ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

Similar documents
ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

one filter having K between 1.5 and 2.5 m -1

Automotive CNG/LPG Vehicles Test Method to Evaluate the Range

Technical Requirements of Fuel Tanks for Agricultural Tractors

Requirements of Ballast Mass for Agricultural Tractors

AGREEMENT. done at Vienna on 13 November Addendum 1: Rule No. 1. Revision 1

1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL

ECE/RCTE/CONF/4/Add.1/Rev.2

Requirements of Load Platforms of Agricultural Tractors

Date of hosting on website: 30 th August 2018 Last date for comment: 14 th September 2018

Driver-Perceived Noise Level of Agricultural Tractors - Method of Measurement

Amendment No July 2015 AIS-050: 2004

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

Battery Operated Vehicles - Method of Measuring the Range

Reference: C.N TREATIES-2 (Depositary Notification) DRAFT RULE NO. 1

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

Electric Power Train Vehicles - Method of Measuring the Range

(LAST DATE OF SUBMISSION: ) QUOTATION FOR ANNUAL MAINTENANCE CONTRACT OF SERVERS, COMPUTERS, PRINTERS, NETWORKING AND LAN

AUTOMOTIVE INDUSTRY STANDARD

v.meku rfkk fudksckj iz kklu ANDAMAN & NICOBAR ADMINISTRATION ifjogu funs kky; DIRECTORATE OF TRANSPORT Guidelines

SANDAG Vanpool Program Guidelines as of February 2018

REQUEST FOR INFORMATION (RFI) : LIGHT BULLET PROOF VEHICLE (LBPV)

SAKHALIN ENERGY INVESTMENT COMPANY LTD. INVITATION TO TENDER

Electric Power Train Vehicles Measurement of Net Power and The Maximum 30 Minute Power

Automotive Vehicles Bumper fitment on M1 Category of Vehicles Test Methods

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

For IS: (Part 4): 1987 General requirements for rims for Automotive Vehicles - Part 4 - Scooters and scooter derivative rims

PRINTED BY THE AUTOMOTIVE RESEARCH ASSOCIATION OF INDIA P. B. NO. 832, PUNE ON BEHALF OF AUTOMOTIVE INDUSTRY STANDARDS COMMITTEE

Chapter 16. This chapter defines the specific provisions regarding type-approval of hybrid electric vehicles.

Electric Power Train Vehicles - Method of Measuring the Range

Central Electronics Limited Materials Management Division

Electric Power Train Vehicles Measurement of Net Power and The Maximum 30 Minute Power

Every manufacturer of an agricultural tractor shall meet the following requirements for the tractor model before granting the type approval.

MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 16 th May, Amended by notification S.O.1002(E), dated 4 th May, 2010)

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

DEALER REGISTRATION PACKAGE

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

PETROLEUM PRODUCTS INSPECTION OPERATIONS MANUAL

Agricultural Tractors - Rear View Mirrors - Installation Requirements

Requirements for Metallic Fuel Tanks of Automotive Vehicles

NCC Leisure Battery Verification Scheme. Leisure Accommodation Vehicles

CMVR Type Approval for Hybrid Electric Vehicles

Forensic Sciences Chapter ALABAMA DEPARTMENT OF FORENSIC SCIENCES ADMINISTRATIVE CODE CHAPTER IGNITION INTERLOCK RULES

Date of hosting on website: 22 nd December 2016 Last date for comments: 6 th January 2017

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

TRAILER USER GUIDE SKIS

COMHAIRLE CONTAE DHÚN LAOGHAIRE - RÁTH AN DÚIN DÚN LAOGHAIRE RATHDOWN COUNTY COUNCIL

THE BATTERIES (MANAGEMENT AND HANDLING) RULES, 2001 NOTIFICATION

AMENDMENT NO May TO AIS-002/ 2001 Automotive Vehicles - Rear View Mirrors - Installation Requirements. (F2 + F1) or (F2 + F3)

PLUG-IN ELECTRIC VEHICLE SUBMETERING PILOT PHASE 2 Single Customer-of-Record Enrollment Agreement

THE CORPORATON OF THE TOWN OF MIDLAND VEHICLE TOWING AND POUND SERVICES 2018/2019 TENDER L

BY AND BETWEEN AND. The Franchisor and Franchisee are hereinafter collectively referred to as Parties and individually referred to as Party.

No. TE/F-814/16/WO- 145/ Dt

Amendment No th September 2016 To AIS 037: Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

Amendment No August, 2015 To AIS-037 Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

CITY OF SALEM, ILLINOIS ALTERNATIVE TRANSPORTATION APPLICATION AND INSPECTION REPORT (GOLF CARS) Applicant Name:

TERMS AND CONDITION OF USE FOR THE AUTHORISED VEHICLE AREA

The new EU type-approval framework for motor vehicles

AGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 102: Regulation No. 103

WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests

Requirements of Driver s Field of Vision for Agricultural Tractors

PART X SUB PART (B): DETAILS OF STANDARDS OF VISIBLE AND GASEOUS POLLUTANTS FROM DIESEL ENGINES FOR CONSTRUCTION EQUIPMENT VEHICLES

FREQUENTLY ASKED QUESTIONS ON AC REPLACEMENT SCHEME

Tamilnadu Trade Promotion Organisation, Chennai-89

AIS 123 (PART 1): CMVR

Rig Master Power by Mobile Thermo Systems Inc.

CONTENTS. Introduction. Thank you for purchasing the AlcoSense Precision+ breathalyser.

CITY OF HAMILTON BY-LAW NO

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Amendment No August 2014 To AIS-070: Requirements of Temporary Cabin for Drive-Away-Chassis Configuration Vehicles

DEPARTMENT OF HEALTH

As Introduced. 132nd General Assembly Regular Session S. B. No

Requirements for IC Engine Coolant Hoses

This Part applies to the emissions of visible pollutants from compression ignition engined (diesel) vehicles, effective from 1st April 1991.

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002

MAINE LEMON LAW SUMMARY

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

Broadband PowerShield. CP27U Models. User Manual

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT

Individual Fuel Card Application Form

MULTIPLE CUSTOMER-OF-RECORD ENROLLMENT AGREEMENT PLUG-IN ELECTRIC VEHICLE SUBMETERING PILOT PHASE 2 FORM

Decree of the Ministry of Transport and Communications

EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Customs Policy, Legislation, Tariff Customs Legislation TRANSIT MANUAL AMENDMENT

MAHARASHTRA NATURAL GAS LIMITED

REGIONAL MANAGER (VADODARA REGION)

Supply of Batteries

RSPO PalmTrace - Book and Claim Terms and Conditions

AMENDMENT NO April AIS-071(Part 2):2009. Automotive Vehicles - Control Location and Operation Requirements

TENDER FOR DG SET. Tender for DG SET. POCKET-14, SECTOR-8, PHASE-1, DWARKA, NEW DELHI Website: TENDER DOCUMENTS FOR

REMOTE CONTROLLED CENTRAL LOCKING SYSTEM. INCLUDES 4 DOOR ACTUATORS. Owner s Operation Manual

Ring Mount Floodgates

Transcription:

Airvisor Technologies Pvt. Ltd. H-155, Adhyapak Nagar, Nangloi, New Delhi 110041. CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES Cert Annex Drg Total 1 7 0 8 pgs Exhaust Gas Analyzer Model AVG500 from M/s Airvisor Technologies Pvt. Ltd, New Delhi, was examined and tested as per the test procedure approved by Ministry of Road Transport and Highways, Government of India, New Delhi, and specified in MoRTH/CMVR/TAP-115/116, Issue No.4, Part-VIII for 4-gas analyzer. Based on the verification and tests carried out, it is certified that the 4-Gas Analyser Model AVG500, manufactured and marketed by M/s Airvisor Technologies Pvt. Ltd, New Delhi, meets the requirements of the provisions of Rule 116(3) of the Central Motor Vehicles Rules 1989, as amended up-to-date, for the 4-Gas Analyzer. The 4-Gas Analyzer Model AVG500 is suitable for measurement of idling CO and HC of in-use vehicles fitted with SI engines as per CMVR 115(2), subject to following conditions: i. The supplier shall abide by the Code of Practice attached herewith as Annexure-A. The supplier has already submitted an affidavit to this effect. ii. The supplier shall enter into AMC agreement on annual basis with the authorized PUC Test Centers to whom this model is supplied. The AMC terms shall be as per the Code of Practice referred in (i) above. This Type Approval Certificate is valid for the period of 5 years from the date of its issue or any amendment in the test procedure, whichever is earlier. The first Conformity of Production (COP) testing should be completed on or before 16 th Oct 2019 or production of next 200 4-gas analyzer units from 17 th Apr 2017, whichever is earlier. Disclaimer 1. ARAI issues Type Approval Certificates (TAC) for vehicles/ components/ parts/ assemblies etc. based on the documents produced and /or prototype/s submitted by the applicant and testing thereof. 2. ARAI issues TAC in compliance to Motor Vehicle Act / Central Motor Vehicles Rules and their provisions as amended from time to time or any other statutory orders under which ARAI is authorised. Other Rules/ Acts are outside the purview/ scope of TAC. 3. Test(s) on prototype(s) is/are carried out on the basis of standard procedures as notified under specific rules. Results of such tests are the property of bearer of TAC. These results cannot be disclosed unless specifically so ordered by Government, Court, etc. 4. The bearer of the TAC is under obligation to ensure production strictly as per the provisions of the specific TAC. 5. ARAI is not responsible for testing each vehicles/ components/ parts/ assemblies etc. for which TAC is issued. Further, ARAI is not responsible for ensuring manufacturing quality of the type approved vehicles/ components/ parts/ assemblies etc. 6. ARAI is in no way responsible for any misuse or copying of any design/ type/ system in connection with entire vehicle/ components/ parts and assemblies covered under the TAC. 7. Breach of any statutory provision of Indian laws or laws of other countries, will be the sole responsibility of the bearer of TAC and ARAI shall not be liable for any claims or damages. The bearer shall alone be liable for the same, and shall undertake to indemnify ARAI in this regard. 8. ARAI has the right, but not under obligation, to initiate cancellation/ withdrawal of the certificate issued, in case of any fraud, misrepresentation, when it surfaces and comes in the knowledge of ARAI. The appropriate local courts at Pune shall have the jurisdiction in respect of any dispute, claim or liability arising out of this certificate / Report. Authorised Signatory A A Deshpande Mrs. Rashmi Urdhwareshe Deputy Director Director Ref: Test Report No.ARAI/AED/CT/OC-1617-6320/53 Dt.17.04.2017

ANNEXURE - A CODE OF PRACTICE FOR PUC EQUIPMENT MANUFACTURER / SUPPLIER 1. PUC equipment manufacturer / supplier should include the description of the test procedure described in Part I or Part II, whichever is applicable, amended from time to time of the document MOST/CMVR/TAP 115/116 in the user s manual of the PUC equipment. PUC equipment manufacturer / supplier shall keep PUC operator informed about the changes in the test procedure in future. 2. PUC equipment manufacturer/ supplier shall supply copy of type- approval certificate with date of validity along with the PUC equipment. 3. The validity of the type approval certificate of the PUC equipment shall be 5 years, after the expiry of which the PUC equipment manufacturer/ supplier shall get it re-validated from the test agency. 4. PUC equipment manufacturer / supplier shall provide the status of production/ supply of PUC equipment at a regular interval of 1 year to the test agency from where the equipment has been certified. 5. PUC equipment manufacturer / supplier shall submit the equipment for COP as per procedure mentioned above. 6. PUC equipment manufacturer / supplier shall enter into AMC on annual basis with the authorised PUC test agency based on charges as approved and finalized in EECG meeting as per Annexure-4. This AMC contract shall include 3 visits and equipment calibration as per field calibration procedure given in Annexure-1. PUC equipment manufacturer/ supplier shall provide calibration certificate as per format given in the Annexure-2. 7. PUC equipment manufacturer / supplier shall train minimum 3 operators of PUC test agency and shall provide training certificate as per format given in Annexure 3. ***********

ANNEXURE 1 TO ANNEXURE A FIELD CALIBRATION PROCEDURE FOR TESTING OF GAS ANALYSERS 1.0 INTRODUCTION This procedure has to be carried out on gas analysers after they are commissioned in the field and for the subsequent calibration. 2.0 TESTING The test procedure for gas analysers is as follows: i) Check that the power supply is as per specifications of the manufacturer and electrical earthing is proper. ii) iii) iv) Check that all the accessories as per manufacturer are available and are functioning properly. Check the span and zero calibration using sample gas of suitable value for CO as well as HC. Check the electrical calibration. v) Check that the sampling system is leak proof. vi) vii) The printer is working correctly and the print out details are correct. Checking of 1 no. of vehicle for idling emission measurement using this analyzer. ************

1.0 INTRODUCTION 2.0 TESTING ANNEXURE 1 TO ANNEXURE A (contd..) FIELD CALIBRATION PROCEDURE FOR TESTING OF SMOKE METERS This procedure has to be carried out on meters after they are commissioned in the field and for the subsequent calibration. The test procedure for smoke meters is as follows: i) After the warm-up of the meter, the calibration of the meter has to be checked at zero and midscale point with the neutral density filter available. The value must lie within 0.1 m -1. ii) iii) iv) The meter shall have the standard accessories as specified by the manufacturer. It shall be checked that the sample hose, internal pipes etc are not deteriorated or damaged to ensure that there is no leakage. The functionality of oil temperature and RPM sensor. The heating system for the optical chamber is functioning. v) The purge air system is working correctly. vi) vii) viii) ix) Visual displays are functioning correctly. The printer is working correctly and the printout details are correct. The instrument casing is proper and has proper electrical earthing. Free acceleration test is carried out using a vehicle and the print out details are checked. ************

ANNEXURE 2 TO ANNEXURE - A CALIBRATION CERTIFICATE FORMAT 1.0 Component: PUC equipment model: Sr. No. 2.0 PUC Center Registration No.: 3.0 Objective of the test: To carry out Physical check and calibration of gas Analyser / Smoke meters as per the test procedure specified in Annexure 1 of CMVR / TAP 115-116 Part-8. 4.0 4.1 Detailed Observations Checking of supply/ earthing 4.2 Checking of accessories: 4.3 Span Calibration Details of accessories checked. OR 1. Details of span gas concentration % 2. Calibration gas cylinder No.: 3. Calibration gas cylinder make: 4. Calibration gas validity date: 5. Details of Natural Density filters used for mid point calibration 4.4 Electrical Calibration OK/ Not OK 4.5 Leak test: Passed/ Failed 5.0 One no of petrol / diesel vehicle checked for idling Emission / Free acceleration, measurement 6.0 Conclusion: 7.0 Next Calibration Due Date: Signature & Seal of manufacturer/ Supplier

ANNEXURE 3 TO ANNEXURE - A TRAINING CERTIFICATE PUC Operator Photograph It is to certify that Mr. / Mrs. has attended the training and knows all required operation of the smoke meter / Gas Analyser model to perform PUC tests. Training is given in the following areas: Understanding of procedure for testing of Idling emission/ free acceleration smoke as CMVR/ TAP/ 115/116 procedure. 1. Normal thermal condition of the vehicle 2. Actual testing procedure 3. Procedural understanding of issue of PUC certificate Operation of smoke meter / Gas analyzer 1. Vehicle testing mode 2. Zero Calibration 3. Span calibration 4. Electronic calibration 5. Leak test Maintenance 1 Replacement of filters 2 General maintenance ************* Authorized Signature & seal of manufacturer / supplier

ANNEXURE-4 TO ANNEXURE-A AMC CHARGES Sr. No. Details 2 Gas Analyser 4 Gas Analyser Smoke Meter Amount in Rs. (Taxes Extra) 1. AMC Charges with Spares and 3 12500 * 17500 * 11500 * Calibrations 2. AMC Charges without Spares and with 3 Calibrations 7000 10000 7500 Note: * List of spare parts included in AMC is given below : Sl. No. 2-Gas & 4-Gas Analyser Component 1 Controller PCB 2 Communication module 3 Power module 4 Display 5 Keypad 6 Pneumatic fittings (connectors and tubes) 7 Remote (If provided) Smoke Meter Sl. No. Component 1 Smoke head 2 Light detector 3 Heater 4 Controller PCB 5 Power module 6 Communication Module 7 Display 8 Keypad/Remote 9 RPM / oil temperature module (In case of alternate rpm sensor) Spare parts not included in the list will be provided by the PUC equipment manufacturer/supplier on chargeable basis.

ANNEXURE 4 TO ANNEXURE A (contd..) In case of 2-gas analyser and 4-gas analyser, both the AMC options include cost of calibration gases which will be provided by the PUC equipment manufacturer/supplier. In case of smoke meters, both the AMC options include calibration with neutral density filter (NDF) by PUC equipment manufacturer/supplier. *************** ARAI issues Type Approval Certificates for vehicles / components / parts / assemblies etc., based on the documents produced / submitted by the customer and on these basis, the vehicles / components / parts / assemblies, etc., are examined and if approved, the certificate is issued. ARAI is in no way responsible for any misuse of copying of any design / type / system in connection with entire vehicle / components / parts and assemblies. Breach of any statutory provision of Indian laws or laws of other countries, will be the sole responsibility of the customer and ARAI shall not be liable for any claims or damages, made by the party, whatsoever. The customer shall alone be liable for the same and undertakes to indemnify ARAI in this regard. Further, the ARAI has the right to initiate cancellation / withdrawal of the certificate issued, in case of any fraud, misrepresentation, when it surfaces and comes in the knowledge of ARAI. The appropriate local courts at Pune shall have the jurisdiction in respect of any dispute, claim or liability arising out of this certificate.