Construction Noise Worksheets

Similar documents
Appendix D. Noise Calculations

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Appendix C Noise and Vibration Worksheets

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ASSESSMENT

APPENDIX C AIR QUALITY

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

Appendix D Noise Data

Schedule of Equipment Rates

Appendix H: Construction Impacts H-3 Air Quality

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

FEMA's Schedule of Equipment Rates

T.A.T Minimum Wage Scale

FEMA's Schedule of Equipment Rates

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

Construction Noise Memorandum

APPENDIX H-2 CONSTRUCTION NOISE ANALYSES

TEXAS DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2005 FUEL REPORTS EQUIPMENT FUEL USAGE

Definitions of Acoustical Terms

B.6 Construction Equipment Utilization and Workforce

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day)

Construction Emissions Estimates ICTF Modernization Project Long Beach, California

H.1 Construction Emissions

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

Why? Faster To reduce the duration of the process

Auction Ring 1 -Ramp - North Auction Theatre

EL653. Low-noise Construction Machinery [EL /2/ ]

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

The regulatory limits for the project include those prescribed via the Imperial County municipal code.

ATTACHMEMT I. VEHICLE AND EQUIPMENT LIFE CYCLE CRITERIA (Usage or Months Whichever Comes First)

Auction Ring 1 -Ramp - North Auction Theatre

APPENDIX A AIR QUALITY AND GREENHOUSE GAS EMISSIONS MODEL OUTPUTS

Harrisburg Auction 2005 Description

Construction Equipment

Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

CONSTRUCTION and OFF ROAD EQUIPMENT

FarmSmart January 20,2018

All Users of the City of Denver Prevailing Wage Schedules

Appendix 4-2-C Project Air Emissions Inventory

59. RANSOMES TURF PROTECTOR CAT 931B BULL DOZER HRS BOBCAT BOBCAT 763 G SERIES 0416

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010

Appendix G. Energy Worksheets

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

This appendix describes various types of equipment that can

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

CT DEMHS ESF #3 Quick Reference Guide for Public Works Resource Typing

(Construction) Minimum credit to be achieved at, or above, the level of the qualification: 49

GREASE TIME RATE SINGULARLY OPERATED MACHINES

Where Quality makes the Difference...

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

On-the-Job Training Program. Overview of Training Programs

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

2015 FEMA Schedule of Equipment Rates

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

General Construction Lesson Two: Heavy Equipment. Facilitator Guide

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

SEWER AND WATERMAIN CONSTRUCTION

CONSTRUCTION EQUIPMENT

Qualification structure for the Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF)

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway


NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Lawrence County Engineer s Office Dump Trucks, Pickup Truck, Trailers & Truck Crane & More

FAIR WAGE SCHEDULE Sewer and Watermain

Capacity or Size. hour $ Automobile to 130 Transporting people. mile $ Automobile to 130 Transporting cargo. hour $14.

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

NCHRP ROADWAY CONSTRUCTION NOISE PREDICTION MODEL VERSION 2.0 DATA COLLECTION PROGRAM TARA MINNI SHARON PAUL CARPENTER

ATTACHMENT 13 DAVIS-BACON WAGE DETERMINATION (HIGHWAY) NUEX Bldg Luke AFB Temporary Lodgin Facility. 20 June 2014

SEWER AND WATERMAIN CONSTRUCTION

APPENDIX F. Air Quality Modeling Results

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

FEMA s SCHEDULE OF EQUIPMENT RATES

SECTION 11 Mobile work shop truck 100. SECTION 12 Amphibious dredger 12. SECTION 13 Tyre shovel 500. SECTION 14 Fork lift 300

Minneapolis, MN March 28, 2017 (Tuesday)

CHICAGO S PAVEMENT PROBLEM SOLVERS

European Inventory Calculations for Agricultural (Ag) and Construction Equipment (CE) Applications of Diesel-Powered Non-Road Mobile Machinery (NRMM)

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park

Environmental Permit No. FEP-01/457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification

Eligibility Criteria to Undertake an Advanced Technical Test

Bev Quinn. Govemor. Acting Director. August 31,2017. Bruce Rauner

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

APPENDIX B. Air Quality Analysis Methodology

St. Cloud State University St. Cloud, MN

Transcription:

Appendix F Construction Noise Worksheets Al Larson Boat Shop Improvement Project Draft EIR January 2012 ADP# 080627-072 SCH# 2010091041

This page left intentionally blank ADP# 080627-072 SCH# 2010091041 Al Larson Boat Shop Improvement Project Draft EIR January 2012

Construction Noise Levels (no shielding assumed) Case Description: Al Larson Boat Shop Improvement Project, Construction Noise Levels Receptor #1 Baselines (dba) Al Larson Marina 57 54 54 Residential Usage Spec Actual Receptor Equipment Description (%) Lmax (dba) Lmax (dba) Distance (feet) Derrick Barge Crane Hoist 16 88 100 Concrete Mixer Truck 40 78.8 280 Dump Truck 40 76.5 280 Front End Loader 40 79.1 280 Compressor (air) 40 77.7 280 Generator 50 80.6 280 Barge Crane 85 88 280 Impact Pile Driver 20 101.3 280 Excavator 40 80.7 280 Grader 40 85 280 Paver 50 77.2 280 Roller 20 80 280 Backhoe 40 77.6 280 Crane 16 80.6 280 Slurry Trenching Machine 50 80.4 280 Dozer 40 81.7 280 Pickup Truck 40 75 280 Calculated (dba) (Ambient + ( Derrick Barge Crane Hoist 82 74 74.08 17.08 Concrete Mixer Truck 63.8 59.9 61.69 4.69 Dump Truck 61.5 57.5 60.26 3.26 Front End Loader 64.1 60.2 61.89 4.89 Compressor (air) 62.7 58.7 60.94 3.94 Generator 65.7 62.7 63.73 6.73 Barge Crane 73 72.3 72.42 15.42 Impact Pile Driver 86.3 79.3 79.32 22.32 Excavator 65.7 61.8 63.04 6.04 Grader 70 66.1 66.6 9.6 Paver 62.3 59.2 61.24 4.24 Roller 65 58 60.53 3.53 Backhoe 62.6 58.6 60.88 3.88 Crane 65.6 57.6 60.32 3.32 Slurry Trenching Machine 65.4 62.4 63.5 6.5 Dozer 66.7 62.7 63.73 6.73 Pickup Truck 60 56.1 59.58 2.58

Construction Noise Levels (no shielding assumed) Receptor #2 Baselines (dba) San Pedro 65 62 62 Residential Usage Spec Actual Receptor Equipment Description (%) Lmax (dba) Lmax (dba) Distance (feet) Derrick Barge Crane Hoist 16 88 4000 Concrete Mixer Truck 40 78.8 4000 Dump Truck 40 76.5 4000 Front End Loader 40 79.1 4000 Compressor (air) 40 77.7 4000 Generator 50 80.6 4000 Barge Crane 85 88 4000 Impact Pile Driver 20 101.3 4000 Excavator 40 80.7 4000 Grader 40 85 4000 Paver 50 77.2 4000 Roller 20 80 4000 Backhoe 40 77.6 4000 Crane 16 80.6 4000 Slurry Trenching Machine 50 80.4 4000 Dozer 40 81.7 4000 Pickup Truck 40 75 4000 Calculated (dba) (Ambient + ( Derrick Barge Crane Hoist 49.9 42 65.02 0.02 Concrete Mixer Truck 40.7 36.8 65 0 Dump Truck 38.4 34.4 65 0 Front End Loader 41 37.1 65 0 Compressor (air) 39.6 35.6 65 0 Generator 42.6 39.6 65.01 0.01 Barge Crane 49.9 49.2 65.11 0.11 Impact Pile Driver 63.2 56.2 65.53 0.53 Excavator 42.6 38.7 65.01 0.01 Grader 46.9 43 65.02 0.02 Paver 39.2 36.1 65 0 Roller 41.9 34.9 65 0 Backhoe 39.5 35.5 65 0 Crane 42.5 34.5 65 0 Slurry Trenching Machine 42.3 39.3 65.01 0.01 Dozer 43.6 39.6 65.01 0.01 Pickup Truck 36.9 33 65 0

Construction Noise Levels (no shielding assumed) Receptor #3 Baselines (dba) Reservation Point 55 52 52 Residential Usage Spec Actual Receptor Equipment Description (%) Lmax (dba) Lmax (dba) Distance (feet) Derrick Barge Crane Hoist 16 88 3500 Concrete Mixer Truck 40 78.8 3500 Dump Truck 40 76.5 3500 Front End Loader 40 79.1 3500 Compressor (air) 40 77.7 3500 Generator 50 80.6 3500 Barge Crane 85 88 3500 Impact Pile Driver 20 101.3 3500 Excavator 40 80.7 3500 Grader 40 85 3500 Paver 50 77.2 3500 Roller 20 80 3500 Backhoe 40 77.6 3500 Crane 16 80.6 3500 Slurry Trenching Machine 50 80.4 3500 Dozer 40 81.7 3500 Pickup Truck 40 75 3500 Calculated (dba) (Ambient + ( Derrick Barge Crane Hoist 51.1 43.1 55.27 0.27 Concrete Mixer Truck 41.9 37.9 55.08 0.08 Dump Truck 39.5 35.6 55.04 0.04 Front End Loader 42.2 38.2 55.08 0.08 Compressor (air) 40.8 36.8 55.06 0.06 Generator 43.7 40.7 55.15 0.15 Barge Crane 51.1 50.4 56.29 1.29 Impact Pile Driver 64.4 57.4 59.37 4.37 Excavator 43.8 39.8 55.12 0.12 Grader 48.1 44.1 55.33 0.33 Paver 40.3 37.3 55.07 0.07 Roller 43.1 36.1 55.05 0.05 Backhoe 40.7 36.7 55.06 0.06 Crane 43.6 35.7 55.05 0.05 Slurry Trenching Machine 43.5 40.4 55.14 0.14 Dozer 44.8 40.8 55.16 0.16 Pickup Truck 38.1 34.1 55.03 0.03

Construction Noise Levels with Shielding Case Description: Al Larson Boat Shop Improvement Project, Construction Noise Levels w/ Shielding Receptor #1 Baselines (dba) Al Larson Marina 57 54 54 Residential Usage Spec Actual Receptor Shielding Equipment Description (%) Lmax (dba) Lmax (dba) Distance (feet) (dba) Derrick Barge Crane Hoist 16 88 100 3 Concrete Mixer Truck 40 78.8 280 3 Dump Truck 40 76.5 280 3 Front End Loader 40 79.1 280 3 Compressor (air) 40 77.7 280 3 Generator 50 80.6 280 3 Barge Crane 85 88 280 3 Impact Pile Driver 20 101.3 280 3 Excavator 40 80.7 280 3 Grader 40 85 280 3 Paver 50 77.2 280 3 Roller 20 80 280 3 Backhoe 40 77.6 280 3 Crane 16 80.6 280 3 Slurry Trenching Machine 50 80.4 280 3 Dozer 40 81.7 280 3 Pickup Truck 40 75 280 3 Calculated (dba) (Ambient + ( Derrick Barge Crane Hoist 79 71 71.16 14.16 Concrete Mixer Truck 60.8 56.9 59.96 2.96 Dump Truck 58.5 54.5 58.93 1.93 Front End Loader 61.1 57.2 60.11 3.11 Compressor (air) 59.7 55.7 59.4 2.4 Generator 62.7 59.7 61.56 4.56 Barge Crane 70 69.3 69.54 12.54 Impact Pile Driver 83.3 76.3 76.35 19.35 Excavator 62.7 58.8 61 4 Grader 67 63.1 64.05 7.05 Paver 59.3 56.2 59.62 2.62 Roller 62 55 59.12 2.12 Backhoe 59.6 55.6 59.36 2.36 Crane 62.6 54.6 58.97 1.97 Slurry Trenching Machine 62.4 59.4 61.37 4.37 Dozer 63.7 59.7 61.56 4.56 Pickup Truck 57 53.1 58.48 1.48

Construction Noise Levels with Shielding Receptor #2 Baselines (dba) San Pedro 65 62 62 Residential Usage Spec Actual Receptor Shielding Equipment Description (%) Lmax (dba) Lmax (dba) Distance (feet) (dba) Derrick Barge Crane Hoist 16 88 4000 3 Concrete Mixer Truck 40 78.8 4000 3 Dump Truck 40 76.5 4000 3 Front End Loader 40 79.1 4000 3 Compressor (air) 40 77.7 4000 3 Generator 50 80.6 4000 3 Barge Crane 85 88 4000 3 Impact Pile Driver 20 101.3 4000 3 Excavator 40 80.7 4000 3 Grader 40 85 4000 3 Paver 50 77.2 4000 3 Roller 20 80 4000 3 Backhoe 40 77.6 4000 3 Crane 16 80.6 4000 3 Slurry Trenching Machine 50 80.4 4000 3 Dozer 40 81.7 4000 3 Pickup Truck 40 75 4000 3 Calculated (dba) (Ambient + ( Derrick Barge Crane Hoist 46.9 39 65.01 0.01 Concrete Mixer Truck 37.7 33.8 65 0 Dump Truck 35.4 31.4 65 0 Front End Loader 38 34.1 65 0 Compressor (air) 36.6 32.6 65 0 Generator 39.6 36.6 65 0 Barge Crane 46.9 46.2 65.05 0.05 Impact Pile Driver 60.2 53.2 65.27 0.27 Excavator 39.6 35.7 65 0 Grader 43.9 40 65.01 0.01 Paver 36.2 33.1 65 0 Roller 38.9 31.9 65 0 Backhoe 36.5 32.5 65 0 Crane 39.5 31.5 65 0 Slurry Trenching Machine 39.3 36.3 65 0 Dozer 40.6 36.6 65 0 Pickup Truck 33.9 30 65 0

Construction Noise Levels with Shielding Receptor #3 Baselines (dba) Reservation Point 55 52 52 Residential Usage Spec Actual Receptor Shielding Equipment Description (%) Lmax (dba) Lmax (dba) Distance (feet) (dba) Derrick Barge Crane Hoist 16 88 3500 3 Concrete Mixer Truck 40 78.8 3500 3 Dump Truck 40 76.5 3500 3 Front End Loader 40 79.1 3500 3 Compressor (air) 40 77.7 3500 3 Generator 50 80.6 3500 3 Barge Crane 85 88 3500 3 Impact Pile Driver 20 101.3 3500 3 Excavator 40 80.7 3500 3 Grader 40 85 3500 3 Paver 50 77.2 3500 3 Roller 20 80 3500 3 Backhoe 40 77.6 3500 3 Crane 16 80.6 3500 3 Slurry Trenching Machine 50 80.4 3500 3 Dozer 40 81.7 3500 3 Pickup Truck 40 75 3500 3 Calculated (dba) (Ambient + ( Derrick Barge Crane Hoist 48.1 40.1 55.13 0.13 Concrete Mixer Truck 38.9 34.9 55.04 0.04 Dump Truck 36.5 32.6 55.02 0.02 Front End Loader 39.2 35.2 55.04 0.04 Compressor (air) 37.8 33.8 55.03 0.03 Generator 40.7 37.7 55.08 0.08 Barge Crane 48.1 47.4 55.69 0.69 Impact Pile Driver 61.4 54.4 57.72 2.72 Excavator 40.8 36.8 55.06 0.06 Grader 45.1 41.1 55.17 0.17 Paver 37.3 34.3 55.03 0.03 Roller 40.1 33.1 55.02 0.02 Backhoe 37.7 33.7 55.03 0.03 Crane 40.6 32.7 55.02 0.02 Slurry Trenching Machine 40.5 37.4 55.07 0.07 Dozer 41.8 37.8 55.08 0.08 Pickup Truck 35.1 31.1 55.01 0.01