 2.44.65 Actual time average (days) 8,39 Construction rate (ft/day) 477,83 Moving Average (days) 0,92 Down Time (%) 2,94
Operational Days 0.84 Drilled wells Depth average (ft) 4.853 PETREVEN CORPORATE STATISTICS 2002-2009 Total feet drilled (ft) 4.742.83 Actual time average (days) 9,73 Construction rate (ft/day) 438,57 Moving Average (days) 2 Down Time (%) 2,68
PETREVEN ARGENTINA R.O.P. RECORD RIG H06 December 2007 OPERATOR WELL OILFIELD HOURS FT DRILLED DEPTH R.O.P. CHEVRON ET-899 EL TRAPIAL 24.5 4235 4642 74 FT/HR
PETREVEN ARGENTINA DRILLING RECORD RIG H03 November 2007 OPERATOR PETROBRAS WELL PH-203 Time (day) OILFIELD PUESTO HERNANDEZ 0,00 0,50,00,50 2,00 2,50 3,00 3,50 4,00 0,00 HOURS 25 500,00 Program Petreven FT DRILLED 366 000,00 DEPTH ROP PLANNED 3638 02 FT/HR Depth (ft) 500,00 2000,00 2500,00 DRILLING AVERAGE 303 FT/DAY 3000,00 ROP REAL 25 FT/HR 3500,00 TOTAL HOURS SAVED 20.64 4000,00
PETREVEN VENEZUELA DRILLING RECORD RIG H200 May 2002 Time (day) OPERATOR PETROBRAS 0 0 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 WELL ORM-74 OILFIELD ORITUPANO-LEONA PLANNED DEPTH 952 FT REAL DEPTH 9430 FT PLANNED DAYS 24 Depth (ft) 000 2000 3000 4000 5000 6000 7000 Program Petreven REAL DAYS 3.64 8000 9000 0000
PETREVEN COLOMBIA DRILLING RECORD RIG G02 October 2006 OPERATOR WELL OILFIELD PETROBRAS MAN-2H MANGO Time (day) 0 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 0 500 Program Petreven 000 PLANNED DEPTH 4066 FT REAL DEPTH 4256 FT PLANNED DAYS 24 REAL DAYS 3.8 Depth (ft) 500 2000 2500 3000 3500 4000 4500
MANAGEMENT COMMITMENTS HSEQ POLITICS INCENTIVE PROGRAMS RESPONSABILITY IN OPERATIONS IMS PROCEDURES & NORMATIVES CONTINUATIVE EVALUATION GOALS OBJECTIVES PETREVEN works following strict politics to fulfill Client s expectation and at the same time to ensure the best QHSE standard to his Personnel and for the Environment close to which perform his operations HSEQ SUPPORT ANOMALIES INVESTIGATIONS INSPECTIONS AUDITORIES TRAINING to do this PETREVEN works with an Integrated Management System that allows a continuous controls and reaction when needed.
QHSE STATISTICS 50 Corporative 2002-2008 Accidents type vs. working area 40 2 6 30 7 20 3 2 3 9 0 0 6 2 7 2 0 2 2 With lost time Restricted Work M edical treatment First Aid Well site Maintenance Tanks Pumps Substructure Pipe rack Rig Floor
QHSE STATISTICS Various 45 40 35 30 Corporative 2002-2008 Accidents type vs. Operation type 8 8 Rig cleanig Rig maintenance Rig down Rig up Running casing Drilling 25 20 5 0 5 0 2 8 3 3 2 4 9 2 2 2 With lost time Restricted Work Medical treatment First Aid
Safety & Quality Awarding received in 2004-2005 and 2006 as best drilling contractor for the technical excellence, always complying with all safety and environmental protection criteria
4,0 2,0 0,0 8,0 6,0 4,0 2,0 0,0 GLOBAL FREQUENCY INDEX (TRCF) ACUM ULATED (2 m onths ) HSEQ STATISTICS Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr May 08 08 08 08 08 08 08 09 09 09 09 09 Argentina Colombia Perú Venezuela Corporativo LOST TIM E FREQUENCY INDEX (LTIF) ACCUM ULATED (2 m onths) 3,5 3,0 2,5 2,0,5,0 0,5 0,0 Jun 08 Jul 08 Ago 08 Sep 08 Oct 08 Nov 08 Dic 08 Ene 09 Feb 09 Mar 09 Abr 09 May 09
Safety & Quality Leader in Performances and Safety In the six years up to June 2009, PETREVEN Colombia reported zero Lost Time Incident (LTI) 2008. PETREVEN, has been chosen among all companies operating in the field in Colombia to be awarded with the Prize by the Safety Columbian Council 0,7 LTIR PETREVEN LTIR IADC 0,6 0,5 0,4 0,3 0,2 0, 0 2004 2005 2006 2007 2008