Don ts. Do's. Please follow the Do's and Don ts as enumerated below:

Similar documents
Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Contact: Michael Parks, Manager, Traffic Engineering Services (905)

AVAILABLE AM / PM PEAK HOUR TRAFFIC VOLUMES AND LEVELS OF SERVICE (17 JANUARY 2013)

Here is a map from the LBNL gate to Bldg. 55:

8150 Sunset Bl Valet on Crescent Heights Bl 4 messages

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC MANA GEMENT PLA N FOR A METAL SALVAGE FACILITY IN DALLAS, TEXAS

WASHINGTON UNIVERSITY IN ST. LOUIS DEPARTMENT OF FACILITIES PLANNING & MANAGEMENT ACCESS CONTROL & ELECTRONIC SECURITY OFFICE

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Public Improvement Permit Instructions

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

RTE. 1 at RTE. 637 & RTE. 639

La Canada Flintridge Parents for Healthy Air November 1, 2018 Presented by Elizabeth Krider, Ph.D., Esther Kornfeld and Tamar Tujian

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

Construction Realty Co.

MINIBUS AND TRANSPORT POLICY

To Let. making property work. Units 9 & 10 Tesco Extra New Road Worthing West Sussex BN13 3PB. Two Vacant Retail Units

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Tomingley Gold Operations. Traffic Management Plan

Clean Harbors Canada, Inc.

ESSENTIAL SAFETY RESOURCES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY.

INF28. Driving a minibus. For more information go to 1/13

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

Transit City Etobicoke - Finch West LRT

Craigieburn Employment Precinct North and English Street

STAY SAFE NEAR ELECTRICITY

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

INDUSTRIAL HAUL AGREEMENT

MEMO 1. SITE LOCATION AND EXISTING USE. 2.1 Vehicle Access. Table 1: Vehicle Parking Requirements and Proposed Supply

Kenosha H.O.G. Chapter Road Captain & Assistant Road Captain Rules and Requirements

MO 370 Interchange Ramp at Salt River Road - Phase 1

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

2.0 Development Driveways. Movin Out June 2017

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030

Safe Driving Standards & Procedures

MUNICIPAL CLASS EA PROCESS 1

Night Work Specification

DRIVER FATIGUE MANAGEMENT GUIDE

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

Southern Oregon University Van Safety Training for Students and Employees of the University

Transportation & Traffic Engineering

PROPOSED TRAFFIC RESOLUTION

MINIBUS SAFETY POLICY STANDARD & PROCEDURES

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

LCV Operating Conditions & Routes (August 2017) Page 1 of 5

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Minibus Policy. Reviewed: March Next Review: March Signed By Headteacher: Signed by Chair of Governors:

Order No. of the options EMC filter Class A

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

PROPOSED TRAFFIC RESOLUTION

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Bulletin 109 IEC Non-Reversing Starters. Product Overview/Product Selection. Table of Contents

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Access Management Standards

TRAFFIC PARKING ANALYSIS

Day Kajang KTM to Campus [IN] Campus to Kajang KTM [OUT] PM 1:00 (Mini bus) 3:00 (Mini bus) 5:00 (Mini bus) 6:15 7:00 (Mini bus) 9:00 (Mini bus) 9:15

djangoproject.com skillsapp.com for invite)

The Corporation of the TOWN OF MILTON

OPERATION MANUAL SUBMERSIBLE FOUNTAIN PUMP PM2 600LV PM2 900LV PM2 1500LV PM2 2400LV PM2 4500LV

Project Location. Purpose and Need for Action. File Code: 1950 Date: September 14, Dear Interested Party,

IMPROVEMENT CONCEPTS

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King Soopers #116 Thornton, Colorado

Network Safeworking Rules and Procedures

Motor Vehicle Use Map 2009

Plan Check Policies and Guidelines

Solar Power. Michael Arnold, LEED AP. ACI-NA Environmental Committee Meetings June 27, 2011

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016

Characterization of Combined Use of County Road Segment

SAN RAFAEL CITY COUNCIL AGENDA REPORT

Occupational Driving Consider the Risks. Sandra Wilson, OSACH

Technical Feasibility Report

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

Transport in Minibuses

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

Managing Electrical Safety on Boats

Summer Institute in New Economics Logistics Packet

In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment:

Waco Rapid Transit Corridor (RTC) Feasibility Study

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

Plan Check Policies and Guidelines

APPENDIX 9. Transport Management Plan and Swept Path Analysis. Erection of Single Wind Turbine, Land at Sedgemoor Road, Eston, TS6 0UA

SAFE WORK PROCEDURE SWP 053 TRACTOR OPERATION DOC. NO. D15/81228

ELMORE COUNTY HIGHWAY DEPARTMENT

10 S e r i e s PRESSURE SWITCH. features

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS

Land Transport Rule Omnibus Amendment 2013

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for.

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

GC108: EU Code: Emergency & Restoration: Black start testing requirement

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Transport Club Guidelines

Summary of the Alcoa Highway Redevelopment Project

Transcription:

Sri Selvavinayakar Temple (Ganesha Temple) 49-4923 Mt Lindesay Hwy (MLH), South Maclean, Qld 4280 Notice to devotees on changed traffic/parking arrangements On 1 st January 2018 New Year Special Pooja (9AM-2PM) ue to anticipated influx of large number of devotees on Monday the 1 st January 2018, restricted and changed traffic and parking arrangements are planned in compliance wit h legal requirements for the safety of devotees and other road users. evotees are kindly requested NOT to take right turn or crossing the Hwy at the intersection of Temple road and Mt Lindesay Hwy. rivers are urged to park at designated places and follow the direction from traffic controllers/volunteers. Between 9AM 2PM on the New Year day, devotees are requested to take careful note of the changed conditions and plan their trip accordingly to and from the Temple for t he safety of everyone. Please follow the o's and on ts as enumerated below: on ts No right turn into Casuarina Street (Temple Street) from Mt Lindesay Highway (when travelling from Brisbane side). o not park at spaces marked by red on Casuarina Street. On exit from Temple, no right turn on to Mt Lindesay Highway. Strictly no queuing, parking and walking/crossing on the Highway. o's Please follow the traffic signs and directions from traffic wardens/volunteers on duty. Always turn left into and out of Casuarina Street (Temple Street). Coming from Brisbane, you may take a U-turn at traffic lights, refer to attached map for details and familiarize yourself before commencing the trip (Refer to Map 2 below). Allow extra time for additional drive to take U turn. For parking please proceed along Casuarina Street to the rear of the Temple as indicated on the satellite map (Refer to Map 1 below). NB: evotees are kindly requested to follow the direction by traffic controllers/volunteers and drive to the condition on the road. To ensure safety of everyone, the committee may refer to authorities for any unsafe behav iors. Any vehicles parked outside of marked areas may be towed away at owner s expense.

Map 1: Temple Parking Arrangement Map 2: Proposed etour Route for devotees from Brisbane

www.invarion.com VM NOTES: 1. Traffic Control to assist with the ingress and egress of vehicles to the temple. 2. No vehicles to be parked on the shoulder of Mt Lindesay Hwy 3. Traffic Control to ensure vehicles only turn left from Casaurina Rd S E AH TOU EA R RE UC ES PEE 80 R MA E CONITIONS ETOUR ROUTE CL LIN EA IV E R MT E TO UR CHANGE TRAFFIC N F ST 90 EL Y R E SPE ET OU CE E U YH MACLEAN ST WY FOLLOW ETOUR CASUARINA R E IV R PE CE E TEM CAR PLE R PARK S EU CE RI 80 RE U CE S PE E RE U UA CA S WY YH E SP LIN NA MT R R EE TO U 90 LY E TEMPLE SITE FE TABLE 4.6 RECOMMENE TAPER LENGTH Permanent Posted Speed, km/h 40 or less 50 70 80 90 100 Greater than 100 Recommended Taper Length, mtr TC at beginning of taper Lateral shift taper 5 Merge taper TABLE 4.2 VALUE OF IMENSION Posted Speed Limit, km/h [Prior to Roadworks] imension [mtr] 40 or less 5 to 10 50 10 to to 45 70,80 to 80 90,100 80 to 100 110 100 to 120 Job Location N Casaurina Rd, South MaClean Orginal Size A4 RAWN BY: KIM KNAPP APPROVE BY: ANGELA HARRIS TM OPEN: 125 SIGNE: AHarris SITE ETAILS Activity: Road Type: Road Width: Posted Speed: Client Term Of Works: Travelled Path: Control Type: TC Requirement: Temple Management Committee ate: Version: CS1392 20.3.2017 Scale NTS NTS Map No. Job No. Sheet No. CREST R isclaimer: This plan has been prepared as a guide for Traffic Management Purposes from information supplied by third parties. Traffic Control Australia at all times attempt to be as accurate as possible but disclaims all responsibility and all liability (including without limitation, liability in negligence) for all expenses, losses, damages and costs you might incur as a result of the information being inaccurate or incomplete in any way, and for any reason. A site specific risk assessment conducted by a competent person is required before Implementing this plan. STOCKLEIGH R Legend