IMPLEMENTATION OF ARTICLE 9 OF EED Roll-out of electricity Smart meters in Spain.

Similar documents
Smart Metering: A driver for creating energy efficiency for households

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

Committee for the Common Organisation of Agricultural Markets. 26 April 2018 POINT 3.1 A. Information on the EU white sugar prices

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk

GC108: EU Code: Emergency & Restoration: Black start testing requirement

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019

Recent Development in Energy Efficiency Policy in the EU

Highlights of EU efforts for Smart Grids deployment and the way forward

Large General Service Time-of-Use Storage Program

The TV regulation review, due for 12 August 2012, was reported to the Consultation Forum on 8 October 2012.

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

GC108: EU Code: Emergency & Restoration: Black start testing requirement

RSWGM meeting European Commission DG MOVE 3-4 April 2017

124 th MEETING OF THE WORKING GROUP ON "MOTOR VEHICLES" 20 October 2014 Agenda item 4:

End-Customer Owned Decentralized Storage as a Part of the Smart Grid Volker Wachenfeld, SMA Solar Technology AG

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Introducing the world's most reliable solar panel. Company presentation / Solar panels

Load profiling for balance settlement, demand response and smart metering in Finland

Proportion of the vehicle fleet meeting certain emission standards

Consolidated Edison Company of New York, Inc.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Cost Reflective Tariffs

Life Needs Power, Hannover Messe, April 24, 2018 The role of smart and strong grids in Europe s energy transition

LATEST DEVELOPMENTS IN THE SPANISH BIOFUELS SECTOR

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Group 3: Pricing from 1 April 2018 and load management

Committee on Transport and Tourism. of the Committee on Transport and Tourism. for the Committee on the Internal Market and Consumer Protection

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 December /3/06 REV 3 ADD 1. Interinstitutional File: 2003/ 0153(COD) ENT 84 CODEC 561

Electricity Subsidy in Oman

Official Journal of the European Communities

Flexible gas markets for variable renewable generation

New York s Mandatory Hourly Pricing Program

Innovation in electricity retailing for EVs in New Zealand

Richard Herrmann, et ux. Rezoning from F-District Farming to F-1 District Rural Residential

Reducing Noise Emissions from Motor Vehicles New EU Legislative proposal

Distributed Storage Systems

Enel Smart Info: consumption data at hand

Smart Grid s s Potential for Clean Energy

1. H. Julius Hackett General Manager Phone: (850) Extension 201 Cell: (850)

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version]

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

NEU Electric and Natural Gas Price Update

MCS. MCS Metering Guidance V1.0. Gemserv Ltd 10 Fenchurch Street, London. EC3M 3BE.

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

SERVICE CLASSIFICATION NO. 7. Also optional for: This option is not available to Service Classification No. 2 customers, effective December 3, 2002.

10th Eastern Partnership Transpot Panel

Appendix G Examples and Recommended Methods

ECHOtourism STATistics

RSB List of Documents and references

Sprinkler System Waiver Application Packet

JEA Distributed Generation Policy Effective April 1, 2018

ILLINOIS COMMERCE COMMISSION

Energy efficiency in New Member States and Candidate countries. Policies, potentials and needed action

New EU Regulation on General Safety. Implementation of Tyre Aspects

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

RATES, RULES AND REGULATIONS APPLICABLE TO ELECTRIC SERVICE. rendered in THE STATE OF OREGON

Drink Driving in the EU

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

What, Why, and Where? Brian Lips Senior Project Manager for Policy NC Clean Energy Technology Center

Solomon Islands Government. Statistical Bulletin: 19 /2011. HONIARA CONSUMER PRICE INDEX (November 2011)

POSITION PAPER Version 3.0

GEODE Report: Flexibility in Tomorrow s Energy System DSOs approach

The Swedish Government Inquiry on Smart Grids

Smart Meter Impact: Enabling Smart Metering System for Consumption Optimisation and Demand Management. By Gregers Reimann

FEDIOL assessment of the practical implications of mandatory country of origin labelling options on the vegetable oils sector 1

FLEXIBILITY & NUCLEAR ENERGY MANAGEMENT IN FRANCE

SUMMARY OF THE IMPACT ASSESSMENT

Capacity Market Rules for Energy Storage Resources

TURKISH ELECTRICITY NETWORK

National Seniors Association 18 October 2010 Jo Benvenuti David Stanford

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Solomon Islands Government. Statistical Bulletin: 11/2011. HONIARA CONSUMER PRICE INDEX (June 2011)

Security of Supply. on the European Electricity Market

Novel planning techniques for the optimal allocation of DSOs owned energy storage

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

DG CLIMA studies on CO2 emissions from vehicles

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)

Current Development of the Tariff Structure in the Electricity System of the Republic of Macedonia

11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe. MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

FLORENCE ELECTRICITY DEPARTMENT. GENERAL POWER RATE--SCHEDULE GSC (October 2015) Availability

Street Address. City-Village-Township

Control & monitoring system for Siemens gas engines & gen-sets siemens.com

Legal Statement. M E T A L S Research and Consulting

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

Inventory Levels - All Prices. Inventory Levels - By Price Range

January 1, 2018 RATE SCHEDULE. 395 Southgate Drive, Guelph, ON N1G 4Y1. Billing: Admin: Fax:

Using Active Customer Participation in Managing Distribution Systems

Sacramento Municipal Utility District s EV Innovators Pilot

CONSULTATION DOCUMENT

New Power Market Model. Activities towards market integration in compliance with the New European Legislation

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

Using big data to relieve energy distribution stresses

2016 UC Solar Research Symposium

Smart Grid Demonstration Projects Update

Smart metering Estonian case study

RSB ROUNDTABLE ON SUSTAINABLE BIOMATERIALS RSB List of Documents and references. 18 January RSB reference code: RSB-DOC

July 24, Project IR

LAW OF THE REPUBLIC OF KAZAKHSTAN # 588-II DATED JULY 9, 2004 ON THE ELECTRIC POWER INDUSTRY

Transcription:

IMPLEMENTATION OF ARTICLE 9 OF EED Roll-out of electricity Smart meters in Spain. María Jiménez Navarro Ass. Deputy D.G. for Electricity MINISTRY OF INDUSTRY, ENERGY AND TOURISM 18 th September, 2016 1

. INDEX ROLL-OUT OF SMART METERS IN : State of the art. Functionalities. HOURLY BILLING: VOLUNTARY PRICE FOR SMALL CONSUMERS. DEMAND SIDE MANAGEMENT AND SMART METERS. 2 Oct- 2016

APPLICABLE LEGISLATION Directive 2006/32/CE of 5 April 2006 Member States shall ensure that final customers are provided with meters that accurately reflect the final customer's actual energy consumption and that provide information on actual time of use. Royal Decree 1110/2007, of 24 August 2007 All household electricity meters shall be smart meters. It defines the functionalities of the smart meter s system. 2006 2007 Royal Decree 809/2006, of 1 July 2006 Since 1 July 2007, new electricity meters for customers of a contracted capacity below 15 kw, shall allow differentiation of consumption in different time periods and remote management. Ministerial Order ITC/3860/2007, of 28 December. Establishes the roll-out plan of remote managed electricity meters (Smart meters). 100% of household electricity Smart meters to be deployed before 31 December 2018 3

APPLICABLE LEGISLATION Directive 2009/72/CE, of 13 July, on common rules for the internal market in electricity Member States shall ensure the implementation of intelligent metering systems may be subject to an economic assessment before 3 September 2012. Subject to that assessment, Member States shall prepare a timetable with a target of up to 10 years for the implementation of intelligent metering systems. Directive 2012/27/UE, of 25 October 2012, on Energy Efficiency MS shall ensure that final customers for electricity are provided with competitively priced individual meters that accurately reflect the final customer s actual energy consumption and that provide information on actual time of use. 2009 2012 M. Order IET/290/2012, 16 February, modifies the milestones of the Smart meter roll-out plan : 35% before 31 December 2014 35% before 31 December 2016 Remaining 30% before 31 Dec 2018 Commission Recommendation 2012/148/EU on preparations for the roll-out of smart metering systems 10 common and mínimum functional requirements for Smart metering systems. 4

Functionalities of household electricity meters: Registers for different time periods. 6 time periods to be programmed. For each of them: registers of active and reactive energy, maximum demanded power every 15 (including its date and hour). Capacity to programme registration periods of a maximum interval of 1 hour (not less). Integrated in remote mangement and remote metering system. Power control elements. Quality register: number and duration of shortages and out-of-limits voltage. 5

Functionalities of remote management system: Remote reading of active and reactive energy, and power. Remote Reading of quality parameters. Remote parameter setting of Metering equipment. Activation of power control mode: maxímeter or power control device. Remote periodic synchronization with the system. Power remote control: supply interruption and reconnection. Load management capacity. Reduction of demand in critical situations. 6

KEY ISSUES: DATA PROTECTION, PRIVACY AND SECURITY: Carrying out the Data Protection Impact Assessment HEALTH PROTECTION 7

CASE STUDY: VOLUNTARY PRICE FOR SMALL CONSUMERS HOURLY CONSUMPTION REGISTERS and Remote Reading HOURLY MARKET PRICES Hourly Billing (both consumption and Price) Hourly Self-consumption 8

VOLUNTARY PRICE FOR SMALL CONSUMERS (PVPC) PVPC is calculated considering: Hourly spot market prices Ancillary and balancing services Other costs associated to electricity supply Billing based on actual consumption: a) Final consumers with Smart meters effectively integrated in remote management sytems: actual hourly registered consumption. b) Other consumers: actual registered consumption affected with a standard load profile according to time-of-use periods. 8

SOME REFLECTIONS linked to DEMAND SIDE RESPONSE. Billing based on hourly prices and consumption ( HOURLY BILLING ) is at the front of demand side response measures. Potential savings in household electricity consumers are limited. We propose to start with projects for intensive or big electricity consumers. Need of an ex ante analysis of consumption patterns and habits to detect the potential for savings. CBA. NO need to introduce meter funcionalities far beyond the state-ofplay of the electricity markets: limited meter s lifetime (around 15 years) and hourly electricity markets. THE PROCESS SHOULD BE GRADUAL. 8

Thank you for your attention MARÍA JIMÉNEZ NAVARRO Ass. Deputy D.G. for Electricity. MINISTRY OF INDUSTRY, ENERGY AND TOURISM Pº CASTELLANA, 160 28071 MADRID. Tel: +34 91 349 74 86 Web: www.minetur.es Email: mjimenezn@minetur.es 11