Saturn V. 50th Anniversary Commemorative. Evening, November 8, AS-501 / Apollo 4, Pad 39A, KSC, FL.

Similar documents
Apollo BP-1102/1102A Water Egress Trainer

The Apollo 13 Mission Compiled by Daniel R. Adamo

WHAT WE WILL DISCUSS IN THIS VIDEO

FACT SHEET SPACE SHUTTLE EXTERNAL TANK. Space Shuttle External Tank

Where Are They Now? Gemini SA-5 Apollo BP-25 Apollo BP-1101/1101A

Apollo BP-1101/1101A

The Apollo 11 Mission Compiled by Daniel R. Adamo

The Sea Kings of Project Apollo

Blue Origin Achievements and plans for the future

Fly Me To The Moon On An SLS Block II

Atlas V Launches the Orbital Test Vehicle-1 Mission Overview. Atlas V 501 Cape Canaveral Air Force Station, FL Space Launch Complex 41

Copyright 2016 Boeing. All rights reserved.

Apollo Boilerplate #1207

Ares V: Supporting Space Exploration from LEO to Beyond

6. The Launch Vehicle

Massachusetts Space Grant Consortium

Precision Paper Space Models

Travel: Detailed Flight Plan

Ares I Overview. Phil Sumrall Advanced Planning Manager Ares Projects NASA MSFC. Masters Forum May 14, 2009

Lunar Driving Simulator History

THE FALCON I LAUNCH VEHICLE Making Access to Space More Affordable, Reliable and Pleasant

Cygnus Payload Accommodations: Supporting ISS Utilization

Antares Rocket Launch recorded on 44 1 Beyond HD DDR recorders Controlled by 61 1 Beyond Systems total

TOWARDS A HEAVY LAUNCHER - PROPULSION SOLUTIONS - A. Souchier - C. Rothmund Snecma Moteurs, Direction Grosse Propulsion à Liquides

MISSION OVERVIEW SLC-41

NASA s Choice to Resupply the Space Station

Welcome to Vibrationdata

CHAPTER 1 INTRODUCTION

USA DELTA DELTA Mc DONNELL DOUGLAS SPACE SYSTEMS

Performance Evaluation of a Side Mounted Shuttle Derived Heavy Lift Launch Vehicle for Lunar Exploration

A LEO Propellant Depot System Concept for Outgoing Exploration

Apollo Spacecraft News Reference - Command & Service Module By Robert Godwin

Next Steps in Human Exploration: Cislunar Systems and Architectures

Typical Rocketry Exam Questions

Vehicle Reusability. e concept e promise e price When does it make sense? MARYLAND U N I V E R S I T Y O F. Vehicle Reusability

Martin J. L. Turner. Expedition Mars. Published in association with. Chichester, UK

IST Sounding Rocket Momo User Guide

NASA s Space Launch System Marks Critical Design Review

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

SPACE LAUNCH SYSTEM. Steve Creech Manager Spacecraft/Payload Integration & Evolution August 29, 2017 A NEW CAPABILITY FOR DISCOVERY

MISSION OVERVIEW SLC-41 CCAFS, FL

ENERGIA 1. IDENTIFICATION. 1.1 Name. 1.2 Classification Family : K Series : K-1/SL-17 Version : 4 strap-ons

Suitability of reusability for a Lunar re-supply system

SPACE LAUNCH SYSTEM (SLS)

Boeing CST-100. Commercial Crew Transportation System. Keith Reiley, The Boeing Company. February, 2011

Wernher von Braun Symposium. Dream Chaser Program. Sierra Nevada Corporation. Overview. October For the

LUNAR INDUSTRIAL RESEARCH BASE. Yuzhnoye SDO proprietary

THE 21 ST CENTURY SPACE SHUTTLE

Notes: GENERAL DYNAMICS EARLY LUNAR ACCESS [1993]

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ULA's new Vulcan rocket 24 June 2015, by Ken Kremer, Universe Today

Design Reliability Comparison for SpaceX Falcon Vehicles

Enhanced. Chapter 3. Baseline

Space Propulsion. An Introduction to.

How to Assess Heritage Systems in the Early Phases? Andreas M. Hein

ReachMars 2024 A Candidate Large-Scale Technology Demonstration Mission as a Precursor to Human Mars Exploration

USA FALCON 1. Fax: (310) Telephone: (310) Fax: (310) Telephone: (310) Fax: (310)

Preliminary Cost Analysis MARYLAND

Appendix A. Acronyms and Abbreviations

US Spacesuit Usage. Jonathan McDowell. 1 NASA Spacesuits. July 28, 2006

On Orbit Refueling: Supporting a Robust Cislunar Space Economy

Adrestia. A mission for humanity, designed in Delft. Challenge the future

Airplanes Under 30 AIR FORCE Magazine / March 2004

Ares V Overview. presented at. Ares V Astronomy Workshop 26 April 2008

Cost Estimation and Engineering Economics

Transportation Copyright Council for Economic Education

Curiosity lands on Mars

H-IIA Launch Vehicle Upgrade Development

[ Apollo Operations Handbook Extra Vehicular Mobility Unit ] By NASA ( Author ) [ 2012 ) [ Paperback ] By NASA READ ONLINE

Chapter 20. Space-Lift Systems. Maj Christopher J. King, USAF; LCDR Jeremy Powell, USN; and Maj Edward P. Byrne, USAF

Space Propulsion. An Introduction to. Stephen Hevert Visiting Assistant Professor Metropolitan State College of Denver

CRITICAL DESIGN REVIEW. University of South Florida Society of Aeronautics and Rocketry

67-25,000 gallon fuel tanks

Lunar Surface Access from Earth-Moon L1/L2 A novel lander design and study of alternative solutions

First Nations Launch Rocket Competition 2016

Sub- Item Box Location Description Models Category Category 14: Models

LOW-COST TANKAGE PROVIDED FOR RECENT DISCOVERY MISSIONS

Atlas V MSL. Mission Overview Cape Canaveral Air Force Station, FL

How Does a Rocket Engine Work?

Lessons in Systems Engineering. The SSME Weight Growth History. Richard Ryan Technical Specialist, MSFC Chief Engineers Office

Phoenix Lander Implications on in situ resource utilization for robotic exploration of Mars

Architecture Options for Propellant Resupply of Lunar Exploration Elements


350 International Atlas of Lunar Exploration

Orion MPCV. Briefing. Orion MPCV (Multi-Purpose Crew Vehicle) is a proposed American human-rated capsule designed to accommodate longduration

THE HISTORY OF MARS EXPLORATION

FEDERAL SPACE AGENCY OF RUSSIAN FEDERATION LAVOCHKIN ASSOCIATION PROGRAM OF THE MOON EXPLORATION BY AUTOMATIC SPACE COMPLEXES

Supersonic Combustion Experimental Investigation at T2 Hypersonic Shock Tunnel

TYPE-CERTIFICATE DATA SHEET

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

lights on, down 2 ½ 40 feet, down 2 ½ Kickin up some dust 30 feet, 2 ½ down faint shadow

Space Launch System. NASA s Reusable Stages and Liquid Oxygen/Hydrocarbon (LOX/HC) Engines

Rocket 101. IPSL Space Policy & Law Course. Andrew Ratcliffe. Head of Launch Systems Chief Engineers Team

SABRE FOR HYPERSONIC & SPACE ACCESS PLATFORMS

'ELaNa XIX' press Kit DECEMBER 2018

Exploration Architecture Update

Taurus II. Development Status of a Medium-Class Launch Vehicle for ISS Cargo and Satellite Delivery

USA ATHENA 1 (LLV 1)

Delta Iv Payload Planners Guide Ula September 2007

Transcription:

Saturn V 50th Anniversary Commemorative Evening, November 8, 1967. AS-501 / Apollo 4, Pad 39A, KSC, FL.

The Saturn V Launch Vehicle With a capacity to boost a payload of 260,000 lb. into low Earth orbit, or a 100,000 lb. payload into a lunar trajectory, the Saturn V remains the most powerful launch vehicle yet to leave the Earth's atmosphere. It was capable of placing in orbit a payload more than four times heavier than the future Space Shuttle could lift, and was six times more powerful than the next largest expendable rocket of its day. The Saturn V was designed by NASA engineers at the Marshall Space Flight Center, (MSFC), in Huntsville, AL, under the direction of Dr. Wernher von Braun. Development began in January, 1962. A total of fifteen vehicles were produced. Thirteen flew missions. Characteristics Overall length: 281 ft. (booster), 363 ft. (with spacecraft). Maximum diameter: 33.0 ft. Weight at liftoff: 6,423,000 lbs. Trans-lunar payload capability approximately 107,350 lbs. Earth orbit payload capability, (two stage configuration); 212,000 lbs. Stages First Stage, (S-IC); Contractor: Boeing Assembled: New Orleans, LA. Length: 138 ft. Diameter: 33 ft. Weight: 5,022,674 lbs. fueled / 288,750 lbs. dry. Engines: F-1 (x5) Designed and manufactured by Rocketdyne, Canoga Park, CA. Propellants: LOX (Liquid Oxygen) / RP-1 (Kerosene.) Thrust: 7,610,000 lbs. During the production run, the F-1 was redesigned and up-rated in preparation for the later "J Series" of extended lunar missions. These missions carried heavier payloads. With up-rated engines, the S-IC produced 7,724,000 lbs. of thrust. Burn time: 168 seconds, nominal. Second Stage, (S-II); Contractor: North American Aviation, (now Rockwell). Assembled: Seal Beach, CA. Length: 81.5 ft. Diameter: 33 ft. Weight: 1,059,171 lbs. fueled / 79,918 lbs. dry. Engines: J-2 (x5) Designed: MSFC, Rocketdyne. Manufactured: Rocketdyne, Canoga Park, CA. Propellants: LOX / Liquid Hydrogen Thrust: 1,150,000 lbs. Burn Time: 384 seconds, nominal. Interstage* (S-IC/S-II); Ullage Motors: eight, (small); AS-501 through AS-509, two (large); AS-510 through AS-515. Thrust: 1,353 lbs. (small), 8,750 lbs. (large). p.2 of 8.

Third Stage, (S-IVB); Contractor: McDonnell-Douglas Assembled: Huntington Beach, CA Length: 58.3 ft. Diameter: 21.7 ft. Weight: 260,523 lbs. fueled / 25,000 lbs. dry. Engine: J-2, (single). Rocketdyne. Propellants: LOX / Liquid Hydrogen Thrust: 238,000 lbs. Orbital Insertion Burn (1st): 147 seconds, nominal. Trans-Lunar Injection Burn (2nd): 384 sec., varied per mission. Interstage* (S-II/S-IVB); Ullage Motors: 2. Thrust: 8,081 lbs. Instrument Unit; Contractor: IBM Assembled: Huntsville, AL. Height: 3 ft. Diameter: 21.7 ft. Guidance System: Inertial Interstage * Interstage; a transition cowling, or adapter between stages. Ullage Motor; a small solid rocket motor attached to the Interstage. During staging, these motors ignite and burn until the upper stage engines have ignited and reached nominal thrust. Their purpose is threefold; 1. Maintain momentum of the remaining vehicle. 2. Force the liquid propellants of the upper stage downward against the engine intake valves. 3. Insure against accidental collision with the tumbling spent stage. Interstage Ullage Motor Saturn V Diagram courtesy NASA, Johnson Space Center, online archive. p.3 of 8.

List of Saturn V Flights 1. Vehicle: AS-501 Mission: Apollo 4; Prove the integrity of Saturn V and Command Module heat shield. Successful. Launched: November 9, 1967, 12:00:01 UT, Complex 39A, Kennedy Space Center, FL Payload: Command/Service Module CSM-017. Simulated Lunar Module designated LTA-10R. Crew: Unmanned. Duration: 8 hrs. 37 min. 9 sec. Splashdown: Pacific Ocean. 2. Vehicle: AS-502 Mission: Apollo 6; Same as Apollo 4. The S-IC experienced severe vibration. Two S-II engines failed. S-IVB motor failed to re-start for its planned second burn. Vertical oscillation in the S-IC, called pogo, caused failures in S-II and S-IVB. An extended Service Module burn compensated, allowing Command Module to complete mission. The S-IC was redesigned to eliminate pogo by injecting helium into fuel lines which damped out vibration. On April 27, 1968, NASA Administrator James Webb ordered the next Saturn V to be prepared to carry a human crew. Launched: April 4, 1968, 12:00:01 UT, Pad 39A, KSC, FL. Payload: Apollo CM-020, SM-014, Lunar Module Simulator LTA-2R. Crew: Unmanned. Duration: 9 hrs. 57 min. 20 sec. Splashdown: Pacific Ocean. 3. Vehicle: AS-503 Mission: Apollo 8; First humans to leave Earth s gravitational field and enter lunar orbit. Successful. Launched: December 21, 1968, 12:51:00 UT, Pad 39A, KSC, FL. Payload: CSM-103. Ballast to simulate a Lunar Module payload, designated LTA-B. Crew: Frank Borman, Cdr. James Lovell, CMP. Bill Anders, LMP. Duration: 147 hrs. 00 min. 42 sec. Recovered: December 27, 1968, USS Yorktown, 8 7.5 N 165 1.2 W, Pacific Ocean. 4. Vehicle: AS-504 Mission: Apollo 9; Test of production Lunar Module descent and ascent engines in earth orbit. Full practice of rendezvous and docking procedures necessary for lunar landing. Successful. Launched: March 3, 1969, 16:00:00 UT, Pad 39A, KSC, FL. Payload: CSM-104, (Gumdrop), LM-3, (Spider). Crew: James McDivitt, Cdr. David Scott, CMP. Russell Schweickart, LMP. Duration: 241 hrs. 00 min. 54 sec. Recovered: March 13, 1969, USS Guadalcanal, 23 15 N 67 56 W, Atlantic Ocean, (1,000 mi. east of Cape Canaveral). 5. Vehicle: AS-505 Mission: Apollo 10; Full rehearsal of lunar landing maneuvers in lunar orbit. Successful. Launched: May 18, 1969, 16:49:00 UT, Pad 39B, KSC, FL. Payload: CSM-106, (Charlie Brown), LM-4, (Snoopy). Crew: Thomas Stafford, Cdr. John Young, CMP. Eugene Cernan, LMP. Duration: 192 hrs. 03 min. 23 sec. Recovered: May 26, 1969, USS Princeton, 15 2 S 164 9 W, Pacific Ocean. p.4 of 8.

6. Vehicle: AS-506 Mission: Apollo 11; First lunar landing, Sea of Tranquility. Successful. Launched: July 16, 1969, 13:32:00 UT, Pad 39A, KSC, FL. Payload: CSM-107, (Columbia), LM-5, (Eagle). Crew: Neil Armstrong, Cdr. Michael Collins, CMP. Edwin Aldrin, LMP. Duration: 195 hrs. 18 min. 35 sec. Recovered: July 24, 1969, USS Hornet, 13 19 N 169 39 W, Pacific Ocean, (Southwest of Hawaii). 7. Vehicle: AS-507 Mission: Apollo 12; Second lunar landing, Ocean of Storms. AS-507 was twice struck by lightning as it left the pad. The crew lost all telemetry and control. As a testament to the integrity of the Saturn V design, they were propelled safely into orbit by the Saturn s inertial guidance system. Once in orbit, telemetry was restored and the mission was successful. Launched: November 14, 1969, 16:22:00 UT, Complex 39A, KSC, FL. Payload: CSM-108, (Yankee Clipper), LM-6, (Intrepid). Crew: Charles Conrad, Cdr. Richard Gordon, CMP. Alan Bean, LMP Duration: 244 hrs. 36 min. 25 sec. Recovered: November 24, 1969, USS Hornet, 15 47 S 165 9 W, Pacific Ocean. 8. Vehicle: AS-508 Mission: Apollo 13; Third lunar landing attempt. Mission aborted due to Service Module failure. Crew recovered safely. Launched: April 11, 1970, 19:13:00 UT, Pad 39A, KSC, FL. Payload: CSM-109, (Odyssey), LM-7, (Aquarius). Crew: Jim Lovell, Cdr. Jack Swigert, CMP. Fred Haise, LMP. Duration: 142 hrs. 54 min. 41 sec. Recovered: April 17, 1970, USS Iwo Jima, 21 38 S 165 22 W, Pacific Ocean. 9. Vehicle: AS-509 Mission: Apollo 14; Third lunar landing, highlands north of Fra Mauro crater. Successful. Launched: January 31, 1971, 21:03:02 UT, Complex 39A, KSC, FL. Payload: CSM-110, (Kitty Hawk), LM-8, (Antares). Crew: Alan Shepard, Cdr. Stuart Roosa, CMP. Edgar Mitchell, LMP. Duration: 216 hrs. 1 min. 58 sec. Recovered: February 9, 1971, USS New Orleans, 21 1 S 172 39 W, Pacific Ocean, (780 mi. south of Samoa). 10. Vehicle: AS-510 Mission: Apollo 15; Fourth lunar landing. First of J series extended missions and up-rated Saturn V. Destination; Hadley Rille, Apennine Mountains. Successful. Launched: July 26, 1971, 13:34:00 UT, Pad 39A, KSC, FL. Payload: CSM-112, (Endeavour), LM-10, (Falcon). Crew: David Scott, Cdr. Alfred Worden, CMP. James Irwin, LMP. Duration: 259 hrs. 11 min. 53 sec. Recovered: August 6, 1971, USS Okinawa, 26 17 N 158 8 W, Pacific Ocean, North of Honolulu. p.5 of 8.

11. Vehicle: AS-511 Mission: Apollo 16; Fifth lunar landing, Descartes Highlands. Successful. Launched: April 16, 1972, 17:54:00 UT, Pad 39A, KSC, FL. Payload: CSM-113, (Casper), LM-11, (Orion). Crew: John Young, Cdr. Ken Mattingly, CMP. Charles Duke, LMP. Duration: 265 hrs. 51 min. 5 sec. Recovered: April 27, 1972, USS Ticonderoga, 0 43 S 156 13 W, Pacific Ocean. 12. Vehicle: AS-512 Mission: Apollo 17; Sixth lunar landing, Taurus-Littrow Valley. Successful. Launched: December 7, 1972, Pad 39A, KSC, FL. Payload: CSM-114, (America), LM-12, (Challenger). Crew: Eugene Cernan, Cdr. Ronald Evans, CMP. Harrison "Jack" Schmitt, LMP. Duration: 301 hrs. 51 min. 59 sec. Recovered: December 19, 1972, USS Ticonderoga, 17 53 S 166 7 W, Pacific Ocean. 13. Vehicle: AS-513 (Originally configured for the cancelled Apollo 18 mission.) Mission: Skylab 1; Place Skylab 1 in orbit. Launched: May 14, 1973, 17:30:00 UT, Pad 39A, KSC, FL. Payload: Skylab orbital workstation in place of third stage (S-IVB). Crew: Unmanned. Duration: 9 min. 50 sec. (Lift-off to orbit). December 16, 1976: Unable to fund Apollo 19 and Apollo 20, NASA Administrator James Fletcher ordered the two remaining Saturn V vehicles, AS-514 and AS-515, to be released to museums. Here is where you can see the remaining Saturn V components; U.S. Space & Rocketry Center, Huntsville, AL; AS-500D made up of S-IC-D, S-II-F/D, S-IVB-D. All components are test stages, never meant for flight. None the less, it is a full scale Saturn V. Johnson Space Center, Houston, TX; S-IC from AS-514, S-II from AS-515, S-IVB from AS-513. Kennedy Space Center Visitor Complex, Cape Canaveral, FL; S-IC-T, (test stage), S-II and S-IVB from AS-514. NASA Stennis Space Center, Pearlington, MS; S-IC from AS-515. The S-IC was first test fired at this location. National Air & Space Museum, Washington, DC; S-IVB from AS-515, (converted to Skylab B backup spacecraft). Steven F. Udvar-Hazy Center, National Air & Space Museum, Chantilly, VA, James S. McDonnell Space Hanger; IBM Instrument Unit. p.6 of 8.

Bibliography; The Encyclopedia of U.S. Spacecraft, Yenne, Bill, 1985, Bison Books Corp., Published; Exeter Books, New York, NY, ISBN 0-671-07580-2. The History of Manned Space Flight, Baker, David, Ph.D, 1981, New Cavendish Books. Published in the United States by Crown Publishers, Inc., New York, NY. Second Edition, 1985. The Rocket, (The History and Development of Rocket & Missile Technology), Baker, David, Ph.D, 1978, New Cavendish Books. Crown Publishers, New York, NY., First Edition. Spaceflight And Rocketry: A Chronology, Baker, David, 1996, Facts On File, Inc., New York, NY, ISBN 0-8160-1853-7. Space Technology, Gatland, Kenneth, et al, 1981 Salamander Books, Ltd., Published by Harmony Books, New York, NY. ISBN 0-517-54258-7. Additional Resources; NASA, Johnson Space Center; online archives. NASA, Marshall Space Flight Center; online archives. Photos NASA. Source; Great Images In NASA. Used with permission. ~ Prepared by Bill Boublitz, NAR 36860, Section 139, NARHAMS, August, 2017. p.7 of 8. Earth from AS-501 / Apollo 4 at apogee; 11,242 mi.

Liftoff of AS-501 / Apollo 4, November 9, 1967.