Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

Similar documents
A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Xcel Energy MN Solar*Rewards Community

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Consumer Guidelines for Electric Power Generator Installation and Interconnection

TILLAMOOK PEOPLE S UTILITY DISTRICT

Renewable Net Metering Program Appendix ESD APX 001 1

2018 Solar Installer Training. March 2018

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Community Shared Solar for Local Governments

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Interconnection of Distributed Generation Net Metering (Excluding Solar*Rewards) DATE: August 17, 2015

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

JEA Distributed Generation Policy Effective April 1, 2018

Electrical District No. 3 SOLAR Q & A

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

NET METER REQUEST FORM

Municipality Generator Interconnection Application Single Meter Application Part I

Solar Net Metering and Billing FAQ

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Solar*Rewards Frequently asked questions system size and customer usage

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Battery Interconnection Process

TERMS AND CONDITIONS

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

REVISION NO.: 7 EFFECTIVE: 07/07/16

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

Battery Interconnection Process

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Louisville Gas and Electric Company

2018 Solar Installer Training for Xcel Energy Colorado

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Definitions. Scope. Customer Generation Interconnection Requirements

2017 Solar Installer Training. October 2017

Net Metering Service. Customer Information Package

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

NET METERING APPLICATION

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Purpose. Background. Exclusions

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Renewable energy & your co-op Installation procedures & guidelines for Farmers EC members YOU RE IN POWER.

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

Section 6. Generation Interconnection

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

24. SOLAR INCENTIVE PROGRAM II

Connecting your home or small business generation

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Solar Power Installation Application

ENGINEERING SPECIFICATION

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

Presentation to the PJM NEMSTF Interconnection Issues. Interconnecting Solar Projects on the PSE&G Distribution System

Net Metering & Compensation Seminar

Interconnection Process Simplification Webinar

INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES

Umatilla Electric Cooperative Net Metering Rules

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Noble County Rural Electric Membership Corporation

Dominion Energy Instructional Guide for Completing Virginia Form NMIN

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

NYS Commercial Solar Interconnection Workshop & Roundtable. Thomas V. Higgins Lead Technical Support Consultant - 9/29/2016

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

HydroGenerations PROGRAM HANDBOOK

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Implementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Michigan Renewable Energy Case Study

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

06/05/2018. COMMUNITY SOLAR OVERVIEW For Generation Owners and Subscribers

SMART Program Specific Metering Wiring Diagrams. November 2018

Transcription:

P a g e 1 Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota The purpose of this document is to provide Garden Operators further documentation of engineering requirements for the Solar*Rewards Community program. Many elements of this document will come from Xcel Energy s Electric Rate Book, Section 9, which can be found here.

TABLE OF CONTENTS P a g e 2 1. What documents are needed for engineering review? 2. What are the engineering review fees and how may they be submitted? 3. What are typical interconnection costs? 4. How long does engineering review take? 5. How does an applicant appeal a Co Location and/or engineering decision? 6. What is a Material Upgrade? 7. What is House Power? 8. May a Solar Gardens be placed behind an existing service? 9. How should the metering be designed? 10. Where do external utility disconnect switches need to be placed? 11. Are any customer owned materials allowed on the utility side of the point of common coupling? 12. What must appear on the Line Diagram? 13. What if my project impacts the transmission system? 14. How do I schedule a bi weekly meeting? 15. Where can I find Standards for Electric Installation and Use for 2014? 16. Will Xcel Energy accept new inverter technologies? 17. What telemetry details are required for Solar*Rewards Community projects?

1. What documents are required for engineering review? P a g e 3 Xcel Energy requires (1) a one line diagram, (2) site plan, and (3) complete Interconnection Application (sometimes referred to as IA) Further information can be found on our website. 2. What are the engineering review fees and how may they be submitted? Interconnection Application and Engineering Study fees for Solar*Rewards Community Gardens are determined by system size and are as follows: System Size Application Fee 20kW andunder $100 20kW 250kW $1,000 250kW 500kW $3,000 500kW 1,000kW $2,000* *Engineering study fees may apply; firm cost of estimate for study will be given at the time of preliminary review. Application fees need to be accompanied with an Interconnection Application Fee Form, which can be downloaded through the application portal in Salesforce, and mailed in check form to: Xcel Energy Solar*Rewards Community Program P.O. Box 59 Minneapolis, MN 55440 0059 3. What are typical interconnection costs? Range of Typical DG Interconnection Costs, as shown in section 10 tariff DG Size Range Limited Parallel Extended Parallel 0 40 kw $300 to $10,000 $300 to $10,000 40 250 kw $500 to $15,000 $500 to $20,000 >250 1000 kw $2,000 to $25,000 $2,000 to $150,000 >1 MW $5,000 to $35,000 $5,000 to $1,000,000 Note: actual interconnection costs may fall outside of these ranges. 4. How long does engineering review take? Engineering review typically takes 40 days on a best efforts basis, but no more than 50 business days as noted in our Section 9 Tariff, 2 nd Revised Sheet No. 68.

5. How does an applicant appeal a Co Location and/or engineering decision? P a g e 4 Appeals relating to Co Location and Engineering can be referred to the Department of Commerce. Appeals are initiated through email to the Department of Commerce. Xcel Energy must be copied at SRCMN@xcelenergy.com. 6. What is a Material Upgrade? Material Upgrades are defined by the Section 9 Tariff Original Sheet No. 68.4 68.5 for co located projects. 7. What details are required for grounding? Xcel Energy requires grounding details (i.e. grounding transformer) including ratings. The study shall check for effective grounding for the generation system. Requirements can be found here. 8. What is House Power? The House Power rule can be found in the Section 9 Tariff, Sheet 71. It states: House Power shall mean the electricity needed to assist in the PV System s generation, including system operation, performance monitoring and associated communications, except for energy directly required for the local control and safe operation of the PV System. It also means other electricity used by the Community Solar Garden, such as for perimeter lighting, a visitor s center or any other structures or facilities at the Community Solar Garden Site. House power is all electrical usage between the main service meter and production meter. More information can be found on tariff Sheets 74 & 75. 9. May a Solar Gardens be placed behind an existing service? No. Each garden must have its own separate service. 10. How should the metering be designed? Metering standards can be found in the Blue Book; found: The main service meter will be bidirectional; the production meter will be uni directional. 11. Where do external utility disconnect switches need to be placed? They must be visible, lockable, and readily accessible. Preferred location is within 10 of metering, or an exception can be requested. Any exception must include permanent placard indicating location of all meters and utility AC safety disconnects, specifically clarifying main service meter and production meter associated with each individual garden.

P a g e 5 12. Are any customer owned materials allowed on the Utility side of the Point of Common Coupling? No. 13. What must appear on the Line Diagram? Please see applicable sample Line Diagrams on the Xcel Energy website under Information for Garden Operators. Please see the Section 10 Tariff Info Packet cover letter for further details on secondary service. 14. What if my project impacts the transmission system? Xcel Energy will refer your project to MISO for further review under the following circumstances: If the interconnection affects the transmission system, which is currently defined by tariff as power being exported onto the bulk system. Xcel Energy transmission engineers will review the proposal and contact MISO and the applicant of the potential transmission impact. MISO will assess whether more detailed study is required and, whether any upgrades are needed to accommodate the additional distributed generation. If MISO determines that upgrades are needed, the applicant will be given the option of paying for these upgrades or reducing the size of their project to avoid the need for the upgrades. 15. Where can I find Standards for Electric Installation and Use? Information on standards can be found here. A Professional Engineer stamp is not needed on the engineering documents for Xcel Energy but local jurisdiction might require it. 16. Will Xcel Energy accept new inverter technology? Xcel Energy has noted several inverters proposed for projects that may not be capable of operating at the full power factor range of 90% leading to 90% lagging at the inverter terminals, in accordance with the Interconnection Agreement. It is the developer s responsibility to verify the inverters utilized are compliant. We have also received requests to use inverters that would be de rated to meet the required program standards. If the inverter has an apparent power (MVA) or real power (MW) rating above the capacity noted in the interconnection agreement (IA), up to 120% of the approved capacity, the inverter shall use a real power limiting function to assure that the IA real power capacity is never exceeded.

P a g e 6 If the inverter is overrated by more than 20%, a different inverter may be required that better matches the facility IA capacity. We can accept a factory derating of the proposed inverter, which is not accessible to the field personnel, with a factory installed placard with the reduced rating. Derating by other means will not be accepted and the facility will be reviewed as capable of the full, original inverter rating. We will monitor compliance of the IA capacity by measured values from the generator production meter. Violation of the capacity of an IA is viewed as a serious issue due potential impacts to reliability and power quality. For these reasons, operational generation systems that do not comply with this policy may be disconnected in an expedited manner after initial notice is given. Inverter Nameplate* as Percentage of IA Capacity (MW) 120% 100% Factory Derating and Placard of New Capacity from Manufacturer is Required Real Power Limiting Function Required to Keep Power Production At or Below IA Capacity No Requirement for Derating or Power Limiting * If the inverter has MW and MVA nameplate capacities, the MW value should be used for this determination. If only a MVA rating is present, that should be used. 17. What telemetry details are required for Solar*Rewards Community projects? Telemetry is required for all community solar garden projects and is often determined by site. The Company will allow a cellular 4G interconnection telemetry enclosure requiring one enclosure (sized 20 by 20 by 12 ) to hold all the details and security for telemetry equipment. The cost estimate for this solution is $20,000 plus the inclusion of a monthly fee for the cellular connection. Further information can be found on our website.