Cable Management System Installation Manual

Similar documents
Dearborn Overhead Crane

1415 W. Bonanza Rd. Las Vegas, NV

CEILING MOUNTED WORK STATION BRIDGE CRANES & MONORAILS

WORK STATION BRIDGE CRANES

CERTAIN MODEL YEAR TRANSIT WAGON VEHICLES WITH LOW ROOF SIDE CURTAIN AIRBAG INSPECTION AND ADJUSTMENT

FLEXI-COIL 67 Series (1999+) Installation Manual FC1

CALIFORNIA STATE UNIVERSITY, LOS ANGELES LADDER SAFETY PROGRAM

TABLE OF CONTENTS Section Page 12 Benefits of Rapid Overhead Conveyors Glossary 4-6 Track and Accessories 7-9 Trolleys and Chain Attachments

Hagie 264, 284XP, DTS8, 2100, 2101, DTS10 Installation Manual HG2

SUMMERS Pull-Type with Proxy Switch Sense Installation Manual SM2

Spray Height Controller

MS Sprayers NT 1000/1250 Installation Manual MS1

Table of Contents. Chapter 2 Safety Fundamentals for Bridge Inspectors. Methods of Access Introduction

AGCO América do Sul (Factory Install) Installation Manual SP01

Fast Standard Control Installation Manual FT4

Spray Height Controller

Top Drive System Installation and Commissioning Manual

Installation Information 2009 Model 300 Dumbwaiter

SIDE PULL WINCHING WITH THE 35K WINCH TWO PART LINE WARNING

John Deere 4730, 4830 Installation Manual JD8

Creating An Accessible World ELVORON CPL.

WORK STATION BRIDGE CRANES & MONORAILS FREE STANDING & CEILING MOUNTED CAPACITIES FROM 250 TO 4000 LBS

C-Rail Festoon track systems

Installation, Operation, & Maintenance Manual

Midmark Track Light Installation

Installation, Operation, & Maintenance Manual

Vehicular Swing Gate Operator. Nice. Titan 912L. The Titan 912L Gate Operator is intended for use with vehicular swing

SLIDE DOOR OPERATOR ADDENDUM

Step 1 - Pre-assembly...1. Step 2 - Hanger Installation Step 3 - Runway Installation Step 4 - Splice Joint Installation...

Elvoron CPL. Planning Guide

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G When High Wind Version (HWV) or 6h x 2w, L

LOADING THE TDRT WARNING LOADING/UNLOADING OPERATION

Installation, Operation, & Maintenance Manual

HARDI Economy EAGLE Installation Manual HD9

Installation, Usage & Maintenance Guide

INSTALLATION OF TYPE ZSP PTO DRIVEN Fire Pump

BOSTROM SPRINTER SEAT INSTALLATION

Rogator 64 and 74 Series and Willmar Eagle 8650 (JIC) & 84, 94 & 1386 Series (Flat Faced O-Ring) Installation Manual RG2 & RG6

Installation Instructions

Installation, Operation, & Maintenance Manual

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

Rubbish Chutes Operating & Assembly Instructions

CRANE TESTING REQUIREMENTS FOR PERFORMANCE TESTS

VHM-P (Non-Locking) and VHM-PL (Locking) Variable Height Arm with Slide-In Mounting Plate

Single Seat Trailer. Owner s manual and safety instructions

CEILING MOUNTED WORK STATION STEEL BRIDGE CRANE

Star Swivel-Arm Hoist Installation and Operating Instructions

WORK STATION JIB CRANES CAPACITIES: TRACKS: PRODUCTIVITY: Up to 2000 lbs Steel, Aluminum & Stainless Steel Average 28% increase

WORK STATION JIB CRANES CAPACITIES: TRACKS: PRODUCTIVITY: Up to 2000 lbs Steel, Aluminum & Stainless Steel Average 28% increase

BREAK-SAFE Load Break & Pick-up Tool


Installation Instructions CLCA /S S197 Mustang Rear Lower Control Arm System

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Miller Condor & New Holland Rear Mount Truss Boom Installation Manual MC02

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Safelift Overhead Runway Beams & Rolling Beam Cranes

M REV. C MARCH 2011 OPERATION MANUAL GPSLR-33 & GPSLR-44

Rogator 854, 1054 & 1254 Series Installation Manual RG4

Roll Bar (MMRB-6.1 to -6.7)

Crane Systems GREER COMPANY. LALT 1151L System for Lattice Cranes. Installation and Calibration Manual. 1 of 39

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

I-Beam Festoon Instruction Manual

BREAK-SAFE Load Break & Pick-up Tool

THERN STAGE EQUIPMENT thernstage.com 1

Parts Manual. Operator's Manual Supplement. Special Supplement to Genie Industries Operator's Manual

PowerAssist. Installation Manual

3875 Cypress Drive Petaluma, CA Fax

John Deere (4730 & 4830) with Proportional Main Lift Installation Manual JD08

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G

Case IH 3150, 3185, 3200, 3310, Tyler Patriot Installation Manual CS2

ECU Mounting Bracket Installation

HO-Series Horizontal Offset Conveyors

Installation instructions for the LUX LED-GYM WAVE

In order to receive proper credit for returned units and

2106 HDCT-DUAL Belt Tracker

Heavy Equipment & Rigging Specialist Training

Top-of-Pole Mount for 15 Modules (TPM15) For Module Types E, F, & G ASSEMBLY INSTRUCTIONS

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Site Planning Guide. Staff Workstation Model M Library Systems. Printed in U.S.A. 3M 1999 July

Stairfriend Stairlift Owner s Manual

P.O. BOX 246 Franksville, WI USA Ph Fax

"Tension Control in a Turret Winder" Clarence Klassen, P.Eng. Abstract:

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

Intermodal Operations Committee

Type N550 Emergency Shutoff Valves. Instruction Manual. Type N550 Emergency Shutoff Valves. Introduction. Specifications. Scope of Manual.

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

Stand Alone Fog Lights Installation Instructions

Rogator Passive Roll (2012+) 3 Height Sensors Installation Manual RG10

INSTRUCTION MANUAL 16K - Fifth Wheel Hitch

Belt Installation, Tracking, and Maintenance Guide

Nitro (4000 Series) Installation Manual NT04

Revision Control Page REPORT PFS Kit PFS REVISION DATE REMOVE PAGES

Installation Instructions READ THOROUGHLY BEFORE BEGINNING Signature Series Rail Kit Dodge Ram Trucks-all, including Mega-cabs

SINGLE ACCENT LIGHT KIT

ERGO KIT TEK01 SERIES

Important. Contents. Contact us:

Installation and Set-Up Manual

70-81 Camaro TigerCage Shoulder Harness Bar Installation

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of Sutphen Aerial Operations Revised

Essential. Stairlift USERS MANUAL

Transcription:

Cable Management System Installation Manual

TABLE OF CONTENTS 1.0 INTRODUCTION and SAFETY... 2 2.0 INSPECTION and UNPACKING... 2 3.0 GENERAL INSTALLATION... 2 4.0 UPPER MOUNTING... 5 4.1 Under Hung Loft Block Rigging with out Grid... 5 4.2 Grid Mounted... 6 4.3 Line Shaft Rigging with out Grid... 7 5.0 BATTEN ATTACHMENT... 8 5.1 Double Pipe Batten... 8 5.2 Double Pipe Batten with Safety Guide Yokes... 9 5.3 Truncated Double Pipe Batten... 10 5.4 Truncated Double Pipe Batten with Safety Guide Yokes... 11 6.0 ADJUSTMENTS... 12 6.1 End Stops... 12 6.2 Festoon Extended... 12 6.3 Festoon Retracted... 13 7.0 CONTACTS... 14 LIST OF FIGURES Figure 1. General Arrangement and Major Components... 2 Figure 2. Trolley Attachment Bracket and Trolley... 3 Figure 3. Batten Attachment... 4 Figure 4. Trolley Track with Under Hung Rigging... 5 Figure 5. Trolley Track and Centerline of Set - Under Hung Rigging... 5 Figure 6. Grid Mounted CMS... 6 Figure 7. Grid Mounted CMS - End View... 6 Figure 8. Trolley Track with Lineshaft Rigging... 7 Figure 9. Trolley Track and Centerline of Set - Lineshaft Rigging... 7 Figure 10. Double Pipe Batten... 8 Figure 11. Double Pipe Batten with Safety Guide Yokes... 9 Figure 12. Truncated Double Pipe Batten... 10 Figure 13. Truncated Double Pipe Batten with Safety Guide Yokes... 11 Figure 14. CMS in Up Position... 12 Figure 15. CMS with Festoon Cables Extended... 13 Figure 16. CMS with Festoon Cables Retracted... 13 Page 1 of 14

1.0 INTRODUCTION and SAFETY The SSRC CMS (cable management system, aka pantograph) is a means to manage the electrical cables that feed a stage lighting batten. This can range from a few circuits to as many as 36 circuits. The CMS unit can weigh up to 500 lbs. Qualified personnel familiar with stage rigging practices should install it. As with all overhead rigging components, it is imperative that it be installed correctly to prevent injury or death. When installed correctly, the SSRC CMS is a safe, reliable system that meets or exceeds industry safety factors. The motorized rigging set upon which the CMS is to be installed must be in good working condition, have adequate capacity, and its upper and lower travel limits must be functioning correctly. The speed of the motorized set must not exceed 25 FPM (feet per minute). The rigger must have a safe means to gain access to the locations required during installation such as scaffolding or personnel lift. This manual addresses the most common integration methods with various rigging systems. Other integration techniques exist; please consult the factory for assistance or guidance. 2.0 INSPECTION and UNPACKING Inspect shipping carton for signs of damage during delivery. Unpack unit near the installation location. Check the CMS for any visible signs of damage. If damage is observed contact the factory immediately and do not proceed with installation. 3.0 GENERAL INSTALLATION Figure 1. General Arrangement and Major Components Page 2 of 14

Locate the Trolley Track (typically a 10 ft. long section of P1001 Unistrut or equal), CMS Trolley, Festoon Trolley Assembly, and End Stops. Install the Trolley Track in accordance with one of the methods outlined in Section 4.0. The Trolley Track may need to be cut shorter to fit the particular installation conditions. Due to the nature of the variety of installation environments, the brackets required to mount the Trolley Track are the responsibility of the Rigging Contractor or Integrator. These are not provided by SSRC, as there are an infinite number of variations. The integrator, who is intimately familiar with the field conditions of the project, is most suited to provide the CMS Track Hanger Brackets. Each bracket must be designed to support the entire weight of the CMS with an appropriate factor of safety. During the planning phase of a project, SSRC is available to provide suggestions on these brackets. Load the CMS Trolley and Festoon Trolley into the track. See Figure 1. Make sure the Festoon Trolley is oriented correctly in relation to the CMS Trolley to manage the swag of the cable bundles as they exit the top of the CMS. Install the End Stops. Torque the End Stop bolts to 25 ft-lbs. After the trolley track is correctly installed, raise the top section of the CMS, while allowing the lower sections to unfold, to a position where the Trolley Attachment Bracket can be attached to the CMS Trolley. Insert the 1/2 inch bolt through the bracket and trolley. Torque the 1/2 inch Nyloc to 50 ft-lbs. See Figure 2. Figure 2. Trolley Attachment Bracket and Trolley Page 3 of 14

Install the Batten Connection Assemblies in the lowest section of the CMS. These should be placed approximately 15 inches from each end of the CMS section housing. Torque the 5/16 bolts securing the tube to the CMS Housing to 15 ft-lbs. Place the CMS on top of the pipe batten and secure the batten clamps. Torque the 1/2 inch nut of the batten clamps to 15 ft-lbs. The batten supporting the CMS must not be allowed to rotate. See Figure 3. Figure 3. Batten Attachment Page 4 of 14

4.0 UPPER MOUNTING 4.1 Under Hung Loft Block Rigging with out Grid Figure 4. Trolley Track with Under Hung Rigging The Trolley Track must be installed in the same plane with the lifting lines of the set and below the horizontally running lines. See Figure 4 and Figure 5. Custom brackets to support the trolley track are usually required. Each track support bracket must be rated for a 500 lb working load. NOTE: If the weight of the CMS is in excess of 200 lbs, the Trolley Track must have an additional support at its center span. Depending on the structural environment, this may require a supplemental support member (such as P1001 Unistrut or equal) to support the Center Track Bracket. Figure 5. Trolley Track and Centerline of Set - Under Hung Rigging Page 5 of 14

4.2 Grid Mounted Figure 6. Grid Mounted CMS The Trolley Track must be installed in the same plane with the lifting lines of the set and below the Grid. See Figure 6 and Figure 7. One suggested mounting method utilizes a flat plate large enough to span the grid members with a through bolt into a strut nut secured by the trolley track. Each track support bracket must be rated for a 500 lb working load. NOTE: If the weight of the CMS is in excess of 200 lbs, the Trolley Track must have an additional support at its center span. Depending on the structural environment, this may require a supplemental support member (such as P1001 Unistrut or equal) to support the Center Track Bracket. Figure 7. Grid Mounted CMS - End View Page 6 of 14

4.3 Line Shaft Rigging with out Grid Figure 8. Trolley Track with Lineshaft Rigging The Trolley Track must be installed in the same plane with the lifting lines of the set. See Figure 8 and Figure 9. Sandwich style brackets can be used to clamp to the horizontal framing members of the lineshaft set which in turn attach to the Trolley Track. If the lineshaft set is not supplied with horizontal members, then custom brackets to support the trolley track are required. Each track support bracket must be rated for a 500 lb working load. NOTE: If the weight of the CMS is in excess of 200 lbs, the Trolley Track must have an additional support at its center span. If the lineshaft set is not supplied with horizontal members, then a suspension system similar to one shown in Section 4.1 must be used to support the Center Track Bracket. Figure 9. Trolley Track and Centerline of Set - Lineshaft Rigging Page 7 of 14

5.0 BATTEN ATTACHMENT 5.1 Double Pipe Batten A double pipe batten is defined as two pipe battens running the full width of the rigging set and joined by connector strip brackets. See Figure 10. The lift lines attach to the top pipe or the top of the connector strip brackets. The connector strip brackets must have sufficient grip to prevent the pipes from rotating. The CMS is located between two of the lift lines. Figure 10. Double Pipe Batten Attach the CMS to the top pipe of the batten with the clamps included in the Batten Connection Assembly. Torque the 1/2 inch nut of the clamps to 15 ft-lbs. The CMS must be clamped securely to the pipe batten so that it cannot rotate about the pipe. The top pipe batten must also be clamped via the connector strip brackets in a manner that prevents rotation. Page 8 of 14

5.2 Double Pipe Batten with Safety Guide Yokes If the CMS has five (5) or more active full length arm sections, then Safety Guide Yokes are required. See Figure 11. The Safety Guide Yokes maintain the alignment of the CMS arm sections as they stack up when the set is being raised. They also prevent further damage if the set is lowered onto an obstruction and the batten assembly rotates out of plumb. Figure 11. Double Pipe Batten with Safety Guide Yokes The Safety Guide Yokes fasten to the square tube of the Batten Connection Assembly and the lower pipe of the double pipe batten. The lower bracket of the Safety Guide Yoke is adjustable to accommodate various pipe spacings of the double pipe batten. Page 9 of 14

5.3 Truncated Double Pipe Batten A Truncated Double Pipe Batten is defined as a lower pipe batten running the full width of the rigging set and an upper pipe batten wide enough to attach to the connector strip brackets on either side of the CMS. See Figure 12. The two lift lines on either side of the CMS must attach to the top of special extended-arm connector strip brackets. These connector strip brackets raise the lift point of the set above the center of gravity of the CMS. This improves the stability of the CMS. They also have sufficient grip to prevent the pipes from rotating. Figure 12. Truncated Double Pipe Batten Attach the CMS to the top pipe of the batten with the clamps included in the Batten Connection Assembly. Torque the 1/2 inch nut of the clamps to 15 ft-lbs. The CMS must be clamped securely to the pipe batten so that it cannot rotate about the pipe. The top pipe batten must also be clamped via the connector strip brackets in a manner that prevents rotation. Page 10 of 14

5.4 Truncated Double Pipe Batten with Safety Guide Yokes If the CMS has five (5) or more active full length arm sections, then Safety Guide Yokes are required. See Figure 13. The Safety Guide Yokes maintain the alignment of the CMS arm sections as they stack up when the set is being raised. They also prevent further damage if the set is lowered onto an obstruction and the batten assembly rotates out of plumb. Figure 13. Truncated Double Pipe Batten with Safety Guide Yokes The Safety Guide Yokes fasten to the square tube of the Batten Connection Assembly and the lower pipe of the double pipe batten. The lower bracket of the Safety Guide Yoke is adjustable to accommodate various pipe spacings of the double pipe batten Page 11 of 14

6.0 ADJUSTMENTS 6.1 End Stops The End Stops on the Trolley Track must be adjusted to obtain the best performance of the CMS. If the End Stops are located too far inboard, the CMS unit will cause excessive batten sway. If they are located too far outboard, then excessive force is generated as the unit is raised and it folds each successive section. The End Stops always need to be located inboard of the pivot points of the CMS. Typically, the End Stop on the side opposite the Festoon should be 12 inches from the pivot point on this side. This is the left hand End Stop shown in Figure 14. The End Stop on the Festoon side should be 8 1/2 inches from the pivot point on this side. This accounts for the space the Festoon Trolley occupies and maintains equal stop points for the CMS Trolley. The upper limit of the rigging set should be adjusted so that the swags of the Festoon Portion of the Upper Tail do not foul or touch the CMS arms. Figure 14. CMS in Up Position 6.2 Festoon Extended Lower the batten until the CMS Trolley is up against the End Stop opposite the Festoon direction. See Figure 15. Move the Festoon Trolley to a position at the center of its travel. Adjust the swags of the flat festoon cables so that they are equal on each side of the Festoon Trolley. They should drape approximately 4 to 5 inches. Secure the end of the Festoon Portion of the Upper Tail with the Festoon Tail Clamp Assembly or other suitable means. The end of the Festoon Portion must be adequately clamped so that it does not limit the travel of the CMS Trolley. Page 12 of 14

6.3 Festoon Retracted Figure 15. CMS with Festoon Cables Extended After the previous adjustments are made, move the batten through its range of travel and ensure the CMS Trolley and Festoon Trolley move smoothly in the track. Make sure the trolleys travel the full range of motion between the stops. Make sure the festoon cables loop nicely in even swags. See Figure 16. Figure 16. CMS with Festoon Cables Retracted Page 13 of 14

6.4 Contacts Please contact SSRC with questions you may have regarding the installation of the CMS Pantograph products. SSRC, Inc. 170 Fortis Dr. Duncan, SC 29334 Telephone number 864-848-9770 Fax number 8648483746 Our web address is, www.ssrconline.com Page 14 of 14