Security Is So Square

Similar documents
Penetrator ALTERNATIVE TO CONCRETE FOOTINGS at half the cost* *Based on customer feedback

Traffic Safety Devices Parking & Valet Solutions Work Zone Safety

THE ARCHITECTURAL BRANDS

OPR Replacement Foxbody Floor Pans Pair (79-93 All)

Installation Instructions for Bike Fixtation. Bottle Fill and Bike Wash Stations Manual Rev. B

for every application...indoors & out

QTY 3D PART NO. DESCRIPTION

How to Make Realistic Roads & Parking Lots

2017 4X2 TUNDRA REG CAB LONG 5.7L Accessories

SMART TRUCK BED LINER - BLACK

Replacement Door Bottom for Pease style doors MD /16 Beige 6 $13.20

Rev TOOLS & MATERIALS REQUIRED QTY 3D PART NO. DESCRIPTION

QTY 3D PN. FCS PART NUMBER DESCRIPTION

OPTIONAL PANEL MOUNTING FLANGES. Case shown with optional feature.

Installation Manual. For. Hi-Speed Alumavator / Platinum Vertical Boat Lifts

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

LK Shunt Cabinet VS2, Shunt Cabinet VS2 Prefab

Sportworks Northwest, Inc. General Guidelines Inspection: Cleaning: Graffiti Removal: Sticker Removal:

CITY OF SAN MARCOS ENGINEERING DIVISION

Installation Manual. For. Trident Boat Lifts

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

Installation Instructions X-Force UTV Lift (000 Series) Capacity 2,275 lbs (1,035 kg)

POR-15 Kits. Super Starter Kits $22.99

Marine grade polished stainless steel

Installation Instructions 1662SG SG.223

TM MANUFACTURERS

Model # 42-RDS. 2/28/2017 Page 1 of 11

Westcoast (wall mount) - Speciality

Let our professional customer service and product selection improve your bottom line.

Installation Instructions 1662SG SG.222

INSTRUCTION MANUAL- PLANT OPERATIONS

Installation Instructions 1662SG SG.224

35-kV Safefront SuperWell Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current Limiting Fuses

SECTION METAL LOCKERS. A. ADAAG Americans with Disabilities Act, Accessibility Guidelines.

ARQUA STATION DF4 + DF7

SOLAR PARK LIGHTS COLOR OPTIONS. Solar Light Area Light

Polyurethane Notice Boards

Protect. Enviro-Guard. environment. the. with

AUTOMATIC POOL COVER. Serial number: ENGLISH SOLAR CARLIT MODEL INSTALLATION MANUAL AND MAINTENANCE /18 Revision number

Urban Rack. Basket Racks. Hard Top Carrier. Bike Racks. Made in the USA. Stainless Steel Deck Rack. Track Mounts. Gutter Mount Adapter

Congratulations, you have joined the

Tex-614-J, Testing Epoxy Materials

M O TO R C YC L E S TA N D OWNER S MANUAL

SMART TRUCK BED LINER - TINTABLE

.3 Coordinate benches, garbage bins and other exterior furnishings to match, in area to be installed or change.

Type 4 Panel Enclosures

DRAG-A-BOX BRAND MATERIAL SPREADERS

DekPro EFFEX. Post Cap and Lighting Guide.

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

4' x 10' Assembly Instructions. We re Here To Help! Call Toll Free Section Roll In Dock Shown

ITEM NO DESCRIPTION STUD CENTER WEIGHT ITEM NO DESCRIPTION STUD CENTER WEIGHT ITEM NO DESCRIPTION STUD CENTER WEIGHT NARROW FRAMES WALK THROUGH FRAMES

Model # PR-32RE. 11/5/2014 Page 1 of 10

Applicable to the Following Part Numbers. Notes and Maintenance. Torque Specifications. Metric SAE. Use above torque setting unless otherwise noted

Place these instructions in vehicle s glove box after installation is complete. Clean Tonneau Cover with a mild detergent and water solution.

Rigid Rak. Closet Accessories & Wardrobe Furniture /DAT BuyLine 3206

1PC TONNEAU COVER INSTALLATION INSTRUCTIONS IMPORTANT

TIGER Drylac ral colors. exterior powder coatings

baumann.com.au

POWERED RUNNING BOARDS INSTALLATION MANUAL

Installation Manual. For. High Speed Alumavator and Platinum. 10 and 23 Degree. Elevator Boat Lifts

Durulite Door Hardware Manual

TORNADOTM BOLLARD PATENTS PENDING

Installation Manual. For. Alumavator and Platinum. Vertical Installation. Elevator Boat Lifts

3 PIECE HARD TONNEAU COVER INSTALLATION INSTRUCTIONS

SECTION FIRE HYDRANTS WITH HYDRANT LOCKS

Installation Instructions

The M-Series MegaFrame Cabinet

Tex-614-J, Testing Epoxy Materials

Installation Manual. For. Alumavator / Platinum Boathouse Lifts

QTY 3D PN. FCS PART NUMBER DESCRIPTION

5 * THREE BOXES OF ASSORTED SELF TAPPING SCREWS 6 * TWO BOXES OF ASSORTED SELF TAPPING SCREWS 7 * BOX OF ASSORTED TIMBER CONTEMPORARY SOFA LEGS

Tuf-Lite III Fans 6000K Series Hub

Flex Work Station Delivery Units Installation Guide

CONVEYOR BELTING For The Construction Industry

BRASCO INTERNATIONAL, INC. BE Model L Seat Material Armrest Backrest. BE Model L Seat Material Armrest Backrest

material voc lbs/gal GenRock 2K Series Specific Gravity % solids by weight lbs/gal

Brittania - Speciality

NIS NAV AM (MY15 >) - Aluminium Tonneau Cover ATC0051 (silver) ATC0052 (Black) Installation Time: Approx. 60 Minutes WARNING!

APPROVED MATERIALS LIST SERVICE MATERIALS July 2017 **REVISED 12/6/17**

Fiberglass Rod Extensometer

METRO Magnolia Transit Center - Bid Tab

VALVES, FIRE HYDRANTS, AND APPURTENANCES

SECTION SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

A SOLUTION FOR ALL YOUR MASKING NEEDS

APPENDIX B SPECIFICATION FOR GENERATOR OVERHAUL EMD MODEL AR10 D18... B-1

Product card User manual. Koliber Safes Koliber Deposit Drop Safes KSN Wall Safes Grade S1

Model # TR-32-RT. 4/29/2015 Page 1 of 9

Linx System with Atra Flex Installation for Model 424 Automotive Dynamometers

Mixing tools. Type-tested by TÜV Collomix mixing tools stand for quality and reliability

Generator Fire Safety: Generator assemblies should be located outside the building.

Application Guide. ATL composites Pty Ltd Tel (+61) Fax (+61)

Heavy welded steel outlet half. 3/4-inch NPT test plug. Benefits

Utility Task Force Corrosion Pictures for IEEE C Fall 2018 & Submersible Transformer Galvanic Application Compatibility Chart (STGACC):

INSTALLATION INSTRUCTIONS WINCH MOUNTING KIT Part number: Application: Ford F150 Ecoboost

ORNAMENTAL STEEL FENCE

JEEP JK 4 LONGARM. Tools Needed: Thank you for choosing Rough Country for your suspension needs.

Specifications CCS1902

Pre-Installation. Surface Preparation TRAFFIC STRIPES, EPOXY RESIN

Model # 358-OPR-GT. 4/15/2015 Page 1 of 12

On-the-Job Training Program. Overview of Training Programs

Transcription:

D OWN TOW N R AC K Security Is So Square The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking by giving the bike full support and multiple locking points for a u-style bike lock.

YOUR LOGO HERE Customize the Downtown Rack and brand your bike parking FINISH OPTIONS MOUNT OPTIONS Galvanized Stainless PVC Dip Surface In-Ground Rail Powder Coat White Black Light Gray RAL 7042 Deep Red RAL 3003 Yellow RAL 1023 CNH Bright Yellow Orange RAL 2004 Blue RAL 5005 Sky Blue RAL 5015 Hunter Green RAL 6005 Light Green RAL 6018 Green RAL 6016 Sepia Brown RAL 8014 Bronze Silver 9007 Dark Purple Flat Black Wine Red RAL 3005 Beige RAL 1001 Iron Gray 7011 Thermoplastic Black Green Red Blue Gray Brown Optional Lean Bar

Submittal Sheet CAPACITY 2 Bikes 36 MATERIALS Standard 2 x 2 x.188 square tube - mild steel 2 x 2 x.120 square tube - stainless steel Lightweight *Powder coat or galvanized only 2 x 2 x.083 square tube - mild steel FINISHES Galvanized An after fabrication hot dipped galvanized finish is our standard option. 30 2 Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sandblast 2. Epoxy primer electrostatically applied 3. Final thick TGIC polyester powder coat Thermoplastic In addition to an increased thickness (8-10mils), the thermoplastic finish covers a galvanized layer and offers superior impact resistance over powder coating. PVC Dip (plastisol) Other colors available by special order (minimum orders apply) In-ground Surface Stainless Stainless Steel: 304 grade stainless steel material finished in either a high polished shine or a satin finish. Rail MOUNT OPTIONS In-ground In ground mount is embedded into concrete base. Specify in ground mount for this option. Surface Foot Mount has two 2.5 x6 x.25 feet with two anchors per foot. Specify foot mount for this option. Rail Rail Mounted Downtown Racks are bolted to two parallel rails which can be left freestanding or anchored to the ground. Rails are heavy duty 3 x1.4 x3/16 thick galvanized mounting rails. Specify rail mount for this option. OPTIONAL LEAN BAR Add Lean Bar

Setbacks WALL 24 WALL 42 STREET 36 56 STREET

Installation Instructions Surface Mount TOOLS NEEDED Tape Measure Marker or Pencil Masonry Drill Bit Drill (Hammer drill recommended) Hammer Wrench 9/16 Level RECOMMENDED BASE MATERIAL Solid concrete is the best base material for installation. To ensure the proper anchors are shipped with your rack, ask your Dero Rack representative which anchor is appropriate for your application. Be sure nothing is underneath the base material that could be damaged by drilling. 1 2 Place the rack in the desired location. Use a marker or pencil to outline the holes of the flange onto the base material. Drill 3/8 diameter holes 3 deep into surface. Make sure the holes are at least 3 away from any cracks in the base material. 3 4 Place rack (and washers to level rack if necessary) over holes. Thread nuts onto anchors, leaving approximately 1/4 of the anchor protruding, and tap into surface. Tighten nuts down to secure rack.

Installation Instructions In Ground Mount TOOLS NEEDED Level Cement mixing tub Shovel Trowel Hole coring machine with 4 bit Access to water hose Materials to build brace (see Install Tip at bottom of page) INSTALLING INTO EXISTING SIDEWALK Core holes no less than 3 diameter (4 recommended) and 10 deep into sidewalk. Fill holes with Por-Rok or epoxy grout. Place rack into holes, making sure the rack is level. 33-36 of the rack should remain above the surface. If the rack is less than 33 high, it will not support the bike adequately. Make sure the rack is level and held in place until the grout has set. INSTALLING INTO A NEW SIDEWALK Final grade level 1 2 Poured concrete (4-7 deep) Sand pour bed Place corrosion resistant sleeve (min. 3 inside diameter) in sand pour bed in exact location where rack will be installed. Make sure top of sleeve is at same level as desired finished concrete surface. Fill sleeve with sand to keep it in place and prevent it from filling with concrete. Pour concrete and allow to cure. 3 After appropriate cure time, dig out sand from sleeves and insert racks, making sure they are level and at the appropriate height. Pour in Por- Rok or epoxy grout and allow to set. INSTALL TIP An easy way to brace the rack while the grout sets is to bolt two 1x4 boards together at one end and clamp them onto the rack like a clothes pin.

Rail Mounted Options RAIL MOUNTED OPTIONS Rail mounted Downtown Racks are standard foot mounted Downtown Racks attached with bolts to a rail as in the diagram at left. Rail mounted racks provide more flexibility than other mounting options while providing the same degree of security. Rail mounted Downtown Racks can be left freestanding, or they can be anchored to the ground using several anchors. This option allows for easier snow removal and sweeping. Installation of Rail mounted Hoops is also much less expensive than embedding the racks into the ground. Anchor runs through rail into base install surface * Note: Though racks may be painted, the rails will remain with only a galvanized finish ADVANTAGES: Easier and inexpensive installation Can be left freestanding or anchored to the ground Easier to remove for sweeping and snow removal APPLICATIONS: Installation to pavers Asphalt Installations Ground, dirt, or mulch Situations where the rack needs to be moved occasionally 3 Unit Rack 76 Long Parks 6 Bikes 4 Unit Rack 108 Long Parks 8 Bikes 5 Unit Rack 146 Long Parks 10 Bikes 6 Unit Rack 181 Long Parks 12 Bikes