Head with piston Use and Maintenance Manual

Similar documents
Plunger Heads Use and Maintenance Manual

GENERAL WARNING. General instructions. Technical assistance. Doseuro S.r.l. Liability

USE AND MAINTENANCE MANUAL. Series A Type A 125N A 175N A 250N A 350N ALTERNATIVE DOSING PUMP WITH PISTON AND SPRING RETURN. Doseuro S.R.L.

Reduction gear use and maintenance manual

ATTENTION: Industrial machinery for professional use. These instructions are for qualified personnel USE AND MAINTENANCE MANUAL

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080

GRUNDFOS ALLDOS INSTRUCTIONS. DMB dosing pump. Installation and operating instructions (basic version)

Pump Manual. Model Numbers: SP240VDFS57LPM SP240VDFS80LPM. Product Names: Digital Refueling Station - 57 L/min Digital Refueling Station - 80 L/min

INSTALLATION, OPERATION AND MAINTENANCE TECHNICAL MANUAL

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700

SL 250 SL 350 Series

Turbocharger / A100-L Original assembly instructions English

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

Vertical Chemical Pumps

BW - BIG VOLUME BOOSTER INSTRUCTION MANUAL 2072

Instruction Manual. Unique Single Seat Valve - Manually Operated ESE00523-EN Original manual TD TD

Purging Air From Divider Block Lubrication Systems

PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS

Installation, Operating & Maintenance Instructions. HV gate valve with pneumatic actuator. Series 110 DN mm (I. D.

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

Mod: KLD6-12/35XLAS-N

PRODUCT SERVICE MANUAL. BK6DHZ(C)-250, 275, 312 and 400 PUMPS

Installation, Operating & Maintenance Instructions. UHV gate valve with pneumatic actuator. Series 108 DN mm (I. D. 2½ 8 )

CSA products for waste water. Combination air valve. Mod. SCF 2

PRODUCT SERVICE MANUAL FOR. F312XICR-312_, 325_, 400_ and 437_ Pumps. For Solar Turbines

Operation & Maintenance Manual 4900 Series Pipeline Injection Pumps Bulletin 150

Installation, Operating & Maintenance Instructions. HV angle valve with pneumatic actuator single acting with closing spring (NC)

CPM-I-D60 Constant-Pressure Modulating Inlet Valve

Pressure relief valve

Operation & Maintenance Manual For 4900 Series Pumps Bulletin 134

Operation & Maintenance Manual for Northern Magnetic Drive Pumps. Operation Manual. Northern Magnetic Drive 4400 and 4600 Series

ONYX VALVE CO MODEL DAO-PFC Installation & Maintenance

NUFORS-DC VALVE SERVICE

Turbocharger / TPS-H Original assembly instructions English

HV angle valve with single acting pneumatic actuator and closing spring (NC)

Instruction Manual. LKAP Air-Operated Valve ESE01993-EN Original manual

Instruction Manual. Unique Single Seat Valve - Manually Operated ESE00523-EN Original manual TD TD

Starting up hydraulic systems

A408 GB. Pneumatic oil and diesel pumps 1:1

OFFICINE OROBICHE S.p.A. 1/7 INSTRUCTION MANUAL FOR FLOW SWITCHES PL SERIES

US - UP2/OIL 12V US - UP2/OIL 24V

Medium and high pressure pumps

USE and MAINTENANCE INSTRUCTION MANUAL AZ3 HTE2 AZ3 HTE2 HVLP GRAVITY. SPRAY GUN Series. en it fr es pt de se

ONYX VALVE CO MODEL DAO-PFO Installation & Maintenance

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

Electric Pressure Washer

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation, Operating & Maintenance Instructions. All-metal gate valve with compact or extended pneumatic actuator

PNEUMATIC PUMP Series

ONYX VALVE CO MODEL DAO-ADA Installation & Maintenance

Assembly instructions

SYDEX / MAINTENANCE AND OPERATION MANUAL

BELT CONVEYOR CB/M5 Series

ONYX VALVE CO MODEL DAC-ADA Installation & Maintenance

Instruction Manual. SMP-BCA Aseptic Mixproof Valve with PTFE Diaphragm IM70811-EN

Pro Gun (Model: UCpro and UCPro Plus)

Spa USE AND MAINTENANCE CULTIVATOR MODEL BL300 / BL350

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

Operating and installation instructions

POMPE AUTOADESCANTI SELF-PRIMING ELECTRO PUMP ACM DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR MULTISTAGE SELF-PRIMING PUMPS

TECHNICAL MANUAL MT064

Pneumatic grease pump 50:1 and grease supply system

Water pump Owner's Manual

CSA products for waste water. Anti water hammer combination air valve. Mod. SCF-RFP

Air Operated Diaphragm Pumps Operating and Maintenance Instructions

Unique 7000 Series Valve - Standard and Reverse Acting

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

Oxiperm C 164 Fully automatic chlorine dioxide processing plant C, -450C,-750C, -1300C, -2500C. Service manual

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS SINGLE STAGE WITH MECHANICAL SEAL TRMB to TRVB to

Turbocharger / TPL-B Original assembly instructions English

DISASSEMBLY AND ASSEMBLY INSTRUCTIONS FOR LIQUID RING VACUUM PUMPS

#9040 FUEL TANK SWEEPER

Round profile cylinders Tie rod cylinders

Instruction Manual. Magnetic Mixer MM UltraPure ESE01696-EN Original manual TD

June14. Type

Northern Pump A Division of McNally Industries, LLC

SUBMERSIBLE WATER PUMP

BELT CONVEYOR PNL/4 Series User and maintenance manual

Installation and Operating Instructions for EAS -NC clutch Type 45_. _. _ Sizes 02 and 03

2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE

CONTENTS. VIKING PUMP, INC. A Unit of IDEX Corporation Cedar Falls, IA USA SECTION TSM 710.1

DYNAFLUID 2000 STEAM & WATER MIXING VALVE INSTALLATION & OPERATING MANUAL

Compensation unit AGE-XY 50-80

DIAPHRAGM PUMPS: Instruction Manual

RADEX -N Composite Operating/Assembly instructions

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS RIGHT ANGLE FILTER Original Manual EN (0) 2019/02

Instruction Manual. Unique 7000 Series Aseptic - Manually Operated ESE02421-ENUS Original manual

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS

1/2" AIR DRIVEN DIAPHRAGM PUMP

DIAPHRAGM LIQUID PUMP NF 2.35

SBS Manual for the specialised craftsman. Filling and flushing station. Connection Operation. en Manual

KEYSTONE Figure 990/991 Butterfly valves Installation, operation and maintenance instructions

Swing Piston Compressors and Vacuum Pumps

AIRCLEAN 32 USER MANUAL. High-pressure cleaner. Wilhelmsen Ships Service. Produced in Norway for:

WARNING Carefully Read These Instructions Before Use

50:1 Grease Pump Kits

SERVICE MANUAL 200 SERIES MOTORIZED 20352, 20452, 20551, 20552, AND MODELS

ORIGINAL INSTRUCTIONS

Parker Hannifin Filtration Group Racor Division DUAL FBO OPERATION AND MAINTENANCE INSTRUCTIONS SPARE PARTS

Transcription:

Head with piston Use and Maintenance Manual UK Type Positive displacement dosing pump PDP Series A-I 175 A-I 250 A-I 350

General instructions We thank you for choosing this product and recommend you read this manual carefully before starting installing the dosing pump. Please pay particular attention to the safety warnings marked with pictographs. Complying with the rules and prescriptions herein ensures safe use and proper maintenance. The Use and Maintenance Manual is an integral part of the machinery and must be easily accessible by the operators and maintenance staff, so it should be stored intact in a safe place. Technical assistance Standard and extra maintenance must be carried out according to the instructions contained in this manual. For technical assistance and spare parts, please contact DOSEURO main office, your dealer or installer, and report the data on the plate attached to the pump: Pump type Id number Year of construction If repairs to the pump are not carried out according to the instructions herein, or are done in a way that which affects integrity or modifies its characteristics, the manufacturer shall be incur no liability for people s safety and faulty operation of the pump. Doseuro S.r.l. Via G. Carducci, 141 - I20093 Cologno Monzese (Mi) - Italy Sales office: Ph. +39-0227301324 Fax +39-0226700883 Web site: www.doseuro.com E-mail: info@doseuro.com Liability Non-compliance with the instructions contained in this Use and Maintenance Manual shall release the manufacturer from all responsibilities. For any information which is not included in or cannot be inferred from the following pages, contact DOSEURO directly. 2

Via G. Carducci, 141 I-20093 Cologno Monzese (Mi) Italy Ph. +39 0227301324 Fax +39 0226700883 doseuro S.r.l. The Right Dosing Choice DECLARATION OF COMPLIANCE DOSEURO S.r.l. With main office in: Via G. Carducci, 141 - I-20093 Cologno Monzese (Mi) Italy Declares under our sole rsponsibility that the products belonging to the indication commercial: POSITIVE DISPLACEMENT METERING PUMPS PDP Series Model: I 175 - I 250 - I 350 2006/42 EEC Machinery Directive (and any subsequent modifications). 2004/108 EEC Directive Electromagnetic Compatibility. 2006/95 EEC Electric material low voltage end. As well as with the following harmonised rules for Safety: UNI EN 12100-1:2009 Safety of machinery UNI EN 12100-2:2009 Design principles part 2. CEI EN 60204-1 98 Electrical equipment of machinery. The technical documentation is available in our office. PLACE AND DATA: Cologno Monzese - January 2010 UP TECHNICAL FILE CDA President MICCICHE TULLIO Via G. Carducci, 141 I-20093 Cologno Monzese (Mi) EDITORIAL STANTEMENT OF COMPLIANCE Technical Direction MICCICHE TULLIO 3

Table of contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 7 Chapter 8 Chapter 9 Chapter 10 Chapter 11 Chapter 12 Chapter 13 SIGNS USED 5 1.1 Symbols 5 1.2 Protective clothing 5 BLOCK REMOVAL 6 SUCTION CIRCUIT CONNECTION 6 DELIVERY CIRCUIT CONNECTION 7 LEAKAGE COLLECTION SYSTEMS 8 PLENUM CHAMBER INSTALLATION HEAD WITH GASKET CLEANING 8 "PTFE" GASKET PACK REPLACEMENT 9 10.1 "PTFE" gaskets adjustment and compression 9 MAINTENANCE PLAN 10 9.1 Scheduled maintenance 10 9.2 Repair procedure 10 INTERMEDIATE MAINTENANCE 10 10.1 Liquid leakage from the hole under the lantern 10 10.2 Valve assembly cleaning 11 10.3 Piston seal control 11 YEARLY MAINTENANCE REPAIRS AT THE FACTORY 12 DISABLING THE PUMP 12 Chapter 14 DISPOSAL OF COMPONENTS AND HARMFUL SUBSTANCES 12 REFERENCE DIMENSIONAL & SECTION DRAWING (see attached sheets) 4

Chapter 1 SIGNS USED It is important to draw attention to the symbols used in this document to highlight the residual risks associated with the suitable use of the pump. The following pictographs use different shapes and colours to indicate general warnings and the behaviour required for the operator to carry out all of the activities in full safety according to specific symbol indications. Features of safety signs Colour Shape Meaning Indications and details Yellow Orange yellow Light blue Warning Instruction Warns you to be careful, pay attention to mechanical risks or potential dangers of various kinds in the working environment. Inform workers about personal protection devices to be used and specific behaviour required. 1.1 Symbols The non-compliance with safety rules can cause minor personal injury or damage to property. DANGER! The non-compliance with safety rules can cause personal injury or damage to property. DANGER OF SERIOUS INJURY! The non-compliance with safety rules can cause serious injury or serious damage to property. DANGER! DANGER OF SERIOUS INJURY! DANGER OF SERIOUS INJURY! RESIDUAL RISK! These general instructions are valid only in combination with specific instructions of use of dosing pumps and hydraulic accessories. 1.2 Protective clothing DANGER! To carry out any maintenance activities on the pump or plant, the operator must wear personal protection devices according to the law in force (626/94) to avoid skin contact with the pumped liquid, i.e.: protective gloves and goggles, respiratory masks, protective headphones or earplugs, protective suit, safety shoes. COMPULSORY SIGNS 5

Chapter 2 BLOCK REMOVAL Before installing the pump, make sure to remove all protective caps located on the suction inlets and the valve delivery system. Before the installation, if the pump as remaining stock for a long period, we suggest to check the plunger gasket to be sure that they haven t any kind of alterations. In case of any discrepance from the quality standard to replace it to avoid any damage to person or things. Chapter 3 SUCTION CIRCUIT CONNECTION The following is a number of recommendations installers should follow for proper installation. Before connecting the lines to attack the pump should run a wash cycle in the pipes to remove any foreign body, weld spatter, seal cuttings, etc. The suction pipe should be as short and straightforward as possible, using large-radius curves, not to exceed 3 feet of pressure drop, it is preferable to install the pump suction head. If the pump is located above the tank, you should install the foot valve. Avoid counterslopes to facilitate the evacuation of any air bubbles and ensure that there is a perfect sealing particularly in suction. The pipes and fittings in the inlet, must be sized to a nominal diameter equal to that of the valves of the pump or greater if in the presence of viscous liquids. The maximum speed of the fluid in the pipes, must not exceed 0.7 m/s for liquids contained in a range of viscosity up to 100 mpa - (cps). CONNECTION EXAMPLES CORRECT APPLICATION WRONG APPLICATION Acceptable execution 6

CONNECTION EXAMPLES CORRECT APPLICATION WRONG APPLICATION Acceptable execution It blocks the fluid stream It sucks up debris from bottom Chapter 4 DELIVERY CIRCUIT CONNECTION Proper realisation of the delivery pipe path is particular important to ensure the good functioning of the pump. Moreover, careful fixing is required, particularly if the pipe is subject to high strain conditions. For this purpose, following is a list of indications installers should comply with to build the system properly. DANGER! Pipe path should be as straight as possible; the pipe should be supported independently to prevent expansion due to heat sources that may affect the pump head. Provide one or more T-couplings after the delivery flange that can be used for installing pressure gauges, safety valves, and pulsation dampers. Always install a safety valve and a drain valve on the delivery system to protect the plant and make maintenance and starting of the pump easier. CONNECTION EXAMPLES CORRECT APPLICATION WRONG APPLICATION Injection valve Overflow valve If the main pipe is under pressure, it can damage the secondary pipe and the pump. A delivery valve is not enough to avoid siphoning. 7

Chapter 5 LEAKAGE COLLECTION SYSTEMS RESIDUAL RISK! A proper leakage or drip collection system is required for safe discharge of harmful liquids. Use the pipe holder of the covering under the head-holding lantern, if applicable, to make connection and leakage drainage due to worn out gaskets easier. Chapter 6 PLENUM CHAMBER INSTALLATION The use of a plenum chamber installed on the delivery system is often required. Benefits include: more steady flow rate, no vibrations on the line, protection against pressure peaks and water hammering. Chapter 7 HEAD WITH GASKET CLEANING This type of head is used with products which may SEDIMENT or CRYSTALLISE. Continuously washing the gasket housing helps remove deposits, and prevents the product from hardening and causing abrasion on the piston or damage to the seal gasket profile. Gasket washing: Using the needle valve C, adjust the flow rate at 40-50 l/h for at least 10-15 minutes after stopping the pump. Dirty fluxing water must be drained. Head and valve washing: Once dosing is complete, before stopping the pump close the A valve, simultaneously open the B valve and let washing water circulate for about 3/4 minutes. After this time, stop the pump and let water flow till it becomes clear. When washing is complete, close the B valve and open the A valve. Pump is now ready for dosing. Note: This procedure should be also carried out after a work process if the pump is being stopped for a long time. A C B DELIVERY PIPE TO PLANT FROM WATER NETWORK FOR GASKET WASHING DISCHARGE WASHING PIPE FROM WATER NETWORK FOR HEAD WASHING SUCTION ON-OFF VALVE 8

Chapter 8 PTFE GASKET PACK REPLACEMENT After the depressurisation procedure is completed, proceed as follows: Disconnect the pumping head pos.1 from the system and the lantern of the dosing pump. Clean the pumping head to ensure the operator can safely handle the component. Loosen the ring nut pos.11 and remove it. Check if the piston (pos.2) is worn out. If it is scored or cut, replacement is recommended. In this case, loosen the dowels pos.15. Remove the gasket pack pos.3 and place the new pack into the pumping head paying attention to the gasket orientation. Tighten the clamping ring nut pos.11 till it touches the gaskets. Place the pumping head pos.1 on the piston pos.2, push it against the lantern, then fix it with screws pos.4. 1 3 11 2 15 4 8.1 PTFE gaskets adjustment and compression To ensure this type of gaskets is water-tight, they need adjusting. If you replace the gaskets, follow the steps as indicated hereunder. PUMPING HEAD DESIGN Connect the dosing pump and possibly use a harmless liquid; tighten the ring nut one-fourth of a turn to apply light pressure on the gaskets. The upper part of the head will drip. Let the pump run for 4/5 hours before tightening the ring nut again. After this time, tighten another fourth of a turn. Let the pump run 2 to 3 hours before tightening the ring nut again; verify that it drips less. This tightening and checking procedure should be carried out till the dripping stops. The gasket pack must be checked and adjusted regularly. While carrying out these operations, make sure not to tighten the ring nut too strongly to avoid damaging the gaskets. 9

Chapter 9 MAINTENANCE PLAN The control and maintenance plan depends on the operating conditions for the pump. Good maintenance allows to improve performance, increase operating life and continuously maintain safety requirements. 9.1 Scheduled maintenance To maintain pump's safety and performance, maintenance should include visual checks. TIME PERIOD TYPE OF CONTROL TYPE OF SERVICE Once a month Visual check for any leakage from seals. Leakage detection, repair Every 800 hours Piston seal check Adjustment or fixing Every 6 months (or 1.500 hours) Accurate cleaning of valve assemblies, filters, bottom valve. Replacement or repair 9.2 Repair procedure Before doing any repairs on your dosing pump and pipes, take all necessary measures to avoid that the pumped product especially if it is harmful causes danger to people or nearby objects. BEFORE DOING ANY REPAIRS, STAFF MUST VERIFY THAT: Pump is idle and disconnected from the power line. Pump head and plant are depressurised and the liquid has been emptied from the pump. Pump temperature allows to handle the pump safely. Lifting equipment is suitable for handling heavy or big parts that needs dismounting. After verifying that none of those above conditions exist, thoroughly clean pipes and pump components. Chapter 10 INTERMEDIATE MAINTENANCE Not only do steady and thorough checks preserve the pump, but they also prevent faulty operation which can require extra repairs. The following chapters describe the parts which more likely need repairing as they are subject to additional strain and wear. FINDING FAULTS: 10.1 Liquid leakage from the hole under the lantern Establish if the collected fluid is mechanical oil or pumped liquid. If it is pumped liquid, the seal gasket of the piston is worn or damaged and must be replaced. If it is mechanical oil, the seal gasket of the slide is worn or damaged and must be replaced. 10

10.2 Valve assembly cleaning Make sure to follow the steps as indicated hereunder after seeing the assembly drawings. Delivery circuit: unscrew the delivery system container. Remove the valve seat, ball and valve slide, paying attention to the installation order for remounting. Clean the threaded parts of the head and valves to remove impurity. Clean the valve components. Worn parts must be replaced. 10.3 Check and replacement of piston seals The check and maintenance plan depends on the operating conditions. Should any failure occur involving leakage from the hole under the lantern due to worn out gaskets, these must be immediately replaced. Before doing any repairs on your dosing pump, the maintenance staff must verify that the pump is idle and disconnected from the power supply and the plant is depressurised and empty. The operations carried out to uninstall the head and piston with autocentering system include: Uninstalling the pumping head Remove the lantern cover. Uninstall the lantern head. Remove the head gaskets that are damaged. Disassembly for piston replacement Loosen the counter-clamping ring nut ref. 2/6 Completely loosen the clamping ring nut ref. 2/5 from the slide coupling ref. 41 Completely loosen the piston from the piston shaft ref. 2/2 Check if piston is worn out. If it is scored or cut, replacement is recommended. Lantern cover Once maintenance is complete and the pump is connected to the plant, screw the ring nut 2/5 with a slight clearance without tightening it, run the pump for a few seconds so the piston is centred properly in the head, then completely tighten the ring nut ref. 2/5 and the counter ring nut ref. 2/6. Piston 2/5 2/2 41 2/6 Chapter 11 YEARLY MAINTENANCE Yearly check-up (or check-up after 3,000 hours of operation) is a key factor to increase the life of the equipment and ensure product safety and functionality over time. Verify that the internal and external parts of the pump show no corrosion or no signs of degradation (cracking or breaking), with particular regard to plastic components. If any of these problems occur, damaged parts must be replaced. It is good practice to use original materials for repairs so to ensure reliability and safety of the pump. DANGER OF SERIOUS INJURY! Staff must wear all protective devices which are normally used for these types of operations. Abide by safety procedures set out in the existing law (626/94) and take all necessary care to avoid skin contact with the pumped liquid. 11

Chapter 12 REPAIRS AT THE FACTORY In most cases, replacing damaged parts does not involve any difficult operations. Before starting, the operator must refer to the drawings in the manual and follow the instructions. If the failure is difficult to deal with on site, we recommend you send the pump to our factory. ITEMS ARE ACCEPTED FOR FACTORY REPAIR ONLY AT THE FOLLOWING CONDITIONS: The head must be emptied of any liquid or deposit, so the equipment can be handled without danger to the operator even without wearing gloves. Customer shall state that the parts have been cleaned to ensure safe handling. If parts are sent to us without complying with these instructions, they will be returned unrepaired and relevant expenses shall be charged to the sender. Chapter 13 DISABLING THE PUMP If you need to disable the pump, make sure the following requirements are met to protect product and staff. ATTENZIONE! Before disabling the pump, clean it thoroughly with detergents which are compatible with the liquid pumped, as residual toxic, caustic or acid liquid and sediments can easily crystallise. Before removing the pump from the plant, verify no liquid is under pressure and intercept the pipe next to the pump. Chapter 14 DISPOSAL OF HARMFUL SUBSTANCES AND COMPONENTS Please bear in mind that the user is responsible for waste separation and material recycling according to the national and regional laws governing waste disposal and for delivering all waste materials to authorised waste companies, prior to obtaining the authorisation for temporary stocking. RESIDUAL RISK! If the materials used in the manufacturing process, with particular regard to lubricants or condensate water, are not collected or disposed of in compliance with national laws, there may be residual risks of environmental pollution. 12

NOTES: 2012-1 Edition 0 Review

To optimise use and complement your dosing pump choose DOSEURO S.r.l. ACCESSORIES Contact our Sales office Doseuro The Right Dosing Choice I-20093 Cologno Monzese (Mi) - Via G. Carducci, 141 Ph. +39 0227301324 r.a. - Fax. +39 0226700883 http://www.doseuro.com S.r.l. 14