Short Circuit/Coordination & Arc Flash Study Specifications

Similar documents
NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces. Table Hazard Risk Category Classification

January 30, Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT. Re: NFPA 70E Hazard Assessment. Date of Visit.

TECHNICAL TOPICS UNIVERSITY. General Electrical Safety BEST PRACTICES

take to complete our safety compliance

Application of Sepam Relays for Arc Flash Hazard Reduction at Low Voltage Switchgear

Illinois State University. Electrical Safety Procedure

ARC FLASH MANAGEMENT REVIEW. October 2017

BP-Husky Refinery Toledo, OH

NFPA 70E Electrical Safety in the Work Place. R. Casey 2/1/05

Electrical Safety in Die Casting

BP OIL -- TOLEDO REFINERY

ELECTRICAL PERSONAL PROTECTIVE EQUIPMENT STANDARD

Electrical Safety CSA Z462 & NB Regulations

Safe Working on or near low voltage electrical installations & equipment

Design Considerations to Enhance Safety and Reliability for Service Entrance Switchboards

4-Day Power System Analysis, Coordination, System Studies

The New 2017 National Electric Safety Code Overview and Significant Changes. Presented by. Mickey Gunter October 28, 2016

COOPER POWER SERIES. Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions. Fusing Equipment MN132014EN

Arc Flash Resistant Equipment

8.3kV, 9.9kV, 15.5kV, 17.2kV and 23kV Cooper ELSP Backup Fuses Testing per C

ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy

Advanced Protective Relay Training

Safety Working with LV Drives

2. Panelboards shall have new or updated paper directories printed from the master Excel spreadsheet inserted in the door

Hazards SAFETY CORNER. of Establishing an. Work Condition

SAMPLE. Arc Flash Study ABC CONTENTS. City, State. John D. Aeiker, PE, CSP Consultant

Electrical Safe Work Practices

Arc-Flash Mitigation Technologies. Dennis Balickie

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

NESC 2007 FLAME RESISTANT CLOTHING

AECI Health, Safety & Environmental Procedures. Electrical Safety

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Integrating Roles Within Electric Utilities to Achieve Arc Flash Safety. MIPSYCON Presenters Neil Stiller & Bob Cooke

Arc flash hazard mitigation

Instruction and Installation Guide

Reducing. with Current. arc flash note 2. points of interest. Why Use Current Limiting Fuses. By mike lang, Principal field engineer

120-ELECTRICAL SAFETY PROGRAM

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

Fusing Equipment. Kearney Fuse Links. general. Internal Construction. tin element

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

ENERGIZER BATTERY MANUFACTURING ST. ALBANS, VERMONT

www. ElectricalPartManuals. com Section 13 Switchgear Low Voltage

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

Arc flash solutions catalogue Australia. Safety solutions - Protecting employees and the enterprise

Selective Coordination

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE

600 V Class Switchgear ( with power circuit breakers or fused Opening hinged covers (to expose bare, energized electrical - Note 1. switches) --Note 4

Future Proof Your Arc Flash Assessment

PRO-WEAR ARC FLASH PROTECTION CLOTHING & KITS

SIEMENS. XJ-L Busway Systems. Storage, Installation and Maintenance Instructions for... Piece No. 32-J Rev 3

New 2002 NEC. Arc Flash Hazard Marking Requirement Cooper Bussmann, Inc.

Type 2 Arc Resistant WL Low Voltage Metal-Enclosed Switchgear

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

EV-2051-M Electric Motor. Operation and Maintenance Manual

BUSWAY Low Voltage (Pow-R-Flex)

Switchgear and Distribution Systems for Engineers and Technicians

ESSENTIAL SAFETY RESOURCES

6/4/2017. Advances in technology to address safety. Thomas A. Domitrovich, P.E., LEED AP VP, Technical Sales Eaton

Unrestricted. S.Mukhopadhyay

Kearney fuse links. Technical Data General. Effective December 2013 Supersedes November 2009

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

A. Submit manufacturer's literature and technical data before starting work.

GE Arc Vault TM Protection System. By Mark Clapper GE Specification Engineer. Introduction. What Variables Contribute To An Arcing fault?

Standard Operating Procedure

Electrical Safety Program

UPS Battery Maintenance Training

Industrial Substation Maintenance April $4,250 Abu Dhabi. UAE

Power-Limiting Cables

NEW SERIES OF ETIBREAK EB2 IN VIEW OF SELECTIVITY

Foreword

Q-Frame Main Circuit Breaker (225 A Maximum) and Adapter Kit Installation onto an NQ Panelboard Class 1640

Energized Electrical Work

Effective November 2016 Supersedes September 1998 (S )

Zero Energy Verification An Alternative Approach. Timothy Snow CESCP Electrical Safety Officer

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

What NENS Means for You

Technical Specification. for. Supply, installation and commissioning of Diesel Generators for UNDP

ELECTRICAL GROUNDING SAFETY PROGRAM

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926)

Are the New 2005 NEC Selective Coordination Requirements Causing an Increase in Arc Flash Energies and Reducing Distribution System Reliability?

Not all Low Voltage Switchgear is created equal

Live Line Technology Arc Flash suits

ANALYSIS OF OVERCURRENT PROTECTION RELAY SETTINGS OF A COMMERCIAL BUILDING NURUL SYAQIRAH BINTI MOHD SUFI UNIVERSITI MALAYSIA PAHANG

Kearney fuse links. Technical Data General. Effective March 2014 Supersedes December 2013

Electrical Safety Policy (EHS-0018)

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

Not all Low Voltage Switchgear is created equal

One-Fit,UFES, Reyrolle LM

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives

Reprogramming guide. Power Defense ICCB. Instructional Leaflet IL EN WARNING WARNING. Instructions apply to:

COOPER POWER SERIES. ELSG Full-Range Current-Limiting Fuse Re-Fusing Instructions. Fusing Equipment MN132017EN

NXPLUS C Single busbar. Maintenance-free for lifetime

High Voltage Electrical Maintenance Training

Actsafe Safety Bulletin #23 WORKING WITH LIGHTING SYSTEMS AND OTHER ELECTRICAL EQUIPMENT

Agenda / ESPS Electrical Safety Program Solutions INC.

Companion II 8.3kV, 17.2kV and 23kV 12K - 40K Backup Fuses

Transcription:

Delphi Short Circuit/Coordination & Arc Flash Study Specifications April 28, 2005

Short Circuit/Coordination & Arc Flash Specification Table of Contents I. General Overview 3 II. Engineering Firm Requirements.. 4 A. Short Circuit/Coordination & Arc Flash Study B. Documentation C. Training III. SKM Study Option Section Requirements. 5 IV. Preferred One-Line Drawing Color Coding 6 V. Personnel Protective Equipment Clothing Requirement 7 VI. Delphi Warning and Danger Label Requirements. 8 2

I. General Overview This specification provides the requirements for engineering firms performing short circuit/coordination & arc flash studies for Delphi Facilities. This specification outlines the requirements for documentation, training, study option section in the SKM software, preferred one-line drawing color-coding, personal protective equipment (PPE) and Delphi warning and danger labels. The short circuit/coordination and arc flash study software used for the Delphi Facilities will be the SKM Power Tools -current version. In the study option section of the SKM software, Delphi will select the IEEE 1584 Standard. This is the preferred method throughout the industry and is considered more accurate due to the extensive testing performed while creating this standard. Delphi Personnel It is imperative Delphi plant personnel be involved in reviewing the study so they understand the areas that need to be addressed. They need to understand the areas that are labeled Dangerous and the Safe Operating Procedures (SOP) required for work to be performed in these areas. Full cooperation and participation in reviewing this study will benefit the site as well as the safety of all plant personnel. Delphi Personnel that should attend this review include the following: Electrical Facility Engineers Controls Engineers Safety Personnel Site Manager Supervisors Maintenance, Engineering, etc. Electricians Group Leaders Union Representatives Delphi representative must approve any deviation from this specification. 3

II. Engineering Firm Requirements A. Short Circuit/Coordination & Arc Flash Study: - A licensed/registered Engineer with 5 years minimum experience in power system studies - Software model shall be developed starting with the incoming utility down through the 480V substations. The model shall include the plug-in bus duct system in the production areas. All facilities equipment, such as motor control centers, feeder breakers and air-handling equipment shall be included. - It will be determined by the Delphi representative if additional equipment should be modeled and any if not all equipment on the plant floor. - Where feasible, system drawings and existing protective devices and setting records shall be furnished by the Delphi representative. These items shall be distributed to the engineering firm with the understanding they will be responsible to verify existing conditions of the protective device settings. - The study shall include the latest utility fault contribution from all sources and be evaluated for normal and alternate sources when applicable - A complete coordination review of all relevant substations shall be performed for As Found over-current device settings - A complete coordination review of all relevant substations shall be performed for As Recommended over-current device settings - An arc flash evaluation shall be performed and provided for the As Found and As Recommended settings B. Documentation: - Engineering firm shall be responsible to present an oral technical report to the site upon completion of the work. - All the information provided from the study will be issued on a CD unless otherwise directed by the Delphi representative. - The Delphi representative shall determine the number of hard copies for their site. C. Training - Should the Delphi representative elect to contract training services for the SKM software or if training is provided by the engineering firm the following guidelines should be followed. The training should not cover how to model an entire facility but include some of the following items: Modeling production equipment on the floor Moving equipment from one bus to another Changes to breaker settings impact on the incident energy level and coordination when breaker settings are changed Time Current Curves (TCC) introduction to coordination when reviewing the curves 4

III. SKM Study Option Section Requirements The following parameters in the Study Option Section provided in the SKM software shall be used for all short circuit/coordination and arc flash studies for Delphi Facilities. SKM Software Study Option Section: 5

IV. Preferred One-Line Drawing Color Coding The Delphi representative shall determine if they prefer to color code the one-line drawing based on the Hazard Risk Category. Color Coding for One-Line Drawings preferred: HRC 0 Green HRC 1 Blue HRC 2 - Magenta HRC 3 & 4 Red Example of One-Line Drawing Color-Coding: 6

V. Personal Protective Equipment Clothing Requirements (PPE) The chart below provides the PPE requirements for all Delphi facilities. Hazard Risk Incident Energy Level Clothing Description Category cal/cm 0 <1.2 Untreated Cotton* 1 1.2 to 4 FR Shirt & Pants + Hard Hat 2 4 to 8 Cotton Underwear + FR Shirt & Pant + Hard Hat + Face Shield + Leather Shoes Required 3 8 to 25 Cotton Underwear + FR Shirt & Pant + Double Layer Switching Suit + Hard Hat + Flash Hood + Leather Shoes Required 4 25 to 40 Cotton Underwear + FR Shirt & Pant + Double Layer Switching Suit + Hard Hat + Flash Hood + Leather Shoes Required * Because most Delphi Sites are wearing Class 2 clothing as normal daily wear, they are changing the clothing description for Class 0 to FR Shirt & Pant. Delphi representatives may opt to change the Class 0 clothing description to FR Shirt & Pant. 7

VI. Delphi Warning and Danger Label Requirements The Delphi representative will determine if the engineering firm is to provide labels for the facility. This may include or may not include placing labels on the equipment. Delphi requirement for labeling shall be as follows: Label size for Warning and Danger - Width 4.5 inches X Height 6.5 inches If labels are hung from the bus the spacing will be 40 feet (Same as piping standard) Delphi has created a blanket with the Brady Corporation to provide the following Pre-printed warning and danger label using laser material Sealable pouches to hang the label from the bus Generic label plant floor Brady Thermal Transfer Printer kit for pre-printed warning and danger labels Delphi will provide the file for the custom labels created on the SKM software if requested by the engineering firm so they can print directly from the SKM software. The following custom label file provides the following: Pre-Printed Warning Label Pre-Printed Danger Label Complete Warning Label Complete Danger Label Color-coding labels based on the hazard risk category will not be allowed. The Delphi representative must approve any deviation from this labeling requirement. Example of Delphi Warning and Danger Label: 8