COCIR SELF-REGULATORY INITIATIVE FOR MEDICAL IMAGING EQUIPMENT ULTRASOUND EQUIPMENT MEASUREMENT OF ENERGY CONSUMPTION 2015

Similar documents
accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies

COMMISSION REGULATION (EC)

The Role of Electricity Storage on the Grid each location requires different requirements

To: Honorable Public Utilities Board Submitted by: Senior Energy Resources Analyst Deborah Whiteman Senior Energy Resources Analyst Approved by:

EN 1 EN COMMISSION OF THE EUROPEAN COMMUNITIES. Brussels, xxx C(2008) YYY. Draft COMMISSION REGULATION

Rate Schedules. Effective 1/1/2019

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

ETA-TP008 Revision 2 Effective March 1, Battery Charging

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii First Revised Sheet 80 Cancels Original Sheet 80

Electric Vehicle Battery Swapping Stations, Calculating Batteries and Chargers to Satisfy Demand

The TV regulation review, due for 12 August 2012, was reported to the Consultation Forum on 8 October 2012.

PATENTED TECHNOLOGY» PROVEN RESULTS» PAYBACK

Schedule GS-2 INTERMEDIATE GENERAL SERVICE

GLOBAL REGISTRY. Addendum. Global technical regulation No. 10 OFF-CYCLE EMISSIONS (OCE) Appendix

Adopted: September 24, 2015 Version: Version 1.0

In-House paper on Implementation of Telescopic Tariffs in LMV-6 category

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations

Press. Extensive additions to Sinamics G120 portfolio for optimum handling. SPS IPC Drives 2017, Hall 11

Brexit Update for US Industry Neil Williams 18 October 2018

Procedure in the case of connection requests by power plant operators for the purpose of feeding into the Amprion grid

Digital Imaging and Communications in Medicine (DICOM) Supplement 48: Ultrasound Image IOD extensions for Intravascular Ultrasound (IVUS)

PUBLIC SERVICE ELECTRIC AND GAS COMPANY Sixth Revised Sheet No. 73 Superseding B.P.U.N.J. No. 15 ELECTRIC Fifth Revised Sheet No.

ENERGY MANAGEMENT 4/22/2014. What are your approximate yearly energy costs? (Electricity, natural gas, etc.)

National Truck & Bus Driver Trainers Conference

RIDER NM NET METERING

NET METERING ENROLLMENT APPLICATION REFERENCE GUIDE

REAL WORLD DRIVING. Fuel Efficiency & Emissions Testing. Prepared for the Australian Automobile Association

Delaware Electric Cooperative

Compact Energy Storage Module. Modular Systems, EPDS. Product overview

A GUIDEBOOK FOR Generator Owners

THE DRIVING EMISSIONS TEST

ECODESIGN BATTERIES FIRST STAKEHOLDER MEETING DRAFT TASK 3

TERMS AND CONDITIONS

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

Agenda. Introduction to IEC Differences between the 1 st and 2 nd edition. How will these changes impact the industry?

Moon Exploration Lunar Polar Sample Return ESA Thematic information day BELSPO, 3 July 2012

Price OPtiOns FOr ArkAnsAs commercial & industrial customers

Application of claw-back

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

CENTURY YUASA - STANDBY OVERVIEW

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

City of Palo Alto (ID # 6416) City Council Staff Report

Gas Turbine Aircraft Engines

July 16, Dear Mr. Randolph:

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities

Modelling of a Large Number of Electric Vehicles (EVs) in the All-Island Ireland Energy System

Hello, I am the new Zelsius C5 heat meter. The new generation of ultrasonic heat and cooling meters for precise energy consumption measurement.

E-15 Uninterruptible Power Systems (UPS)

Efficiency Challenges for the European Utilities A view from Enel

Evaluating Stakeholder Engagement

Non-Road Mobile Machinery EU Regulation

Consumer Guidelines for Electric Power Generator Installation and Interconnection

T his chapter provides data on lighting technologies, including

Update on the UN-ECE Particle Measurement Programme (PMP)

All of Texas Has Excellent Solar Resources. United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.

Charder. Medical scale. User instruction. Important information. This user instruction must be read before the medical scale is used.

TEXAS ALCOHOLIC BEVERAGE COMMISSION 2008 ENERGY CONSERVATION PLAN

COMPANY INTRO. PowerCore Engineering

Electrovaya Provides Business Update

DEP7007CC Compliance Certification

E-15 Uninterruptible Power Systems (UPS)

UNS Electric, Inc. Rules and Regulations

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Common Mistakes in Battery Pack Development (And how to avoid them) By Katherine Mack, Rose Electronics

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

Port of Long Beach. Diesel Emission Reduction Program

CEMS FOR COAL FIRED POWER STATIONS DEVICE CALIBRATION AND MAINTENANCE

EU RO Mutual Recognition Technical Requirements

Tendering Public Charging Infrastructure for Electric Vehicles

Draft Final form Rulemaking: Commercial Fuel Oil Sulfur Limits for Combustion Units. Citizens Advisory Council September 18, 2012

EAU CLAIRE ENERGY COOPERATIVE FALL CREEK, WI Issue Date: 05/28/2014 Subject: New Distributed Generation Post May 28, 2014

Revise model name, charging level and printing mark. Battery cell P/N and MSDS included. Revise spec to comply with certification conditions

Michigan Public Service Commission Grid Tied Solar Photovoltaic

12468/10 SJC/fp 1 DG I 1A

PR1000ELCD / PR1500ELCD User s Manual

L-Vehs Sound: Study on enhanced sound requirements for mopeds, quads and replacement silencers of L-category vehicles

SPRINGFIELD UTILITY BOARD ELECTRIC RATE SCHEDULES

INTER PLANT STANDARD STEEL INDUSTRY NO CORRESPONDING IS

2020 GLOBAL SULPHUR LIMIT HISTORY, CURRENT STATUS, AND THE INTERNATIONAL MARITIME ORGANIZATION S (IMO S) WORK PLAN FOR EFFECTIVE IMPLEMENTATION

Zero Emission Bus Impact on Infrastructure

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

Te Mihi Commissioning

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Ecodesign Directive for Batteries

Small General Service Time-of-Use Rate Schedule GS-TOU3

Write the term that correctly completes the statement. Use each term once. ampere. electric current. resistor battery.

SERVICE CLASSIFICATION NO. 7 LARGE GENERAL TIME-OF-DAY SERVICE

Power Supply Cost Recovery

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

i-stat 1 Analyzer 2 Before You Use the Analyzer

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

ISO INTERNATIONAL STANDARD

Cornwall SD&G Emergency Medical Services

ANNEX 7. RESOLUTION MEPC.182(59) Adopted on 17 July 2009

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES

Economic and Social Council

Technical support to the correlation of CO 2 emissions measured under NEDC and WLTP Ref: CLIMA.C.2/FRA/2012/0006

Hydrogen Station Equipment Performance Device (HyStEP Device) Specification

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

Analyse Cost Effectiveness of Different Charging Systems for Electric Buses

Transcription:

COCIR SELF-REGULATORY INITIATIVE FOR MEDICAL IMAGING EQUIPMENT ULTRASOUND EQUIPMENT MEASUREMENT OF ENERGY CONSUMPTION 2015 REVISION : 0 DATE : September 2015 APPROVED : July 2015

TABLE OF CONTENT 1. INTRODUCTION... 3 2. SCOPE... 3 3. DEFINITIONS... 4 4. SYSTEM POWER MODES... 5 5. USE MODES OVERVIEW... 5 6. RESOURCES FOR MEASUREMENT PROCEDURE... 5 7. UNIT UNDER TEST (UUT)... 5 8. MAINS POWERED U/S DEVICES... 6 8.2.1. OFF MODE POWER MEASUREMENT... 6 8.2.2. STAND-BY MODE POWER MEASUREMENT... 6 8.2.3. READY-TO-SCAN POWER MEASUREMENT... 6 9. BATTERY POWERED ULTRASOUND DEVICES... 6 9.1.1. OFF MODE POWER MEASUREMENT... 6 9.1.2. STAND-BY MODE POWER MEASUREMENT... 6 9.1.3. READY-TO-SCAN POWER MEASUREMENT... 7 10. ENERGY CONSUMPTION CALCULATION... 7 2 / 7

1. INTRODUCTION The Energy-related Products (Ecodesign) Directive, 2009/125/CE, enables the European Commission (EC) to set Ecodesign requirements through new regulations for any group of products which uses energy or is related to energy consumption. In 2007, Medical Devices were identified as a Priority A product group by the European Commission for future regulation. COCIR Companies presented in 2009 a Self-regulatory Initiative for Medical Imaging Equipment, driven by the Ecodesign Steering Committee, committing to improve the environmental performances of their products. As the Steering Committee has done for magnetic resonance and computed tomography, a working group was formed to determine a measurement methodology and ecodesign goals for Ultrasound imaging equipment. The outcome is an agreed upon procedure for measuring typical energy consumption of ultrasound equipment. This procedure defines specific states of system operation and instructions for determining a set of scanning protocols to be analysed. 2. SCOPE This methodology can be used to measure all U/S systems. Equipment and accessories beyond a basic U/S product and not required for a basic scan, or customer-provided equipment, are outside the scope of this procedure. 3 / 7

3. DEFINITIONS Energy: The capacity to do work. In this document, the unit of energy is kilowatthours (kwh). Power: The rate at which energy is generated or consumed. In this document, the unit of power is kilowatt (kw). Procedure Type: An examination is the collection of a scan for an individual patient. Procedure Type refers to an examination for a specific anatomy or type of exam. (e.g. Abdomen or Vascular). Off mode: The system is shut down according to the user manual, plugged into mains, AC mains ON. Stand-by: The system is configured in the lowest possible energy consuming state, according to the user manual. Ready-to-scan: A state of the system when fully powered and ready to acquire image. Scan mode: A state of the system during scans. This mode includes ultrasound generation and real-time image rendering. 4 / 7

4. SYSTEM POWER MODES The operation modes are defined as Off, Stand-by, Ready-to-scan, and Scan. As the energy usage in scan is virtually no different from ready-to-scan readyto-scan is used. The anticipated power of these modes, from high to low, is: Ready-to-scan > Stand-by > Off 5. USE MODES OVERVIEW Typical daily system operation is set as follows: Time period Mode Duration 12h night-time Off 12 hours 12h day-time 6h Ready-to-scan 6h Stand-by 12 hours The typical daily energy consumption of an U/S system is the sum of the energy consumption for each of the two time periods. 6. RESOURCES FOR MEASUREMENT PROCEDURE The following personnel are recommended: An engineer or technician familiar with the power distribution of the system and power electronics safety. An engineer or applications specialist familiar with system operation. 7. UNIT UNDER TEST (UUT) System Voltage: The system should be installed according to the manufacturer s installation instructions. Installation: The system shall be installed and calibrated according to its specification. Any equipment and accessories beyond the basic product offering that is not required for a basic scan shall not be included in the measurement (e.g. printers and DVD recorders should be completely off and drawing no electricity) Environmental Conditions: The measurements are to be taken at a steady-state operating temperature within manufacturer s specified ambient temperature and humidity limits. Measurement: Prior to each mode s measurement, the equipment shall remain in that mode for sufficient time to allow temperature and other pertinent transient conditions to stabilize. 5 / 7

8. MAINS POWERED U/S DEVICES 8.1. POWER MEASUREMENT DEVICE The measurements shall be recorded using a device capable of measuring voltage and current, and calculating the integral of power with respect to time (energy) or a power meter able to sample average power ratings. The power measurement device shall be installed onto the input to the system to ensure that all energy consumption of the U/S equipment is captured, including any cooling equipment provided by the U/S supplier as part of the base system. 8.2. MEASUREMENT OF POWER The power measurement of different system states described in the following sections shall finally allow calculating the complete 24h power consumption according to formulas in chapter 10. 8.2.1. OFF MODE POWER MEASUREMENT 1) Switch the system to Off mode according to the user manual. 2) Start the power measurement on the measurement device. Continue the measurement to include possible cyclical variation in the power. 3) Record the power consumption in off mode state. 8.2.2. STAND-BY MODE POWER MEASUREMENT 1) Switch the system to stand-by mode according to the user manual. 2) Start the power measurement on the measurement device. Continue the measurement to include possible cyclical variation in the power. 3) Record the power consumption in stand-by state. 8.2.3. READY-TO-SCAN POWER MEASUREMENT 1) Switch the system to ready-to-scan mode according to the user manual. 2) Start the power measurement on the measurement device. 3) Record the power consumption in ready-to-scan mode 9. BATTERY POWERED ULTRASOUND DEVICES The power measurement device shall be installed onto the input to the charger to ensure that all energy consumption of the U/S equipment is captured, including any cooling equipment provided by the U/S supplier as part of the base system. The U/S battery is connected to the battery charger provided with the device itself and charged until 100% level is reached. 9.1.1. OFF MODE POWER MEASUREMENT 1) With the battery fully charged to 100% and the battery charger still connected to the mains 2) Switch the system to Off mode according to the user manual 3) Start the power measurement on the measurement device. Continue the measurement to include possible cyclical variation in the power 4) Record the power consumption in off mode state 9.1.2. STAND-BY MODE POWER MEASUREMENT 1) With the battery fully charged to 100% and the battery charger still connected to the mains 2) Switch the system to stand-by mode according to the user manual 6 / 7

3) Start the power measurement on the measurement device. Continue the measurement to include possible cyclical variation in the power 4) Record the power consumption in stand-by state 9.1.3. READY-TO-SCAN OR SCAN POWER MEASUREMENT 1) With the battery fully charged to 100% and the battery charger still connected to the mains 2) Switch the system to ready-to-scan mode according to the user manual 3) Start the power measurement on the measurement device 4) Record the power consumption in ready-to-scan mode Any U/S device equipped with batteries has to be considered battery powered. Backup batteries or button cells shall not be considered. For battery powered devices, the daily energy consumption has to be calculated using the formulas in chapter 10. 10. ENERGY CONSUMPTION CALCULATION The 24h energy consumption has to be calculated out of the measured power and energy consumption of the different system states with the following formula for the 3 scenarios: Scenario Off The U/S device is in Off mode for 12h during night time E tot = P off x 12h + P ready-to-scan x 6h + P stand-by x 6h In case the U/S devices has not a stand-by mode: E tot = P off x 12h + P ready-to-scan x 12h Scenario Stand-by The U/S device is in stand-by mode for 12h at night time E tot = P stand-by x (12+6)h+ P ready-to-scan x 6h Scenario Ready-to-scan The U/S device is in ready-to-scan mode for 24h as it is never switched to off or to Stand-by modes. E tot = P ready x 24h 7 / 7