INDONESIA GAS RESERVES NAD 6,93 NATUNA SUMATERA UTARA 1,22 50,48 KALIMANTAN SUMATERA TENGAH 8,06 14,63 PAPUA SUMATERA SELATAN 18,30 JAWA BARAT 3,18 JAWA TIMUR 5,89 2,58 SULAWESI MALUKU 15,21 23,90 CADANGAN GAS BUMI ( TSCF ) TERBUKTI Proven : 101.54 = 101,54 TSCF TSCF POTENSIAL Potential : = 48.85 48,85 TSCF TSCF TOTAL TOTAL : 150.39 = 150,39 TSCF TSCF 2 2
PERTAMINA 1.031 BSCFD NATURAL GAS PRODUCTION AND UTILIZATION KPS 7.099 BSCFD PROD 8.130 BSCFD DOMESTIC 47.6 % MMSCFD (%) DOMESTIC FERT ILIZER 618.2 7.6 REFINERY 94.1 1.2 PET ROCHEMICAL 62.4 0.8 CONDENSAT E 12.3 0.2 LPG 73.0 0.9 PGN 694.3 8.5 PLN 830.0 10.2 KRAKATAU STEEL 43.9 0.5 OTHER INDUSTRIES* 682.9 8.4 CITY GAS 0.20 0.0 DOMESTIC LNG 160.60 2.0 SPBG/BBG 3.00 0.0 OWN USED 595.7 7.3 SUB TOTAL DOMESTIC 3,870.6 47.6 EXPORT 44.4 % EXPORT LNG REFINERY FEED 2,691.5 33.1 LPG - 0.0 PIPELINE GAS 918.3 11.3 SUB TOTAL EXPORT 3,609.7 44.4 *) KKKS distribution to industries in addition to PGN s conumers **) Status up to 2013 LOSSES 650.1 8.0 T O T A L 8,130.4 100 3
DOWNSTREAM GAS BUSINESS STRUCTURE PRE DEREGULATION Monopoly Era POST DEREGULATION Clear, Transparent and Competitive Regulator / Player Government Pertamina P G N Business Deregulation POLICY MAKER REGULATOR Government BPH Migas Pertamina PGN PLAYERS Player A Player B Player C 5
BPH MIGAS S REGULATIONS 1 Ensuring the availability of natural gas in Indonesia; 2 Setting Transportation Tariffs for Natural Gas which is transported through Pipelines; 3 Setting the price of Natural Gas for Households and for Small Scale Customers; 4 Conducting tenders to decide which companies will be awarded Special Rights to construct and operate both transmission and distribution gas pipelines; 5 Ensuring there is Open Access in gas transportation pipelines. 6
Open Acces Documents 1 Access Arrangement : Is a document which is made by Transporter, containing the term and conditions that must be followed in joint utilization of pipeline controled and operated by Transporter, which shall effectively bind Transporter and Shippers after having been approved and legalized by BPH Migas 2 GTA (Gas Transportation Agreement) 7
Access Arrangement Document 1 2 3 4 Rights and Obligations of Transporter & Shippers : - Right to use pipeline, pay & recieve toll fee Gas Management System (GMS) : - Gas stock, allocation, atribution, transfer swap, reporting Rules Related to Technical Aspects : - PVT, Access Capacity Compositions & Specification Rules Related to Legals aspect : - arbitrations, force majeure, etc 8
9
Peta Ruas Transmisi NAD 14-2 km, T= 0.02 14-6 km, T= 0.04 8-13.5 km T= 0.14 AAF PIM POINT B KKA
Peta Ruas Transmisi Sumatera Utara PANGKALAN BATU 8-6.5 km, T= 0.07 PANGKALAN SUSU 14-6.5 km, T= 0.08 PANGKALAN BRANDAN 18-51.6 km, T= 0.61 WAMPU 12-51.6 km, T= 0.61 WAMPU MEDAN MEDAN
Peta Ruas Transmisi Sumatera Selatan PALEMBANG 22 17.05 km, T=0.03 PUSRI 14 23 km, T= 0.06 TERAS RAMBUTAN 16 20.20 km, T=0.05 BENAKAT BETUNG LIMAU TIMUR BENUANG 20 42.3 km, T=0.19 12 28.6 km, T=0.24 14 28.6 km, T=0.17 20 58.31 km, T=0.20 20 58.31 km, T= 0.27 24 10.10 km, T=0.11 CAMBAI PRABUMULIH 12 8.13 km, T= 0.06 12 8.3 km,t=0.06 12 10.10 km, T=0.11 SIMPANG Y LEMBAK 14 50 km, T=0.14 PULAU LAYANG 24-18.61 km, T=0.03 14 58.31 km, T=0.22 BERINGIN 10 27.5 km 10,T=0.15 27.5 km, T= 0.15
Peta Ruas Transmisi Jawa Barat 8 32 km T=0.44 CILEGON 12 18 km 0.15 24 74 km, T=0.30 BITUNG 24 51 km, T=0.07 NAGRAK 24 27 km, T=0.15 24 21 km, T=0.05 32 45 km, T=0.16 TEGALGEDE 24 45 km, T=0.15 CITARIK CILAMAYA DAWUAN 14 59 km, T=0.59 KHT 18 21 km, T=0.05 18 59 km, T=0.73 BALONGAN MUNDU SUNYARAGI 18 7 km, T=0.03 14 34 km T=0.39
Peta Ruas Transmisi Jawa Timur PKG 10 4.65 km, T=0.05 PLN PAGERUNGAN ISLAND GRESIK SURABAYA 24 3.42 km, T=0.02 28 369.7 km, T=0.59 PORONG 28 52.63 km, T=0.20 GRESIK PKG
Peta Ruas Transmisi Kalimantan Timur 16 13 km, T = 0.05 16 39.7 km, T = 0.15 KM 53 KM 29 20 13 km, T = 0.11 BONTANG TANJUNG SANTAN 16 3.2 km,t = 0.14
Natural Gas Pipeline on Process of Development Section Length (km) Diameter (inch) Developed by Description Gundih Semarang 140 20 PT Sumber Petrindo Perkasa On progress comissioning Arun Belawan KEK Medan 480 24 PT Pertamina Gas On progress construction Pemping - Batam 13.5 16 PT PLN Batam PT UBE On progress construction Porong - Grati 56 18 PT Pertamina Gas On progress construction Kalija I 207 18 PT Kalimantan Jawa Gas Construction preparation Kalija II 1200 36 PT Bakrie & Brothers Tbk Waiting for gas supply Gresik Semarang 260 28 PT Pertamina Gas Construction preparation Cirebon Semarang 230 28 PT Rekayasa Industri Waiting for gas supply Duri Dumai 130 24 PT PGN (Persero)Tbk On progress of land acquisition Muara Karang Muara Tawar Tegal Gede 79 24 PT Pertamina Gas On progress of local governemnt licensing arrangements TOTAL 2795.5 17
DISTRIBUTION AREA (OPEN ACCESS CATEGORY) POTENTIALLY TO BE TENDERED JAMBI (1891 Km) LAMPUNG (2991 Km) SEMARANG (1317 Km) PASURUAN (557 Km) 18
Conclution Legal aspect : follow the rule & regulation. Economical Aspect : Pricing negotiations, take alot of time, minimize time. Permit Aspect; minimize permits. Financing Projects : joint ventures. Unpredictible aspect : political issues, sosials issues, etc, anticipated. 19