Residential Application for New Electric Service

Similar documents
RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

TEMPORARY ELECTRICAL SERVICE

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

Installing or Rebuilding Your Electric Service

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

57. Line Extensions Policy 1: Individual Residential Customers

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

See NT POWERCOS , Classification Based On Service Size.

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

ELECTRIC LINE EXTENSION POLICY

New Commercial Service Request-Job Process

GENERAL INFORMATION 1.01 PURPOSE

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

For Conduit Inspections

Table of Contents. Electrical Service Requirements. 1. General Requirements

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

Parkland Light & Water Co. ELECTRIC SERVICE REQUEST AND METER STANDARDS

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

All territory within the incorporated limits of the City and land owned or leased by the City.

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

ELECTRICAL ORDER FORM

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE

TERMS AND CONDITIONS

INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION. Builder/Developer Information

ELECTRICAL ORDER FORM

5. NOTE: ALL VENDORS PAID IN FULL BY 12/30/18 WILL BE INCLUDED ON THE VENDORS LIST AT OUR GUEST SERVICES BOOTHS LOCATED THROUGHOUT THE FAIRGROUNDS.

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

IID. Customer Project Development Services. Customer Project Application. A century of service.

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

ELECTRICAL ORDER FORM

Commercial Electric Policy

ELECTRICAL ORDER FORM

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Customer Guide to Electric Service Requirements

Application for Service Residential Subdivision / Development

INSTRUCTIONS FOR SECONDARY EMPLOYMENT APPROVAL APPLICATION FOR PRIVATE BUSINESSES AND PUBLIC AGENCIES AND FOR SPECIAL EVENTS

ELECTRIC LINE EXTENSION POLICY

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Please Refer to Attached Sample Form

7 Single Family Service

Please Refer to Attached Sample Form

Commercial Plan Submittal Form Utility Service Requirements

To complete the process for a net metering interconnection, please follow the steps below:

BGE Service Application Guidelines Residential Single Projects

ELECTRICAL ORDER FORM

Regarding: North Industrial Park/Infrastructure Build Project - Contractor Payments

Show Name: Anaheim Home & Garden Show 2018 ELECTRICAL

REQUIREMENTS FOR A RESIDENTIAL STRUCTURE TO BE CONSIDERED A PERMANENT INSTALLATION

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

Attention Exhibitors Electrical Service Installation Notice

Electric Service Requirements & Guidelines

Customer Guide to Electric Service Requirements

To complete the process for a net metering interconnection, please follow the steps below:

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

ELECTRIC SERVICE HANDBOOK INFORMATION & REQUIREMENTS

APPLICATION for BUSINESS LICENSE Licensing & Permits City of Williston PO Box 1306, Williston, ND

Electric Service Requirements

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Show Month. Sound Equipment $ $ $ $ $ $ $ $ $ Special Instructions

To complete the process for a net metering interconnection, please follow the steps below:

2018 Vermont Electric Cooperative Inc. Requirements for Electric Service

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

CHAPTER 2 TYPES OF SERVICE AND VOLTAGES AVAILABLE 8 Types of Service and Nominal Voltage Furnished

7. Residential Single-Family and Duplex Buildings (Dwellings)

Deadline for advance rate is 15 days prior to show opening.

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

EL PASO ELECTRIC COMPANY SCHEDULE NO. 99 MISCELLANEOUS SERVICE CHARGES

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Indianapolis Power & Light Company

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

A Homeowner s Guide to Natural Gas Service

Louisville Gas and Electric Company

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

DEALER REGISTRATION PACKAGE

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

Residential and Non-Residential Checklist for Permitting Electric Vehicles and Electric Vehicle Service Equipment (EVSE)

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

WEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA Fax FEE: $75.00 (Up to 200 S.F.)

GUIDELINES FOR RESIDENTIAL ELECTRIC SERVICE HOOKUP

City of Westerville Electric Division

2018 Ascension Hot Air Balloon Festival Food Vendor Information

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

COMMERCIAL QUICK REFERENCE

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

Electrical Design of Residential Services

Q. Are you familiar with the matter which is the subject of this petition? A. Yes, I am.

Transcription:

Attn: Engineering Department 42 Wescom Rd Johnson VT 05656 1-800-832-2667 ext. 1171 802-635-2331 ext. 1171 802-635-4210 fax Residential Application for New Electric Service

INVOICE Attn: Engineering Department 42 Wescom Rd Johnson VT 05656 Item # Description Qty Price Total Due 142.25 Engineering Fee 1 $200.00 $200.00 Payments accepted up to $1,499.00 if using a credit card: Note: A $200 fee will be charged for each additional site visit(s) when required. Initial billing for construction may be subject to true up when job is completed. This will be a line item on the construction bill. This means an additional bill may be mailed to you at the end of your job.

Vermont Electric Cooperative, Inc. Attn: Engineering 42 Wescom Road Toll Free: 1-800-832-2667 ext. 1117 Johnson, VT 05656-9717 Telephone: 802-635-2331 ext. 1117 www.vermontelectric.coop Fax: 802-635-4210 *** Please complete application, sign and return with a $200 Engineering Fee (this fee will be charged with each additional site visit(s) when required). *** PLEASE PRINT - ***All items in section 1 and 3 are required*** Section 1 Applicant Co-Applicant First Name, Middle Initial, Last Name First Name, Middle Initial, Last Name Company Name Mailing Address (as of today) City St Zip Building Site Physical Address City Service Type (i.e. garage(residential or commercial), business, etc.) Telephone Home - - Work - - Cell - - Email Address Are you a current member? Yes No Please Circle the appropriate information (if over 200amp service you must complete the load sheet provided on the next page). Size of Service (amps) Meter Location Primary Single Family Dwelling 100 200 other pole building stub post overhead underground Mobile Home (4-wire cable required) 100 200 other pole building stub post overhead underground Farm 100 200 other pole building stub post overhead underground Commercial 100 200 other pole building stub post overhead underground Duplex 100 200 other pole building stub post overhead underground Temporary Service * 100 200 other pole building stub post overhead underground *Must complete temporary application which is attached Other (please specify) 100 200 other pole building stub post overhead underground Distance from nearest VEC pole or vault to building site feet Section 2 Size of electric load to be added other than normal residential usage Motors larger than 3 H.P. (please list each: 1) @ H.P. Contractor(s): 2) @ H.P. General Contractor Contact Person Telephone - - Electrician Contact Person Telephone - - Office Use: W.O. Acct

Section 3 Sketch Area: Draw a diagram of the property showing poles (location & number), roads, near neighbors and/or 911 addresses, property lines, septic location and power lines: N Load Sheet (this must be filled completed if asking for more than 200amp) Total Diversity Diversified Motors Qty Voltage HP/KVA Amps Amps w/125% Factor Load Heating/Cooling Miscellaneous

Member Service Agreement By Vermont Electric Cooperative, Inc. s (VEC) filed tariff, the new member is allowed the installation cost credit of 100 feet of overhead service. If the new member requires an extension longer than 100 feet of overhead, by VEC s filed tariff, he/she will be required to contribute towards the cost of the extension according to the appropriate rate schedule. In addition, for any line extension, the new member is required to furnish at his cost all required tree clearing, Right of Way procurements, permits, trenching, conduit and backfill for underground installations, and the costs for all public hearings, if required. Furnished by VEC: a) All necessary materials with overhead line extension(s), pole(s), and riser(s), if required, and meter(s) installed; costs paid by member in accordance with the filed tariffs b) Application packet of forms to be completed by member c) Copy of VEC filed electric service Line Extension Policy d) Copy of line extension charges e) Copy of Requirements for Electric Service Booklet Furnished by Member: a) Completed application packet including signed Application for Service and/or Additional Service and any right of way easements b) Member shall install a minimum of four stakes to show the approximate location of proposed building. The cost of the additional field engineering required due to relocation or re-orientation of proposed building or buildings after the original site survey will be borne in full by the member c) Meter socket and service entrance shall comply with VEC specifications (see construction drawings provided in packet) d) Secondary extensions from an existing overhead or underground system (point of attachment, service entrance, grounding system, etc.) will comply with the national Electrical Safety Code (NESC) e) One of the following: Overhead: a) Cost of all right of way clearing b) Meter socket on building (provide by owner s electrician) c) Cost for all extensions over 100 feet in length according to attached schedule Underground Secondary a) Cost of all right of way clearing b) All trenching, backfilling, conduit, wire, meter sockets, and grounding system (per NESC) c) Cost for all extensions over allowable service credit according to attached rate schedule d) Stub pole or 10 x 6 x 6 pressure treated post, set 4 in ground, which member agrees to install and maintain (see construction drawings), or two stub poles w/ ¾ pressure treated back-board for multiple services Underground Primary a) Cost of all right of way clearing b) All trenching, backfilling, conduits and vaults as required c) Cost of primary underground extension d) Pull line capable of 500 lbs. pull strength NOTE: Primary (wire conductor) to be provided by VEC We the undersigned, hereby agree to the above requirements and conditions for electric service. We understand that before construction will be started payment for the costs of the extension must be paid in full. We also understand that initial billing for construction may be subject to true up when job is completed. This will be a line item (14200) on the initial construction bill. This means an additional bill may be mailed to you at the end of your job and payment is expected. Applicant s Signature Date Co-Applicant s Signature

Vermont Electric Cooperative, Inc. Attn: Engineering 42 Wescom Road Toll Free: 1-800-832-2667 ext. 1117 Johnson, VT 05656-9717 Telephone: 802-635-2331 ext. 1117 APPLICATION FOR TEMPORARY ELECTRIC SERVICE W.O.# Account# Name: Mailing Address: State Zip I, the undersigned, hereby request Vermont Electric Cooperative, Inc. (VEC) to make a temporary electric service connection at: Physical Address: Town: I further agree: 1) To provide, erect or install an adequate distribution panel and to maintain such a panel in a weatherproof condition. 2) To install a 3 wire circuit (per NEC) to the distribution panel, which shall be sized to the amperage of the main disconnect, as specified above. 3) To install 2 copper ground rods at the distribution panel, such rods to have at least the minimum dimensions of 8 feet in length and ½ inch in diameter. 4) To install ground fault protection (see drawing) on all 120-volt circuits going out of the distribution panel. 5) To accept full responsibility to examine and inspect daily, prior to use, all electrical tools, extension cords, and equipment. 6) To perform all installation in full compliance with the requirements of the National Electric Code (NEC) of the National Board of Fire Underwriters, together with any state or local electric codes or regulations, where applicable. 7) To have and hold VEC harmless from, and to indemnify VEC against any and all claims, actions, or suits for injury, damage, or loss of persons or property however caused, which may arise or be alleged to have arisen in connection with the furnishing of electric service under this agreement. 8) To make advance payment for labor and expense of performing the temporary connection and for all material, including salvageable material, when applicable, and as required by the filed tariff of VEC. 9) All energy used during the period for the temporary service as provided is to be billed to the above address at the application rate set forth in VEC s tariff rate schedule. 10) Application valid for 6 months from date of application, after which VEC will review and disconnect or extend the application date. Please refer to appropriate drawing (attached) for either the overhead or underground temporary service that you will be constructing. Owners Signature: Date: Telephone Number: Home: Cell: