Data Sheet WÖHR PARKING PLATFORM 501

Similar documents
Parking space border or support. Drive axis 15 L

Parking space border or support. Drive axis 15 L

PRODUCT DATA. Parking Automat P kg 1

PRODUCT DATA. crosswise shifting 2000 kg / 2600 kg

Free space height 340 (330) height 360 (340) height 400 (360) height

Barrier. Delimitation car height lower level car height lower level

Free space car height car height. height 340 (330) height 360 (340) car height car height

PRODUCT DATA kg

STOREPARKER SERIES STOREPARKER N2503 THE DEPENDENT PARKING SYSTEM ON 3 LEVELS WITHOUT PIT DEPENDENT PARKING SYSTEMS

PRODUCT DATA. Parking Automat P kg 1

Product Data SingleVario

Stack Parking Surface Mounted Stackers

LIFTPARKER N4100 S/D. The best solution for. ceiling heights below 3m

Product Data SingleVario 2061

To retrieve #5 platform first #6 platform be lifted up. entrance level.

Quadro Outdoor T2 S/D

The #PT platform then slides under #2 and #4 platforms to cover the now-empty space.

PARKLINE SERIES PARKLINE N5102 THE SEMI-AUTOMATIC PARKING SYSTEM WITHOUT PIT AND NO COLUMNS AT THE ENTRY SEMI AUTOMATICS SHORT DESCRIPTION

Available in 5 platform widths from 7'-7" to 8'-11" Available in 2 headroom heights: 5'-9" and 6'-11" Available in 4400 lbs or 5060 lbs load capacity

Carlift Series PHP 220F

PARKLINE N5803 PARKLINE SERIES THE SEMI-AUTOMATIC PARKING SYSTEM ON 3 LEVELS, WITHOUT PIT SEMI-AUTOMATICS

TECHNICAL SPECIFICATION SEMI-AUTO BI-DIRECTIONAL MAX 2 SMART SOLUTIONS FOR VEHICLE PARKING AND CAR STORAGE

UNIPARKER SERIES UNIPARKER N5303 THE SEMI-AUTOMATIC PARKING SYSTEM WITH PIT AND WITHOUT COLUMNS AT THE ENTRY SEMI-AUTOMATICS SHORT DESCRIPTION

When platform #4 is requested. Platform #3 and #5 shift to the left. Then platform #4 is lowered to the entrance level.

483 mm (19 ) Wall Mounting Cabinets IP55 (Outdoor), 600 mm width mm, 600 mm depth

so increased accessibility

Removal and Installation Guidelines

PRODUCT RANGE. we compact parking space. Otto Wöhr GmbH Auto-Parksysteme

Allen-Bradley Parts. CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns. Installation Instructions. Catalog Number 2500

BUREAU OF INDIAN STANDARDS DRAFT FOR COMMENTS ONLY. (Not to be reproduced without the permission of BIS or used as an AMENDMENT)

483 mm (19 ) Server Cabinet Unique Series. Abstract. Features. 1.5 mm strong steel sheet. Load capacity up to 1000 kg. Standard colors grey and black

Installation and Maintenance Manual. End Terminals

A maximum of power with a minimum investment the economical solution for road construction.

PRODUCT OVERVIEW CARPORTS

Polycarbonate manholes

Operating Instructions Installation Information. METTLER TOLEDO MultiRange Weighing Platforms PUA574 / PUA579(x)

Parkonfor Series. Parkist C Series Parkist 1C - 11C - 111C / 2C - 22C - 222C

Standard. Industrial Storage Technology

Timing-Belt Reverse Unit 8 80 R25 Notes on Use and Installation

Assembly Instructions Maxi Cheops Pyramid Art B to set into concrete

Heating oven with mechanical convection

Timing-Belt Reverse Unit 8 80 R50 II Notes on Use and Installation

Volute Casing Centrifugal Pumps PN 16 for heat-transfer liquids Heat-transfer oil up to 350 C Hot water up to183 C

SECTION VII METERING INSTALLATIONS

Creating An Accessible World ELVORON CPL.

Reinforced edge channels KE-100

Drying ovens. ED 53 - Drying oven with natural convection. Performance features and equipment :

Installation and Service Instructions (Translation of the Original Instructions) SV120. C _EN 11/2009 Rev.0

PROUD TO PROMOTE. Guide to Safety Edge Systems

ELVORON HOME ELEVATOR

Operating Instructions Garlock Butterfly Valves DN : mm / 2-24

5. Underground Requirements

A Assembly Instructions Trampoline Piccolo Art with Special Installation Frame

Installation and Operational Instructions for ROBATIC -clutch Types _.0 and _.0 Sizes 3 7

BDP. BDP Bi-Directional Parking System PROFESSIONAL PARKING SOLUTION PROVIDER! WE PLAN, DESIGN, MANUFACTURE AND INSTALL... QINGDAO MUTRADE CO., LTD.

Heating chamber with mechanical convection

BoWex FLE-PA. BoWex FLE-PAC. KTR-N Sheet: Edition: EN 1 of BoWex FLE-PA / FLE-PAC Operating/Assembly instructions

Heating oven with mechanical control

FS II - Mounting Instruction. 1 General 2. 2 Pile driving (Ramming) 3. 3 Mounting individual assemblies 4. 4 Components list 5

Emergency Repair of Runway after Cargo Plane Accident

Moisture-proof cable branch boxes Ceiling distribution boxes Lamp suspension boxes Wall boxes Concrete wall boxes and accessories

GROUPCODE NEN : ANSI : STEEL BS : STEEL

Elvoron Home Elevator

Heating chamber with mechanical convection

INTRODUCTION GENERAL GUIDELINES ATTACHING THE DRIVE PARTS

Tracked Paver SUPER 700

DIGITUS Network- and Server Cabinet Dynamic Basic Series

Operating Instructions Type MPT 53

Installation Manual. stairlift. A 4724 Neukirchen/W, Salling 8 Tel: 07278/ , Fax: 07278/ Mobil: 0664/

Die changing technique

Heating oven with natural convection

CAR PARKING SYSTEMS Program overview

BDP Puzzle Lift Bi-Directional Parking System

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Is Low Friction Efficient?

Tracked Paver SUPER 800

Tracked Paver SUPER 800

Climate chambers with illumination

Installation and Operating Instructions for ROBA -ES couplings Type 940. _. _ Sizes 14-48

Separators. industrieblick Fotolia.com. For indoor or below ground installation ACO Light Oil Separators Coalisator-P

Standard. Manual Shopfitting and Storage Systems

EC Declaration of Conformity

KR 30, 60-4 KS; KR 60 L16-2 KS

Knürr Miracel. Knürr Miracel. 19 Server Rack Platform.

Hahn Serie 60 AT. Universal hinge for versatile application. More modern look Improved technology

On-the-Job Training Program. Overview of Training Programs

Aluminium Productive Fence System 40 PRODUCT CATALOGUE

SERVO MOTORS BRUSHLESS SERVO MOTORS OPERATING INSTRUCTIONS 2016

Hydro-Park High-end Four Post Parking Lift PROFESSIONAL PARKING SOLUTION PROVIDER!

Bearings and steel balls

Installation and operating instructions. Solar charge controller 10 A / 15 A / 0 A / 30 A PHOTOVOLTAIK - PHOTOVOLTAICS - PHOTOVOLTAIQUE - FOTOVOLTAICA

Heating chamber with mechanical convection

Solar Heating Pool Installation

ENGINEERS RESPONSIBILITY-WINDERS

ACO Qmax Unit size

Climate chamber with illumination

SERVO MOTORS BRUSHLESS SERVO MOTORS ATEX ZONE 2-22 OPERATING INSTRUCTIONS 2016

Operating Instructions Installation Information. METTLER TOLEDO MultiRange Weighing Platforms PFA574 / PFA575(x) / PFA579(x)

Data sheet. D-2011/05/ Date: 02/2013. Type TS50 CNG. Fuelling System. for installation in cars FUTURE. TECHNOLOGY. TODAY.

Transcription:

Data Sheet WÖHR PARKING PLATFORM 501 For lateral shunting. Suitable for condominium and office buildings. Dimensions in cm. Load per parking place max. 2000 kg (max. wheel load 500 kg). 500 500 90 *safety distances acc. to EN 140 min. 250 Arrangement with columns between the platform rows switch cabinet central operating device performed by customer: lockable main switch on 180 cm height 01 500 560 560 650 X X Notes 1. According to EN 140 a 30 cm safety distance must be provided between the front and rear bumpers of cars being parked on the parking platforms and fixed parts of the environment, e.g. columns, or other cars. Considering a max. car length of 500 cm, the resultant distance between the columns must be 560 cm. This distance may only be reduced with the consequence of shortened max. car length or parking place length, or by introducing light barriers. 2. Each operating device can handle a number of car park places depending on project, parking arrangement and overview. Please consult WÖHR. 3. The operating device has to be installed at a place, where the whole shiftway can be viewed. 4. The manufacturer reserves the right to construction or model modifications and/or alterations. Furthermore, the right to any subsequent part modification and/or variations and amendments in procedures and standards due to technical and engineering progresses in the art or due to environmental regulation changes, are also hereby reserved. WÖHR Autoparksysteme GmbH Ölgrabenstr. 14 71292 Friolzheim Germany +49 [0] 7044 46-0 +49 [0] 7044 46-149 info@woehr.de www.woehr.de X = according to project size

Dimensions of Parking Platform Dimensions in cm. Scale 1:50 Section 500 clear height 2/220 max. 2* min. 18 * safety distances acc. to EN 140 355 approx. 90 Top view wheel stop Rear view 02 safety flaps Clearance profile (standard saloon/estate car) 40 40 60 60 120 platform width A 27 5 22 14 38 max.290 500 162 90 8 48 46 height* dimension gives clear A platform width 226 197 236 207 246 217 256 227 We recommend a minimum platform width of at least 207 cm. * max. car height: please note the conditions of the building

Evenness and tolerances According to EN 140 the danger of trapping between nonparallel platforms edges and the ground has to be prevented. The distance between the lower flange of the platforms and the garage ground must therefore not exceed 2 cm. To adhere to the safety regulations and to get the necessary even ground, the tolerances of evenness to DIN 18202, table 3, line 3, must not be exceeded. Therefore exact levelling of the ground by the client is essential. Abstract from DIN 18202, table 3 column 1 2 3 4 5 6 Vertical measurements as limits in mm with measuring points distances in m to* line reference 0,1 1 4 15 2 Unfinished to surface of covers, subconcrete and subsoils for higher 5 8 12 15 20 demands, e.g. as foundation for cast plaster floor, industrial soils, paving tiles and slabstone paving, compund floor paving. Finished surfaces for minor purposes, e.g. warehouses, cellars 3 Finished grounds, e.g. floor pavement serving as foundation for coverings. 2 4 12 15 Coverings, tile coverings, PVC flooring and glued coverings. * Intermediate values are to be taken out the diagram and must be rounded-off to mm. Tolerances in mm 20 15 5 0 0 line 2 line 3 1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 distance between measuring points in m Measuring points The evenness of a surface is checked independently of its position and slope by bore hole gauges between two check points on the surface. WÖHR make a random test using single measurements in case of obviously inaccurate surfaces. For uniform examination of the evenness of the ground surface the following points are defined as measuring and check points: a) for surface recess b) for finished floor a) Layout for surface recess width cm 0 0 0 0 95 80-0,04 RFB surface recess 370 560 Measuring points at 0 cm points for checking unevenness acc. to DIN 18202, table 3, line 2, or acc. diagram b) Layout for finished floor after placing floor pavement 0 0 0 0 finished 130 80 150 560 150 Measuring points at 0 cm points for checking unevenness acc. to DIN 18202, table 3, line 3, or acc. diagram 03

Track and floor details The moving rail load of each platform wheel is max. 6 kn. The evenness of the floor + screed must be achieved according to DIN 18202, table 3, line 2. After checking the floor + screed the levelling rails are mounted on top of the highest point. The underlining and fixing of the levelling rails occurs at the intended fixing points. For the laying of the running and levelling rails a meter tear is to be attached permanently for every railway track by the client. The screed is to be peeled off by the client on height of the levelling rails. Do not use mastic asphalt. The running rails are fastened after placement of the screed with wood screws and plastic dowels. Evenness according to DIN 18202, table 3, line 3. In the area of the railway track no expansion gap or building dividing gaps are allowed. With later installations of the parking platforms, dependent on the ground evenness, an additional screed must be taken into consideration by the client. The decision of the steps occurs after a levelling. Entrance parking bay limitation front levelling rail 7 3 running rail contact rail finish floor see page 2 min. 4 cm high running rail contact rail 3 parking bay limitation back 2 levelling rail heavy duty anchor bolts bore hole depth 8 cm 4 heavy duty anchor bolts bore hole depth 8 cm 300 25 370 12 80 Drainage According to EN 140 the distance between finished floor and platform may not exceed 2 cm to avoid any danger to persons feet. No slope in the area of the parking platform. 0% slope in longitudinal direction no slope max. slope of 1% in the parking bay area max. slope of 1% within the driving aisle 04

Notes and directions Control and supply of power The current entry including lockable main switch must be mounted by the customer up to the control with 3 x 1,5 mm 2, 230 V (fuse 16 A slow blow according to DIN VDE 00 part 430). (See page 1 the position of the lockable main switch.) The power is led to the parking platforms via the track system. (The supply is led) from the control system to the track system via cables which pass through empty pipes laid by Noise Ball bearings of the rollers provide a low sound level. Illumination the client. The parking platform is selected at the operating device via a push button or a coded key. By means of the control system the parking platforms are moved in such a way that the access to the selected parking place is free. In addition, there is about 60 80 cm space on the left side of the parking place to get in and out of the car. On special request, this space can also be made available on the right side. Illumination has to be considered acc. to local requirements by client. Temperature The installation is designed to operate between +5 and +40 C. Atmospheric Humidity: 50% at +40 C. If the local circumstances differ from the above please contact WÖHR. Fire safety Each and every fire safety requirement and all possible mandatory item(s) and equipment(s) (fire extinguishing systems and fire alarm systems, etc.) are to be provided by the customer. Numbering of the parking spaces Conformity assessment (TÜV) Product liability WÖHR does not take any liability for damages due to squeezing danger because the evenness tolerances are not fulfilled. The distance between the lower edge of the platform and the finished floor may not exceed 2 cm. Maintenance WÖHR and its foreign partners have an assembly and customer network. Annual maintenance is performed at conclusion of a maintenance contract. Prevention of corrosion damage voluntary conformity assessment by the TÜV SÜD the parking systems are compliant to: EC Machinery Directive 2006/42/EC DIN EN 140 all operations listed in the WÖHR Cleaning and Maintenance Instructions are to be performed regularly (independently of maintenance operations) zinc-plated parts, components and platforms are to be kept clean of dirt, road-salt and any other debris (due to corrosion hazards) always keep the garage well ventilated and deaerated Surface protection please be mindful of the information flyer on Surface Protection for WÖHR Car Parking Systems Technical specifications please be mindful of the Technical Specifications 7 8 9 Parking places Parking place-profile please be mindful of the product information Parking Place-Profile Vehicle drawings creativ collection Verlag GmbH/www.ccvision.de 4 5 6 1 2 3 Parking Platform 501 Parking Platform 501 Different numbering of parking spaces is possible at extra cost (software changes are necessary). Construction formalities the documentation necessary for construction permit applications is provided by WÖHR Dimensions All dimensions are in cm. 05