SSC Swedish Space Corporation

Similar documents
SpaceLoft XL Sub-Orbital Launch Vehicle

Rocketry, the student way

Pre-Launch Procedures

Deployment and Drop Test for Inflatable Aeroshell for Atmospheric Entry Capsule with using Large Scientific Balloon

To determine which number of fins will enable the Viking Model Rocket to reach the highest altitude with the largest thrust (or fastest speed.

Reentry Demonstration Plan of Flare-type Membrane Aeroshell for Atmospheric Entry Vehicle using a Sounding Rocket

Deployment and Flight Test of Inflatable Membrane Aeroshell using Large Scientific Balloon

Rocket Activity Advanced High- Power Paper Rockets

SmallSats mission opportunities for the Vega launch system: the Small Spacecraft Mission Service 7 th August, 2016

EUROPEAN RECOVERY SYSTEM (ERS)

Palamede, more than a microsatellite. Workshop on University Micro Satellites in Italy Rome, July 27, 2005

OMOTENASHI. (Outstanding MOon exploration TEchnologies demonstrated by NAno Semi-Hard Impactor)

Jordan High School Rocketry Team. A Roll Stabilized Video Platform and Inflatable Location Device

From MARS To MOON. V. Giorgio Director of Italian Programs. Sorrento, October, All rights reserved, 2007, Thales Alenia Space

SMARTSat. Shape Memory Alloy Research Technology Satellite. Allison Barnard Alicia Broederdorf. Texas A&M University Space Engineering Institute

IRENE PROGRAM. European Sounding Rocket Experiment on Hypersonic Deployable Re-entry Demonstrator

NASA s Choice to Resupply the Space Station

Presentation Outline. # Title # Title

THE FALCON I LAUNCH VEHICLE Making Access to Space More Affordable, Reliable and Pleasant

System Testing by Flight Operators the Rosetta Experience

Name: Space Exploration PBL

VEGA SATELLITE LAUNCHER

NASA - USLI Presentation 1/23/2013. University of Minnesota: USLI CDR 1

On the feasibility of a fast track return to Mars

Development of a Low Cost Suborbital Rocket for Small Satellite Testing and In-Space Experiments

Challenges of Designing the MarsNEXT Network

Presentation Outline. # Title

Capabilities Summary and Approach to Rideshare for 20 th Annual Small Payload Rideshare Symposium NASA Ames Research Center June 12-14, 2018

IST Sounding Rocket Momo User Guide

MARS-OZ: A Design for a Simulated Mars Base in the Arkaroola Region

SOYUZ-IKAR-FREGAT 1. IDENTIFICATION. 1.1 Name. 1.2 Classification Family : SOYUZ Series : SOYUZ Version : SOYUZ-IKAR SOYUZ-FREGAT

Travel: Detailed Flight Plan

FLIGHT READINESS REVIEW TEAM OPTICS

Adrestia. A mission for humanity, designed in Delft. Challenge the future

Vector-R Forecasted Launch Service Guide

The GHOST of a Chance for SmallSat s (GH2 Orbital Space Transfer) Vehicle

MARVEL THE MARTIAN AIRBORNE RESEARCH VEHICLE

EXTENDED GAS GENERATOR CYCLE

GK L A U N C H SER VICES MOSCOW 2017

The 1 N HPGP thruster is designed for attitude and orbit control of small-sized satellites. FLIGHT-PROVEN. High Performance Green Propulsion.

VSS V1.5. This Document Contains No ITAR Restricted Information But Is Not Cleared for General Public Distribution

Massachusetts Space Grant Consortium

The 1 N HPGP thruster is designed for attitude and orbit control of small-sized satellites. FLIGHT-PROVEN.

Next Steps in Human Exploration: Cislunar Systems and Architectures

Suitability of reusability for a Lunar re-supply system

GUIDANCE, NAVIGATION & CONTROL SYSTEMS. REVIEW, ANALYSIS AND FUTURE DESIGNS

Rocket 101. IPSL Space Policy & Law Course. Andrew Ratcliffe. Head of Launch Systems Chief Engineers Team

THE FIRST IN-SPACE DEMONSTRATION OF A GREEN PROPULSION SYSTEM

Alternative technologies and possible competitors in the satellite business

Canisterized Satellite Dispenser (CSD) As A Standard For Integrating and Dispensing Hosted Payloads on Large Spacecraft and Launch Vehicles

University Student Launch Initiative

Cygnus Payload Accommodations: Supporting ISS Utilization

NASA USLI PRELIMINARY DESIGN REVIEW. University of California, Davis SpaceED Rockets Team

CHAPTER 1 INTRODUCTION

Auburn University. Project Wall-Eagle FRR

INTERMEDIATE EXPERIMENTAL VEHICLE. JETTISON MECHANISM ENGINEERING AND TEST

Flight Readiness Review Addendum: Full-Scale Re-Flight. Roll Induction and Counter Roll NASA University Student Launch.

Abstract. Traditional airships have always been designed for robust operations with the ability to survive in

The DoD Space Test Program Standard Interface Vehicle (ESPA) Class Program

GIT LIT NASA STUDENT LAUNCH PRELIMINARY DESIGN REVIEW NOVEMBER 13TH, 2017

Philae : A made to measure battery. Richard Hague ESTEC AIM Workshop 22/23 Feb 2016

CRITICAL DESIGN REVIEW. University of South Florida Society of Aeronautics and Rocketry

DemoSat-B User s Guide

OLEV AN ON-ORBIT SERVICING PROGRAM FOR COMMERCIAL SPACECRAFTS IN GEO

PRELIMINARY PAYLOAD SPECIFICATIONS

SMILE - Small Innovative Launcher for Europe

lights on, down 2 ½ 40 feet, down 2 ½ Kickin up some dust 30 feet, 2 ½ down faint shadow

In-Space Demonstration of HighPerformance Green Propulsion (HPGP) and its Impact on Small Satellites

AMSAT-NA FOX Satellite Program

NEXT Exploration Science and Technology Mission. Relevance for Lunar Exploration

MULTI-LAYER INSULATION I STRATOSPHERIC BALLOONS I ISR TETHERED BALLOONS I INFLATABLE TECHNOLOGIES RELIABLE. ADAPTABLE. MULTIPURPOSE. PERSISTENT.

The Mars Express Mission A Continuing Challenge. Erhard Rabenau, NOVA Space Associates Ltd Mars Express Senior Mission Planner

Solely EP based Orbit Control System on Small GEO Satellite

Routine Scheduled Space Access For Secondary Payloads

Vector-R. Payload User s Guide

Exploration Architecture Update

LUNAR INDUSTRIAL RESEARCH BASE. Yuzhnoye SDO proprietary

PROJECT AQUILA 211 ENGINEERING DRIVE AUBURN, AL POST LAUNCH ASSESSMENT REVIEW

Human Exploration of the Lunar Surface

H-IIA Launch Vehicle Upgrade Development

'ELaNa XIX' press Kit DECEMBER 2018

Cable Dragging Horizontal Takeoff Spacecraft Air Launch System

r bulletin 96 november 1998 Figure 1. Overall ATV configuration (ESA/D. Ducros)

The European Lunar Lander Mission

'Prototype' Commission Regulation on Unmanned Aircraft Operations. FAI proposal for model flying activities

D-SEND#2 - FLIGHT TESTS FOR LOW SONIC BOOM DESIGN TECHNOLOGY

LAUNCHERONE: REVOLUTIONARY ORBITAL TRANSPORT FOR SMALL SATELLITES

Formation Flying Experiments on the Orion-Emerald Mission. Introduction

Case Study: ParaShield

Modular Reconfigurable Spacecraft Small Rocket/Spacecraft Technology Platform SMART

Rocketry and Spaceflight Teleclass Webinar!

The Role of Electric Propulsion in a Flexible Architecture for Space Exploration

AUBURN UNIVERSITY STUDENT LAUNCH. Project Nova. 211 Davis Hall AUBURN, AL Post Launch Assessment Review

RocketPod : A Method for Launching CubeSat-Class Payloads on ELVs and Spacecraft

TOWARDS A HEAVY LAUNCHER - PROPULSION SOLUTIONS - A. Souchier - C. Rothmund Snecma Moteurs, Direction Grosse Propulsion à Liquides

THE FIRST IN-SPACE DEMONSTRATION OF A GREEN PROPULSION SYSTEM

EPIC Gap analysis and results

ENERGIA 1. IDENTIFICATION. 1.1 Name. 1.2 Classification Family : K Series : K-1/SL-17 Version : 4 strap-ons

Auburn University Student Launch. PDR Presentation November 16, 2015

Typical Rocketry Exam Questions

Transcription:

SSC Swedish Space Corporation Platforms for in-flight tests Gunnar Florin, SSC

Presentation outline SSC and Esrange Space Center Mission case: Sounding rocket platform, dedicated to drop tests Satellite launches from Esrange

Our history SSC Swedish Space Corporation Founded in 1972 Private company, 100% owned by Ministry of Finances Main office in Solna, Stockholm Launch range ESRANGE in Lapland, northern Sweden SSC Group with activities in 10 countries, 4 continents

Over 50 years in space 1961 The first sounding locket launch from Sweden 1966 First rocket from Esrange 1974 First balloon from Esrange to the Ural mountains 1978 Satellite data reception at Esrange Landsat Station 1990 Sounding rocket over 700 km

After 48 years at Esrange: - 477 balloon missions - 533 rocket launches and still counting

2015

Why Esrange?

The least populated area in Europe Esrange - 67.9 N - 21.1 E Norway Finland 6000 km 2 restricted airspace Kiruna Esrange

Esrange - 67.9 N - 21.1 E Norway Finland 6000 km 2 restricted airspace Kiruna Esrange

Rocket missions at Esrange Payload Altitude Microgravity MAXUS 25 800 kg 700 km 13 min MASER /TEXUS 17 400 kg 260 km 6 min National programs 14 200 kg 125 250 km Student program 14 105 kg 85 km -

Stratospheric Balloons Atmospheric physics Astronomy/astrophysics High altitude crane

マスタ D-SEND タイトルの書式設定 #1, Herkules マスタテキストの書式設定 第 2 レベル 第 3 レベル 第 4 レベル» 第 5 レベル 8th European Symposium on 2015/3/9 15 1-5 March 2015 2015/3/9 Aerothermodynamics for Space Vehicles, Lisbon 15

Drop tests missions from Esrange Mikroba - micro gravity experiment in free flight 1986-92 DLR Hugyens drop test of moon probe 1995 CNES HSFD - high speed flight demonstrator (HOPE-X Reusable Launch Vehicle) D-SEND Drop tests for non-symm. sonic boom 2003 JAXA /CNES 2011-15 JAXA SHADT - Sub-scale high altitude parachute 2014 ESA Balloon launches up to 42 km SHARK - re-entering capsule UHT Ceramic 720 km 2010 Super-MAX super sonic parachute test 720 km 2016 ESA/CIRA ESA

Other in-flight opportunities Maser 13 Payload data transmitter demonstrating ability of enhanced data down-link bandwidth by SOQPSK modulation. 3 kg equipment with antenna system. Inertial Measurement Unit Breadboard, testing performance in representative launch, ascent and planetary descent/re-entry environment under ESA contracts, flying on ESA missions.

SSC provider of systems and sub-systems In addition to launch systems, SSC provides sub-systems for balloons and sounding rockets; Structures, gondolas service systems telemetry, power systems, gps, tracking systems, video system, parachute systems rocket motors, fin sets, radar systems, separation system, and also complete experiment systems for sounding rockets

Mission case: Sounding rocket platform dedicated to drop tests

Current situation High interest in making use of existing missions for going piggyback Difficulties: - Interfaces, engineering budgets are tight - Reluctance due to logistics to bring aboard passenger at late stage - Don t disturb the main mission! - Reluctance to involve other organisations in a National project - Dependency on main mission schedule

Drop tests High interest in Europe for using in-flight platforms for test/validation/verification of re-entry body technologies, inflatable structures, supersonic parachutes and thermal protection materials 6000 km2 impact area SSC can offer a recurrent sounding rocket platform with dedicated launches for releasing re-entry bodies from high altitudes, launched and recovered at Esrange Space Center. 120x70 km Drop tests from high-altitude (<42 km) balloons is already practice at Esrange, and can be used as complementary test platform.

Sounding Rocket mission case A low cost mission, configuration derived from Swedish Leewaves mission Apogee: Experiment payload: 100 km 50 kg Payload diameter: 14 inches ( 345 mm inside width)

Launch configuration Experiment module Rocket Motor: Motor adapter: Experiment module: Service module: Nose cone: Single-staged Improved Orion Housing motor igniter and payload separation system Accommodating the system to be tested (re-entry body) Housing GPS, TM transmitter and antennas (for safety tracking) Empty

Launch configuration Experiment module length (mm) mass (kg) Rocket Motor: 2660 420 14 inch Motor adapter: 240 13 14 inch diameter Experiment payload: 1480 50 14 inch (356 mm) Service module: 300 12 14 inch Nose cone: 1000 10 < 75 kg payload mass

Imp.Orion (Leewaves) total speed up to 40 seconds

Imp.Orion altitude and range profile

Improved Orion (Leewaves) acceleration profile

Experiment payload Housed in 14 diameter structure 1500 mm length 345 mm inside width 310 mm minimum diameter at radax joints Example of 14 inch structures with radax joints, narrowing the inner diameter from 345 to 310 mm at ends

Flight time line Once motor separation has occurred, the experiment can be initiated. Several possibilities/solutions for carrying missions; Ejecting a re-entry body from the inside of the experiment structure Splitting the experiment module open late in the descent phase, to release the experiment once the speed is high (as practiced in drop tests from balloons) Using nose-cone and service module as ballast mass for super-sonic parachute tests

Recurrent mission scenario With access to several motors of Improved Orion type, a recurrent mission scenario can be depicted. With ten missions over a number of years, non-recurrent system design and development costs would not be significant, and there could be several launches each year. Esrange is open for balloon and rocket launches through-out the year, apart for the month of September.

Cost picture Cost of the described low-cost scenario, with repeated flights: Around 600 k recurrent cost for flight ticket Around 200 k non-recurrent costs Flight ticket: motor with separation system, nose cone, service module, experiment outer structure, System AIV, launch campaign support, recovery campaign fee.

More possibilities for access to space Higher apogees than 100 km and larger diameters than 14 opens up for further range of tests. Missions with larger payload diameter (e.g. 16, 17, 20,.. inches) and higher apogees calls for different motor combinations than the one of the presented mission case, combinations which SSC can offer to provide and launch. Maser 12 launch from ESC, Maxus 8 launch from ESC, 275 kg scientific payload, 250 km apogee 510 kg of scientific payload, 700 km apogee

SATELLITE LAUNCHES FROM ESRANGE PROJECT RAINBOW

BACKGROUND With increasing demand for independent access to space and the Cubesat and small sat market expansion, SSC has initiated the idea of building a European launch capability of small satellites from Esrange Europe has a capability for launching large satellites but lacks the ability for small satellites A complement to Ariane and Vega Financed by EU and European organisations, not ESA s Launcher Program

THE CONCEPT: 1-100 kg satellites. CubeSats are target payloads (commercial, governmental, scientific) Standardized orbit: h=500 km, i=97,4 (Sun-synchronous orbit) Node at 2200, 0600, or 1400 Local solar time Fixed launch periods: 2-3 times per year Deploy a constellation in three launches Green launch site, no hydrazine

Satellite launch area (4 km from main building) Sounding rocket launch area Balloon launch area Main building Satellite station Entrance

PROJECT STATUS Phase A study completed. Result: it is feasible to implement a satellite launch service at Esrange Phase B1 study initiated. Will concentrate on ensuring program engagement and momentum Goal: to launch small satellites from Esrange in 2020

WE HELP EARTH BENEFIT FROM SPACE!