First of all I thank you all for this oppotunity to expose and speak about this very important theme

Similar documents
The Santos São Vicente LRV: pioneering medium capacity rail transport in Brazil

Igor Baria BRAZILIAN URBAN RAIL SYSTEMS SCENARIO. Balance 2016/2017

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

BYD SkyRail Elevate Your Commute, Elevate Your Life

Economy. 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29%

WAVE World Advanced Vehicle Expedition. Invitation

ELEVATED STRUCTURE. Solving the Traffic Problem in Jakarta. City. The 5 th REAAA Business Forum Manila, 21 st July 2017

CTA Blue Line Study Area

Amman Green Policies Projects and Challenges. Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017

EXCEPTION TO STANDARDS REPORT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

The Bioethanol for Sustainable Transportation Project - Results from Brazil

Notice to the Market PREVIEW OF OPERATIONAL RESULTS 3Q17

Public transit, automobile traffic and loading

TRAVEL DEMAND FORECASTS

Welcome. Green Line in Your Community

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

P anorama 12 Brazil automotive Guide 2008

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road

Painel III: Agenda Urbana e o papel das cidades no desenvolvimento sustentável. Torres Vedras. Lisboa Maio 2017

Click to edit Master title style

Greater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager

4. Good Practice Example: Automatic light metro system (Brescia, Italy)

Motorways and Tomorrow s Urban Mobility

Urban Mobility by BRT

Current Corridor Characteristics. MN 62 Corridor Performance

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Brainstormed Solutions - Passenger

The electric trolleybus system of Quito, Ecuador

Modal Choice for Mass Rapid Transit

4 Circulation & Transportation

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Yonge-Eglinton. Mobility Hub Profile. September 19, 2012 YONGE- EGLINTON

Public Works and Infrastructure Committee. General Manager, Transportation Services and Treasurer. P:\2015\Internal Services\rev\pw15018rev (AFS20761)

Evaluating opportunities for soot-free, low-carbon bus fleets in Brazil: São Paulo case study

G. Di Pasquale, A. Santiago Dos Santos, A. Galindo Leal, M. Tozzi. PluService, IPT, UITP

2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION

The future of transportat systems Approaches in South America

Green Line LRT: Beltline Segment Update April 19, 2017

Sequence, Synergy, and Subsidy

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

HOW TO DELIVER PUBLIC TRANSPORT ON REDUCED BUDGET

STATE OF SÃO PAULO. Whereas the methodology applied to SABESP s 2 nd Tariff Revision, established in Technical Note NT.

THE CITY OF CHATTANOOGA SMART TRANSPORTATION SYSTEMS

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

Public Transportation Problems and Solutions in the Historical Center of Quito

Benefits of greener trucks and buses

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

8. TRIP DISTRIBUTION. 8.1 Trip Distribution by Trip Purpose. Figures 8.1 show desire lines by trip purpose. < To Work >

CORE AREA SPECIFIC PLAN

TRANSFORMING THE WAY OUR REGION MOVES

DAVID DAVID BURNS BURNS RAILROAD RAILROAD INDUSTRIAL INDUSTRIAL ENGINEERING ENGINEERING CONSULTANT CONSULTAN CHICAGO CHICAGO, USA, USA

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

ATTACHMENT [B] PROJECT DESCRIPTION REQUESTED CITY OF LOS ANGELES ACTIONS

Smart ORL The future of urban sustainability. Chris Castro, LEED GA, CPB Director of Sustainability, Co-chair of Smart Cities

Nº Field evaluation of equipment and systems for automatic monitoring of urban traffic: the city of São Paulo experience.

APPENDIX VMT Evaluation

FREQUENTLY ASKED QUESTIONS

SAFETY. CONVENIENCE. ENJOYMENT.

Suggestions toward quality improvement in public transportation service in Rio Branco, Acre, Brazil

The ION Story. November 2015

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs

Develop ground transportation improvements to make the Airport a multi-modal regional

Vertical Loads from North American Rolling Stock for Bridge Design and Rating

DRAFT Subject to modifications

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Content. Volvo s BRT experience Globally and offers. Volvo Buses in India Journey So far. BRT Challenge in Indian Context

WELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016

Ambev Brewery will have more than 1/3 of its third-party fleet composed by electric trucks by 2023

Eurocities 25 th April Chris Verweijen, Movares. Bridging the gap! Roadmap to a sustainable city

Reducing Vehicle Use in Megacities Johanna Partin, N. America Regional Director Transportation and Energy Conference August 8, 2013

ITEM 9 Information October 19, Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment

RAILYARDS SUPPORT A VARIETY OF OPERATIONS INCLUDING: LOCOMOTIVES, ON-ROAD AND OFF-ROAD TRUCKS, CARGO-HANDLING EQUIPMENT, TRANSPORTATION

Construction workers weld large concrete struts together along Rua Lacônia in the south of São Paulo. Visible in the background are pylons for

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

The development of the Milan transport system and the ECOPASS congestion charge

STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR

FROM SMALL-SCALE RESEARCH TO REAL-LIFE INSTALLATIONS

FREQUENTLY ASKED QUESTIONS

Population Trends. US 12 Corridor Performance

Population density. Population (MM) Extension km²

PUBLIC TRANSPORTS IN OPORTO

2040 REGIONAL TRANSPORTATION PLAN

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Findings from the Limassol SUMP study

Transportation & Transit Activities

RUF capacity. RUF International, May 2010, A RUF DualMode system can obtain very high capacity by organizing the vehicles in small trains.

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

Maintaining the current-, and developing future Performance Management

Continental Mobility Study Klaus Sommer Hanover, December 15, 2011

OFF-STREET PARKING REFORM IN MINNEAPOLIS AND ST. PAUL

INTA 28th World Urban Development Congress Management of Metropolitan Growth and Sprawl

CO 2 Emissions: A Campus Comparison

City of Montréal s strategies to move smarter

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

SMART MOBILITY. Our mobility services aim to improve traffic under the smart city concept

Public Involvement Summary

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Seoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%)

Transcription:

Good morning First of all I thank you all for this oppotunity to expose and speak about this very important theme The presentation will consist only photographs Our CFO Mrs Viviane Saraiva will support me We work in a Brazilian construction company, Construtora Queiroz Galvâo, which is part of one of the largest brazilian conglomerates, present in several segment. Our Construction company has a large experience in bridges, highway, subway, etc

BUILDING A NEW BRAZIL

LRV BAIXADA SANTISTA The Light Rail Vehicle is an urban train powered by electricity. It features zero gas emission and is considered a model of efficiency and accessibility around the world. It s a safe, fast and totally integrated transport to the urban environment. Construtora Queiroz Galvão pioneered and built Brazil s first LRV, in Baixada Santista, South Coast of the State of São Paulo. There are 11.5 km of extension, 15 interconnected stations with bike path, paracycles and bicycle stands, generating even more benefits for the population. The LRV circulates at the street level, preserving historical heritage and contributing to the urban revitalization of the roads through which it passes.

LRV BAIXADA SANTISTA

Prior to the integration of the Baixada Santista LRV, studies were conducted in order to reduce impacts during the construction phase while increasing environmental benefits. LRV technology consumes 75% less energy compared to an electric bus. This LRV operation serves about 80 thousand users per day, but benefits almost two million residents of the municipalities of Baixada Santista. Each vehicle has the capacity to carry 400 people. LRV BAIXADA SANTISTA

LRV BAIXADA SANTISTA

LRV BAIXADA SANTISTA

Another Project Worth mencining is the Monorail Line 15, called Silver line. It will be the first monorail in Brazil and one of which features the world's largest transport capacity - 48 thousand passengers per hour per direction. Each vehicle has the capacity to carry one thousand people. MONORAIL The project, with approximately 24 km and 54 trains, will transform São Paulo into the first city in Latin America to have the monorail as a high capacity public transportation system. This will be possible thanks to the automatic traffic control system, which allows circulation interval between trains of up to 75 seconds. With the completion of the works, the São Paulo residents will reduce to only 50 minutes the time spent on the route between the neighborhoods of Vila Prudente and Cidade Tiradentes, which today takes more than two hours. It will benefit about 500 thousand passengers per day.

MONORAIL

MONORAIL In comparison to other means of transport, the monorail provides less environmental impact. By running on tires rather than sliding over beams, not rails, allows for low noise levels. And because it s electric, it also contributes not to raise air pollution. CQG had the concern of planting compensatory trees for those that had to be suppressed at the construction site. Adjacent streets and squares have received more than a thousand trees so far. Five thousand trees will be planted by the end of the works. There is also a landscape study to harmonize the center of the roadway with implantation of bicycle paths, gardens and trees, beautifying a previously deteriorated area.

MONORAIL

MONORAIL The construction of the project is carried out with precast concrete, which expedites the work and does not interfere with the day-to-day life of the city. Construtora Queiroz Galvão is the first Brazilian company to offer this type of transportation in Latin America. The Monorail Line 15 Silver was awarded by the International Union of Public Transport in the intermodality category during the 60th World Congress on Mobility and Public Transport in Switzerland.

MONORAIL