Final Capacity Auction Results 2018/2019 T-1 Capacity Auction. Date 26/01/2018 Version 1.0

Similar documents
Final Capacity Auction Results 2019/2020 T-1 Capacity Auction. Date 01/02/2019 Document: FCAR1920T-1 Version 1.0

SEM experience to date and the impacts for the future Sean McGoldrick, General Manager SEMO

EirGrid Monthly Availability Report March 2017

POWER SYSTEM INCIDENT REPORT NORTHERN POWER STATION STABILISER OUTAGE APRIL AND MAY 2010

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT MULTIPLE CONTINGENCY EVENT IN NORTH WEST TASMANIA ON 6 APRIL 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

Rate of Change of Frequency Project Quarterly Report for Q4 2017

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014

Power System Operating Incident Report Trip of Murray Lower Tumut No kv Transmission Line at Murray End Only on 18 November 2013

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015

Rate of Change of Frequency Project Quarterly Report for Q2 2017

STATEMENT OF CHARGES. For Use of. Northern Ireland Electricity Ltd. Transmission System. Applicable from 1 st October 2013

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT GEORGE TOWN ON 27 NOVEMBER 2012.

POWER SYSTEM OPERATING INCIDENT REPORT LIGHTNING STRIKES IN TASMANIA AND PACIFIC ALUMINIUM POTLINE LOAD REDUCTIONS 21 MARCH 2013

STORAGE IN IRELAND- AN OVERVIEW. IWEA Autumn Conference October 11 th 2018 Bernice Doyle Chair IWEA Storage Committee

Fuel Mix Disclosure 2016

Short Term Operating Reserve

TUoS Statement of Charges

SUMMARY OF REPORT TO ENERGIAVIRASTO SEPTEMBER Study on the amount of peak load capacity for

RENEWABLES INTEGRATION STATUS REPORT

END USER TERMS OF USE

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

It is 5.30 on a winter s evening...

WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests

Solar-Wind Specific Request for Proposals

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

Rhode Island Net Metering First Bill Walkthrough. Updated September 2017

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan

COMPONENT HOMOLOGATION POLICY AND PROCEDURE

Kontakt. Turnkey solutions for hydropower plants An overview of the ABB portfolio

All-Energy 2016, Glasgow. Contributing funding partners:

POWER SYSTEM INCIDENT REPORT: OVERLOAD OF WAUBRA- HORSHAM 220 KV TRANSMISSION LINE AND INSECURE OPERATION OF THE SYSTEM ON 13 DECEMBER 2012

Telhio Credit Union Account to Account (A2A) Transfer Service User Agreement

ELECTRICITY TRANSMISSION USE OF SYSTEM PRICES - 1 JULY 2014 TO 30 JUNE 2015

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

SOUTH AUSTRALIAN HISTORICAL MARKET INFORMATION REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS

RATE 765 RENEWABLE FEED-IN TARIFF

Sacramento Municipal Utility District s EV Innovators Pilot

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Shifting Seasons Wind Energy in the Philippines

Dublin Airport Chauffeur Code of Conduct Dublin Airport Chauffeurs Code of Conduct. Dublin Airport Parking

PPL GOLD Credit Union User Agreement for Account to Account (A2A) Transfer Service

For personal use only

16385 Steering Tie Rods Chrysler A-Body

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

LONDON STOCK EXCHANGE GROUP

Motors & Drives Rebate Application

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

Vertabelo Academy. Terms of Service PLEASE READ ALL OF THE FOLLOWING TERMS OF SERVICE BEFORE USING THIS WEBSITE A. General Terms

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

Fuel Mix Disclosure and CO 2 Emissions 2012

Sport Sway Bar Kit UP SCION xb

ibusiness Banking Application Form Welcome to ibusiness Banking Need help completing this form? Adding an Additional Company to an existing Group

SUBSTATION INTERLOCKING SCHEMES

Derivative Valuation and GASB 53 Compliance Report For the Period Ending September 30, 2015

NATIONAL GRID ELECTRICITY TRANSMISSION plc THE CONNECTION & USE OF SYSTEM CODE TABLE OF CONTENTS

Dr. Chris Dudfield. Chief Technology Officer Intelligent Energy. Sponsors

Chief Operating Officer. Nigel Bell, Energy Resource Manager

Independence- Freedom- Happiness No.: 96/2012/TT-BTC

Managing Electrical Safety on Boats

2015 & 2018 Fender Brace Installation Instructions

Sport Sway Bar Kit Chevy Camaro

PIVOT BUSHING KIT GM F-BODY

SECONDARY FUEL TESTING ARRANGEMENTS

P/N# Performance Lowering Springs Installation Instructions

16366 Steering Tie Rods Chrysler B-Body, Charger, Super Bee, Road Runner, GTX Chrysler E-Body, Cuda, Challenger

SONI LTD TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

JEA Distributed Generation Policy Effective April 1, 2018

Public Access Electric Vehicle Charging Station Rebate Program Agreement

Published on Market Research Reports Inc. (

2006 SHOCK TOWER BRACE 93-UP F-BODY CAMARO/FIREBIRD

Motor and Drive Efficiency Constant Speed Motor Controller Rebate Application

PricewaterhouseCoopers Survey on the take-up of e-invoicing by businesses and related difficulties. Key Findings 2008

RMS CONDITIONAL REGISTRATION SCHEME HISTORIC (CRS-H) RULES FOR MEMBERS. Mustang Owners Club Australia (N S W) Inc.

SERIES 7400 THREE PIECE BALL VALVES

2014 RENEWABLE ENERGY PHOTOVOLTAIC Fact Sheet

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

Frequently Asked Questions New Tagging Requirements

Global Cost Review Q4/2017. Results as of 01/29/2018

User Agreement For Transfer To/From Other Financial Institution (A2A) Transfer Service

2013 Final Results. 19 March 2014

Touring Demo Ride Campaign Prize Draw ("Prize Draw") Terms & Conditions

Global Cost Review Q2/2017. Results as of 08/29/2017

Information Memorandum

Respect for customers, partners and staff. Service: another name for the respect that a company owes its customers, partners and staff.

Rear Suspension System C-10 Pickup Truck

Inland Truck Shortage in North America. February 2018

Global Index Briefing: MSCI Sectors Forward P/Es Selected Countries & Regions

Modelling of a Large Number of Electric Vehicles (EVs) in the All-Island Ireland Energy System

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

Municipality Generator Interconnection Application Single Meter Application Part I

Transcription:

Final Auction Results 2018/2019 T-1 Auction Date 26/01/2018 Version 1.0 1

Contents Executive Summary... 4 Final Qualification Decisions... 5 Final Auction Results... 6 Auction Results by Locational Constraint Area... 11 List of Tables Table 1 Qualified per Technology Class... 5 Table 2 Final Auction Results... 7 Table 3 Awarded New Implementation Plans... 10 Table 4 Total per Locational Constraint Area... 11 Table 5 New Locational Constraint Area... 11 2

Disclaimer Prior to taking business decisions, interested parties should not rely on the data set out in this information pack as a substitute for obtaining separate and independent advice in relation to the matters covered by this document. Information in this document does not amount to a recommendation or advice in respect of any possible investment. The use of information contained within this document for any form of decision making is done so at the user s own risk. This document should be read in conjunction with the Market Code and Trading and Settlement Code including any amendments to these rules. Whilst every effort is made to provide information that is useful and care has been taken in the preparation of the information, EirGrid and SONI give no warranties or representations, expressed or implied, of any kind, with respect to the contents of this document, including without limitation, its quality, accuracy and completeness. EirGrid and SONI and their respective advisers, consultants and other contributors to this document (or their respective associated companies, businesses, partners, directors, officers or employees) hereby exclude to the fullest extent permitted by law, all and any liability for any errors, omissions, defects or misrepresentations in the information contained in this document, or for any loss or damage suffered by persons who use or rely on such information (including by reason of negligence, negligent misstatement or otherwise). Copyright Notice Copyright Notice Copyright EirGrid plc 2018, all rights reserved. The entire publication is subject to the laws of copyright. Market Contact Details If you have any questions in relation to this document please contact us using the details below: Email Correspondence: Phone Correspondence: capacitymarket@sem-o.com 1800 726772 (ROI) or 0800 0726772 (NI) +353 (1) 2370584 (International) 3

Executive Summary This report contains Final Auction Results as detailed within F.9.5.1 of the Market Code (CMC) for the first Auction, which took place on 15th December 2017, for the first Year. All information set out in this document relates solely to the 2018/2019 T-1 Auction. The Final Auction Results were approved by the Regulatory Authorities in accordance with F.9.3 of the CMC. MW refers to a megawatt of de-rated capacity, unless otherwise stated. For prices specified in /MW per year or /MW per year, year refers to a 12-month year, unless otherwise stated. Please note that the 2018/2019 T-1 Auction covers an approximate 16 month delivery period from market Cutover Time to 30th September 2019. In addition to the results presented in this document, the System Operator can confirm that no Opt-Out Notifications were submitted for any Market Unit (CMU) to the System Operators for the 2018/2019 T-1 Auction. All Locational Constraints for Northern Ireland, Ireland and Greater Dublin were satisfied. The Auction results are as follows: - The Auction Clearing Price ( /MW per year) is 41,800.00 /MW per year. - The Auction Clearing Price ( /MW per year) is 38,104.88 /MW per year. - The Average Price of Awarded ( /MW per year) is 42,774.84 /MW per year. - The Average Price of Awarded ( /MW per year) is 38,993.54 /MW per year. - 104 Market Units were Qualified for the Auction. - No Opt-Out Notifications were submitted during Qualification. - 100 Market Units submitted Auction Offers. - 93 Market Units were allocated Awarded. This report includes further details with respect to the Final Qualification Decisions for the 2018/2019 T-1 Auction as well as the Auction Results per individual CMU. 4

Final Qualification Decisions A total of 147 Candidate Units sought to qualify for the T-1 2018/19 Auction, totaling 9418 MW of Net De-Rated. Of these, a total of 104 Market Units (CMUs) were successful. This equates to a total of 9066 MW of Net De-Rated ; 248 MW of New and 8818 MW of Existing. Table 1 below provides a summary of Final Qualification Decisions by Unit Type and Technology for both Existing and New. Figure 1 Qualified CMUs per Technology Type Table 1 Qualified per Technology Class Qualified per Technology Class Technology Class Net De-Rated (Existing) Net De-Rated (New) Total Net De-Rated Gas Turbine 4833.2 3.111 4836.311 Demand Side Unit 374.811 244.603 619.414 Interconnector 450.77 0 450.770 Hydro 199.876 0 199.876 Wind 19.287 0 19.287 Pumped Hydro Storage 228.344 0 228.344 Steam Turbine 2711.826 0 2711.826 Total 8818.115 247.714 9065.829 5

Final Auction Results 100 Market Units submitted Auction Offers for the 2018/2019 T-1 Auction within the Market Platform. A total of 9014 MW of De-rated capacity was offered into the auction and the total successful de-rated capacity in the auction was 7,774 MW. The Auction Clearing Price was 41,800 /MW per year and 38,104.88 /MW per year. The Auction Results and total Awarded for each CMU are listed in Table 2 in accordance with the requirements of CMC Section F.9.5.1. In addition, Table 2 provides brief information relating to the Final Qualification Decisions for individual CMUs that qualified for the 2018/2019 T-1 Auction. Please refer to Appendix A for the full provision of Final Qualification Decisions per CMC Section F.9.5.1 (c). 23 CMUs were successfully Awarded New within the 2018/2019 T-1 Auction. In accordance with Section F.9.1.1 (b) of the CMC, please find Awarded New Implementation Plan details listed in Table 3 on page 10 of this document. 6

Company Name CMU ID Net De- Rated (Existing) Table 2 Final Auction Results Net De-Rated (New) De-Rated (Total) Technology Class Awarded Payment Price (EUR/MW) or (GBP/MW) AC Automation (UK) Ltd DSU_501200 0 0 0 Demand Side Unit 0 - AES Ballylumford Limited GU_500281 128.46 0 128.46 Steam Turbine 0 - AES Ballylumford Limited GU_500282 125.83 0 125.83 Steam Turbine 125.83 91,370 AES Ballylumford Limited GU_500283 53.225 0 53.225 Gas Turbine 53.225 38,104.88 AES Ballylumford Limited GU_500284 53.225 0 53.225 Gas Turbine 53.225 38,104.88 AES Kilroot Power Limited GU_500820 38.406 0 38.406 Gas Turbine 38.406 38,104.88 AES Kilroot Power Limited GU_500821 38.406 0 38.406 Gas Turbine 38.406 38,104.88 AES Kilroot Power Limited GU_500822 218.247 0 218.247 Steam Turbine 0 - AES Kilroot Power Limited GU_500823 220.522 0 220.522 Steam Turbine 0 - AES Kilroot Power Limited GU_500824 26.796 0 26.796 Gas Turbine 26.796 38,104.88 AES Kilroot Power Limited GU_500825 26.796 0 26.796 Gas Turbine 26.796 38,104.88 Aughinish Alumina Ltd GU_400120 52.681 0 52.681 Gas Turbine 52.681 41,800 Aughinish Alumina Ltd GU_400121 52.681 0 52.681 Gas Turbine 52.681 41,800 Ballywater Windfarms Ltd GU_400130 4.326 0 4.326 Wind 4.326 41,800 Bord Gais ROI GU_400930 387.168 0 387.168 Gas Turbine 387.168 41,800 BRI Green Energy Limited GU_401720 2.003 0 2.003 Wind 2.003 41,800 Contour Global Solutions (Northern Ireland) Limited GU_500900 2.797 0 2.797 Gas Turbine 2.797 38,104.88 Contour Global Solutions (Northern Ireland) Limited GU_500904 11.19 0 11.19 Gas Turbine 11.19 38,104.88 Cushaling Power Limited GU_401010 53.476 0 53.476 Gas Turbine 53.476 41,800 Cushaling Power Limited GU_401011 53.476 0 53.476 Gas Turbine 53.476 41,800 Dublin Waste to Energy Supply GU_402030 54.839 0 54.839 Steam Turbine 54.839 41,800 Edenderry Supply Co GU_401860 104.402 0 104.402 Steam Turbine 104.402 41,800 EirGrid Interconnector Designated Activity Company I_ROIEWIC 234.5 0 234.5 Interconnector 234.5 41,800 Electricity Exchange Limited DSU_401400 25.711 15.098 40.809 Demand Side Unit 40.095 41,800 Electricity Exchange Limited DSU_401870 12.752 24.038 36.79 Demand Side Unit 18.014 41,800 Electricity Exchange Limited DSU_402090 3.948 6.041 9.989 Demand Side Unit 6.713 41,800 Electricity Exchange Limited DSU_402100 3.731 6.123 9.854 Demand Side Unit 6.92 41,800 Electricity Exchange Limited DSU_402120 3.793 12.751 16.544 Demand Side Unit 8.293 41,800 Empower Generation Limited GU_501230 9.141 1.259 10.401 Gas Turbine 9.141 38,104.88 Endeco Technologies Limited DSU_401530 35.53 7.936 43.466 Demand Side Unit 43.466 41,800 Endeco Technologies Limited DSU_401910 3.891 6.221 10.112 Demand Side Unit 10.112 41,800 Endeco Technologies Limited DSU_402180 0 16.172 16.172 Demand Side Unit 16.172 41,800 Endeco Technologies Limited DSU_501460 3.863 6.621 10.484 Demand Side Unit 10.484 38,104.88 Energy Trading Ireland Limited DSU_401390 10.324 0.769 11.093 Demand Side Unit 11.093 41,800 Energy Trading Ireland Limited DSU_501380 11.212 5.498 16.71 Demand Side Unit 16.71 38,104.88 7

Company Name CMU ID Net De- Rated (Existing) Net De-Rated (New) De-Rated (Total) Technology Class Awarded Payment Price (EUR/MW) or (GBP/MW) Energy Trading Ireland Limited DSU_501510 8.041 0 8.041 Demand Side Unit 8.041 38,104.88 Energy Trading Ireland Limited DSU_501600 0 4.61 4.61 Demand Side Unit 4.61 38,104.88 EnerNOC Ireland Limited DSU_401270 80.163 0 80.163 Demand Side Unit 80.163 41,800 EnerNOC Ireland Limited DSU_401610 10.231 0 10.231 Demand Side Unit 10.231 41,800 EnerNOC Ireland Limited DSU_401620 12.865 0 12.865 Demand Side Unit 12.865 41,800 EnerNOC Ireland Limited DSU_401800 9.93 3.972 13.902 Demand Side Unit 13.902 41,800 EnerNOC Ireland Limited DSU_401850 14.091 0 14.091 Demand Side Unit 14.091 41,800 EnerNOC Ireland Limited DSU_403020 0 13.902 13.902 Demand Side Unit 13.902 41,800 EnerNOC Ireland Limited DSU_403030 0 13.902 13.902 Demand Side Unit 13.902 41,800 EnerNOC Ireland Limited DSU_403040 0 13.902 13.902 Demand Side Unit 13.902 41,800 EnerNOC Ireland Limited DSU_403050 0 13.902 13.902 Demand Side Unit 13.902 41,800 EnerNOC Ireland Limited DSU_403080 0 12.865 12.865 Demand Side Unit 12.865 41,800 EnerNOC Ireland Limited DSU_403120 0 9.22 9.22 Demand Side Unit 9.22 41,800 EnerNOC Ireland Limited DSU_501450 8.339 0 8.339 Demand Side Unit 8.339 38,104.88 ESB CAU_400301 199.876 0 199.876 Hydro 199.876 41,800 ESB CAU_400302 7.354 0 7.354 Wind 7.354 41,800 ESB DSU_401330 18.052 0 18.052 Demand Side Unit 18.052 41,800 ESB DSU_403000 0 19.538 19.538 Demand Side Unit 0 - ESB GU_400180 220.59 0 220.59 Steam Turbine 0 - ESB GU_400181 82.8 0 82.8 Gas Turbine 82.8 41,800 ESB GU_400182 82.8 0 82.8 Gas Turbine 82.8 41,800 ESB GU_400183 82.8 0 82.8 Gas Turbine 82.8 41,800 ESB GU_400240 81.263 0 81.263 Steam Turbine 81.263 41,800 ESB GU_400270 241.395 0 241.395 Steam Turbine 241.395 41,800 ESB GU_400271 241.395 0 241.395 Steam Turbine 241.395 41,800 ESB GU_400272 241.395 0 241.395 Steam Turbine 241.395 41,800 ESB GU_400300 78.2 0 78.2 Gas Turbine 0 - ESB GU_400311 95.472 0 95.472 Gas Turbine 95.472 42,990 ESB GU_400324 208.15 0 208.15 Gas Turbine 208.15 41,800 ESB GU_400325 208.15 0 208.15 Gas Turbine 208.15 41,800 ESB GU_400360 57.086 0 57.086 Pumped Hydro Storage 57.086 41,800 ESB GU_400361 57.086 0 57.086 Pumped Hydro Storage 57.086 41,800 ESB GU_400362 57.086 0 57.086 Pumped Hydro Storage 57.086 41,800 ESB GU_400363 57.086 0 57.086 Pumped Hydro Storage 57.086 41,800 ESB GU_400370 120.971 0 120.971 Steam Turbine 120.971 41,800 ESB GU_400430 4.378 0 4.378 Wind 4.378 41,800 ESB GU_400500 356.4 0 356.4 Gas Turbine 356.4 41,800 8

Company Name CMU ID Net De- Rated (Existing) Net De-Rated (New) De-Rated (Total) Technology Class Awarded Payment Price (EUR/MW) or (GBP/MW) ESB GU_400850 376.694 0 376.694 Gas Turbine 376.694 41,800 ESB GU_500040 369.196 0 369.196 Gas Turbine 369.196 38,104.88 ESB GU_500041 48.408 0 48.408 Gas Turbine 48.408 38,104.88 Huntstown Power Company GU_400480 304.038 0 304.038 Gas Turbine 304.038 42,171 Indaver Energy Limited GU_401230 15.436 0 15.436 Steam Turbine 15.436 41,800 Ipower Solutions Limited GU_501130 62.863 0 62.863 Gas Turbine 62.863 38,104.88 KiWi Power Ireland DSU_402290 0 7.136 7.136 Demand Side Unit 0 - Moyle Interconnector Ltd I_NIMOYLE 216.27 0 216.27 Interconnector 216.27 38,104.88 Power NI Energy Limited Power Procurement Business (PPB) GU_500130 221.994 0 221.994 Gas Turbine 221.994 38,104.88 Power NI Energy Limited Power Procurement Business (PPB) GU_500131 221.994 0 221.994 Gas Turbine 221.994 38,104.88 Power NI Energy Limited Power Procurement Business (PPB) GU_500140 92.283 0 92.283 Gas Turbine 92.283 38,104.88 Powerhouse Generation Limited DSU_401660 12.033 7.838 19.871 Demand Side Unit 13.045 41,800 Powerhouse Generation Limited DSU_501330 26.213 8.564 34.777 Demand Side Unit 31.109 38,104.88 Ronaver Energy Limited GU_403000 0 1.852 1.852 Gas Turbine 1.852 41,800 Slievereagh Power GU_400671 0 0 0 Wind 0 - SSE Generation Ireland Limited GU_400750 48.6 0 48.6 Steam Turbine 48.6 41,800 SSE Generation Ireland Limited GU_400751 48.6 0 48.6 Steam Turbine 48.6 41,800 SSE Generation Ireland Limited GU_400752 206.521 0 206.521 Steam Turbine 206.521 41,800 SSE Generation Ireland Limited GU_400753 206.521 0 206.521 Steam Turbine 206.521 41,800 SSE Generation Ireland Limited GU_400762 376.694 0 376.694 Gas Turbine 376.694 41,800 SSE Generation Ireland Limited GU_400770 46.62 0 46.62 Steam Turbine 46.62 41,800 SSE Generation Ireland Limited GU_400771 46.62 0 46.62 Steam Turbine 46.62 41,800 SSE Generation Ireland Limited GU_400780 46.8 0 46.8 Steam Turbine 46.8 41,800 SSE Generation Ireland Limited GU_400781 46.8 0 46.8 Steam Turbine 46.8 41,800 Tynagh Energy Ltd GU_400530 352.4 0 352.4 Gas Turbine 352.4 41,800 Vayu Ltd GU_402050 0 0 0 Wind 0 - Veolia Alternative Energy Limited Ireland DSU_401490 18.061 0 18.061 Demand Side Unit 18.061 41,800 Veolia Alternative Energy Limited Ireland DSU_401880 18.144 0 18.144 Demand Side Unit 18.144 41,800 Viridian Energy Ltd DSU_401590 18.075 2.004 20.079 Demand Side Unit 19.343 41,800 Viridian Energy Ltd DSU_402040 5.818 5.98 11.798 Demand Side Unit 11.798 41,800 Viridian Energy Ltd GU_400610 1.226 0 1.226 Wind 1.226 41,800 Viridian Power Ltd GU_400540 352.4 0 352.4 Gas Turbine 0-8818.115 247.714 9065.829 7774.296 9

Table 3 Awarded New Implementation Plans Party / Unit Details Awarded Timelines Provided by CMU Company Name CMU ID Awarded New Substantial Financial Completion Completion of Network Connection Substantial Completion Endeco Technologies Limited DSU_401530 7.936 25/09/2017 20/10/2017 30/11/2017 Endeco Technologies Limited DSU_401910 6.221 25/09/2017 15/11/2017 30/01/2018 Endeco Technologies Limited DSU_501460 6.621 30/11/2017 15/12/2017 22/01/2018 Endeco Technologies Limited DSU_402180 16.172 30/11/2017 15/12/2017 31/01/2018 Energy Trading Ireland Limited DSU_501380 5.498 14/02/2018 28/02/2018 28/02/2018 Energy Trading Ireland Limited DSU_501600 4.610 14/02/2018 28/02/2018 28/02/2018 Energy Trading Ireland Limited DSU_401390 0.769 31/01/2018 14/02/2018 28/02/2018 Electricity Exchange Limited DSU_401400 15.098 05/01/2018 05/01/2018 05/01/2018 Electricity Exchange Limited DSU_401870 24.038 05/01/2018 05/01/2018 05/01/2018 Electricity Exchange Limited DSU_402100 6.123 31/03/2018 31/03/2018 31/03/2018 Electricity Exchange Limited DSU_402120 12.751 31/03/2018 31/03/2018 31/03/2018 Electricity Exchange Limited DSU_402090 6.041 31/03/2018 31/03/2018 31/03/2018 EnerNOC Ireland Limited DSU_401800 3.972 12/10/2017 05/01/2018 22/05/2018 EnerNOC Ireland Limited DSU_403020 13.902 12/10/2017 05/01/2018 22/05/2018 EnerNOC Ireland Limited DSU_403030 13.902 12/10/2017 05/01/2018 22/05/2018 EnerNOC Ireland Limited DSU_403040 13.902 12/10/2017 05/01/2018 22/05/2018 EnerNOC Ireland Limited DSU_403050 13.902 12/10/2017 05/01/2018 22/05/2018 EnerNOC Ireland Limited DSU_403080 12.865 12/10/2017 05/01/2018 22/05/2018 EnerNOC Ireland Limited DSU_403120 9.220 12/10/2017 05/01/2018 22/05/2018 Powerhouse Generation Limited DSU_501330 8.564 31/12/2017 31/01/2018 31/03/2018 Powerhouse Generation Limited DSU_401660 7.838 31/01/2018 28/02/2018 30/04/2018 Viridian Energy Ltd DSU_401590 2.004 05/01/2018 05/01/2018 05/01/2018 Viridian Energy Ltd DSU_402040 5.980 03/08/2017 03/08/2017 26/09/2017 10

Auction Results by Locational Constraint Area The tables below provide details relating to the total successful and unsuccessful capacity in the auction for Ireland, Northern Ireland and Greater Dublin. The values are given in terms of De-rated and Initial (MEC or Registered ). Table 4 Total per Locational Constraint Area Total Northern Ireland Ireland Greater Dublin Market Total De-rated Offered Quantity 2267 6748 1689 9014 De-rated Scheduled Quantity 1698 6076 1336 7774 De-rated Unsuccessful 568 671 352 1240 Initial Offered 2749 8069 1891 10818 Initial Scheduled 2089 7304 1491 9393 Initial Unsuccessful 660 765 400 1425 A total of 174.6 MW of De-rated New was successful in the auction. The majority of the successful De-rated New was in the DSU Technology Class and 1.85 MW was successful within the Gas Turbine Technology Class. Table 5 New Locational Constraint Area New Northern Ireland Ireland Greater Dublin Market Total De-rated Offered Quantity 22.9 173.2 100.8 196.1 De-rated Scheduled Quantity 21.6 153.0 80.5 174.6 De-rated Unsuccessful 1.3 20.3 20.3 21.5 Initial Offered 24.8 188.2 109.6 213.0 Initial Scheduled 23.5 166.1 87.4 189.6 Initial Unsuccessful 1.4 22.1 22.1 23.5 11

Appendix A Full provision of the Final Qualification Decisions information per Section F.9.5.1 (c) of the CMC can be found via the following Excel report: Final Qualification Decisions Appendix B The Final Auction Results can be accessed via Excel report using the link provided below: Final Auction Results 12

13