Delivering Renewable Energy Responsibly ENERCON s Approach for Environmentally Conscientious Operation Hassan Shahriar November 3, 2015 1
A Bit of History Aurich GERMANY Dr. Aloys Wobben develops inverter technology for wind turbine application Dr. Wobben founds ENERCON (ENERGY CONVERTER) First ENERCON turbine ENERCON WEC E- 15 installed in Dr. Wobben s backyard Dr. Aloys Wobben (pictured rear -1984) 2
Driven by Innovation 40% of world patents in wind power generation 3
38+ GW of Wind Energy (2015) Batskär, Scandinavia Estinnes, Belgium Aurich, Germany Antarctica Griess, Switzerland Diavik, Canada Swanton, Canada 4
2GW of Wind Energy in Canada Lundbreck, AB - ENERCON s first turbine in Canada 2001 Montreal, QC ENERCON Canada Beaupré, QC - 365MW, 164 WECs 5
Vertically Integrated Operation R&D Manufacturing Transportation Installation Maintenance Incorporating renewables into manufacturing processes Innovations in transportation Wind-storage in action 6
Vertically Integrated Manufacturing R&D Manufacturing Transportation Installation Maintenance 85% built in-house 7
ENERCON Foundry 8
GZO Self Supply 9
Magdeburg Manufacturing 7.5MW E-126 10
Reducing Energy Bill & CO 2 Emission 11
REBCOE Canada Mining Diavik Diamond Mine, NWT 4 x E-70, Diavik Diamond Mine, NWT Copyright, Rio Tinto 12
Diavik Operational Data 11M liters of diesel consumption saved to date 60,000,000 Plan Combined 50,000,000 Total kwh vs Plan 10% ahead of Plan 40,000,000 30,000,000 20,000,000 10,000,000 0 Courtesy: Rio Tinto 13
Driven by Innovation 40% of world patents in wind power generation 14
E Ship 1 R&D Manufacturing Transportation Installation Maintenance Commissioned in 2008 by Dr. Wobben Propelled by 4 Flettner rotors that make use of the Magnus effect Specifically designed to transport ENERCON components Verified 15% less diesel consumption for cross Atlantic trips 15
Operational Wind-Storage System Feldheim - Largest commercially operating windstorage system in Germany 42 turbines connected to 3,360 Li-ion batteries and the grid RRKW Feldheim, Brandenburg ENERCON SMART Container 2MVA 16
Renewables Integration in Alberta Innovating for long term has both commercial and environmental benefits Alberta has fantastic energy resources (for the 21 st century and beyond) Technology & experience exist today to unlock opportunities 17
Thank You The ENERCON Canada Inc. Team sales.canada@enercon.de 1-514-363-7266 ENERCON Canada Inc. 700 rue de la Gauchetiére Suite 1200 Montreal, Quebec www.enercon.de Disclaimer: Recipient acknowledges that these general specifications are for Recipient s informational purposes only. The general specifications do not constitute an offer for sale or create or constitute a warranty, guarantee, promise, commitment, or other representation by Enercon, all of which are expressly disclaimed by Enercon. Calculations contained herein are based on data from readily available sources and reasonable assumptions and estimates. Enercon has no liability for any errors or omissions in the materials, whether provided by Enercon or third parties. Enercon reserves all patent, copyright, trade secret and other proprietary rights to this document and information contained herein may not be used, reproduced or disclosed. 18