OPERATION MANUAL VCX-1

Similar documents
OPERATION MANUAL MCX-2F Multiple Coolant Exchanger

OPERATION MANUAL MCX-2HD Multiple Coolant Exchanger

OPERATION MANUAL MCX-1

ACF Operation Manual

OPERATION MANUAL ESX-2

MOTORVAC TECHNOLOGIES INC. TRANSTECH-1000 Transmission Service System

PNEUMATIC SLIDING VALVE

D Instructions/Parts. Siphon Feed Detail Spray Gun D

MGFHVLP. Instructions/Parts. Mini Gravity Feed System E. Part No Includes MGFHVLP Mini Gravity Feed Spray Gun and MGC 125 Gravity Cup.

PENTECH, INC. BD Spray Gun. Operating Manual Parts Manual May, 2008 Issue 1. Plural Component, Impingement Mixing, Mechanical Purge Spray Gun

M-1115S Series Fuel Pump

SERVICE BULLETIN for Series 250 Two-Way Shutoff Valved Nipples and Couplers Models 64 and 65

Installation, Operation, and Maintenance Manual

Page 1 of 12. Part# /30/2016

WEBER CARBURETOR TROUBLESHOOTING GUIDE

Automated Steering Hydraulic Installation Kit

Operating instructions Form no safety definitions

LEAK TEST PROCEDURE MRT4-DC LIFTERS SINGLE VACUUM SYSTEMS TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON KEEP FOR FUTURE REFERENCE

DISPLACEMENT PUMP INSTRUCTIONS-PARTS LIST Rev. K. Model , Series A Model , Series B Model , Series A

45 VALVE SERIES. 2-Position 4-Way 5-Ports, Installation & Service Instructions. Valve with Stem Operator, Installation & Service Instructions

60V RECHARGEABLE LITHIUM-ION BATTERY

MODEL G300 BRAKE BLEEDER

OPERATOR'S MANUAL FOR DOUBLE ACTING PISTON HAND PUMP

Fits AGCO, Challenger, & Massey Ferguson Tractor Models:

TC Series Cooling Systems

COOLANTCLEAN III Engine Cooling Service System

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

SERIES OPERATION AND MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL

T1-Titanium Non-HVLP Spray Gun

RUFNEX Series Low Profile Wrenches Operation and Maintenance Manual

Rugby Manufacturing Hoist Cylinder Bulletin. Preface Technical Service Bulletin

LS100L Battery-powered Punch Driver

EBS PRODUCTS

Air / Hydraulic Pump

OWNER S MANUAL PRODUCT CODE: BOD1907

MANUAL FLUID EXTRACTOR

Pump Operating and Maintenance Manual - Models

DA Series Diaphragm Valve

Installation Instructions. Standard Gate Valves

HexPro Series Low Profile Wrenches

Congratulations PRE-OPERATION SETUP

HYDRAULIC PUMP. INSTALLATION, OPERATION, & MAINTENANCE MANUAL MAINTENANCE MANUAL #: MM-HP Rev. A Page 1 of 12

ENGINE COOLING SYSTEM

#9040 FUEL TANK SWEEPER

Installation, Operation, and Maintenance Manual

Operating Manual Model 3023

Tidland D5 Differential Air Shaft. Installation, Operation and Maintenance

Cooling System. Table of Contents

Model Ton Hand Carry Axle Jack P/N: CJ67D0250-1

Sediment strainer (Type Y)

6722 Rev. A CAPACITY: 22 TON TRUCK AXLE JACK WITH AIR RETURN

SECTION 4 - FUEL/LUBRICATION/COOLING

Automated Steering Hydraulic Installation Kit

Explanation of Safety Signal Words

LEAK TEST PROCEDURE DC CHANNEL LIFTERS SINGLE VACUUM SYSTEMS TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON KEEP FOR FUTURE REFERENCE

Getz Equipment Innovators 450 lb Portable / Wheeled Unit Dry Chemical Fill System Part No: 3G0061/3G0063

SERVICE BULLETIN for Series HFC-134a BalLoc Coupler Model 87 (High Side)

INSTALLATION INSTRUCTIONS

20 TONNE HYDRAULIC PRESS MODEL NO: CSA20FBT

USE and MAINTENANCE INSTRUCTION MANUAL AZ3 HTE2 AZ3 HTE2 HVLP GRAVITY. SPRAY GUN Series. en it fr es pt de se

Installation, Operation, and Maintenance Manual

AIR/HYDRAULIC INJECTION GUN MODEL INSTRUCTIONS

Suspension System RS6525 (B)

ENGINE COOLING SYSTEM

XP-AIR Multi-Port Power Pack Operation and Maintenance Manual

ANDERSON Products OWNER OPERATION MANUAL VC6FTR-SP, VC6R-SP, VC7FTR-SP, & VC7R-SP

Post Driver Attachment

Low Lift Transmission Jack

M-3025CB-AV Fuel Pump

Installation, Operation, and Maintenance Manual

Jandy Pro Series NeverLube and Backwash Valve

Crispin Valves Operating Guide. Crispin

The most economical unit toevacuate, Leak Test & RefillEngine Cooling System!

INSTALLATION INSTRUCTIONS 88511

Pro 30 Plus Gas Caddy

UV-AIRE AIR PURIFYING SYSTEM

January Rev. B Rel. 2

Instructions for Installing the Vi p e r Si g n a l Ma s t e r

Offset Solar LED Umbrella

MR 5-30 or MR 5-30N Series Fuel Meter Owner s Manual

MGM Brakes Service Manual

MECHANICAL FUEL METER. FM-100 and FM-200 Series Owner s Manual

40 V LITHIUM-ION BATTERY ATTACH YOUR RECEIPT HERE AB13786C 1. kobalttools.com ITEM # /

WPS500X. 500 psi / 34.5 bar Automotive Pressure Transducer. User s Guide

PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS

Installation and Operation Manual

Operating and Maintenance Manual Gas/Diesel Engine Powered Self-Priming Centrifugal Pumps Series

Embedded Rack Slide-out System

Low Profile Wrenches Operation and Maintenance Manual


IMPORTANT SAFETY NOTICE

Instructions for Installing the Vi p e r Si g n a l Ma s t e r with Brake Module

Instruction Manual. Maximum Operating Pressure 700 bar

WPS500X 500 psi /34.5 bar Automotive Pressure Transducer. User s Guide

Mandatory X Information Recommended Change. Series/Parts Affected: LS40D, LS40TD, LS50TD and LS60TD Concrete Pumps

KLW4000D Multi-Port Power Pack

Light condition and operation Windshield glass condition Wiper blade condition Paint condition and corrosion Fluid leaks Door and hood lock condition

SERVICE GUIDE For WARN PULLZALL 24Vdc P/N &

SYSTEM SAVER 318 AIR COMPRESSOR FOR MACK E-TECH AND ASET ENGINES MAINTENANCE MANUAL

Transcription:

OPERATION MANUAL VCX-1 Vacuum Coolant Exchanger MAHLE Aftermarket Inc., Service Solutions 10 Innovation Drive York, PA 17402 800-468-2321 www.servicesolutions.mahle.com Manual P/N 035 81661 00 (REV B)

Table of Contents Component Description... 2 Safety Precautions... 3 Home Position... 4 Fill New through Hose... 5 Empty Radiator... 6 Special Hookups... 8 Fill Radiator... 9 Top Off... 10 Flush Radiator... 10 Empty Waste... 11 Empty New... 12 Troubleshooting... 13 Parts Identification... 14 Flow... 15 Page 1

Component Description Unpack all components and verify quantities per this illustration. Contact MAHLE if any items are missing. WASTE COOLANT TANK PANEL VALVE SYSTEM VACUUM GAUGE NEW COOLANT TANK SHOP AIR COUPLER ADAPTER HOSE CONE PLUG ADAPTER QTY=2 CONE ADAPTER VALVE CLEAR REINFORCED HOSE 12FT Page 2

Safety Precautions WARNING: Failure to follow these precautions can result in serious injury or death. Your VCX Vacuum Coolant Exchanger was developed to provide you with years of trouble-free service in accordance with the utilization of proper inspection and maintenance techniques. It is important to understand this machine functions with its coolant cylinders either under pressure or vacuum, so it is imperative all cylinders receive proper inspection to ensure the proper and safe operation of the equipment is maintained throughout its life cycle. Read and understand the Operation Manual completely before operating this unit. Always wear proper skin protection when operating and maintaining this equipment. Always wear safety glasses when operating and maintaining this equipment. Before any VCX machine use it is required for the operator to visually inspect the coolant cylinders for defects such as cracks, nicks, gouges, chips, impact marks, fractures, hairline cracks, crazing, severe discoloration, cloudiness or hazing or other physical damage. VISUAL TUBE INSPECTION IS REQUIRED PRIOR TO EACH MACHINE USE! IF ANY TUBES EXHIBIT ANY DEFECTS, THEY MUST BE REPLACED BEFORE MACHINE OPERATION! FAILURE TO COMPLY MAY RESULT IN TUBE FAILURE AND POSSIBLE INJURY! Automotive cooling systems can be under pressure and extremely hot. Place a rag over the radiator cap during removal to avoid injury. Use extreme caution when removing caps. Coolants are corrosive and poisonous to people and animals. Clean up any spills immediately. Do not allow waste coolant tank to overflow. Immediately clean up any coolant spills. Damage to the vehicle and equipment can result from the corrosiveness of coolant. Continuous monitoring of the coolant exchange process is required. Unit is equipped with factory preset pressure regulator. Do not attempt pressure adjustment without MAHLE Technical Support authorization. If cracks appear in the cylinders, hoses or adapters these parts must be replaced. If VCX unit tipped over, resulting in a fall of the machine onto any side, it is mandatory all coolant tubes be replaced immediately before the machine is placed back into service. If leaks occur at the bottom or top of the cylinders, contact MAHLE for troubleshooting instructions. The cylinders, hoses and adapters are plastic and rubber products and are in contact with oil and chemicals which may lessen their durability. Therefore, when soiled, they should be cleaned with water and a mild detergent. Caution: Do not clean with thinners, solvents or any other chemical cleaners. Only disassemble or reassemble unit parts when directed by an MAHLE representative. Take precautions to keep clothing, hair, hands, hoses, etc. away from all moving parts of the vehicle. Comply with local, state and federal regulations for fluid disposal. Material Safety Data Sheets (MSDS) must be obtained on all chemicals and placed in a shop file for reference. These are available for down load and printing on the MAHLE web-site (www.servicesolutions.mahle.com). Go to TECHNICAL HELP and look under Technical Bulletins. CAUTION: Failure to follow the precautions as outlined in the operation manual can result in damage to the engine, vehicle or equipment which will not be supported or covered under warranty. Page 3

Home Position WASTE COOLANT NEW COOLANT (PRESSURE) (VACUUM) FILL RADIATOR VCX-1 The above valve configuration is set before the VCX is connected to the shop air supply. This is also the position that the valves are returned to after each procedure. To select a procedure turn all of the valves to the colored triangle that corresponds with the desired procedure. This illustration demonstrates the open and closed position on the Cone Adapter Valve. The closed position is 90 degrees clockwise from center. Cone Adapter Valve Valve Open Valve Closed Page 4

Fill New through Hose 1. Turn all panel valves to the Home position. 2. Connect shop air to VCX Shop Air Coupler. 3. Turn all panel valves to the Fill New position as shown in the illustration below. This orientation can also be obtained by positioning the panel valves toward the green highlights closest to each valve. 4. Place the Cone Adapter, with the Adapter Hose attached, into the container of new coolant. Open the Cone Adapter Valve to draw coolant into the New Coolant. 5. Raise the hose out of the container of new coolant when the desired fluid level is reached in the New Coolant. 6. Close the Cone Adapter Valve. 7. Turn all valves to the Home position when done. Note: DO NOT OVERFILL. Waste Coolant New Coolant WASTE COOLANT (PRESSURE) NEW COOLANT (VACUUM) FILL RADIATOR VCX-1 Clear Hose Cone Adapter Valve Adapter Hose 50/50 Mix Water/Coolant Page 5

Empty Radiator 1. Run the vehicle with the heater turned on to bring the engine to operating temperature. Turn the engine off. 2. Turn all panel valves to the Home Position as shown on page 4. 3. Connect shop air to VCX Shop Air Coupler. 4. Turn all panel valves to the Empty Radiator position as shown in the illustration below. This orientation can also be obtained by positioning the panel valves toward the black highlights closest to each valve. 5. Insert the Adapter Hose into the Cone Adapter. Insert end of Adapter hose into overflow tank. Turn the Adapter Hose Valve to the open position to withdraw the coolant. WASTE COOLANT NEW COOLANT (PRESSURE) (VACUUM) Waste Coolant FILL RADIATOR New Coolant VCX-1 Cone Adapter Valve Adapter Hose Clear Hose Engine Block Heater Core Water Pump Radiator Overflow Page 6

Empty Radiator (Continued) 6. Carefully remove radiator cap. Use a shop rag over the cap when removing to avoid injury in case there is still pressure. 7. Place VCX Cone Adapter snugly into the radiator spout. Do not force the Cone Adapter into the spout, the suction pressure from the VCX should secure it adequately. Verify that the Cone Adapter Valve is in the open position. 8. Start the engine once fluid starts to move through the clear hose and into the VCX Waste Coolant. Verify that the System Vacuum gauge reads at least 22 InHg. 9. Once the waste coolant from the vehicle stops flowing through the clear hose, turn all of the panel valves to Home Position and turn the engine off. DO NOT REMOVE CONE ADAPTER FROM THE RADIATOR! Note: In some cases it may be necessary to pinch off the hose going from the radiator neck to the overflow container. This is only necessary when the vacuum leaks through this hose. The hose should be opened only after the Fill Radiator procedure. WARNING Do not overfill the Waste. Waste Coolant New Coolant Clear Hose Radiator Hose Engine Block Cone Adapter Valve Overflow Water Pump PINCH HOSE Page 7

Special Hookups Seal Tight Radiator 1. Insert the Adapter Hose into the end of the Cone Plug Adapter. 2. Place the Cone Adapter snugly into the radiator, coiling the excess length of Adapter Hose at the bottom. 3. Follow the Empty Radiator procedure steps 1-9. More Effective Setup for Empty Radiator During the Empty Radiator procedure clamp off the upper radiator hose and follow steps 1-9 of the Empty Radiator section. PINCH HOSE Radiator Hose Adapter Seal 1. In some cases it may be necessary to cut up to 0.75" off of the Cone Plug Adapter. This is only necessary when a tight seal can not be created due to bottoming out against the inside of a shallow radiator neck. Overflow 2. Take care to cut a clean edge free of loose debris. PINCH HOSE Cut back 0.750 Page 8

Fill Radiator Fill Radiator MAKE SURE THE ENGINE IS OFF 1. Turn all panel valves to the Home position. 2. Turn all panel valves to the Fill Radiator position shown in the illustration below, this orientation can also be obtained by positioning the panel valves toward the magenta highlights closest to each valve. Verify that the Cone Adapter Valve is open. 3. New coolant is automatically pulled out of the VCX New Coolant and into the vehicle radiator through the clear hose. NOTE: IF THE CONE ADAPTER BECOMES DISLODGED BEFORE YOU CAN BEGIN THIS PROCESS YOU MUST RERUN THE FUNCTION, WITHOUT STARTING THE VEHICLE, TO REGAIN THE VACUUM NEEDED TO FILL THE VEHICLE COOLANT SYSTEM. 4. Once the coolant stops moving through the clear hose turn all of the panel valves back to the Home position and remove the Cone Adapter from the radiator. 5. Turn all valves to the Home position. 6. Close the Cone Adapter Valve. WASTE COOLANT NEW COOLANT (PRESSURE) (VACUUM) FILL RADIATOR VCX-1 Page 9

Top Off 1. Turn all panel valves to the Home position. 2. Turn the Cone Adapter Valve to the closed position. 3. Turn all panel valves to the Top Off position as shown in the illustration. This orientation can also be obtained by positioning the panel valves toward the blue highlights closest to each valve. 4. Open the Cone Adapter Valve to fill the radiator and overflow to the proper levels. 5. Turn all valves to the Home position. 6. Close the Cone Adapter valve when done. 7. Replace radiator and overflow caps. WASTE COOLANT (PRESSURE) NEW COOLANT (VACUUM) FILL RADIATOR Flush Radiator VCX-1 1. The New Coolant needs to be filled with water. See Empty Waste and Fill New procedures. 2. The Empty Radiator function must be run to completion. 3. Run the Fill Radiator procedure. 4. The Empty Radiator function must be run again to extract all of the water inside the cooling system. 5. Repeat steps 3 and 4 until the desired results are achieved. Once completed new coolant needs to be added to the vehicle system. Page 10

Empty Waste 1. Turn all panel valves to the Home position. 2. Connect shop air to VCX Shop Air Coupler. 3. Close Cone Adapter Valve. 4. Turn all panel valves to the Empty Waste position shown in the illustration below. This orientation can also be obtained by positioning the panel valves toward the red highlights closest to each valve. 5. Place the end of the clear hose into a bulk waste container and open the Cone Adapter Valve. 6. Waste coolant will begin leaving the VCX from the Waste Coolant through the clear hose. Be cautious not to spill waste coolant onto the floor as the hose may jump when the Waste Coolant is nearing empty. Clean up any spills that may occur immediately. 7. Once the Waste Coolant is empty, close the Cone Adapter Valve and turn all valves to the Home position. WASTE COOLANT NEW COOLANT (PRESSURE) (VACUUM) Waste Coolant New Coolant FILL RADIATOR VCX-1 Clear Hose Cone Adapter Valve Bulk Waste Container Page 11

Empty New 1. Turn all panel valves to the Home position. 2. Connect shop air to VCX Shop Air Coupler. 3. Close Cone Adapter Valve. 4. Turn all panel valves to the Empty New position shown in the illustration below. This orientation can also be obtained by positioning the panel valves toward the blue highlights closest to each valve. 5. Place the end of the clear hose into a bulk storage container and open the Cone Adapter Valve. 6. Coolant will begin leaving the VCX from the New Coolant through the clear hose. Be cautious not to spill coolant onto the floor as the hose may jump when the New Coolant is nearing emptiness. Clean up any spills that may occur immediately. 7. Once the Waste Coolant is empty, close the Cone Adapter Valve and turn all valves to the Home position. WASTE COOLANT NEW COOLANT (PRESSURE) (VACUUM) Waste Coolant New Coolant FILL RADIATOR VCX-1 Clear Hose Cone Adapter Valve Bulk Waste Container Page 12

Troubleshooting Problem Vacuum becomes weak Leakage Overflow External Clear Hose Solution Inside of the VCX, there is a venturi vacuum generator that may have collected debris during the operation of the unit. If this occurs, the vacuum will become weak resulting in a lower vacuum reading on the System Vacuum gauge and poor performance. Remove the venturi from the line and blow shop air through it. Use the Parts Identification (page 14) to locate the venturi. Reconnect to correct lines when done. There may be a vacuum leak at either the top or bottom sealing point on the tanks. Fill the tank to the top with water and turn all valves to the Home position. Close the Cone Adapter Valve and turn all valves to the Empty (leaking tank) position. Check for leaks and follow guidelines from the Leakage section. Debris may have collected at the bottom of the tank. Disassemble tank and clean the base of tank. Take care when reassembling not to over tighten the hex nut (use 60 lb/in torque wrench). Do not use pneumatic or power tools. Over time, the o-ring at the bottom or top of the cylinder may become worn. Inspect and replace if needed. See part break down on left. If fluid is ever filled to the top of the tank while using the unit there is a device that will release excess to the inside of the cabinet. Using the VCX to remove coolant from a vehicle creates high temperatures throughout the unit particularly where the clear hose connects to the Cone Adapter. Repeated exposure to these temperatures may cause deterioration of the hose. If possible cut affect area off and reconnect Cone Adapter. If replacement of the hose is required call MAHLE. Page 13

P/N Description 1 060-81693-00 Top Cylinder Plate 9 2 060-81692-00 Bottom Cylinder Plate 3 060-81695-00 Fiberglass Tube (52 inches) 4 035-81433-00 Level Decal 5 028-80465-00 Large O-Ring 6 026-80238-00 Vacuum Gauge 30"-0 PSIG 7 022-80028-00 Ball Valve 3-Way 1/4 FPT (BHD) 8 028-80228-00 Small O-Ring 6 1 3 4 9 022-80160-00 Valve Relief 1/4 MPT X 1/4 FPT 7 10 370-80110-01 Clear Hose Assy 11 026-80197-00 Vacuum Pump (Venturi) 12 370-80075-00 Pressure Regulator 1/4 FPT X 1/4 FPT (BHD) 13 060-81215-00 Cone Plug Adapter 14 370-80168-00 Cone Adapter Valve Assy 15 370-80095-00 Adapter Hose 14 15 13 10 2 11 12 8 1 5 3 INSIDE OF UNIT Page 14

Flow Page 15

NOTES: Page 16