H. J. Arnett Industries, LLC SW Avery Court Tualatin, OR 97062

Similar documents
2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00

Thunder Power Tarp Kit Operation. Dual Arm Curb Side Stowing Single Arm Curb Side Stowing Flex Arm Curb Side Stowing.

MODEL No s: PP3, PP3K

with lcd display 12-42v

ELECTRICIAN S THEORY EXAMINATION 11 September 2010 QUESTION AND ANSWER BOOKLET

MODEL MAS BAR TO BAR TESTER INSTRUCTIONS

Date: Technical Overview of Power Requirements for Hot Runner Control Systems

ALL PURPOSE CNC/HEAVY DUTY

Transformer Protection

POWERLINE 2000 Energy Management System TM

Rental Industry Safety Tester Safe Check 5s

Thunder Power Tarp Kit Operation Guide

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

Thunder Power Tarp Kit Operation

BREAK-SAFE Load Break & Pick-up Tool

Customer Requirements Downtown Secondary Network Service

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

Smart Switch with External Switch - 12 volt - ( )

Pretest Module 24 Three-phase Service Entrance

P80074 (150 amp connectors) P80071 (300 amp connectors)

Automated Control Electronics (ACE ) System Operation and Diagnostics

Quick Start Guide TS 910

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

Electrical Safety. Introduction

ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET

ALTERNATOR - CHRYSLER 40/90-AMP & 50/120 AMP

INSTALLATION MANUAL SPECTRUM BRAKE CONTROL

Quick Start Guide TS 910 & TS 920

ELECTRICAL SYSTEM RP-7

The function of this Dynamic Active Probe has divided into three preferences on the screen main Menus:

Electromagnetic Industries LLP

HYDRAULIC LEVELING SYSTEMS OPERATIONS MANUAL

ENGINE GOVERNING SYSTEMS LSM672 LOAD SHARING MODULE. GOVERNORS AMERICA CORP. 720 Silver Street Agawam, MA , USA MEMBER

Utilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications

9.17, 9.17si Treadmill

10 Commercial, Industrial, Agricultural Services

PAGE Both power cords must be connected & powered to operate the E-TES SD 120 volt unit.

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

English - Español - Français - Deutsch - Italiano

Automatic taper of charge rate for superior battery life through good equalization of cells and low water use rate.

LED Downlight Ceiling Fixtures

Cutler-Hammer. Installation Instructions for the Digitrip OPTIM Pole Trip Unit Installation and Operation with L-Frame Series C Circuit Breakers

Service Entrance Methods

ADVANCED ELECTRONIC ACCELEROMETER TRAILER BRAKE CONTROL

ELECTRICAL INSTALLER THEORY EXAMINATION 21 June 2014 QUESTION AND ANSWER BOOKLET

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

KD LV Motor Protection Relay

HYDRAULIC LEVELING SYSTEMS OPERATIONS MANUAL (For systems with touch pad part number , , , , or no number at all)

Installation Manual. LHS & LLBS Hide-A-Way Tuckunder Style

INSTRUCTION MANUAL PORTABLE APPLIANCE TESTER

www. ElectricalPartManuals. com Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers

30A SMART ENERGY MANAGEMENT SYSTEM TM

PAGE Both power cords must be connected & powered to operate the E-TES 120.

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

Manufacturing & Service: Bierer & Associates Inc. Patent No. 6,885,180. ST Series Service Tester Phase Identifier Operating Instructions ST500PGN

This chapter contains information on DC Generation, External Power, and Electrical Load Distribution.

24-00 ELECTRICAL POWER

Service Installation

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

SECTION MOTOR CONTROL

Section 55 Chapter 6

ELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET

TrailerTail does not open at all (one or both sides) TrailerTail does not latch closed... 5

1 This instrument must only be used by a competent and trained person and operated in strict accordance with the instructions.

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents.

Renewable Energy Systems 14

DISCONTINUED. OPERATORS MANUAL for SEMI AUTOMATIC RV SYSTEM. 82 L Rev. 0 September 3, Comment [KO1]:

Batteries n Bulbs: Voltage, Current and Resistance (8/6/15) (approx. 2h)

Controls Manual Standard 1 Fan Control Panel

GCU-10. Automatic Engine Control Unit Operators Manual

Service Manual Gulf Stream Electronic Full Wall Slide Systems

GENESIS Electronic Brake Controller Hayes Brake Controller Company - P/N 81790

INTRODUCTION PRELIMINARY DIAGNOSIS

BREAK-SAFE Load Break & Pick-up Tool

Fault Code 34 - Weak Battery Voltage Supply

SE-125 MANUAL GROUND-FAULT GROUND-CHECK MONITOR

Building Operator Certification Level I

Operators Guide: RoboSign Stop/Go Traffic Control System

Change the and later A/C & Heat system on the Discovery coach With the multi-zone coleman mach thermostat

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Electrical Design/Build Guide

12/24 Volt Trailer, Caravan Electrical Tow Plug And Light Tester

Warm Tiles Troubleshooting. Al & Jed

Figure 1. Two and Three-phase MagneX.

Approved Meter Sockets and Cabinets

Exercise 1-1. Lockout/Tagout Procedure EXERCISE OBJECTIVE DISCUSSION. Become familiar with the Industrial Controls Training System.

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

2 SLR Series Line Reactors... 50

1995 Honda Accord LX. ANTI-LOCK BRAKE SYSTEM' ' BRAKES Honda - Anti-Lock

Battery Beak User Manual

Electronic Refrigerator Diagnostics

C960, C962, C964 Treadmill

Phenix Technologies Inc. 75 Speicher Drive Accident, Maryland 21520

MAGNAMAX DVR DIGITAL VOLTAGE REGULATOR

Derailment Detector Assembly

Model (Circuit Tester) Model (GFCI Tester)

Model Railway Reverse Loops How to automate reversing tracks on your two-rail layout, whether DC, DCC or AC powered

ITS-50R TRANSFER SWITCH OWNER S MANUAL

Transcription:

H. J. Arnett Industries, LLC 20460 SW Avery Court Tualatin, OR 97062 Phone: 503-692-4600 Fax: 503-692-4661 Toll free: 800-684-9844 Web address: www.arnettindustries.com USE OF THE MEGA BEAST SERVICE CONDUCTOR TESTER (HJA-900-D) 1.0 GENERAL This work method describes the use of the Mega Beast Service Conductor Tester by H.J. Arnett Industries. The Mega Beast is a conductor tester used to apply up to 80 amps (in 20 amp increments) on 120/240 volt service to determine if one or both of the conductors are open (or partially open), as well as verifying the condition of the neutral conductor. There are many reasons why a service may not be providing maximum voltage to the customer including a faulted cable, loose connection or some other resistive condition. The Mega Beast is a self-contained, fully portable device which can be used to load transformers and service conductors for diagnostic testing. 2.0 HOW THE MEGA BEAST WORKS (from the Mega Beast Service Conductor Tester manual) 2.1 For each position of the burden switch (left, center, right) different readings appear on the meters based on the condition of the conductors. The selected meter may drop (usually only a couple of volts for conductors in good condition) due to the load being put on the transformer. The Mega Beast will read as below when connected to good service conductors. Switch Position Load Left Right

(Burden) Centre OFF 120 volts 120 volts Left ON 120 volts 120 volts Right ON 120 volts 120 volts The Mega Beast will read as below when connected to an open neutral. Switch Position Load (Burden) Left Right Centre OFF 120 volts 120 volts Left OFF 0 volts 240 volts Right OFF 240 volts 0 volts The Mega Beast will read as below when connected to an open hot service conductor. Switch Position Load (Burden) Left Right Open Right Conductor Centre OFF 120 volts 0 volts Left ON 120 volts 0 volts Right OFF 120 volts 0 volts Open Left Conductor Centre OFF 0 volts 120 volts Left OFF 0 volts 120 volts Right ON 0 volts 120 volts 3.0 OPERATION (from the Mega Beast Service Conductor Tester manual) NOTE: Ensure the 100A breaker on the MEGA Beast is in the OFF position and all 4 toggle switches are OFF before connecting any leads. 3.1 Remove the KWH meter. Always wear your personal protective equipment (PPE) and follow Standard Work Method SWM 5.10 and 5.11. If the meter base is deteriorated and meter cannot be removed safely, then the first test can be made at the weather head on the meter side of the service connections 3.2 Inspect the meter base for loose connections or any other observable problems. With the Mega Beast 100 amp breaker in the off position (de-energized), connect the alligator clips. First connect Green to neutral, then Black on left and Red on right. 3.3 Switch the 100 amp breaker on the Mega Beast ON. The voltages between each hot wire and the neutral will be displayed on the meters. 3.4 Turn the burden switch to the LEFT position. Start by turning one 20 amp load toggle switch ON (does not matter which one of the four is used). Sequentially turn ON additional 20 amp load toggle switches and record each step in Appendix A. 3.5 Turn OFF all toggle switches and repeat with the burden switch in the RIGHT position.

3.6 Compare recorded readings (for burden switch in LEFT position) with the table below for analysis of results. Readings will not be exactly as shown. 110 V to 125 V Normal range 106 V to 110 V and 125 V to 127 V Extreme operating conditions, improvement work should be taken on a planned basis <106 V or >127 V Outside the extreme range therefore should be escalated to more immediate fix. Left Right Indication 120 120 Left meter reads 120V, so left conductor is good 85 120 Only left meter drops, so left conductor is partially open. If left meter goes blank, left conductor is fully open. 90 150 Left meter drops, right meter increases, so neutral is open. These readings represent a partial open. If left conductor goes blank and the right meter reads 240V, then the neutral is completely open. 3.7 Compare recorded readings (for burden switch in RIGHT position) with the table below for analysis of results. Left Right Indication 120 120 Right meter reads 120V, so right conductor is good 120 85 150 90 3.8 Complete the description of service table at the bottom of Appendix A. 4.0 3-PHASE APPLICATIONS 4.1 The Mega Beast can be used effectively on 120/208 volt 3-phase Wye systems as seen below. 1. Connect clips to neutral, line 1 and line 2. 2. Take readings on Line 1 and Line 2. 3. Move one clip lead from either line 1 or line 2 to line 3. 4. Take readings again. Results can be interpreted the same as for single phase operation. 5.0 CAUTION (from the Mega Beast Service Conductor Tester manual) 5.1 This tool is not to be used on 120/208 volt 3-phase Delta because 208 volts are present between ground and high phase of a typical 3-phase Delta system. 5.2 This tool is NOT to be used on 347/600V systems. Only right meter drops, so right conductor is partially open. If right meter goes blank, right conductor is fully open. Right meter drops, left meter increases, so neutral is open. These readings represent a partial open. If right conductor goes blank and the left meter reads 240V, then the neutral is completely open.

6.0 PIN-POINTING SOURCE OF TROUBLE 6.1 Refer to sketch below to indicate locations at which the Mega Beast is typically installed in sequence in order to pin-point source of trouble (high impedance connection). 1) Begin at Base if possible (if doubtful that meter can be removed safely, then check at meter base side of service connections at location 2 ) 2) If test 1) above gives bad readings, then attempt to locate source of high impedance by moving backwards sequentially until Mega Beast no longer sees the BAD connection. This will typically begin at location 2, on the source side of the service connections. 3) If step 2) also shows the problem, then move to the next set of connections, possibly at location 3) to test, again on the source side of these connectors. 4) Proceed accordingly until you are at the transformer leads themselves for testing. 6.2 Once the location has been determined, then change out all connections at this one location preferably and return to step 1) above to confirm solution.

APPENDIX A Mega Beast Readings: (Table to record your readings, record voltages from digital meters on Mega Beast) Left Right Condition Switch in LEFT position ONE toggle switch ON ( 20A ) TWO toggle switches ON ( 40A ) THREE toggle switches ON ( 60A ) FOUR toggle switches ON ( 80A ) RESET all toggle switches OFF ( 0A ) Switch in RIGHT position ONE toggle switches ON ( 20A ) TWO toggle switches ON ( 40A ) THREE toggle switches ON ( 60A ) FOUR toggle switches ON ( 80A ) RESET all toggle switches OFF ( 0A ) Description of Service: (Table to record a brief description of the service being tested) KVA rating (KVA) Secondary Voltage (V) Distance from Type of Conductor Number of customers on