Report Turbine inspection WTG 12801, Oudelandertocht 11

Similar documents
Report Turbine inspection WTG 15035, Groettocht 7

Report Inspection of wind turbine

Report Inspection of wind turbine

APPENDIX J V90 3.0MW Turbine Specifications

Hedeager Aarhus N Denmark S (IEC IB)*, :2005

RAS CAT 1 CAT 2 CAT 3 CAT 4 CAT 5

V MW An efficient way to more power

Hedeager Aarhus N Denmark

V MW The future for low wind sites

MAINTENANCE INSTRUCTIONS VDL WEWELER HD & MBS-L/V/W/F AIR SUSPENSION SYSTEMS

Technical specifications. Wind Turbine GS 21 S. Power 60 kwp

Pioneer P750/49. The Premium 750 KW Wind Turbine. green. pioneer. go go with

Project Report on Engineering Services for the Wind Turbine Project at the Cuyahoga County Fair

Siemens Blade De-icing

Hedeager Aarhus N Denmark

Hedeager Aarhus N Denmark

Hedeager Aarhus N Denmark. Vestas V110-2 MW 50 Hz VCS Mk 10

Hedeager Aarhus N Denmark. Vestas V MW / V MW

JOINT VENTURE: Wind Power Development Project United States of America. - Proposal Appendix -

Structure of Wind Supply Chain Onshore to Offshore. Ed Weston Director, GLWN Copyright 2012 GLWN A WIRE-Net Initiative

W8X. Inspection of 12 W2E-93/2.0 at Houston Port REPORT. H. Hoffmann F. Weber COPYRIGHT. W2E Wind to Energy GmbH 2017 PROJECT TITLE

Expert en Acoustique et Vibration

Protection for Wind-Turbines. It

Hedeager Aarhus N Denmark

TS Series Return-to-Home Gear Reducer

Now even more silent! The first certified* small wind turbine in Germany. Produce your own electricity around the clock all year long.

UPGRADE. Tailor- made. High- precision. Perfectly networked. Services and upgrades for your WTG. Wind Systems A/S company

V MW & 2.0 MW Built on experience

ORDERLY NEGOTIATED SALE MICON M1500 WIND TURBINES EQUIPMENT CATALOG AUCTION DIVISION Rochester, Minnesota

V MW Creating more from less

Green energy conversion

360 o Excavator. pre use check sheet page 1/5. How to use this check sheet:

ABB Wind Power Solution

Wind Turbine Machine Head Evaluation Page 1 of 32 Appendix I. Sketch of 1.5XLE (from GE literature).

Dupont Circle Station - Escalator A03S01 (South Entrance) Assessment Checklist

Statement of Compliance on the A-Design Assessment

Module 3: Types of Wind Energy Systems

aeromaster wind turbines Reliable, compact, flexible and economical

BLADEcontrol Greater output less risk

A CAD Design of a New Planetary Gear Transmission

Estimation of Turbine Reliability figures within the DOWEC project

FD21-50 GHREPOWER. Version: 3.0

MAJOR SYSTEM FUNCTIONS

Yaw & Pitch Selection Guide Brochure

FBC CODES AND TRANSLATIONS TRANSLATION

MINI PACK BUILD SPEC. 885 ESN: FA0278 TSN: 15, CSN: 15,815 TSO: N/A CSO: N/A TSHSI: 2, CSHSI: 2,373 RGB SN. FA0278

Reliable and Application specific. Slewing Drives for Wind Turbines

Driver s Vehicle Inspection Report

Table of Contents. 4. Before a New Turbocharger is Installed

SYSCO INDIANAPOLIS INDIANAPOLIS, INDINA

Pre-Trip or Interim Inspection of Heritage Steam Locomotives

K L E I N W I N D K R A F T kleinwind.at

Wind Energy: A new energy with new challenges

EP4-Platform: E-126 EP4 / E-141 EP4. Arno Hildebrand, Programm Manager EP4 ENERCON Research & Development

SIDEWINDER DRILLING RIG 219 LA SALLE, TEXAS

Symbols used: Please, pay attention to the following symbols throughout this document emphasizing particular information.

New dimensions. Siemens Wind Turbine SWT Answers for energy.

PAST EXAM PAPER & MEMO N3 ABOUT THE QUESTION PAPERS:

NIAGARA REGION WIND FARM PROJECT DESCRIPTION REPORT. Appendix C. Turbine Specifications

Drivetrain Simulation and Load Determination using SIMPACK

Report of Inspection

SERVICES. Our maintenance and optimisation modules. Multibrand from Vestas to Gamesa to GE. Wind Systems A/S company

FATIGUE RESISTANT & MAINTENANCE- FREE GEISLINGER COMPOWIND

HM WIND TURBINE. Operation Manual. **Please read the manual carefully before using **

Inspections of Wind Turbine Gearboxes

Maintenance Information

TION AND OPERATION Procedure revision date: 01/22/1999

CE Operating and Maintenance Manual

The company. Operational philosophy. Worldwide presence. Product and design philosophy. our customers permanent performance

Less need of Chinese rare-earths with large diameter direct drive

GOLDWIND S48/750 (50Hz) Technical Specifications

H4.6-3kW/H6.4-5kW/H8.0-10kW/H9.0-20kW. Technical Overview ANHUI HUMMER DYNAMO CO., LTD.

Articulated Dumper. pre use check sheet page 1/5. How to use this check sheet:

GEAR CONTENTS POWER TRANSMISSION GEAR TYPES OF GEARS NOMENCLATURE APPLICATIONS OF GEARS VELOCITY RATIO GEAR TRAINS EXAMPLE PROBLEMS AND QUESTIONS

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

Durch professionelle Datenanalyse clever optimieren sensitive Eis- und Schadenserkennung am Rotorblatt

Reliability is our profession

Operating Instructions Operating Instructions. HEKA testing lane UNIVERS "TX" 4cm above floor

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

EXPERT REMANUFACTURED WIND TURBINE

W650. Beawindhog Rev01 ALASKA'S LOW COST ENERGY SOURCE. Wind, Solar, Bio, and Other alternative energy custom manufacturing

BENEFITS. Maximum output at minimum cost per kwh for medium wind sites. - Class IIA.

SL2000 Series Wind Turbine

AIRWORTHINESS DIRECTIVE

ENERCON GmbH Dreekamp Aurich Germany ENERCON E-82 E4 2.35MW ENERCON E-82 E4 3.0MW. IIA, IEC : Amd1:2010

SERVICE MANUAL TDR - ROTISSERIE OVEN MODELS TDW - WARMER MODELS

Total Gear and Mechanical Power Transmission Solutions

Model: H kW. Features: 1. SCF Supercritical generator. 2. NSK bearings. 3. PLC integrated with Siemens module. 4. Low noise

1900AL Electric Mining Shovel Product Overview

Assessment of Elevator and Escalator Maintenance & Repair Program Final Elevator Audit Submission Foggy Bottom Station - Escalator C04X03 (Entrance)

Technical Documentation Wind Turbine Generator Systems /60 Hz

REPORT NO: R-786 CARGO DOOR C-CHECK INSPECTION PROCEDURES

9kW Multi Wind-Lens Turbine Specification (3kW WL turbine x 3 units)

Digger derrick 900 PREVENTIVE MAINTENANCE AND INSPECTION REPORT. Other:

LIFTRA COMPANY OVERVIEW LIFTRA SELF-HOISTING CRANE OVER 300 GEARBOX REPLACEMENTS WORLDWIDE

Improving The Life Of Gearboxes & Lowering Repair Costs

Mainshaft Bearings: Bearing Arrangements, Damage Modes and Technology Advancements. Presented by Richard Brooks AWEA O&M Conference 2017

ned100 Wind Turbine Generator a step towards your energy independence

Innovative Gearboxes for Wind Turbines

BENEFITS. Maximum unit power with excellent performance for high winds. - Class IA/WZII/WZIII.

Transcription:

Report Turbine inspection WTG 12801, Oudelandertocht 11 Report No. V662015041 09-11-2015

Contents 1 Purpose... 3 2 Abbreviations... 3 3 General information... 4 4 Wind turbine main components... 4 5 Documents... 5 6 Logbook: Overview of recent maintenance... 6 7 Logbook: Transformer... 6 8 Logbook: Notable events... 7 9 Tower and towerbase... 8 10 Yaw system... 10 11 Cabinets nacelle... 11 12 Nacelle... 12 13 Gearbox and main shaft... 13 14 Generator and coupling... 15 15 Hydraulic system nacelle... 16 16 Rotor... 16 17 Conclusion... 21 Date: 09-11-2015 Page 2 of 21

1 Purpose On behalf of Vattenfall an inspection has been executed on the wind turbine. The purpose of the inspection is to determine the technical state of the wind turbine. 2 Abbreviations ok nok na nav nc info okay not okay not applicable not available not checked for information purpose Items marked with ok and info show no visual irregularities. All issues which are not acceptable are marked with nok. Items which are nok will be classified in three different classes. Class Clarification Description in report Priority Low An irregularity, which is not a safety issue, and is relatively easy to solve. Low Priority High An irregularity, which is not a safety issue, and is more serious and is more time and/or money consuming to solve. High Safety Issue Issues which concern the safety of the people working in the turbine. Safe Date: 09-11-2015 Page 3 of 21

3 General information Wind turbine name: Oudelandertocht 11 Wind turbine type: V66 1650/300KW - 690/50 R7035 Wind turbine S/N: 12801 Location: Middenmeer Hub height: 78 Total production [kwh]: 15530918 (according to display) Total hours: 2306 (according to display) Nominal power [kw]: 1650 Year of installation: 2002 Date of inspection: 26-10-2015 Inspectors: P. den Braber D. Lagerweij B. van de Braak J. Langenbach 4 Wind turbine main components Component Type Year Serial number Nacelle V66 1650/300KW - 690/50 R7035 2002 749502-03-02-66021 Gearbox Winergy PEAS 4395 2010 4835501-0020 - 1 Revision gearbox - - - Gearbox oil Texaco Meropa 320 2011 - Generator Weier GEN DASG 450W 2000 581528A Aux. Generator ABB M2CG 315MB 4 B3-3392350 Blade 1 Vestas 32B - not legible Blade 2 Vestas 32B - 35011 Blade 3 Vestas 32B - not legible Date: 09-11-2015 Page 4 of 21

5 Documents Component Remark 1 Operator manual Operating manual is available at the turbine. Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of instructions: (e) the drawings, diagrams, descriptions and explanations necessary for the use, maintenance and repair of the machinery and for checking its correct functioning; ok 2 Wiring diagram Wiring diagrams are not available at the turbine. Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of instructions: (e) the drawings, diagrams, descriptions and explanations necessary for the use, maintenance and repair of the machinery and for checking its correct functioning; nok 3 Hydraulic diagram Hydraulic diagrams are not available at the turbine. Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of instructions: (e) the drawings, diagrams, descriptions and explanations necessary for the use, maintenance and repair of the machinery and for checking its correct functioning; nok 4 Maintenance manual Maintenance manual is not available at the turbine. Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of instructions: (e) the drawings, diagrams, descriptions and explanations necessary for the use, maintenance and repair of the machinery and for checking its correct functioning; nok 5 Logbook Logbook is available at the turbine. ok Date: 09-11-2015 Page 5 of 21

6 Logbook: Overview of recent maintenance Year Type of maintenance Date of execution Maintenance schedule Commissioning 08-2002 2002 9 E- 36 month service 19-08-2011 2011 9½ B - 6 month service 09-02-2012 10 G - 60 month service 14-09-2012 2012 10½ B - 6 month service 14-02-2013 11 M 11 year service 09-08-2013 2013 11½ B - 6 month service 27-01-2014 12 N 48 month service 05-08-2014 2014 12½ B - 6 month service 21-01-2015 13 O 12 month service 20-08-2015 2015 7 Logbook: Transformer Date Event 16-03-2011 Transformer inspection 23-04-2012 Transformer inspection 24-07-2013 Transformer inspection 26-06-2014 Transformer inspection and repair 20-07-2015 Transformer inspection Date: 09-11-2015 Page 6 of 21

8 Logbook: Notable events Date Event 05-08-2009 Replaced RCC 10-09-2009 Generator exchange 22-12-2011 Gearbox exchange 04-10-2012 Exchanged all capacitors of phase-compensation 13-02-2013 Exchanged plain bearings blade A, B and C 26-03-2013 Exchanged 6 capacitors of phase-compensation 10-07-2013 New torque-arm dampers 22-01-2014 Replaced RCC-processor 24-06-2014 Arc detection installed in busbar section 10-07-2015 Repair and maintenance rotor blades 14-07-2015 Replaced RCC-processor 22-09-2015 Exchanged DE-bearing, NDE-bearing generator and RCC replaced Date: 09-11-2015 Page 7 of 21

9 Tower and towerbase Item Remark 1 Outside Graffiti present on the outside of the tower. nok High 2 Inside Oil visible inside the tower and on the ladder. nok High 3 Towerbase HV-switch overview Info Date: 09-11-2015 Page 8 of 21

4 Towerbase cabinet overview Info 5 Miscellaneous Bolt at the beam of the cable suspension is not tightened correctly. nok Low 6 Oscillation damper One of the supports of the oscillation damper is almost broken. Info NOTE: This problem is reported to the owner immediately and the owner has assured TeSuCon that the problem has been solved that same week. Date: 09-11-2015 Page 9 of 21

10 Yaw system Item Remark 1 Yaw bearing overview ok 2 Yaw ring teeth Yaw ring shows no irregularities. ok 3 Yaw pinions Yaw pinions show no irregularities. ok 4 Yaw gears Yaw gear at the front is slightly polluted with oil (arrow). nok Low Date: 09-11-2015 Page 10 of 21

11 Cabinets nacelle Item Remark 1 Controller ok 2 Compensation Cabinet ok 3 Connection boxes ok Date: 09-11-2015 Page 11 of 21

12 Nacelle Item Remark 1 Nacelle overview Info 2 Frame Turbine is equipped with a welded frame. Info 3 Nacelle housing Parts of the insulation are missing or damaged. nok Low 4 Weather station Info Date: 09-11-2015 Page 12 of 21

13 Gearbox and main shaft Item 1 Main shaft bearings Remark Grease of the bearings is a bit dark and only magnetic at the rear bearing. The main shaft is quite dirty (arrow). nok High 2 Radiators The flexible hoses of the radiators are starting to wear. nok Low 3 Manifold Oil present under the manifold. nok High Date: 09-11-2015 Page 13 of 21

4 CCJ-unit A CCJ-filter system is present in the turbine. ok 5 Gear oil system Leakage under the electrical oil pump. nok High 6 Hoses and pipes ok 7 Torque-arms Torque-arm system has been modified. Info 8 Paint / Corrosion ok 9 Brake-system overview Info Date: 09-11-2015 Page 14 of 21

14 Generator and coupling Item Remark 1 Coupling The composite parts of the coupling are in an acceptable condition. The bolts and washer of the connections are a bit corroded. ok 2 Aux. Generator Aux. generator is not connected to the gearbox. Info 3 Paint / Corrosion ok 4 RCC The RCC shows no visual irregularities. Info Date: 09-11-2015 Page 15 of 21

15 Hydraulic system nacelle Item Remark 1 Overview Info 2 Hoses ok 3 Leakage ok 4 Corrosion ok 16 Rotor Item Remark 1 Overview Info 2 Paint / Corrosion ok 3 Connection spinner Connection has not been reinforced. No cracks detected in the tubes. Info Date: 09-11-2015 Page 16 of 21

4 Hub cabinet overview Info 5 Connections cylinder to the blade The clearance of the link bearings of pitch cylinders A, B and C are 0,23 [mm], 0,23 [mm] and 0,28 [mm]. This is acceptable according to the Vestas Manual. ok Date: 09-11-2015 Page 17 of 21

6 Connections cylinder to the hub The clearance of the slide bearings of pitch cylinders A, B and C are 1,12 [mm], 0,91 [mm] and 1,18 [mm]. The clearances of A and C are not acceptable according to the Vestas Manual. nok High 7 Hydraulics inside the hub Several hoses in the hub are covered with oil and the inside of the main shaft is dirty. nok High 8 Hydraulics outside the hub ok Date: 09-11-2015 Page 18 of 21

9 Blade bearings Minor pollution with grease from the blade bearings. nok Low 10 Blade covers Three of the blade covers are defect. nok High Date: 09-11-2015 Page 19 of 21

11 Blades overview Green pollution visible on the surface of the blades. The protective tape at the leading edge of the blades is also damaged (arrow). nok High Date: 09-11-2015 Page 20 of 21

17 Conclusion The logbook shows that the turbine and the transformer have been maintained on a regular basis, according to the maintenance schedule of Vestas. The gearbox has been exchanged in 2011 and the generator in 2009. The RCC and the generator bearings have been replaced in 2015. Despite the blade maintenance/repair in 2015, there is loose tape visible at the tip of the blades. The overall condition of the turbine is quite acceptable for a thirteen year old turbine. There are however several issues (marked as nok in this report) present and it is recommended to solve these, in order to improve the condition of the turbine. D. Lagerweij 09-11-2015 TeSuCon B.V. Mercuriusweg 8 3771NC Barneveld +31610032858 dl@tesucon.nl www.tesucon.nl Date: 09-11-2015 Page 21 of 21

Report Gearbox inspection WTG 12801, Oudelandertocht 11 Report no. V662015081 13-11-2015

Contents 1. Purpose... 3 2. General Information... 3 3. Reporting setup... 4 4. Inspection results... 5 5. Summary... 17 6. Conclusion... 17 Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 2 of 17

1. Purpose On behalf of Vattenfall an inspection has been executed on the wind turbine gearbox. The purpose of the inspection is to determine the technical state of the gearbox. The visual inspection of the gearbox has been executed with a GE Everest XLG3 Videoscoop. 2. General Information Turbine Information Wind turbine name: Oudelandertocht 11 Wind turbine type: V66 1650/300KW - 690/50 R7035 Wind turbine serial no: 12801 Location: Middenmeer Hub height: 78 Total production [kwh]: 15530918 Total hours: 2306 Nominal power [kw]: 1650 Year of installation: 2002 Date of inspection: 26-10-2015 Inspectors: P. den Braber D. Lagerweij B. van de Braak J. Langenbach Gearbox Information Gearbox type: Winergy PEAS 4395 i = 78,659 Gearbox serial number: 4835501-0020 - 1 Production year gearbox: 2010 Revision: - Revision number: - Oil type: Texaco Meropa 320 Date of last oil change: Gearbox exchange date Gearbox has been exchanged on 22-12-2011 Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 3 of 17

3. Reporting setup The next drawing shows a cross-section of a planetary gearbox with two linear stages with corresponding bearing positions. The drawing should be used as a reference for the bearing position only. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 4 of 17

4. Inspection results Picture 1 Picture 1 shows bearing position no. 1, the bearing of the planet carrier at rotor side. No irregularities. Picture 2 Picture 2 shows the bearing of the first planet wheel. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 5 of 17

Picture 3 Picture 3 shows the bearing of the second planet wheel. No irregularities. Picture 4 Picture 4 shows the bearing of the third planet wheel. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 6 of 17

Picture 5 Picture 5 shows bearing position no. 5, the bearing of the planet carrier at generator side. The bearing shows no irregularities. Picture 6 Picture 6 shows bearing position no. 6, the bearing of the low speed shaft at rotor side. The bearing shows no irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 7 of 17

Picture 7 Picture 7 shows bearing position no. 7, the bearing of the low speed shaft at generator side. The bearing shows no irregularities. Picture 8 Picture 8 shows bearing position no. 8, the bearing of the intermediate shaft at rotor side. The bearing shows no irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 8 of 17

Picture 9 Picture 9 shows bearing position no. 9, the bearing of the intermediate shaft at generator side. The bearing shows no irregularities. Picture 10 Picture 10 shows bearing position no. 10, the bearing of the high speed shaft at rotor side. The bearing shows no irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 9 of 17

Picture 11 Picture 11 shows bearing position no. 11, the bearing of the high speed shaft at generator side. The bearing shows no irregularities. Picture 12 Picture 12 shows bearing position no. 12, the bearing of the auxiliary high speed shaft at rotor side. The bearing shows no irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 10 of 17

Picture 13 Picture 13 shows bearing position no. 13, the bearing of the auxiliary high speed shaft at generator side. The bearing shows no irregularities. Picture 14 Picture 14 shows the active flank of the ring gear. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 11 of 17

Picture 15 Picture 15 shows one of the planet wheels. None of the planet wheels show irregularities. Picture 16 Picture 16 shows the active flanks of the sun pinion. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 12 of 17

Picture 17 Picture 17 shows the active flanks of the wheel of the low speed shaft in the linear stage. No irregularities. Picture 18 Picture 18 shows the active flanks of the pinion of the intermediate shaft in the linear stage. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 13 of 17

Picture 19 Picture 19 shows the active flanks of the wheel of the intermediate shaft in the linear stage. No irregularities. Picture 20 Picture 20 shows the active flanks of the pinion of the high speed shaft in the linear stage. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 14 of 17

Picture 21 Picture 21 shows the active flanks of the wheel of the high speed shaft in the linear stage. No irregularities. Picture 22 Picture 22 shows the active flanks of the wheel of the auxiliary high speed shaft in the linear stage. No irregularities. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 15 of 17

Picture 23 shows the oil level of the gearbox. Picture 23 Picture 24 Picture 24 shows the magnet of the gearbox. No steel particles are visible on the magnet. Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 16 of 17

5. Summary The visual inspection of the gearbox shows no signs of severe pitting, major damages or extreme wear. There are no steel particles found on the magnet. 6. Conclusion The gearbox is in an acceptable condition. Dennis Lagerweij Barneveld, 13-11-2015 TeSuCon B.V. Mercuriusweg 8 3771NC Barneveld The Netherlands Tel +31610032858 Email dl@tesucon.nl Web www.tesucon.nl Gearbox inspection Oudelandertocht 11 WTG 12801 Date: 13-11-2015 Page 17 of 17