Fiber Power Enclosure. Installation Manual. Effective: October 2015

Similar documents
OBE-3-FT Outdoor Series

LPE Enclosure. Installation and Operation Manual. LPE Enclosure Effective: 05/2010. member of The

OBE-3 Outdoor Series

Fiber Backhaul Enclosure

XM2-HP and XM2 CableUPS

SMU-F Valve Regulated Lead Acid Battery

FlexPoint TM. Series Power Supplies. Technical Manual FlexPoint 1215 / 1232 / 1250 Series Indoor Power Supplies Effective: August, 2015

PWE/PME Series. PWE/PME Series Technical Manual. Pole and Ground-mount Enclosures. Effective: October Alpha Technologies

SMU-F. AlphaCell TM. Technical Manual. Valve Regulated Lead Acid Battery. AlphaCell SMU-F Valve Regulated Lead Acid Battery Effective: February 2007

FlexPoint TM. Series UPS. Technical Manual FlexPoint 1208-F / 1232-D / 1250-D Series Indoor UPS Effective: September, 2015

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3

AlphaCell SMU. Technical Manual. AlphaCell SMU. Effective: January Alpha Technologies

Nickel Cadmium Clear Case

AlphaGen DCX VDC Portable Generator. Operation Manual. Effective: June 2014

Installing Power Components

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Sentinel Field Satellite Controller

Extended Battery Cabinet for Nfinity

Electric Vehicle Charging Station

INSTALLATION MANUAL ELECTRIC DOUBLE OVEN RANGE

MASTERsine Inverter PXA Series Installation Guide

Technical Manual MPS48-7F/T. Alpha Technologies

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

Section 02: Pre-Installation Procedures

Dual-Lite Trident TRF 40 Wide Battery Cabinet 20-40kVA Systems USER MANUAL

Go Power! Manual. GP-1750HD Inverter GP-2500 Inverter

! "! User Manual Myers Power Products CTEP/G Manual 6/2009

Installation And Operation Instructions

INSTALLATION MANUAL.

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

Installation And Operation Instructions

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

MODEL ELC-12/40-CVM-D BATTERY CHARGER

Battery Power Inverters

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

The Power of Reliability INSTRUCTION MANUAL

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

INSTALLATION GUIDE AND USER MANUAL

Owners Installation, Operation, and Safety Manual

VERTIV XTE 401 SERIES. Ordering Guide

Cabinet and Rack Installation

General Precautions. Personnel Precautions

CIVACON GROUND VERIFICATION RACK MONITOR SYSTEM and ASSOCIATED EQUIPMENT

User Manual. Solar Charge Controller 3KW

Pure Sine Wave Inverter GP-HS1500. Owner s Manual

8300 Series Installation Guidelines

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

Cabinet and Rack Installation

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Switching DC Power Supply

AUTO CHARGE 4000 MODEL #: LOW PROFILE CHARGER AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

Installation Manual. For. Alumavator / Platinum Boathouse Lifts

Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries

10 Commercial, Industrial, Agricultural Services

APX Series. Non-standby Power Supply. APX Series. Installation and Operation Manual. Effective: April 2015 Alpha Technologies

GS-IOB-230VAC. Input/Output/Bypass Assembly. Installation Instructions. Purpose. Scope. Requirements. Grounding Instructions

Company Switch Installation Instructions and User Manual

Generator Fire Safety: Generator assemblies should be located outside the building.

MODEL ELC-12/60-D BATTERY CHARGER

Installation and Operation Guide. Tundra HD 2500 Power Inverter. for the. Webasto BlueCool Truck System

AMENDMENT ELECTRIC SERVICE MANUAL 2014

Installation And Operation Instructions

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

Installation Manual. For. Trident Boat Lifts

SPECIAL SPECIFICATION 1788 Surveillance Cabinet

INSTALLATION GUIDE AND USER MANUAL

GES-202TLP Traffic Light System Installation Manual

Fiber Optic Above-Ground) Cross-Connect Enclosure (ACE) Model ACE-200DS Installation Guide)

Go Power! Manual. GP-SW1500 Inverter. Table of Contents. Go Power! Electric Inc. PO Box 6033 Victoria, BC V8P 5L4

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

AUTO CHARGE 4000 MODEL #: AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL. Ph: Fax:

n Operator s Manual n Redundant Control Unit FOR CFR UNINTERRUPTIBLE POWER SUPPLIES FROM ALPHA TECHNOLOGIES

Solar module user manual Conergy PM 225P-250P

LPC 20 MODEL #: LOW PROFILE CHARGER AUTOMATIC SINGLE OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

Illuminator System Series CIII

Illuminator System Series CM

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257

50A Dual-Feed 5/5 GMT Total Front Access Fuse Panel

SPECIAL SPECIFICATION 6894 Communication Cabinet

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

Installation Instructions and User Manual For. 100 Watt Inverter Power System

Powernode Systems Broadband Power Systems

SP6. Automatic Battery Charger. Model

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

PUMP PLUS 2000 PLC MODEL #: PP AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

Galaxy VM. Battery Breaker Box Installation 09/

Sentry Battery Charger. Installation and Operations Manual Section 75

Installation Manual. D3600- Series Duplex Grinder Systems. Contents

Quick Connection Panel (QCP) Installation Guide

Installation and Operation Instructions SERVICE BY QUALIFIED PERSONNEL ONLY

ELECTRO-MECH SCOREBOARD CO.

GP-1000 Inverter. Go Power! Electric Inc. PO Box 6033 Victoria, BC V8P 5L4 Tel: Fax:

Electrical Installation

MMA 160S ARC/MMA WELDER OPERATION INSTRUCTIONS

Transcription:

Fiber Power Enclosure Installation Manual Effective: October 2015

Safety Notes Alpha considers customer safety and satisfaction its most important priority. To reduce the risk of injury or death and to ensure continual safe operation of this product, certain information is presented differently in this manual. Alpha encourages special attention and care to information presented in the following manner. WARNING! GENERAL HAZARD WARNING provides safety information to reduce the risk of INJURY OR DEATH to the technician or user. WARNING! ELECTRICAL HAZARD ELECTRICAL HAZARD WARNING provides electrical safety information to PREVENT INJURY OR DEATH to the technician or user. WARNING! FUMES HAZARD FUMES HAZARD WARNING provides fumes safety information to PREVENT INJURY OR DEATH to the technician or user. WARNING! FIRE HAZARD FIRE HAZARD WARNING provides flammability safety information to PREVENT INJURY OR DEATH to the technician or user. There may be multiple warnings associated with the callout. Example: WARNING! ELECTRICAL & FIRE HAZARD This WARNING provides safety information for both Electrical AND Fire Hazards. CAUTION! CAUTION provides safety information intended to PREVENT DAMAGE to material or equipment. NOTICE: NOTICE provides additional information to help complete a specific task or procedure. ATTENTION: ATTENTION provides specific regulatory/code requirements that may affect the placement of equipment and /or installation procedures. The following sections contain important safety information that must be followed during the installation and maintenance of the equipment and batteries. Read all of the instructions before installing or operating the equipment, and save this manual for future reference.

Fiber Power Enclosure Installation Manual 031-148-C2-001, Rev. A2 Effective Date: October 2015 2015 by Alpha Technologies, Inc. Disclaimer Images contained in this manual are for illustrative purposes only. These images may not match your installation. The operator is cautioned to review the drawings and illustrations contained in this manual before proceeding. If there are questions regarding the safe operation of this powering system, please contact Alpha Technologies or your nearest Alpha representative. Alpha shall not be held liable for any damage or injury involving its enclosures, power supplies, generators, batteries or other hardware if used or operated in any manner or subject to any condition not consistent with its intended purpose or is installed or operated in an unapproved manner or improperly maintained. Contact Information Sales information and customer service in USA (7AM to 5PM, Pacific Time): Complete technical support in USA (7AM to 5PM, Pacific Time or 24/7 emergency support): Sales information and technical support in Canada: Website: 1 800 322 5742 1 800 863 3364 1 888 462 7487 www.alpha.com 3

Table of Contents Safety Notes... 2 FPE Safety Notes... 6 1.0 Overview... 7 1.1 Introduction... 7 1.2 Enclosure System and Options... 8 2.0 Pre-Installation... 9 2.1 Site Considerations... 9 2.2 Pre-Cast Polymer Concrete Pad Dimensions... 10 2.3 Pre-Cast Pad Foundation... 10 2.4 Underground Vault Installation... 11 2.5 Grounding and Earth Connection... 12 2.5.1 Safety Ground and Earth Connection... 12 2.5.2 Power Output Return... 12 2.5.3 Communications Grounding... 12 2.5.4 Typical Site Grounding... 13 3.0 Installation... 14 3.1 Enclosure Protection... 14 3.2 Transportation and Lifting... 14 3.3 Enclosure Installation... 15 3.3.1 Attaching Enclosure to the Pad... 15 3.4 Utility Powering... 16 3.4.1 Electrical Service Connection... 16 3.5 Service Power Inserter... 18 3.6 Battery Installation... 19 3.6.1. Battery Safety... 19 3.6.2 Battery Identification... 19 3.6.3 Battery Tray Replacement... 20 3.6.4 Battery Terminal Connections... 21 3.6.5 Battery Connection... 22 3.7 Power Supply Installation... 23 3.7.1 Power Supply Installation... 23 3.8 Battery Temperature Sensors... 25 3.9 Cooling Fan Intake Filter... 26 3.10 Fiber Node Installation... 26 3.11 Optional Lightning Arrester... 27 3.12 Optional Equipment... 28 3.13 Dimensions... 29 4

Figures and Tables Fig. 1-1, Front View, with Door Removed... 7 Fig. 1-2, Enclosure System and Options... 8 Fig. 2-1, Pad Dimensions in Inches/Millimeters... 10 Fig. 2-2, Cross-section of Pad Site... 10 Fig. 2-3, Suggested Grounding... 13 Fig. 3-1, Enclosure Protection... 14 Fig. 3-2, FPE Pedestal Mount... 15 Fig. 3-3, Wiring the Service Entrance... 17 Fig. 3-4, SPI Cover Removal... 18 Fig. 3-5, Connecting Coax to SPI Output Port... 18 Fig. 3-6, Battery Date Code Location... 19 Fig. 3-7, Location of Battery Tray Mounting Hardware... 20 Fig. 3-8, Battery Terminal Assembly... 21 Fig. 3-9, 36V Battery String Wiring... 22 Fig. 3-10, 48V Battery String Wiring... 22 Fig. 3-11, Power Supply Placement... 23 Fig. 3-12, Battery Circuit Breaker and Battery Input Locations... 24 Fig. 3-13, Output Connection... 24 Fig. 3-14, Power Cord Connection... 24 Fig. 3-15, Placement of XM2 Series Remote Temperature Sensor (RTS) on Battery... 25 Fig. 3-16, XM2 Series Battery Remote Temp Sensor (RTS) Placement... 25 Fig. 3-17, XM3 Series Precision Temperature Sensor (PTS) Placement... 25 Fig. 3-18, Fiber Node Placement... 26 Fig. 3-19, LA-P+ Installed in Duplex Receptacle... 27 Fig. 3-20, Location of LED on LA-P+... 27 Fig. 3-21, Front View, FPE, Dimensions... 29 Fig. 3-22, Rear View, FPE, Dimensions... 30 Table 1-1, Enclosure Specifications... 7 Table 3-1, Enclosure Equipment Options... 28 5

FPE Safety Notes The manufacturer cannot anticipate every circumstance that may involve a hazard, therefore, these warnings are not comprehensive. Mechanical Safety WARNING! INJURY HAZARD Keep hands and tools clear of fans. Fans are thermostatically controlled and may turn on automatically. Power supplies can reach extreme temperatures under load. Use caution around sheet metal components and sharp edges. Electrical Safety WARNING! ELECTRICAL HAZARD Lethal voltages are present within the power supply and electrical boxes. Prior to any installation or removal procedure, always check the circuit with a volt meter with respect to the grounded portion of the enclosure (both AC and DC). A licensed electrician is required to install permanently wired equipment. Input voltages can range up to 240 Vac. Ensure that utility power is disabled before beginning installation or removal. Ensure no liquids or wet clothes contact internal components. Hazardous electrically live parts inside this unit are energized from batteries even when the AC input power is disconnected. Battery Maintenance Guidelines Follow all battery manufacturer s instructions for battery transportation, installation, storage or maintenance. To prevent damage, inspect batteries every 3 months. CAUTION! Electrolyte (battery emission) is corrosive and may cause injury or equipment damage. Clean and remove all electrolyte in accordance with all federal, state, and local regulations or codes. Only trained, authorized personnel should diagnose, service, and replace batteries or battery components. Replace batteries that show signs of cracking, leaking or swelling with one of the identical type and rating. Replace battery cables showing signs of damage (e.g. fraying, corrosion, etc.). Correctly torque and connect all battery connection hardware per manufacturer s recommendations. Apply battery manufacturer s specified antioxidant compound on all exposed connections. Verify all battery terminals and exposed connection hardware is not within 2" of a conductive surface. Ensure adequate enclosure ventilation to prevent an accumulation of potentially dangerous gas. Always transport batteries per the manufacturer s specifications. Never install old or untested batteries. Recycling and Disposal Instructions ATTENTION: Spent or damaged batteries are considered environmentally unsafe. Always recycle used batteries or dispose of the batteries in accordance with all federal, state and local regulations. 6

STRG A STRG B FLASH = MIN ALM STRG C SOLID = MAJ ALM STRG D N N N OUTPUT 1 OUTPUT 2 N + 1 ON I OFF BATTERY BREAKER LRI OUTPUT ALARM TEST BATTERY TEMP BATTERY INPUT ALM/ RDY RST REG DS TPR ACT E T H LNK Rx/Tx PWR A /B C /D GRN = OK BLUE = WARN RED = OUT C O M 1.0 Overview 1.1 Introduction Alpha s Fiber Power Enclosure (FPE) Series is flexible and provides modular expandability for Cable TV powering applications. The FPE is designed for one CableUPS power supply and up to eight batteries. The FPE is a solution for the customers who choose to co-locate an optical (fiber) node and/or a splice enclosure with the power supply. Enclosure Specifications Dimensions: 42"H x 36"W x 32"D (1067mm x 914mm x 813mm) With Pre-Installed Pedestal Mount - 56"H x 36"W x 32"D (1422mm x 914mm x 813mm) Weight: 145 lbs (66 kg) With Pre-installed Pedestal Mount - 173 lbs (78 kg) Color: Seafoam Green, Pine Green, White, Gray Standard Features: Enclosure, system ground bar and removable / lockable doors, and module tray Options: Finish: Material: Strand mount bar and universal mounting bracket for optical node, fiber-loop kit, built in star pattern, and fan kit Durable powder coat exterior Aluminum Table 1-1, Enclosure Specifications i ~ O ~ Fig. 1-1, Front View, with Door Removed 7

1.0 Overview 1.2 Enclosure System and Options 1 2 3 4 5 6 1 Removable, reversible lid 5 Precast concrete polymer lid, enclosure section 2 Enclosure (rear view) 6 Polymer vault 3 Lockable front and rear doors 7 Precast pad (not shown) 4 FPE mounting ring Fig. 1-2, Enclosure System and Options 8

2.0 Pre-Installation 2.1 Site Considerations Plan the site to ensure the enclosure receives the necessary air flow. If possible, in areas of extreme heat, position the enclosure so that it will be shaded from the sun. In areas of prevailing winds, the sides of the cabinet should face the winds instead of the doors. This will greatly reduce the buildup of sand or snow against the enclosure s air vents. In areas of potential flooding, place the concrete pad on a geographical site located above the flood plain. Place the enclosure where it will be free of obstructions, allowing easy access to the doors for service or equipment access. For ventilation and maintenance, allow a minimum work space of 40 inches in the front and 40 inches in the rear, between the enclosure and other solid structures. Place the enclosure well away from ground level sources of forced water, such as underground sprinkler systems and direct roadway splash. The concrete pad drawing provided in this manual contains all of the required mounting details, including electrical service and cable plant entrances. For ease of installation, lightweight polymer concrete pads are available from Alpha Technologies for all FPE Series enclosures. The vapor barrier material (such as 30 lb. felt, neoprene pond liner, or heavy grade tar paper) must initially extend at least 6" (152.4 mm) in all directions around the perimeter of the enclosure and be trimmed closer to the enclosure after installation. WARNING! ELECTRICAL & FIRE HAZARD Install batteries AFTER the enclosure is installed on site. Transporting the unit with batteries installed may cause a short circuit, fire, explosion, and/or damage to the battery pack, enclosure and installed equipment. Damage caused by improper shipping or transporting a unit with batteries installed is not covered by the warranty. 9

2.0 Pre-Installation 2.2 Pre-Cast Polymer Concrete Pad Dimensions 3.39 / 86 mm 25.3 / 642 mm REF 9.75 / 247 mm REF 35.86 / 910 mm 29.86 / 758 mm +.13 / 3 mm -.00 27.880 / 708 mm 26.550 / 674 mm 25.74 / 653 mm 17.24 / 437 mm 14.19 / 360 mm 13.24 / 336 mm 12.430 / 315 mm B D 14.12 / 358 mm REF 27.9 / 708 mm REF 3.19 / 81 mm 2.19 / 55 mm.000 2.14 / 54 mm +.13 / 3 mm -.00 8.1 / 205 mm B C 11.4 / 289 Wmm 7.46 / 189 mm + 5.37 / 136 mm.13 / 3 mm -.00 2.46 / 62 mm 1.51 / 38 mm.000 6.01 / 152 mm 15.76 / 400 mm 20.31 / 515 mm 25.250 / 641 mm 30.63 / 778 mm +.13 / 3 mm -.00 36.6 / 929 mm 2.3 Pre-Cast Pad Foundation Fig. 2-1, Pad Dimensions in Inches/Millimeters (Alpha Precast Pad p/n 641-095-10) 3 2 1 1 Undisturbed Ground 2 Compacted Gravel (approx. 12" / 304.8mm) 3 Pre-Cast Pad (3" to 6" / 76.2 to 152.4mm thick) 10 Fig. 2-2, Cross-section of Pad Site

2.0 Pre-Installation 2.4 Underground Vault Installation Hardware Recommendations: 7/16" Nut Lock washer Flat Washer Concrete Pad with 7/16" Mounting Studs CAUTION! A 25+ year continous vapor barrier must be used between the enclosure and pad to prevent moisture ingress and possible corrosion caused by metal to concrete contact. The vapor varrier material (such as 30 lb. felt, neoprene pond liner, or heavy grade tar paper) should initally extend at least 6" (152.4mm) in all directions around the perimenter of the enclosure and later be trimmed closer to the enclosure. 1. Unwrap the enclosure and inspect the contents. If items are missing or damaged, contact Alpha Technologies and the shipper immediately. 2. Place the vapor barrier material on the pad. 3. Unbolt the enclosure from the shipping pallet. 4. With no less than two installation personnel, lift the enclosure off the shipping pallet and place over the mounting studs on the pad. 5. Secure the enclosure to the pad using the hardware supplied with the precast pad or pedestal support. 6. Trim the vapor barrier material.. 11

2.0 Pre-Installation 2.5 Grounding and Earth Connection WARNING! ELECTRICAL HAZARD Electrical shock can kill. An ungrounded or improperly grounded system increases the risk of electrical shock. Make all ground rod connections with a listed grounding clamp suitable for direct burial or exothermic welding. A grounding and Earthing system is necessary for the safety of service personnel, operation and protection of the power supply equipment within the network. Lightning strikes, grid switching or other power aberrations on the power line and/or communication cable may endanger service personnel and damage the power and communication systems. An effective ground and Earthing system diverts these unwanted high-energy transients along a low-impedance path to Earth. This prevents such aberrations from reaching high voltage levels, which pose a threat to personnel and equipment. Lightning protection is best achieved by single-point grounding, meaning components of the grounding system act as a single point of uniform impedance. Ground connection in the enclosure should be a single, bonded electrical connection for all equipment to the enclosure. This point should then be connected to the Earth system where all ground rods are properly bonded. 2.5.1 Safety Ground and Earth Connection The safety ground and Earth is a two-part system, comprised of the utility service and the Alpha system. 1. Utility service; As a minimum requirement for the protection of Alpha equipment, the local utility service must provide a low-impedance path for fault current return. In addition, there must be a low impedance bonded path between the Alpha Power Supply and the enclosure. 2. The Alpha grounding system; The Alpha grounding system consists of a low-impedance connection between the enclosure and an Earth ground (located at least 6' (1.828 m)) away from the Utility Earth connection). This impedance between the enclosure and Earth must be 5 Ohms or less at 60 Hertz as measured by AMPROBE Model DGC-1000 or equivalent. The measurement should be made on the wire or ground rod after it exits the enclosure. Local soil conditions dictate the complexity of the grounding system required to meet the 25 Ohm (maximum) resistance. For example, a single 8' (2.438 m) ground rod may be sufficient to meet the requirement. In some cases, a more elaborate system may be required such as multiple ground rods connected by a #6AWG solid copper cable buried 8-12" (0.202 0.305 m) below the surface. Where this is not possible, contact a local grounding system expert for alternate methods that will meet the 25 Ohm (maximum) specification. 2.5.2 Power Output Return For proper operation, the Service Power Inserter (SPI) must be securely bonded to the enclosure. 2.5.3 Communications Grounding For an external status monitoring transponder, the transponder chassis is typically bonded via a separate ground wire to the enclosure. For systems using an embedded transponder, the grounding connection is typically made either through a separate chassis ground block bonded to the enclosure or by means of the internal mounting hardware which bonds the transponder through the CableUPS. Please refer to the appropriate communications product manual for installation procedures. Alpha strongly recommends the use of a surge arresting device (Alpha p/n 162-028-10 or equivalent) on communication cables electrically bonded to the Alpha enclosure. 12

2.0 Pre-Installation 2.5 Grounding and Earth Connection 2.5.4 Typical Site Grounding WARNING! ELECTRICAL HAZARD Electrical shock can kill. An ungrounded or improperly grounded system increases the risk of electrical shock. Make all ground rod connections with a listed grounding clamp suitable for direct burial or exothermic welding. NOTICE: Alpha generally recommends using the grounding method illustrated below. However, the grounding method appropriate for a particular site depends on local codes, the NEC (National Electric Code), and other site-specific characteristics. Alpha Technologies recommends 5 Ohms minimum ground resistance between enclosure and ground rods, in accordance with IEEE 1100-1999 Powering and Grounding Electronic Equipment. Alpha Technologies assumes no responsibility or liability for failure of the installer to comply with the requirements of all applicable local and national codes. Where allowed, exothermic welding may be used as an alternative to Burndy clamps and connectors. Burndy YGHP58C2W-2TN or Equivalent Burndy YGHP58C2W-3 or Equivalent 2 Terminate at Service Entrance Ground Bar 4 Terminate at Enclosure Ground Bar 2 2' min. 8' (2.438 m) Ground Rods 6' (1.828 m) Apart (min.) 1 #2 AWG 0.6096 m 3 2 2 Fig. 2-3, Suggested Grounding Image for reference only Service Grounding (required) 1 2 3 4 #6 bare copper wire from service entrance ground bar, with two 1/2" (12.7mm) X 8' (2.438 m) copper ground rods, driven at least six feet apart. Lightning Protection (optional) Four 1/2" (12.7mm) X 8' (2.438 m) copper ground rods, driven at least two feet from pad. #6 bare copper wire loop, at least 30" (762 mm) below grade, and terminated at each ground rod. #6 bare copper wire from loop to enclosure ground bar in service entrance. 13

3.0 Installation 3.1 Enclosure Protection Alpha Technologies cannot anticipate all of the ways a vehicle may potentially threaten an installed system or the specific type of protection that is appropriate for a particular location. The determination of the threat to the equipment and the means of protection are the responsibility of the end user of the equipment and the authority having jurisdiction. The following installation drawing for Alpha s Standby Power systems are general recommendations and not intended to be a specific guideline for protecting the equipment. The numbers of Bollard posts (or other protection devices) depend upon equipment locations, site surveys, and traffic patterns PAD POSTS SIDEWALK Fig. 3-1, Enclosure Protection 3.2 Transportation and Lifting The FPE cabinet as shipped weighs approximately 100 lbs. (45.36 kg). A safe means of transportation to the site and a safe procedure for unloading the enclosure is necessary. Do not transport or lift with a device that may not be able to bear the unit s weight, and do not place the unit upon a surface that will not be able to fully support it. NOTICE: Enclosure must always remain in the upright position during the shipping, storage and installation process. Damage may result from enclosure being shipped or stored on its side. Electronic modules, batteries or other components must not be installed until the enclosure is securely set in place at its permanent location. 14

3.0 Installation 3.3 Enclosure Installation 3.3.1 Attaching Enclosure to the Pad Tools and Materials Required: Ratchet set with 6" (152.4 mm) extension Vapor Barrier Utility Knife NOTICE: Some FPE configurations have a pre-installed pedestal mount (Alpha p/n 746-617-20). The enclosure installation method for this pre-installed pedestal mount is identical to the normal installation. The panels on the pre-installed pedestal mount can be removed for service access. Procedure: 1. Unwrap the enclosure and inspect the contents. If items are missing or damaged, contact Alpha Technologies and the shipper immediately. 2. Place the vapor barrier material on the pad. NOTICE: A 25+ year continuous vapor barrier must be used between the enclosure and pad to prevent moisture ingress and possible corrosion caused by metal to concrete contact. The vapor barrier material (such as 30 lb. (13.608 kg) felt, neoprene pond liner, or heavy grade tar paper) should initially extended at least 6" (152.4mm) all directions around the perimeter of the enclosure. 3. Unbolt the enclosure from the shipping pallet. 4. Using an appropriate crane and spreader bar, lift the enclosure off the shipping pallet, and place over the mounting studs on the pad. 5. Secure the enclosure to the pad using four stainless steel flat washers, lock washers, and nuts. 6. Trim the vapor barrier material flush with the enclosure. Fig. 3-2, FPE Pedestal Mount Service Panel (Back - Not Visible) Service Panel (Front) 15

3.0 Installation 3.4 Utility Powering 3.4.1 Electrical Service Connection WARNING! ELECTRICAL HAZARD Electrical shock can KILL. All electrical service connections must be made by an authorized, trained personnel. CAUTION! The following should be performed only by qualified service personnel and in compliance with local electrical codes. Verify electrical codes prior to installation. Codes may vary and contain specific conduit and wire sizes for connection to the service entrance. Connection to utility power must be approved by the local utility before installing the power supply. The enclosure can be equipped with a Square D, rainproof service entrance (SUSE rated). The service entrance is equipped with a 20/15 Amp circuit breaker for a 120/240 Vac, split phase, 3 wire w/gnd source. NOTICE: The XM2 and XM3-HP Power Supplies are powered by either 120Vac or 240Vac (120/240 grounded neutral), attached to an external service entrance. The size of the service conductors must be based upon the actual size of the utility service and be in accordance with applicable electrical code requirements. The utility conduit may be placed in two locations, depending upon the utility service entrance requirements. Note the optional conduit location for use with meter base and the standard location for entry directly to the load center. Proper grounding is critical. The enclosure MUST have a hardwired ground to the service entrance. A qualified electrician should verify that grounding is in compliance with applicable electrical codes. Soil conditions vary and may affect the integrity of the pad. Alpha Technologies recommends that proper steps be taken to ensure that the soil supporting the pad is stable. Improper installation of the pad may cause uneven settling or cracking which is not covered under warranty. Both standard and EUSERC style meter bases are available for some configurations. Consult Alpha Technologies or your local representative regarding compatibility with your specific application. Materials Required: 1" (25.4 mm) dia. conduit - PVC or Galvanized Steel (threaded) #6 AWG - Red /stranded insulated wire #6 AWG - Black / stranded insulated wire #6 AWG - White / stranded insulated wire #2 AWG or larger - Stranded copper ground wire 16

3.0 Installation 3.4.1. Electrical Service Connection Tools Needed: No. 2 Flat Head Screwdriver Adjustable Pliers (Channel-Lock) Procedure: 1. Locate the service entrance panel on the enclosure (exterior). Remove the cover to access the circuit breaker assembly. If this service panel is to be used as the primary service entrance, neutral must be bonded to ground. 2. Connect one of the black #6 wires to the top of the left circuit breaker (L1), and the remaining black (or red) #6 wire to the top of the right circuit breaker (L2). 3. Connect the #6 white wire to the top of the neutral bus to the right of the circuit breakers. 4. Connect the #6 green ground wire to the large terminal on the ground bar. 5. Notify the electrical inspector to approve the service entrance wiring. Once approved, contact the local power utility for electrical service. L2 #6 Black (or Red) L1 #6 Black Neutral #6 AWG White Ground #6 Green Fig. 3-3, Wiring the Service Entrance 17

3.0 Installation 3.5 Service Power Inserter 1. The SPI box(es) are mounted on the back wall of the power supply shelf. 2. Remove the two screws on the face of the SPI and lift off the cover to gain access to the seizure screw assembly. (Fig. 3-4) 3. Loosen the seizure screw several turns so that the stinger will pass through the clamp. 4. Insert the coaxial termination into the output port on the bottom of the SPI. Ensure that the stinger goes through the seizure screw assembly. (Fig. 3-5) 5. Tighten the coaxial termination. 6. Tighten the seizure screw to 35.0 in-lbs (47.5 N-m). Replace the SPI cover and screws. 7. Ensure that the switch on the top or the SPI is in the ON position, the AUX position is used only when an alternate power source is connected to the ALT connection on the SPI. 1 2 3 Seizure Screw Assembly Fig. 3-4, SPI Cover Removal Enclosure Wall Coaxial Termination Output Port Seizure Screw Assembly Stinger Circuit Board Side View of SPI Case Tighten Seizure Screw 18 Insert and tighten Coaxial cable Fig. 3-5, Connecting Coax to SPI Output Port

3.0 Installation 3.6 Battery Installation WARNING! ELECTRICAL HAZARD Batteries can deliver LETHAL VOLTAGES. Battery installation, maintenance and data collection should be performed by authorized, trained personnel only. 3.6.1. Battery Safety Battery systems represent a risk of electrical shock and high short circuit currents. The following precautions must be observed when maintaining batteries: Remove all personal metal objects (watches, rings, etc.) Use insulated tools. Wear eye protection and rubber gloves. Observe circuit polarities. Do not make or break live circuits. Do not lay metal tools and hardware on top of the batteries. 3.6.2 Battery Identification Each battery will be marked with a date code on the label. This 4-digit code indicates the month and year of manufacture (MM/YY format). Record this code in the maintenance log (MAINTENANCE manual). If batteries other than those installed by Alpha are used, consult the battery s manufacturers documentation for date code type and placement. Fig. 3-6, Battery Date Code Location 19

3.0 Installation 3.6 Battery Installation 3.6.3 Battery Tray Replacement The battery trays are adjustable in height and removable to facilitate changes in system configurations. Tools Needed: 7/16" socket or nut driver Procedure: 1. If multiple battery strings are installed, remove batteries from shelf. 2. Remove the (4) 1/4"-20 mounting screws (2 per side) holding the shelf to the mounting rack. 3. Adjust the height of the shelf (or remove) as necessary and replace the screws. 4. Remove and/or reinstall batteries as dictated by configuration. Fig. 3-7, Location of Battery Tray Mounting Hardware 20

3.0 Installation 3.6 Battery Installation 3.6.4 Battery Terminal Connections Various types of batteries with different mounting styles and hardware may be shipped with the system. ALWAYS refer to the battery manufacturers specifications for correct mounting hardware and torque requirements. During maintenance procedures, refer to the manufacturers specifications for the maintenance torque requirements. For AlphaCell batteries, use 110 in-lbs (149 N-m). For the AlphaCell 85GXL, use 25 in-lbs (33.86 N-m). Mounting hardware requirements may vary with battery manufacturers. Use only the hardware recommended by the battery manufacturer. For AlphaCell Battery hardware, see Fig. 3-8. 3/4" (19mm) x 1/4-20 Bolt Split Washer Flat Washer Battery Sense Cable Battery Cable Battery Terminal Nut Split Washer Flat Washer Battery Cable In-Line Fuse Link Flat Washer 1" (25.4mm) x 1/4"-20 Bolt Fuse 1" (25.4mm) x 1/4-20 Bolt Split Washer Flat Washer Spacer Battery Terminal Fig. 3-8, Battery Terminal Assembly 21

3.0 Installation 3.6 Battery Installation 3.6.5 Battery Connection Tools Needed: (2) 7/16" open end wrenches Procedure: 1. Connect the battery strings, as shown in Fig. 3-9 or Fig. 3-10. NOTICE: This section is for reference only, follow instructions included in the battery cable kit. For XM3 Series power supplies, Precision Temperature Sensor attaches to battery post. To Power Supply R E D (+) B L A C K (-) Black (-) 0V XM3 Series Precision Temperature Sensor Upper Battery Tray Red (+) NEG(-) NEG(-) NEG(-) 3A 2A 1A POS(+) POS(+) POS(+) NEG(-) NEG(-) NEG(-) Lower Battery Tray 3A 2A 1A POS(+) POS(+) POS(+) Fig. 3-9, 36V Battery String Wiring To Power Supply R E D (+) B L A C K (-) Black (-) 0V RTS Red (+) Upper Battery Tray NEG(-) 4A NEG(-) NEG(-) NEG(-) 3A 2A 1A POS(+) POS(+) POS(+) POS(+) NEG(-) NEG(-) NEG(-) NEG(-) Lower Battery Tray 4B 3B 2B 1B POS(+) POS(+) POS(+) POS(+) Fig. 3-10, 48V Battery String Wiring 22

STRG A STRG B FLASH = MIN ALM STRG C SOLID = MAJ ALM STRG D OUTPUT 1 OUTPUT 2 N + 1 ON OFF BATTERY BREAKER LRI OUTPUT ALARM TEST BATTERY TEMP BATTERY INPUT ALM/ RDY RST REG DS TPR ACT E T H LNK Rx/Tx PWR GRN = OK BLUE = WARN RED = OUT C O M 3.0 Installation 3.7 Power Supply Installation 3.7.1 Power Supply Installation Pictures shown are of the XM3-HP Power Supply. Tools Needed: None Procedure: 1. The power supply is placed on the right side of the top tray, over the vent holes. i N ~ N I O A / B C / D ~ N Fig. 3-11, Power Supply Placement 23

3.0 Installation 3.7.1 Power Supply Installation NOTICE: XM3 applications depicted in Figures 3-12 and 3-13. 2. Verify that the Battery Circuit Breaker is in the OFF position. Connect the red and black battery cable to the BATTERY INPUT connection. Fig. 3-12, Battery Circuit Breaker and Battery Input Locations 3. Connect the black and white wire to the OUTPUT 1 connection. If a second SPI is installed, connect it to OUTPUT 2. OUTPUT 2 is available when the optional XM3 Dual Output Control (Alpha DOC) is installed. 4. Verify that the Input Circuit Breaker in the Service Disconnect Box is in the OFF position. Connect the XM Series AC power cord to the AC power distribution box on the left wall of the enclosure. Fig. 3-13, Output Connection NOTICE: XM2 applications depicted in Figure 3-14. Fig. 3-14, Power Cord Connection 24

3.0 Installation 3.8 Battery Temperature Sensors The XM3-HP Precision Temperature Sensor (PTS) or Remote Temperature Sensor (RTS) connects to the battery terminal. The XM2 Series Remote Temperature Sensor (RTS) is held in place on the AlphaCell 165, 195, and 220 series batteries by a Battery Spacer Clip. To install, flex the clip and hook the retaining tabs over the top of the battery and slide the sensor into place in the clip as shown below. NOTICE: For enclosures with multiple battery strings, the PTS/RTS must be located with the WARMEST battery string. This ensures proper operation of the battery charger s temperature compensation circuit. Failure to locate the PTS/RTS with the warmest battery string could result in overcharging and premature battery failure. Procedure: 1. Attach the RTS Probe to the inner side of the center battery (The XM3 PTS Probe attaches to the battery post). 2. The other side of the Temp Probe is attached to the front panel of the XM Series power supply, in the jack labeled TEMP PROBE. Fig. 3-15, Placement of XM2 Series Remote Temperature Sensor (RTS) on Battery Fig. 3-16, XM2 Series Battery Remote Temp Sensor (RTS) Placement Fig. 3-17, XM3 Series Precision Temperature Sensor (PTS) Placement 25

3.0 Installation 3.9 Cooling Fan Intake Filter The Cooling Fan kit includes two intake filters, located inside the front and rear doors of the enclosure behind the ventilation louvers. The enclosure filters should be inspected every and cleaned when needed as part of the power supply preventative maintenance program. CAUTION! If the filters become blocked, thermal failure of the power supply may result. 3.10 Fiber Node Installation Procedure: NOTICE: The strand bar intended for the fiber node stands further away from the sidewall of the enclosure. 1. The Fiber Node is attached to the left strand mount bar, and the splice housing on the right. 2. Refer to node manufacturer s installation instructions. Fig. 3-18, Fiber Node Placement 26

3.0 Installation 3.11 Optional Lightning Arrester The Lightning Arrester is available in 120VAC and 240VAC, and is installed by plugging into an Input Power Panel or Duplex Receptacle. The unit is operating properly when the green LED is lit. Fig. 3-19, LA-P+ Installed in Duplex Receptacle Fig. 3-20, Location of LED on LA-P+. 27

3.0 Installation 3.12 Optional Equipment Item Part Number: Enclosure Options Star Lock Security Bolt (X4) 744-897-20 Star Lock Security Key 647-089-10 Kit, Security Bar, FPE, Grey 746-613-30 Kit, Security Bar, FPE, Seafoam Green 746-613-31 Kit, Security Bar, FPE, White 746-613-32 Kit, Security Bar, FPE, Pine Green 746-613-33 Kit, Pedestal, 14" 746-617-20 Precast Pad, 44" x 48" 641-095-10-003 Enclosure Cooling Cooling Fan Kit 746-189-20 Replacement Fuse 460-025-10 Replacement Filter 564-234-10 Lightning Arrester LA-P+ 120V (L-N, L-G, N-G) 020-098-24 LA-P-120T 120V 162-046-10 LA-PE+ 240V (L1-L2, L1-G, L2-G) 020-098-25 SPI Options SPI-RF 021-080-20 SPI-20A 744-279-22 SP-25A 744-789-21 Table 3-1, Enclosure Equipment Options NOTICE: Alpha part numbers are correct at the time of printing. As part numbers are subject to change, please contact your Alpha Representative prior to ordering to ensure that numbers are correct. NOTICE: For Security Bar Installation, refer to the Installation Template in the Security Bar Kit. 28

3.0 Installation 3.13 Dimensions NOTICE: The FPE is 14" taller if it is pre-installed with the FPE Pedestal Mount (Alpha p/n 746-617-20). 18.00 2.10 2.53 33.85 32.49 2.10 2.53 8.85 7.49.75 7.62 20.76 34.51 CENTER PUNCH FOR MIDDLE BRACKET, LOCATION-OPTIONAL Fig. 3-21, Front View, FPE, Dimensions 29

3.0 Installation 3.13 Dimensions NOTICE: The FPE is 14" taller if it is pre-installed with the FPE Pedestal Mount (Alpha p/n 746-617-20). 18.00 2.10 2.53 33.85 32.49 2.10 2.53 8.85 7.49.74 7.62 20.76 34.51 CENTER PUNCH FOR MIDDLE BRACKET, LOCATION-OPTIONAL Fig. 3-22, Rear View, FPE, Dimensions 30

Alpha Technologies Inc. 3767 Alpha Way Bellingham, WA 98226 United States Tel: +1 360 647 2360 Fax: +1 360 671 4936 Alpha Technologies Europe Ltd. Twyford House Thorley Bishop s Stortford Hertfordshire, CM22 7PA United Kingdom Tel: +44 1279 501110 Fax: +44 1279 659870 Alpha Technologies Suite 1903, Tower 1, 33 Canton Road, Kowloon Hong Kong City, China Phone: +852 2736 8663 Fax: +852 2199 7988 Alpha Technologies Ltd. 7700 Riverfront Gate Burnaby, BC V5J 5M4 Canada Tel: +1 604 436 5900 Fax: +1 604 436 1233 Toll Free: +1 800 667 8743 Alpha Technologies GmbH Hansastrasse 8 D-91126 Schwabach, Germany Tel: +49 9122 79889 0 Fax: +49 9122 79889 21 Alphatec Ltd. 339 St. Andrews St. Suite 101 Andrea Chambers P.O. Box 56468 3307 Limassol, Cyprus Tel: +357 25 375 675 Fax: +357 25 359 595 Alpha TEK ooo Khokhlovskiy Pereulok 16 Stroenie 1, Office 403 Moscow, 109028 Russia Tel: +7 495 916 1854 Fax: +7 495 916 1349 Alphatec Baltic S. Konarskio Street 49-201 Vilnius, LT-03123 Lithuania Tel: +370 5 210 5291 Fax: +370 5 210 5292 Visit us at www.alpha.com Due to continuing product development, Alpha Technologies reserves the right to change specifications without notice. Copyright 2015 Alpha Technologies. All Rights Reserved. Alpha is a registered trademark of Alpha Technologies.