MOR/ryde Drive Axle Suspension System

Similar documents
Super Duty Front Air Bag Installation Instructions

Toyota Tundra Tow Kit Installation Instructions

Dodge Ram 2500/3500 Tow Kit Installation Instructions

720BAG GM 2 FRONT & 4 REAR LOWERING KIT

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

COMPETITION ENGINEERING. 80 Carter Drive P.O. Box 1470 Guilford, CT Phone: (203) Fax: (203)

CHECK ALL PARTS INCLUDED IN THIS KIT TO THE PARTS LIST BEFORE INSTALLATION. IF ANY PIECES ARE MISSING, PLEASE CONTACT: TOTAL COST INVOLVED

GM HD Heavy Duty 4 Link Tow Kit Installation Instructions

INSTALLATION INSTRUCTIONS

99-04 Ford F250 Super Duty 4-6 Suspension Kit

INSTALLATION INSTRUCTIONS

A. Tools Needed:

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

& 6 XJ CHEROKEE LONG ARM KIT

8" 4-LINK SUSPENSION SYSTEM. Ford Super Duty 4WD Part#:

4 & 6 4-Link Suspension Systems. Ford Super Duty 4WD Part#: ,

COMPETITION ENGINEERING. 80 Carter Drive P.O. Box 1470 Guilford, CT Phone: (203) Fax: (203)

INSTALLATION INSTRUCTIONS P/N: C2094 SLIDE-A-LINK

INSTALLATION INSTRUCTIONS

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

For Technical Assistance, call Competition Engineering's Tech Line at (203) , 8:30am-5:00pm Eastern Time COMPETITION ENGINEERING

Before beginning this installation read the instruction sheet thoroughly. Check that all parts on parts list are present.

Nissan Frontier 2wd/4wd 2.5 Suspension Kit

Installation Instructions

ReadyLift (Part# ) Ford F-350 4WD Leveling Kit Installation Instructions

WD DODGE SUSPENSION LIFT KIT P/N

INSTALLATION INSTRUCTIONS FOR M.O.R.E. SHACKLE REVERSAL SYSTEM (S.R.S. ) PART # THIS SYSTEM FITS Jeep CJ-5, CJ-7, CJ-8 VEHICLES.

4, 6 Suspension System. Ford F250/350 4WD Part#: ,

INSTALLATION INSTRUCTIONS QA1 P/N R , R , R R , R , R F100 Rear Coil-over Conversion System

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

05-07 F250 6 SUSPENSION KIT

Read and understand all instructions and warnings prior to installation of system and operation of vehicle.

»Product» Safety Warning

INSTALLATION INSTRUCTIONS

99-04 Ford F250 Super Duty 4-6 Suspension Kit

LRE SUSPENSION SYSTEM OWNER S MANUAL

37-39 TCI Chevy Rear 4-Link Kit Installation Instructions

NOTICE TO DEALER AND VECHICLE OWNER

WARNING DO NOT EXCEED THE MANUFACTURER S RECOMMENDED GROSS VEHICLE WEIGHT RATING (GVWR).

INSTALLATION INSTRUCTIONS P/N S: C2091 & C2093 SLIDE-A-LINK

»Product» Safety Warning

PRE-INSTALLATION. INSTALLATION INSTRUCTIONS Front Dodge Ram WD 6" Suspension Lift Kit

This suspension system was developed using a Maximum tire size of 33 X 12.5 with a 17 x 9 aftermarket wheel with 4 1/2-5 backspacing..

02-10 GM 2500HD / HD & HD CLASSIC 6 2WD SUSPENSION KIT

HP10033 KIT. * See application guide for proper fitment.

K20 4x4 Radius Arm Conversion Installation Instructions

05-07 F250 6 SUSPENSION KIT

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

INSTALLATION INSTRUCTION 88578

INSTALLATION INSTRUCTIONS CHEVY C-10 4-Link Rear End

2015+ Ford F-150 Off-Road Exhaust Kit

Installation Instructions

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions

»Product» Safety Warning

INSTALLATION INSTRUCTIONS FOR FORD 4WD SUPER DUTY F COIL SPRING SUSPENSION SYSTEM

Technical Support Line: (952) Hanover Ave. Lakeville, MN

Joy Rider Shock System Installation

08-10 F SUSPENSION KIT

09-12 Dodge 4WD Leveling Kit

LIFT Drop Spindle Lift Kit E-Z-Go RXV Gas or Electric Installation Instructions

INSTALLATION INSTRUCTIONS FOR PLEASE READ AND UNDERSTAND TERMS/POLICIES BEFORE YOU INSTALL THIS SYSTEM

»Product» Safety Warning

XJ CHEROKEE LIFT KIT

Installation Instructions

C-10 Rear 4Link

GM Street Scraper Instructions

07-UP AVALANCHE 7.5 KIT

INSTALLATION INSTRUCTIONS FOR FORD 4WD SUPER DUTY F /2 COIL SPRING SUSPENSION SYSTEM

A i r R i d e C o n v e r s i o n S y s t e m I n s t a l l a t i o n I n s t r u c t i o n s. kelderman air ride

08-10 F OR 6 SUSPENSION KIT

NOTICE TO DEALER AND VEHICLE OWNER

»Product» Safety Warning

Installation Instructions

Installation Instructions

08-09 F250 8 SUSPENSION KIT

Ford Super Duty Recoil Traction Bar System. Part#: ,123409

05-07 F250 8 SUSPENSION KIT

09-12 Dodge 4WD /4 Body Lift

PRE-INSTALLATION Ford F150 4WD 4" Suspension Lift Kit

INSTALLATION INSTRUCTION 88148

*1234BAG1 1234BAG WD CHEVY/GM LIFT N200

»Product» Safety Warning

ReadyLift (Part# ) Lift Kit, Installation Instructions Toyota Tundra New Body Style 2WD & 4WD

INSTALLATION INSTRUCTIONS 89551

FRONT & 4 REAR GM WD LOWERING KIT

XJ CHEROKEE LIFT KIT

CLAYTON OFF ROAD COR JEEP GRAND CHEROKEE LONG ARM UPGRADE KIT ( WJ)

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

INSTALLATION INSTRUCTIONS

2013-UP 3500 Dodge 5 Lift Kit SRW

INSTALLATION INSTRUCTIONS

07 & UP 4WD GM FRT 1.5 REAR LIFT KIT

2011-UP CHEVY/GM 2500HD 2WD/4WD 5 NTD LIFT KIT

»Product» Safety Warning

4WD RANGER/BRONCO II WD EXPLORER CLASS II INSTALLATION INSTRUCTIONS

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

»Product» Safety Warning

Transcription:

MOR/ryde Drive Axle Suspension System (Double Eye Leaf Spring) RL Installation Instructions MOR/ryde International 1966 Moyer Avenue Elkhart, IN 46516 574-293-1851 www.morryde.com RL153-003 Rev.1

MOR/ryde RL Installation Instructions Instructions will assume procedures apply to both sides of vehicle. TYPICAL RL DRIVE AXLE SUSPENSION KIT U.S.A. Patent Number 6,176,478 Required Tools for Installation of MOR/ryde RL Suspension Kit *Floor Jack *Safety Stands Socket Set 9/16 Swivel Socket Wrench Set Cutting Torch Hand Drill 1/2 Drill Bit **Reciprocating Saw **Wire Welder Pneumatic Air Chisel Screwdriver Drift Pin MOR/ryde Installation Tool or Large C-Clamp (6 min.), Porta-Power, Small Pipe Clamp * Check for Adequate Capacity. It must support the weight of the rear of the vehicle. ** May be Required for Tailpipe Modifications Torque Chart Foot-LBS +/- 10% Bolt Size Grade 5 Grade 8 1/4-20 5/16-18 3/8-16 7/16-14 1/2-13 5/8-11 5/8-18 7 14 25 40 60 115 125 10 20 35 55 90 170 185 3/4-10 190 280 2

Place floor jack under differential and raise drive axle tires to approximately 6 off the ground. Step 1 Place jack stands underneath OEM frame and release floor jack. Drive axle tires should be approximately 1 off ground. Be sure jack stands and floor jacks have sufficient capacity to safely support vehicle. Step 2 The exhaust pipe can not be closer than 1 from metal parts and no closer than 2 from the rubber parts of the MOR/ryde system. If alteration of the exhaust is expected, cut exhaust just behind the drive axle leaving 1-1/2 of straight flat pipe. The exhaust will be rejoined at a later time. If no exhaust alteration is expected go to Step 4. Step 3 To facilitate installation one may want to remove the spare tire or fuel tank. Remove rear spring eye shackle nut and bolt. If possible, raise drive axle and remove shackle nut and bolt over top of frame. If spring hanger is above leaf spring eye, lower leaf spring to remove spring eye bolt. Note: Save spring eye nut and bolt for use later. Step 4 3

If the OEM spring hanger is riveted onto the frame, remove the rivets with an air chisel or a cutting torch (usually 4-8 rivets). If the hanger is bolted on, remove it with the appropriate tools. DANGER: Gasoline is very flammable. Be sure that the fuel cell, fuel lines and wire harnesses are adequatley protected from sparks. Step 5 If the shackle was not removed in step 4, lower the spring eye below the frame and remove the shakel bolt and nut. Step 6 With the approriate drill bit (see parts list), ream the existing spring hanger hole to be sure that the hole is clear of any debris. These holes will be used to bolt the MOR/ryde frame hanger to the OEM chassis. Step 7 Frame and leaf spring are now ready for installation of MOR/ryde components. Step 8 4

Step 9 MOR/ryde spring carrier Carefully inspect the MOR/ryde spring carrier assemblies for an offset spring plate. If an offset is observed, position the largest offset away from the OEM frame rail. Refer to the diagram below. This will achieve the greatest clearance between the spring plate and the OEM frame rail. Re-use the spring eye nut and bolt to install the MOR/ryde spring carrier, except on the Ford E350 & E450 chassis.* The bolt head must be installed towards the OEM frame rail. OEM frame rail. Offset side Bolt the MOR/ryde frame hanger to the chassis frame through the existing holes that were reamed in step 7. Use the mounting hardware provided by MOR/ryde. The fuel cell may need to be lowered to install the frame hanger nuts. A long handled socket wrench and mechanical fingers may be helpful. The nuts must be installed on the inside of the chassis frame. Do Not tighten the nuts at this time. Step 10 If your kit is equipped with a cross member, install the MOR/ryde cross member between the frame hangers with the bolts provided. Tighten the frame hanger and cross member bolts at this time. Note the torque requirements on page two. Step 11 5

Bolt the MOR/ryde Rubber Spring Assembly to the Frame Hanger using hardware as provided. Note three ride height options on the Frame Hanger, a lower hole setting will raise the vehicle. A top hole setting will lower the vehicle. Step 12 Using a bottle jack, position jack head under MOR/ ryde Rubber Spring Assembly. Step 13 Raise Rubber Spring to align holes through Spring Carrier. Drift pins can be used to aid in aligning the holes. Step 14 Bolt Rubber Spring Assembly to Spring Carrier using hardware as provided. Step 15 6

a ppl yt hes ugge s t e dt or quea ss hownont he

Remove Installation Tool. Be sure Spacer Sleeve/ Pad is flat against leaf spring at normal vehicle weight. Check this after unit is sitting on ground. If required, rotate Spacer Sleeve/Pad to bear flat against leaf spring. Be sure bolt head faces towards frame. Go to step 22. Step 19 C-Clanp Method Position C-clamp between lower portion of Spring Carrier and Frame Hanger as shown. Tighten C- clamp until nose of Spring Carrier is positioned under leaf spring. Install 1/2 bolt and Spacer Sleeve/Pad between legs os Spring Carrier. Be sure bolt head faces towards frame. Step 20 Porta-Power Method Position Porta-Power between lower portion of MOR/ryde Spring Carrier and rear of axle. Pump Porta-Power until nose of Spring Carrier drops below the leaf spring. Install 1/2 bolt and Spacer Sleeve/Pad between legs of Spring Carrier. Be sure bolt head faces towards frame. Step 21 Tighten spring eye bolt. Repeat procedure on opposite side. FINAL HARDWARE CHECK: Be sure all bolts are torqued to spec. If fuel cell was lowered, check hoses and electrical connections. Step 22 8

Step 23 The closest edge of the exhaust pipe to the MOR/ryde Rubber Spring should be a 2 minimum clearance and 1 minimum clearance to steel components. Other options for exhaust and tailpipe termination may be: 1 In front of drive axle, 2 behind Frame Hanger or 3 out the back of the vehicle. Be sure when altering exhaust that the joints are gas tight. Accepable methods may be to weld seams and/or exhaust pipe joint clamps. WARNING: The exhaust pipe must not touch or blow on the MOR/ryde rubber spring. Doing so could cause premature failure of the rubber spring. Perform final check. Be sure all nuts and bolts are properly torqued. Refer to the chart on page 2. Verify spring eye bolt is positioned with bolt head toward the frame. Step 24 9