ASSEMBLY AND OPERATING MANUAL LTW DRAG BOX

Similar documents
ASSEMBLY AND OPERATING MANUAL LTW PIPE GRAB TYPE GZ 5,0 t

Users should note that settlement of the reinstated ground and ground next to the Aluminium Trench Shield is likely to occur after backfilling.

Star Swivel-Arm Hoist Installation and Operating Instructions

Technical test - Theory. Appointed Person A61. No. Question Answers Max. Mark

Concrete Delivery Requirements

Regulation for Installing

Operating Instructions

Water Connection Repair Method and Techniques

ELECTRICAL SAFET Y FOR CONTRACTORS

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

Cranes. OSHA Office of Training & Education 1

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES

AURELIA LTD A59 EXCAVATOR 360 ABOVE 10 TONNES INC LIFTING TECHNICAL TEST THEORY CPCS Issue 09-Jul-2012

CPCS renewal test factsheet

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair

Installation & Operation Manual

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair

P. & I. Pascoe Limited

ARTICEL Drywall Panel Hoist

Humma UV35-25 LOAD CHARTS. Revision 9. A division of Westfield Nominees. Contains the following load charts: Main winch (Standard & Stationary)

Technical Test Theory Excavator 360 above 10 tonnes A59

Installation, Care and maintenance

1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data...

CPCS renewal test factsheet

Single slide rail system, parallel shoring, EG PV

Vanguard Road Plate. Modular trench cover system to allow passage by traffic and pedestrians during road works. Product operating parameters:

BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY. (Not to be reproduced without the permission of BIS or used as an AMENDMENT)

INSTALLATION GUIDELINES

SAFE OPERATION 1. BEFORE OPERATION

RATED CAPACITY PC - D28 TIDD PC25 RATED CAPACITY MANUAL PC - D28 OCTOBER 2013 REV A PC25

STAY SAFE NEAR ELECTRICITY

Excavation worker killed by flying rigging when hook fails

Series 1300 Hydraulic Crane 30 Ton Load Ratings

CPCS renewal test factsheet

Series 1400 Hydraulic Crane 33 Ton Load Ratings

General Instructions and Inspection Instructions for Crane

Series 1400A Hydraulic Crane 33 Ton

RATED CAPACITY MANUAL MODEL MAC 25 HYDRAULIC ALL TERRAIN PICK & CARRY CRANE

Printed: Doc-Nr: PUB / / 000 / 00

Instructions for Use Plain Trolley ULK Geared Trolley UHK

Series 1300A Hydraulic Crane 30 Ton Load Ratings

Spillage from a semi-buried jet fuel tank 30 December, 2005 Sainte-Marie [Reunion Island] France

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

Trench Filler for Compact Utility Loaders

The 42 K.1 fast-erecting crane. Highly adaptable

PLATFORM WHEEL WELL ACCESS STAND

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Owner s Manual Gantry Cranes

Maintenance and Operation Manual for Landing Gear Access Stand

1000 lb. Adjustable Gantry Crane

Electrical Safety Slide Show Presenter s Notes

CPCS renewal test factsheet

5. Underground Requirements

2000 lb Adjustable Gantry Crane

MG12K24T60V4 Mechanical Grapple

Build-A-Box Modular Trench Shielding System

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

User manual. meywalk. Model Small, Medium and Large

Mounting Tools 2 Checking Clearances 3 Components 4-5 Mounting 6-21 Correct Method of Tensioning the Chain 22 Adjusting The Overall Dimension 23-24

1000-LB. HYDRAULIC HOIST OWNER S MANUAL

Medium-Boxes. E+S Trench shoring systems / Endsupported compact shoring systems. Medium-Boxes

Steel Products. 8M Series

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS ALUMINUM PANEL SHIELDS APS-HORIZONTAL-RED/YELLOW. TABULATED DATA Effective March 20, 2015

Presenter s Notes SLIDE 1

Health, Safety, Security and Environment

OPERATING INSTRUCTIONS (Translation) Hoisting crane

TOOL BOX TALKS. Municipality General Safety Rules SAFE (7233)

Work Zone Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Sugar beet covering eqipment

Assembly and Maintenance Manual Type RSBW

Ground bearing pressure 1.1 kg/cm 2 2 HS 855 HD

ASSEMBLY INSTRUCTIONS

MODEL 1324TK TK HYDRAULIC TRACK TRENCHER OPERATOR S MANUAL

Build-A-Box. Modular Trench Shielding System. Tabulated Data Effective January 4, Revised: April 21, with CHANGE THREE

Issue Title Remarks. Instrument transformers See IEC 61869

LIEBHERR MODEL LTM 1150/1-165 TON CAPACITY

LINK-BELT MODEL HTC-8675LB - 75 TON CAPACITY 48 7" (.80m) 41 0" /8" (3.52m) /16" (2.02m) /4" (.34m) 25" 11 0" (.

BAUER GB 60. Hydraulic Grab Carrier 11/2012

Important. Contents. Contact us:

Avoidance of Danger from Electricity Overhead Lines and Underground Cables

MODEL 1824TK TK HYDRAULIC TRACK TRENCHER OPERATOR S MANUAL

Crawler Tractor/Dozer A34

Ride on roller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Magnum-Boxes. E+S Trench shoring systems / Endsupported compact shoring systems. Magnum-Boxes

SECTION 14: AERIAL LIFT PROGRAM

SMB. Assembly and operating instructions Sprinkler measuring orifice SMB/SMB-OE. Sprinkler measuring orifice

FLEXWELL Safety Pipe. Pipe systems for installations Technical details

INSTALLATION OPERATING SERVICE AND SAFETY INSTRUCTIONS

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

SECTION 11 INTERMODAL EQUIPMENT

Important. Contents. Contact us:

Force Measurements in a Small Space. Dynamometers

RTC 8050 Series II. 50 ton (45.36 metric tons) Telescopic Boom Rough Terrain Crane

Excavator 360 above 10 Tonnes A59

1. Cranes. 3. Hazardous Chemicals. 4. Signs. 2. Trenching and Excavations

CPCS renewal test factsheet

Element C7.2 Lifting Work Equipment

Fabricated from grade S x400 steel box section the extensions are quickly assembled into the required

Transcription:

Manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen Phone: +49 (0) 24 62 / 2009 0 Fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 1

General Instructions The following regulations and rules have to be followed in their valid version: - Regulations of the BG-Fachausschuss Tiefbau (technical committee civil and underground engineering) - DIN 4124 Baugruben und Gräben (excavation pits and trenches) - DIN EN 13331 Teil 1 & 2 Grabenverbaugeräte (part 1 and 2 construction equipment) - Regeln für Sicherheit und Gesundheit bei der Arbeit (rules for safety and health during work) - Unfallverhütungsvorschriften / Arbeitsschutzvorschriften (regulations for the prevention of accidents and safety at work rules) Please follow the instructions making use of our Boxes. Lifting & Transportation The shoring may only be attached at the corresponding eyes and openings and/or lifting accessories. Lifting chains must be chosen to suit the weight being handled. To prevent the accidental detachment of the load use only load hooks with safety catches. The allowed tensile forces have to be kept in any cases. Transportation has to be carried out next to soil and unneeded oscillations have to be avoided. It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. When handling and removing the shoring, watch out for overhead contact lines (power cables). A load operator must stand to the front of the excavator and be in eye contact with the machine operator. Measures to reduce hazards The safety of persons on site must be enhanced with the aid of signs, cones, warning tapes and/or safety staff specially deployed on site for this purpose. Neighbouring traffic flow has to be made possible by means of safety staff if needed. Personnel must wear protective clothing (helmet/safety shoes/gloves). The risk of instability as a consequence of wind loads when setting up or using the shoring must be considered. The shoring must be lowered onto level and firm ground. Where the ground is sloping or uneven, the shoring should be set up, if possible, at right angles to the slope. Maintenance & Repair Before use, all shoring components must be checked for their correct function. Faulty or deformed parts must be replaced in any case. Minor repairs can be carried out by the user, after consultation with LTW. There is no warranty on incorrectly performed repairs and the use of non-original parts. According to intenseness of years. use, the components should be painted with anticorrosion paint every two LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 2

System view Flange 500 B H DRAG BOX plate height b b C t Pl shoring width inner working width plate thickness h C L L C pipe culvert height plate length pipe culvert length LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 3

Technical Characteristics: DRAG BOX - Flange 500 plate height 2,50m plate plate plate pipe culvert pipe culvert limit state plate box weight length height thickness length height design load weight L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 4,24 2,50 120 3,36 1,60 70,2 1655 3320 4,74 2,50 120 3,86 1,60 59,3 1795 3590 5,24 2,50 120 4,36 1,60 47,1 1930 3870 5,74 2,50 120 4,86 1,60 46,9 2315 4630 6,24 2,50 120 5,36 1,60 38,9 2475 4950 plate height 3,00m plate plate plate pipe culvert pipe culvert limit state plate box weight length height thickness length height design load weight L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 4,24 3,00 120 3,36 1,80 55,9 1965 3940 4,74 3,00 120 3,83 1,80 50,4 2130 4270 5,24 3,00 120 4,36 1,80 45,9 2295 4600 5,74 3,00 120 4,86 1,80 42,1 2755 5520 6,24 3,00 120 5,36 1,80 38,9 2945 5900 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 4

Tensile Forces pulling eyes R d = 344 kn lifting eyes at the plate head R d = 344 kn bottom eyes R d = 109 kn Distance piece (Extension) - Flange 500 length of distance piece working width b C shoring width b weight G [ m ] [ m ] [ m ] [ kg ] - 0,58 0,82-0,50 1,08 1,32 138 1,00 1,58 1,82 209 1,50 2,08 2,32 269 2,00 2,58 2,82 329 Screw Set: dimension material standard Qty. M 27 * 100 10.9 DIN 6914 zinc coated 6 M 27 10 DIN 6915 zinc coated 6 28 St DIN 6916 zinc coated 12 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 5

System view Flange 700 B H DRAG BOX plate height b b C t Pl shoring width inner working width plate thickness h C L L C pipe culvert height plate length pipe culvert length LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 6

Technical Characteristics: DRAG BOX - Flange 700 plate height 2,50m plate plate plate pipe culvert pipe culvert limit state plate box weight length height thickness length height design load weight L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 4,24 2,50 120 3,36 1,60 66,5 1655 3320 4,74 2,50 120 3,86 1,60 59,3 1790 3590 5,24 2,50 120 4,36 1,60 47,1 1930 3860 5,74 2,50 120 4,86 1,60 46,9 2310 4630 6,24 2,50 120 5,36 1,60 38,9 2470 4950 plate height 3,00m plate plate plate pipe culvert pipe culvert limit state plate box weight length height thickness length height design load weight L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 4,24 3,00 120 3,36 1,80 55,9 1965 3930 4,74 3,00 120 3,86 1,80 50,4 2125 4260 5,24 3,00 120 4,36 1,80 45,8 2290 4590 5,74 3,00 120 4,86 1,80 42,1 2750 5510 6,24 3,00 120 5,36 1,80 38,9 2940 5890 plate height 3,50m plate plate plate pipe culvert pipe culvert limit state plate box weight length height thickness length height design load weight L H t Pl L C h C e d G PL G E [ m ] [ m ] [ mm ] [ m ] [ m ] [ kn / m² ] [ kg ] [ kg ] 4,24 3,50 120 3,36 1,80 55,9 2205 4420 4,74 3,50 120 3,86 1,80 50,4 2390 4790 5,24 3,50 120 4,36 1,80 45,8 2575 5160 5,74 3,50 120 4,86 1,80 42,1 3130 6260 6,24 3,50 120 5,36 1,80 38,9 3345 6700 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 7

Tensile Forces pulling eyes R d = 344 kn lifting eyes at the plate head R d = 344 kn bottom eyes R d = 109 kn Distance piece (Extension) - Flange 700 length of distance piece working width b C shoring width b weight G [ m ] [ m ] [ m ] [ kg ] - 0,56 0,80-0,50 1,06 1,30 123 1,00 1,56 1,80 177 1,50 2,06 2,30 233 2,00 2,56 2,80 287 Screw Set: dimension material standard Qty. M 30 * 85 10.9 DIN 6914 zinc coated 6 M 30 10 DIN 6915 zinc coated 6 31 St DIN 6916 zinc coated 12 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 8

Assembly Instruction Place the Plate on the attachment points facing with the flange assembly upwards. Depending on the required trench width Distance pieces (Extensions) have to be used. Lift the Distance piece by connecting the rope to the corresponding lifting/transportation point. Adjust the adapter (flange) to the plate and use two washers for the screw and nut to tighten it. Use the lifting/transportation points at the top and the cutting edge to lift the second plate above the first plate. Tighten the screws as described above. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 9

Installation Instruction The Drag Boxes have been designed only for open country applications to be used in temporary steady soil. A small area (in between the plates) is protected for pipe laying application. The face sides (front edges) are unprotected and need to be sloped. The excavation follows ahead and the Excavator pulls the Drag Box in the next position. Backfilling and compaction will be effected behind the Box, Pipe laying only in the secured area within the plates. The System is not suitable for being used inner city with lots of service lines and can only be installed in the place in position method. Place in position method The DRAG BOX is placed into the totally pre-excavated trench. The place in position method is only allowed if the following conditions are given: - temporary steady soil; no local groundwater - outside of the sphere of influence of buildings and structures - outside of the sphere of influence of circulation spaces and endangered lines - Settlements can be accepted The ground is considered as temporary firm, if no mayor collapses is noted in the period from the start of the excavation until the insertion of the shoring. The pre-dug trench should be ~10cm wider than required trench width. The face sides are unprotected and need to be sloped depending on soil conditions. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 10

ASSEMBLY AND OPERATING MANUAL Principle of Operation The Drag Box act as shield in the event of trench wall instability. Only the Pipe laying will be effected in between the Shield. Do not enter the unprotected area outside the Drag Box. Before the Box will be pulled forward into next section, you have to leave the excavation. It is prohibited to stay in the danger zone. For pulling the Box forward into the ahead excavation, the chain has to be attached to the drag-eyes located in the front of the Box. Do not pull the Box forward on the front strut! Backfilling and compacting must be effected behind the Box. Only the Pipe Laying will be effected in between the Shield. Re - Installation After completion of the Pipe laying the reinstallation of the shoring can be effected. For lifting up the Drag Box out of the trench, the corresponding lifting eyes in the plate head should be used. Do not try to lift up the Box on the struts! It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. In order to avoid an overstraining of the shoring plates, do not lift one-sided. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 14.11.2012 page 11