PCSB Domestic Idle Well Data Management

Similar documents
Quantified Value Creation through Data Flow Optimisation

Norzilah Bt Jaffar. Head, Regulatory Compliance & Technical Assurance (RCTA) Technical Data (TD) Malaysia Petroleum Management (MPM) PETRONAS

2017 PETROLIAM NASIONAL BERHAD (PETRONAS)

Sr Khairul Faizi B M Taib Robert Toba Siahaan

CLICK HERE TO KNOW MORE

Shale Oil & Gas. Overview of Shale HC Potential in Onshore East Malaysia. May PETROLIAM NASIONAL BERHAD (PETRONAS)

PETRONAS Risk Based Inspection - In Furthering to Optimize Plant Uptime

Corporate Transparency and Enhancing Corporate Image : Action Speak Louder than Words

Managing and Mitigating Environmental Impact in Malaysian Drilling Activities: PETRONAS Approach

Logistic & Integrated Barge Sequence: Optimising Cost, Maximising Value

Adapting and Applying Process Safety Management (PSM) Concept in Fuel/NGV Retail Stations

WÄRTSILÄ 2-STROKE LOW PRESSURE DUAL-FUEL ENGINES

Grain LNG: A Collaborative Approach To LNG Terminal Business Performance Improvement

ad notam INSTALLATION GUIDE GLASS ON MONITOR MOUNTING SYSTEM (GMS) MONITOR ON WALL MOUNTING SYSTEM (MWS) Art.No. GMS-xxxx Art.No.

STEADY STATE ELECTRICAL DESIGN, POWER PERFORMANCE AND ECONOMIC MODELING OF OFFSHORE WIND FARMS

The Automotive Industry

Comprehensive Site Integrity Assessments and Mitigations for Unbonded Flexible Pipes

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Australian Standard. Cranes, hoists and winches Safe use. Part 10: Mobile elevating work platforms AS AS

INCREASING THE ELECTRIC MOTORS EFFICIENCY IN INDUSTRIAL APPLICATIONS

MALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)

STEERING INTERVENTION STRATEGY FOR SIDE LANE COLLISION AVOIDANCE

HYBRID POWER FOR TELECOM SITES

Vehicle Diagnostic Logging Device

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

SLIDEHIDE Track and Accessories for sliding doors

Energy efficiency in New Member States and Candidate countries. Policies, potentials and needed action

DriverUp 101. Webinar 1

CONTROL AND MANAGEMENT SYSTEMS. ABB Ability Network Manager Operational confidence.

EXAMINERS' REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

COMPANY INTRO. PowerCore Engineering

GLOBAL TOUCHLESS SENSING & GESTURE RECOGNITION MARKET ( )

ABUS USA LLC Vitess High Security. Service Manual

Predicted availability of safety features on registered vehicles a 2015 update

A Fresh Approach to Gas Lift Design Verification

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Survey Report Informatica PowerCenter Express. Right-Sized Data Integration for the Smaller Project

Ammonia Industry Outlook in Malaysia to Market Size, Company Share, Price Trends, Capacity Forecasts of All Active and Planned Plants

Dealer Service Instructions for: Customer Satisfaction Notification M04 Engine Oil Addendum Card and Tip Card

Minimizing risk with innovative design. Dual ESP Systems and Accessories

THE ULTIMATE UNIVERSAL PLATFORM for Remote Control, Automation & Monitoring Smart Really Smart

RECHARGE STATION OPERATION MANUAL. Version

Reference: C.N TREATIES-2 (Depositary Notification) DRAFT RULE NO. 1

Battery Aging Analysis

Embedded Torque Estimator for Diesel Engine Control Application

Tenaga Nasional Berhad - SWOT Analysis

MAZDA MOTOR CORPORATION

R-SERIES FASCIA - 3&4 inch Chain Control PRODUCT SPECIFICATIONS

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

Malaysia to implement Euro 4M in 2015

Global and China Camshaft Sensor Industry 2014 Market Research Report

FleetDASH. Fleet Sustainability Dashboard - FleetDASH. Mark Singer National Renewable Energy Laboratory August 17, 2017

Ensuring consumer trust in the safe supply of food and drinks. Cor Groenveld Market Development Manager FSSC 22000

sens.it HD we get your profit out of inflation! Professional Tire Management Integrated tire management with automated tire pressure monitoring

What exactly are next-generation meters?

Informatica Supported Upgrade Paths

Pump Cleaning Mode for Linear Rod Pumping System

Licensing and Warranty Agreement

FIRE CONTAINMENT GUIDE

Australian/New Zealand Standard

Global and China EV Charging Equipment Industry 2014 Market Research Report

SentryGOLD Fully-Automated Fuel Management System

Deep Learning Will Make Truly Self-Driving Cars a Reality

REDEFINING WELL COMPLETION TECHNOLOGIES

Development of the LPT W Concentric Pulse Tube

A Battery Equivalent Model for DER Services

DG system integration in distribution networks. The transition from passive to active grids

Smoke Leak Locator. User Manual. For Models: Pro S 25, Pro S 75, Pro S 500T, Pro S 600T, Pro S 1000HD. Ceramic Heating Technology

CommWeigh Axle Standard Module

1 COPYRIGHT 2018, LUBES N GREASES MAGAZINE. REPRODUCED WITH PERMISSION FROM THE MAY 2018 ISSUE

FOR IMMEDIATE RELEASE 20 OCTOBER 2015 STRATEGIC ALLIANCE BY FOUR ISLAMIC BANKS TO ESTABLISH INVESTMENT PLATFORM

Merger and Acquisition Trends in Malaysia. An Article by Chiu Hoh Yan

ACEM Commitment on Advanced Braking Systems

TMC Semi-trailer Landing Gear Service Manual

Overview Python Scripting in Abaqus Specialized Postprocessing Advanced Topics Introduction to Python and Scripting in Abaqus

Southern California Edison s Preferred Resources Pilot (PRP) Solar Siting Survey. Summary Document

Australian Standard. Rotating electrical machines. Part 9: Noise limits AS IEC , Ed. 4.1 (2007) AS

How much oil are electric vehicles displacing?

Small Scale-Wind Power Dispatchable Energy Source Modeling

An Autonomous Braking System of Cars Using Artificial Neural Network

Introduction to Remanufacturing

Mitigating Risk for a Multimillion Dollar Investment with a Single Click

Learning Guide EMISSION SPECIALIST 5 GAS ANALYSIS COURSE NUMBER: E001-01

CC PR 28 April Operational and Cleanliness verification of a Lonestar 3.0 with ATLAS Sampling Module 2.x

WE BUILD SOMETHING THAT MAKES A DIFFERENCE

ENERGY & UTILITIES. Electricity Metering & Sub-Metering Concepts and Applications. BuildingsOne April 30, 2018

PRODUCT: TJ 24 Front Brake Lines READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

Survey123 for ArcGIS smarter forms, smarter workfields

Selective Laser Sintering Printers. Production thermoplastic parts with ProX and spro SLS printers

TMC CS Mechanical Suspension Service Manual

Using cloud to develop and deploy advanced fault management strategies

TMC 11T Air Suspension Service Manual

Next-generation SCADA and Control Technologies for Large-scale Use of Photovoltaic Generation on Electric Power Grid

Distributor/Dealer Service Instructions for: Customer Satisfaction Notification M04 Engine Oil Addendum Card

CAPACITY LIMITED RESOURCES (CLR) / ENERGY LIMITED RESOURCES (ELR)

Medium Voltage Drives. ABB Value Provider Program Partnership for growth and profit

Electric buses Solutions portfolio

AQA GCSE Design and Technology 8552

PETRONAS PETRONAS CHEMICALS GROUP BERHAD ( K) RELATED PARTY TRANSACTION

CONTAINER LOCK SATLOCK V3.0 PRODUCT OVERVIEW

Transcription:

Domestic Idle Well Data Management Technical Data, Technical Global PETRONAS Carigali Sdn. Bhd. () Digital Energy Journal Conference, Kuala Lumpur: Doing more with Subsurface, Production & Drilling Data 5 th October 2015 Impiana Hotel, Kuala Lumpur 2015 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. Petroliam Nasional Berhad (PETRONAS) 2015 1

Overview What is an idle well? Business driver for idle well management Issues without idle well data management Scope of idle well data management Solution architecture Idle well dashboard Conclusion Benefits of idle well data management Petroliam Nasional Berhad (PETRONAS) 2015 2

What is an Idle String? PETRONAS definition: A string that has not produced or injected for more than 90 consecutive days. The idle string is categorised based on the state of its capacity. Idle Strings Effective Non- Effective Depleted - Facilities - Mechanical - Operations - Artificial Lift - Remedial - Facilities Limit - Reservoir Management - Reservoir - Ultimate Recovery Petroliam Nasional Berhad (PETRONAS) 2015 3

Business Driver for Idle Well Management Achieve management target of having 85% well availability. Fast and precise decision making for well activities prioritization. Achieve s production targets. Petroliam Nasional Berhad (PETRONAS) 2015 4

Issues Before Idle Well Data Management Rollout No single source of truth leading to inconsistent information flow Data scattered & not stored in centralised manner Multiple versions of excel spreadsheet with different individual Idle Well Data Issues Time consuming process for management reporting Data integrity issue Manual data capture and consolidation Inconsistent reporting format Data manipulation for management reporting Management do not have overall picture of well availability and idle status tracking Manual and cumbersome tracking of initiatives for well reactivation Pending well reactivation plans might not be captured Difficulty in estimating soon to be idle wells Petroliam Nasional Berhad (PETRONAS) 2015 5

Solution Architecture Existing production database, PETRONAS Global Production System (PGPS) was chosen as the platform to manage the data PGPS Auto generate idle candidate list Verification process Idle well dashboard Petroliam Nasional Berhad (PETRONAS) 2015 6

Why is PGPS an Ideal Platform? Most of production related data has been captured in PGPS Automated idle string inventory can be generated Well-structured workflow can be introduce for idle well management PGPS is a readily available resource, there is no need for investment in a new system. Users who are involve in idle well management are already familiar with PGPS. Petroliam Nasional Berhad (PETRONAS) 2015 7

Idle Well Standard Dashboard Petroliam Nasional Berhad (PETRONAS) 2015 8

Idle Well Standard Dashboard Petroliam Nasional Berhad (PETRONAS) 2015 9

Idle Well Standard Dashboard Petroliam Nasional Berhad (PETRONAS) 2015 10

Idle Well Standard Dashboard Petroliam Nasional Berhad (PETRONAS) 2015 11

Conclusion - Benefits of Idle Well Data Management Before No Centralised data storage Current Centralised data storage No single source of truth PGPS is the single source of truth Difficulty of tracking emerging idle and manual tracking of initiatives for well reactivation Data manipulation for management reporting Automated email notification and graphical representation in report Management idle well report restricted to management team Time consuming process for HQ to gather data for management reporting Fast report generation Inconsistent reporting format Standard reporting across all domestic fields Petroliam Nasional Berhad (PETRONAS) 2015 12

Thank you Acknowledgment to team members: Ngu King Chai Naveen Gupta Rizuwan Zaz Wandy Nur Ismawati Petroliam Nasional Berhad (PETRONAS) 2015 13

Paper Abstract Leaving a well idle is equivalent to losing production from that well. Many of the idle wells are potential producers and majority of these wells stop producing due to operational issues instead of due to depleted resources. Prematurely plugging these wells would cause permanent loss of large quantities of oil and gas. An effective and efficient idle management system is important to achieve the high well availability. Properly managed idle well data provides a timely, consistent and accurate information to production technologist that will assist in faster and better decisions on managing these idle wells. have a standard practice which makes full use of the existing production and deferment data to generate the idle well inventory automatically. This paper highlights the standardize and systematic idle well data management workflow and reporting (dashboard) that provides information transparency to production technologist and management in helping them monitor and take action to restore the idle well in a prudent manner in line to support meet its production target. Petroliam Nasional Berhad (PETRONAS) 2015 14