Emergency lighting units EM powerled

Similar documents
Emergency lighting units EM powerled

Emergency lighting units EM series

Emergency lighting units EM powerled

Emergency lighting units EM powerled

Emergency lighting units EM powerled

Emergency lighting units EM powerled

Emergency lighting units EM powerled. EM powerled BASIC 4W Emergency lighting LED Driver

Emergency lighting units EM converterled. EM converterled PRO 200 V PRO series

Emergency lighting units EM converterled. EM converterled PRO 50 V PRO series

Emergency lighting units EM series. EM PRO EZ-3, V PRO version

Emergency lighting units LED series

Emergency lighting units EM powerled

Emergency lighting units EM powerled

Emergency lighting units EM converterled. EM converterled ST 90 V SELFTEST series

Emergency lighting units EM converterled. EM converterled ST 50 V SELFTEST series

Emergency lighting units EM INVERTER

Emergency lighting units EM converterled. EM converterled BASIC 200 V BASIC series

Emergency lighting units EM converterled. EM converterled BASIC 50 V BASIC series

Emergency lighting units EM converterled. EM converterled BASIC 90 V BASIC series

Emergency lighting units EM converterled

Emergency lighting units EM Inverter

Emergency lighting units EM converterled

Emergency lighting units EM Inverter. EM SELFTEST G2, V SELFTEST version

Emergency lighting units EM converterled

Emergency lighting units EM converterled

Emergency lighting units EM powerled. EM powerled BASIC CLE Emergency lighting LED Driver

Emergency lighting units EM converterled

Emergency lighting units EM series. EM BASIC lp-2, V BASIC version. Technical data. Ordering data. Article number

Emergency lighting units EM powerled

Emergency lighting units PC COMBO

Emergency lighting units EM powerled. EM powerled BASIC 15 W CLE Emergency lighting LED Driver

Emergency lighting units EM powerled

Emergency lighting units PC COMBO

Emergency lighting units EM powerled. EM powerled BASIC 15 W CLE Emergency lighting units LED

Emergency lighting units EM powerled

Emergency lighting units EM powerled. EM powerled BASIC CLE Emergency lighting LED Driver

Emergency lighting units EM powerled

Emergency lighting units EM LED Light Engines

Emergency lighting units EM INVERTER

Emergency lighting units EM series. EM BASIC, V BASIC version

LED Driver Linear / area fixed output industry. Driver LCI 100W 350mA 900mA TOP INDUSTRY sl TOP series

FL ballasts Electronic fixed output. PC BASIC sl, 4 28 W PC BASIC

LED Driver Linear / area fixed output industry. Driver LCI 65W 150mA 400mA TOP INDUSTRY sl TOP series

FL ballasts Electronic fixed output PC BASIC, 4 28 W PC BASIC

EM BASIC V 50/60 Hz

PC T8 TEC, W PC TEC

Emergency lighting units EM LED Light Engines. EM ready2apply BASIC 1 2 W EM ready2apply

LED Driver Linear / area dimming industry. Driver LC 150W mA IND sl EXC EXCITE series

LED Driver Linear / area fixed output

FL ballasts Electronic fixed output PC T8 TEC, W PC TEC T8

FL ballasts Electronic fixed output. PC TC PRO 1/2x9 70 W PC PRO compact

FL ballasts Electronic fixed output

Electronic ballasts for fluorescent lamps Professional electronic ballast

Emergency lighting units EM LED Light Engines. Module EM-ES 08/10/12 Mk2 EM LED linear / area

FL ballasts Electronic fixed output. PC T5 TOP lp, W PC TOP T5

LED Driver Compact fixed output

LED Driver Compact fixed output

LED control gear Compact fixed output

FL ballasts Electronic fixed output. PC TCL PRO, W PC PRO compact

FL ballasts Electronic fixed output

PHASED OUT. Digital dimmable ballasts for fluorescent lamps ECO series. PCA TCD ECO, W Compact and T5c fluorescent lamps

FL ballasts Electronic fixed output PC T8 PRO, W PC PRO T8

LED Emergency Lighting

PC T8 PRO, W T8 fluorescent lamps

EMERGENCY ONE-LED TM OMNI-LED DST TM LED DALI EMERGENCY CONVERSION MODULE WITH SELF-TEST

LED light engine / OLED LED compact. Umodule STARK CLE 360 CLASSIC EM STARK CLE

EM converterled BASIC Installation and wiring instructions

Emergency lighting units EM Batteries

EMERGENCY ONE-LED TM SOLO TM NON MAINTAINED LED LAMP AND DRIVER KIT

LED light engine / OLED LED linear / area. Umodule STARK LLE-G CLASSIC EM STARK LLE

LED light engine / OLED LED compact. Umodule STARK CLE CLASSIC EM STARK CLE

Electronic ballasts for fluorescent lamps Multi-lamp ECG. PC T5 PRO-M lp, W T5, T8, compact (CFL) and T5c circular fluorescent lamps

TrustSight LED Emergency Lighting

EMERGENCY ONE-LED TM UNITY-LED TM LED MAINS/EMERGENCY DRIVER

EMERGENCY ONE-LED TM UNITY-LED TM LED MAINS/EMERGENCY DRIVER

LED Driver EM converterled ST Product Manual. ø4,5 175,5

PHASED OUT. LED light engine / OLED LED compact. Module CLE G2 190mm 1500lm ADV EM Modules CLE

LED light engine / OLED LED compact

LED Driver Linear / area dimming

DALI Emergency LED Driver - 350/700/1000mA Constant Current

LED light engine / OLED LED linear / area. Module STARK LLE PREMIUM Modules LLE

ABB i-bus EIB EIB Power Supply Units SV/S SV/S SU/S

PHASED OUT. LED light engine / OLED LED compact. Module STARK CLE CLASSIC / CLE CLASSIC Modules CLE

Electronic Circuit Breaker ESS20-0..

Dycon D2430 EN54-4 Fire Alarm Power Supply Series

PHASED OUT. LED light engine / OLED LED linear / area. Module LLE G3 16x140mm 325lm ADV, LLE G3 16x280mm 650lm ADV Modules LLE ADVANCED

Dycon D1532SM. EN50131/PD6662 Grade 3, 12V 2A Power Supply. Technical Description Installation and Operating Manual DYCON POWER SOLUTIONS LTD

PHASED OUT. LED light engine / OLED LED compact. Module STARK CLE , CLE CLASSIC Modules CLE

LED light engine / OLED LED compact

Doc Ref: WD024/2/11/12 Fern-Howard Ltd. 2 Newman Lane, Alton, Hampshire, GU34 2QR. Reg. No

LED light engines LED linear / area. Module STARK QLE G3 SELECT Modules QLE EXCITE

LED light engines ready2apply. Engine SLA AC G2 50mm SNC Engine SLA ESSENCE

2D products are warranted for one year, the expected life of the ballast and/or Emergency module is 5 years

GE FANUC Parts. VersaPoint Power Terminal. Segment Terminal Fused, with Diagnostics 24VDC IC220PWR013. Features. Ordering Information

SLA DC. LED light engines ready2apply. Module SLA DC G2 50mm SNC Modules SLA ESSENCE

Local Control Network - building controls in perfection

Table of contents NLE 2 x 36 W T8, 230 V, 4 Ah, 1.5 h 4

MANUFACTURED IN THE UK

MANUFACTURED IN THE UK

LED light engine / OLED LED linear / area

Transcription:

EM power EM power PRO EZ-3, 1 2 W Emergency lighting units Product description emergency lighting supply unit with I interface and automatic test function Properties Mains and emergency operation I interface for controlled testing and monitoring I able in mains operation (on/off); the ed phase S must be ed on ow-profile casing (21 x 30 mm cross-section) Constant current mode With either screw or clip fastening (clip-fix) 1, 2 or 3 h rated duration Selectable operating time (jumper) Output power limitation Two-colour status display Automatic restart after replacement Electronic multi-level charge system SEV classified (outputs power, battery, status, test ) Polarity reversal protection for battery Deep discharge protection Short-circuit-proof battery connection Addressing function, patented ( EZ easy addressing ) Emergency lighting s available Tests: Status of the battery Status of the Charge condition Function test Service life test Batteries High-temperature cells 2 Ah imh batteries Cs cells Blade terminals for simple connection Screw-fix Clip-fix Screw-fix without jumper position A position B È Standards, page 7 Batteries, page 5 Wiring diagrams and installation examples, page 8 Clip-fix www.tridonic.com 1

EM power Technical data Rated supply voltage 220 240 V Mains frequency 50 / 60 Hz Mains current, 1 W device 30 ma Mains current, 2 W device 42 ma Power in mains operation, 1 W device 4 W Power in mains operation, 2 W device 5 W Maximum forward bias Vf 3.4 V Overvoltage protection 320 V (for 1 h) charging time 12 h Charge current, initial charge 125 ma Charge current, power charge 210 ma Charge current, trickle charge 50 ma discharge current See page 5 Max. casing temperature tc 70 C Mains voltage changeover threshold according to E 60598-2-22 Ingress protection IP20 Ordering data Type Article number carton pallet Weight per pc. Max. number of Screw fastening version EM power 1W PRO EZ-3 89800029 25 pc./pcs. 600 pc./pcs. 0.101 kg 1 1 W EM power 2 W PRO EZ-3 89800030 25 pc./pcs. 600 pc./pcs. 0.101 kg 2 2 W Clip fastening version EM power 1 W PRO EZ-3 89800031 25 pc./pcs. 600 pc./pcs. 0.101 kg 1 1 W EM power 2 W PRO EZ-3 89800032 25 pc./pcs. 600 pc./pcs. 0.101 kg 2 2 W Power Specific technical data Type Ambient current in emergency operation current in mains operation umber of cells / jumper temperature ta 1 x (Vf = 3.4 V) 2 x (Vf = 6.8 V) 1 x (Vf = 3.4 V) 2 x (Vf = 6.8 V) 1 h / removed 2 h / position A 3 h / position B EM power 1W PRO EZ-3-25... +50 C 350 ma 350 ma 2 3 3 EM power 2 W PRO EZ-3-25... +50 C 600 ma 350 ma 350 ma 350 ma 3 4 5 www.tridonic.com 2

EM power ACCES- SORIES Test EM2 Product description For connection to the emergency lighting unit For checking the device function Ordering data Type Article number bag carton Weight per pc. Test EM 2 89805277 25 pc./pcs. 600 pc./pcs. 0.011 kg ACCES- SORIES Status indication bi-colour Product description Two-colour status display Green: system OK, red: fault Ordering data Type Article number bag carton Weight per pc. EM bi-colour 89899720 25 pc./pcs. 200 pc./pcs. 0.017 kg EM bi-colour, high brightness 89899753 25 pc./pcs. 800 pc./pcs. 0.013 kg www.tridonic.com 3

EM power Product description Provides simple addressing for the EM power PRO units Uses the bi-colour for the EM power PRO device identification Converts the binary identification signal to a I address of between 0 to 63 The tool is powered from a 9 V battery (not supplied) ACCES- SORIES Addressing tool Ordering data Type Article number carton Weight per pc. EM PRO addressing tool 89899836 1 pc./pcs. 0.08 kg www.tridonic.com 4

EM power Batteries imh 2.0 Ah, Cs cells Type umber of cells Article number Akku-iMh C 2A Stick 2 89899755 Akku-iMh C 3A Stick 3 89899744 Akku-iMh C 4A Stick 4 89899700 Akku-iMh C 5A Stick 5 89899703 Akku-iMh C 5B * Side by side 5 89899704 Further technical data discharge current 1 W 2 W 1 1 2 1 h 790 ma 850 ma 830 ma 2 h 440 ma 610 ma 600 ma 3 h 440 ma 480 ma 480 ma Type umber of current mains mode The EM power has a unique power regulation circuit; this is designed to limit the total power drawn from the battery in the event of using s with a forward voltage (Vf) higher than 3.4 V. In such cases the unit will reduce the current in order to maintain an acceptable drain current from the battery and hence meet the required duration time. This feature enables the EM power PRO EZ-3 to have minimum battery count for a given range of s. At a low charge state of the battery (<1.5 V at the 1 W driver and <3 V at the 2 W driver) the will not be driven in maintained mode via the ed line until the rated battery voltage levels are exceeded. Testing: current emergency mode ominal output power 1 W 1 x 350 ma 350 ma 1.2 W 2 W 1 x 350 ma 600 ma 2.0 W 2 W 2 x 350 ma 350 ma 2.0 W I Control A I command from a suitable control unit can be used to initiate function and duration tests at individually selected times. Status flags are set for report back and data logging of results. When a I bus has not been connected or when a I bus is connected but the I default DEAY and ITERVA times have not been re-set by sending appropriate I commands, then the EM power PRO EZ-3 will conduct self-tests in accordance with the default times set within the EEPROM. These default times are factory pre-set, in accordance with the I standard E 62386-202, to conduct an automatic function test every 7 days and a duration test every 52 weeks. Since the DEAY time is factory pre-set to Zero, all units are tested at the same time. Test times can be changed with a command over the I bus. The DEAY and ITERVA time values must be re-set when the emergency system test times are to be scheduled by a I control and monitoring system. ote that once the default values have been set to Zero, tests will only be conducted following a command from the control system. If the I bus is disconnected the EM power PRO EZ-3 does not revert to self-testing mode. Addressing The EM power PRO EZ-3 includes the new EZ easy addressing system which allows addressing and identification by using the bi-colour in conjunction with the EM PRO addressing tool. Binary address codes given by the can be simply converted to the I addresses 0 to 63. For single handed addressing using this method it is necessary to send a broadcast ident command every 3 to 9 seconds. During this command the main fluorescent lamp will be ed off and the will flash the 6 bit binary address preceded by a 3 second start indication period. Commissioning After installation of the luminaire and initial connection of the mains supply and battery supply to the EM power PRO EZ-3 the unit will commence charging the batteries for 20 hours (initial charge). Afterwards the module will conduct a commissioning test for the full duration. The 20 hours recharge occurs also if a new battery is connected or the module exits the rest mode condition. The following automatic commissioning duration test is only performed when a battery is replaced and fully charged (after 20 hrs) and the interval time is not set to zero, otherwise the system is expected to perform the testing. Functional test The time of day and frequency of the 5 seconds function test can be set by the I controller. The default setting is a 5 seconds test on a weekly basis. Duration test The time of day and frequency of the duration test can be set by the I controller. The default setting is a duration test conducted every 52 weeks. Prolong time Prolong time can be set by the I controller. This is the delay time between return of the mains supply and the end of the emergency operation. The default prolong time is set as 0 minutes as specified within the I standard. Indicator will stay off for the duration of the prolong time. Rest Mode Rest mode can be initiated by the I controller. The appropriate command should be sent after the mains supply has been disconnected and whilst the module is in emergency operation. A mains reset is required to exit the rest mode. EM power PRO EZ-3 does support the re-light command via the I bus. Test An optional test can be wired to each EM power PRO EZ-3. This can be used to initiate a 5 seconds function test by a short press < 1 second. I Controller I controllers and hardware/software solutions are available from Tridonic. Please refer to the ighting controls section. Service life Average service life 50,000 hours under rated conditions with a failure rate of less than 10 %. Average failure rate of 0.2 % per 1000 operating hours. Technical data Accu-iMh Case temperature range to ensure 4 years design life 0 C to +55 C voltage 1.2 V per cell Capacity Cs 2.0 Ah Packing quantity 5 pcs. per carton www.tridonic.com 5

EM power Storage Batteries should be stored within the specified temperature range in low humidity conditions. Optimal storage conditions are temperature: +5 C to +25 C humidity: 65 % ±20 % Avoid atmosphere with corrosive gas It is recommended to disconnect the battery before store or delivery Avoid to store the batteries discharged A long term storage in open circuit leads to battery self discharge and deactivation of chemical components. It could be required to charge and discharge the batteries a few times to recover the initial performance. Batteries Connection method: 4.8 x 0.5 mm spade tag welded to end of cell Isolation and electric strength testing of luminaires Electronic devices can be damaged by high voltage. This has to be considered during the routine testing of the luminaires in production. According to IEC 60598-1 Annex Q (informative only!) or EEC 303-Annex A, each luminaire should be submitted to an isolation test with 500 VDC for 1 second. This test voltage should be connected between the interconnected phase and neutral terminals and the earth terminal. The isolation resistance must be at least 2 MΩ. As an alternative, IEC 60598-1 Annex Q describes a test of the electrical strength with 1,500 VAC (or 1,414 x 1,500 VDC). To avoid damage to the electronic devices this test must not be conducted. For stick packs this connection is accessible after the battery caps have been fitted. To inhibit inverter operation disconnect the batteries by removing the connector from the battery spade tag. For battery data see separate data sheet. Mechanichal details Case manufactured from polycarbonate. Glow-wire test according to E 61347-1 with increased temperature of 850 C passed. Wiring type and cross section The wiring can be in flexible cable or solid. Strip 8.5 9.5 mm of insulation from the cables to ensure perfect operation of the push-wire terminals. Wiring mains (S,, ) I () ( +, ) wire preparation: 0.5 1.5 mm² 8.5 9.5 mm bi-colour status indicator Green / red Mounting hole 6.5 mm dia ead length 1,000 mm Insulation rating: 90 C Test Mounting hole 7.0 mm dia ead length 550 mm leads Quantity: 1 red and 1 black ength: 1,300 mm Wire type: 0.5 mm 2 solid conductor Insulation rating: 90 C Maximum lead length status indication batteries 3 m 1 m 1,3 m Wiring batteries (Bat +, Bat ) test () status indication (status K, A) wire preparation: 0.6 0.8 mm² 8.5 9.5 mm end termination Push on 4.8 mm receptacle to suit battery spade fitted with insulating cover Module end termination 8.0 mm stripped insulation Two-piece batteries are supplied with a 200 mm lead with 4.8 mm receptacles at each end and insulating covers to connect the separate sticks together. Max. lead insulation diameter 2.1 mm Test 2.1 mm Indicator 2.1 mm Release of the wiring Press down the push button and remove the cable from front. Recommended fixing details for clip fixing 125,2 0,4 mm to 0,6 mm thick gear tray fixing slots 4,3 x 9,3 mm 122,4 0,6 mm to 1,1 mm thick gear tray www.tridonic.com 6

EM power Status indication System status is indicated by a bi-colour and by a I status flag. ink positions for duration and cell count Duration ink Position 1 W Power 2 W Power indiction Status Kommentar Permanent green System OK AC mode Fast flashing green (0,1 sec on 0,1 sec off) Slow flashing green (1 sec on 1 sec off) Function test underway Duration test underway Red on oad failure Open circuit / Short circuit / failure 1 Slow flashing red (1 sec on 1 sec off) Fast flashing red (0,1 sec on 0,1 sec off) failure failed the duration test or function / is defect / Incorrect battery voltage Charging failure Incorrect charging current Double pulsing green Inhibit mode Switching into inhibit mode via controller Binary transmission of address via green/red Address identification During address identification mode Green and red off DC mode operation (emergency mode) 1 If the EM power is operated in non-maintained mode and an fault is detected, the red indicator will be illuminated and the output will be stopped. The uned mains supply must be ed off before the is changed in order that the new can be detected. A function or duration test will not reset the fault indication. 1 hr 2 hr 3 hr without jumper position A position B 2 cell 3 cell 3 cell 3 cell 4 cell 5 cell Jumper selection Module supplied with jumper in 3 hours position (position B). The position of the link will only be read on first power up. If it is changed afterwards both the battery and mains supply must be disconnected for 10 seconds to enable the EM power EZ-3 to read the new link position on reconnection of the battery and mains. It will lead to a false battery failure indication if the link is changed after installation without this reset. Standards according to E 50172 according to E 60598-2-22 E 61347-2-13 E 62384 E 62034 E 55015 E 61000-3-2 E 61000-3-3 E 61547 E 60068-2-64 E 60068-2-29 E 60068-2-30 E 62386 (according to I standard V1) www.tridonic.com 7

EM power Wiring diagram Wiring diagram for one or two in series I control I control ine in from eutral Permanent line S EM power PRO status A status K + Bat Bat + orange pink Optional Test Switch + + Wiring diagram for multiple (3 12) in parallel I control I control ine in from eutral Permanent line S EM power PRO status A status K + Bat Bat + orange pink Optional Test Switch + + + + Take care that the is connected with the right polarity. that are connected to the EM power PRO EZ-3 devices should have a reverse polartity protection device such as a schottky diodes fitted, otherwise irreversible damage could occur if the is connected in reverse polarity. Any protection device must be capaple of handling in excess of 700 ma. ote: Please ensure that at the terminal of the EM power module the battery negative is not connected to the negative of the load. Manually tested emergency lighting with combined modules for general and emergency lighting (e.g. STARK QE CASSIC EM, STARK E 24-280-1250 EM, STARK CE CASSIC EM, SPOT P3xx EM): Due to the fact that independent circuits are used for general and emergency lighting it is important that the normal supply of the mains control gear is ed off together with the permanent emergency supply prior to checking the operation of the emergency s. If this is not done then it may not be possible to see that the emergency s are operating. Use a circuit similar to that shown next. 220 240 V 50/60 Hz PE Test Switch* ight Switch S PE EM power PRO mains control gear status A status K + Bat Bat + + orange pink Optional Test Switch + EM - EM + - Module * Use 230 V Test www.tridonic.com 8

EM power Simple CORRIDOR FUCTIO with EM power 1 2 W With the mains operation function of the EM power 1 2 W a simple corridor function can be realised. An external presence detector es the mains control gear. The EM power 1 2 W has the ed line S connected to permanent mains supply. On presence both mains control gear and EM power 1 2 W are active and driving all s. With no presence the mains control gear is ed off by the presence detector and the EM power 1 2 W stays on operating the emergency s at low power. Use a circuit similar to that shown next. 220 240 V 50/60 Hz PE Test Switch* S EM power PRO 1 2 W status A status K + Bat Bat + orange pink Optional Test Switch + + external presence detector PE mains control gear + + + + + Wiring instructions The power terminals, battery, indicator and test terminals are classified as SEV. Keep the wiring of the I and the input terminals separated from the wiring of the SEV equivalent terminals or consider special wiring (double insulation, 6 mm creepage and clearance) when these connections should be kept SEV. The output to the is DC but has high frequency content at 125 khz, which should be considered for good EMC compliance. power leads should be separated from the mains and I connections and wiring for good EMC performance. Maximum lead length on the power terminals is 3 m. For a good EMC performance keep the wiring as short as possible. Maximum lead length for the Test and Indicator connection is 1 m. The test and Indicator wiring should be separated from the power leads to prevent noise coupling. leads are specified with 0.8 mm cross section and a length of < 1.3 m I terminals are mains proof. Switched live and uned live supplies must be off the same phase. i For comprehensive instructions consult the Tridonic website www.tridonic.com www.tridonic.com 9