PT-91M. WHAT POLISH ARMY THINKS ABORT THIS?

Similar documents
MODALITY OF COMBAT VEHICLES DESIGN USING MULTI-FUNCTION COMBAT PLATFORM AS AN EXAMPLE

NEW CONCEPTS OF VEHICLES, MODELLING AND SIMULATION USING WMI AND MG20 VEHICLES AS AN EXAMPLE

MS20 VEHICLE BRIDGE (BRIDGE ON VEHICLE CHASSIS)

ZESZYTY NAUKOWE RUCHU STUDENCKIEGO Nr 2 (2012) ISSN

DYNAMIC LOAD IN OPERATION OF HIGH-SPEED TRACKED VEHICLES

UT30MK2 & MT30 Unmanned and Manned Turrets

SHERPA MEDIUM. Whatever the mission, wherever, whenever. English version

HIMARS - LOCKHEED MARTIN S OFFER FOR HOMAR MISSILE SYSTEM

Weapons and Equipment (WE-8/9) Room No 208G, South Block Integrated HQ of MoD (Army) DHQ PO, New Delhi Jun 2010

The Puma. Protection I Survivability I Effectiveness

ARMOURED VEHICLES BRAKES TESTS

LIGHT TACTICAL ARMOURED VEHICLE

BOXER for the Danish Armed Forces short briefing

POLISH CANNON BARRELS FROM HSW: MANUFACTURING CAPACITY ESTABLISHED

LAND 400 Phase 2. Defending Australia and its National Interests

DRAFT CONVENTION CONFERENCE FOR THE REDUCTION AND LIMITATION OF ARMAMENTS NAVAL ARMAMENTS ANNEXES TO CHAPTER 2 -

Electro Optic Systems Holdings Limited

Panzerhaubitze mm Self- Propelled Howitzer - Archived 4/2000

Bridging the gaps: China works to boost combat engineer capabilities

A SUCCESSFUL EUROPEAN COOPERATION POWERFUL & COMPACT 40 CTAS CASED TELESCOPED ARMAMENT SYSTEM

BUSHMASTER FAMILY OF VEHICLES.

THIRD UNVEILING OF KRYL IN KIELCE

INNOVATIVE RUN FLAT SYSTEMS

Image 1. Wirbelwind based on Pz IV chassis.

The Matilda II Infantry Tank (A.12)

TESTING OF PROTECTIVE COVERS FOR SPECIAL VEHICLES

NUMERICAL ANALYSIS OF IMPACT BETWEEN SHUNTING LOCOMOTIVE AND SELECTED ROAD VEHICLE

PRESS KIT IDEB 2018 May 16th May 18th 2018

OPERATIONAL LOADS OF COMBAT VEHICLES

VOP-026 Šternberk, s.p.

MARAUDER LAND SYSTEMS ELECTRONIC SYSTEMS AEROSPACE LEADERS IN DEFENCE AND SECURITY INNOVATION

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT

Transmissions for Military Tracked Vehicles

Transmissions for Military Tracked Vehicles

COMPANY COMMANDER SUPPORT WEAPONS TACTICAL BRIEFING ON SUPPORT WEAPONS

CONCEPT OF IED/EOD OPERATIONS (CONOPs) FOR ENGINEER MISSION SUPPORT ROBOT TEAM

ANNUAL REPORT ON EXPORTS AND IMPORTS OF CONVENTIONAL ARMS, IN ACCORDANCE WITH ARTICLE 13(3) OF THE ARMS TRADE TREATY. Col. (Rtd.) Saa Anthony Sinah

From vision to reality

THE ARMS TRADE TREATY PROVISIONAL TEMPLATE

Out with the old: Polish land systems modernisation

Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference

Septembre Presentation of the "VAB" Armoured Vehicle

The Sherman Medium Tank

CHAPTER 1 INTRODUCTION

Power Converter Products. For Naval, Aviation and Land Applications

This We'll Defend. Russell Phillips. Shilka Publishing U. S. A R M Y

Gaining Ground. Michael Fabey/AW&ST

Nondestructive testing of composite armours by using IR thermographic method

AMARA-CLASS MAIN HULL

ARCHIVED REPORT. Schützenpanzer Marder- Archived 7/98

British Commando (1934/45)

CTAS Maturity Briefing 9 th April David Leslie, Chairman CTAI

REQUEST FOR INFORMATION FROM VENDORS FOR DESIGNS FOR A FUTURE READY COMBAT VEHICLE FOR INDIAN ARMY

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Combat proven Allen Vanguard blast attenuating seats and Skydex energy absorbing floor panels further enhance crew protection and ride comfort.

ATGM5. land combat weapon. ATGM5: Indigenously Designed, Developed and Manufactured (IDDM)

[11]: Renault FT-17. SAMPLE

FUNCTIONS AND TECHNOLOGY OF DIGITAL TACHOGRAPHS SYSTEMS WITH CONTEMPORARY TELEMATIC SYSTEM IN ROAD TRANSPORT, ON BOARD INFORMATICS NET AND GPS SYSTEM

British equipment losses at Dunkirk and the post Dunkirk situation

POLISH BORSUK IFV UNVEILED? TWO VARIANTS OF THE NEW VEHICLE

ANALYSIS OF BAR AND NET SCREENS STRUCTURE PROTECTING VEHICLES AGAINST ANTI-TANK GRENADES FIRED FROM RPG-7

on base tank T-54, T-55, Type 59, Type 69, Type 79

THE RESEARCH ON DYNAMIC LOADS AND TRACTION PROPERTIES OF MILITARY VEHICLES IN THE ASPECT OF IMPROVEMENT OF THEIR STRUCTURES

AW149 MULTI-MISSION PERFORMANCE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

Journal of Engineering Sciences and Innovation Volume 2, Issue 4 / 2017, pp

ANNUAL REPORT ON EXPORTS AND IMPORTS OF CONVENTIONAL ARMS, IN ACCORDANCE WITH ARTICLE 13(3) OF THE ARMS TRADE TREATY

STU in Lapland. Table 1

AW149 MULTI-MISSION PERFORMANCE

1st Armoured Regiment

WESTA Leading Ukrainian producer of automotive batteries

Archer Artillery Program Mr. Ulf Einefors. Copyright 2000 Bofors Defence AB, A United Defense Company Sign:Peoh/GO

AGRICULTURAL TRACTOR DRIVER S LIMITATIONS OF VISUAL TRANSMISSION IN ASPECT OF ROAD SAFETY IN POLAND. Krzysztof Olejnik

ANNUAL REPORT ON EXPORTS AND IMPORTS OF CONVENTIONAL ARMS, IN ACCORDANCE WITH ARTICLE 13(3) OF THE ARMS TRADE TREATY

TATRA chassis concept

UnSiL. Modification of Diesel Engine Design for Military Vehicles. Version 1.3. October 8, 2009

Future of Defence. Shipbuilding In India. P75 Make in India

REPORT IN-012/2011 DATA SUMMARY

THE ARMS TRADE TREATY REPORTING TEMPLATE

REQUEST FOR INFORMATION (RFI) : LIGHT BULLET PROOF VEHICLE (LBPV)

METHODS OF REDUCTION OF FUEL CONSUMPTION AS MEANS FOR CO2 EMITTED BY SEAGOING SHIPS MINIMISING

FIRST OF THE FRENCH BARRACUDA SUBMARINES IS READY FOR LAUNCH

Protecting the Warfighter

Background. If It Ain t Broke CASE STUDY

SMALL ARMS AMMUNITION

This appendix describes various types of equipment that can

The HIPPO All Terrain Support Vehicle (ATSV)

Project description Environmental issues Beneficiaries Administrative data

WITH REVA, NOBODY GETS LEFT BEHIND!

PROTECTED FAMILY OF VEHICLES

CMI Defence, The authority for weapon systems integrated on high-mobility armoured vehicles

Euro Hawk. EuroHawk GmbH. Prerequisites for a Successful Transatlantic Cooperation

Evaluation of Intelligent Transport Systems impact on school transport safety

A SUPPLEMENT FOR BOLT ACTION CANADIANS. Second World War

PM Individual Weapons Ms. Barbara Muldowney

TOYOTA 76 ARMOURED LANDCRUISER STATIONWAGON

CMI Defence, the authority for weapons systems integrated on high-mobility armoured vehicles

Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division. Before the

THE T IN DETAIL

Transcription:

Journal of KONES Powertrain and Transport, Vol. 16, No. 1 2009 PT-91M. WHAT POLISH ARMY THINKS ABORT THIS? Karol Chodkiewicz Zak ady Mechaniczne BUMAR- ab dy S.A. Mechaników 9, 44-109 Gliwice, Poland tel.: +48 32 7345111 www.bumar.gliwice.pl Abstract The article describes the new products of Zak ady Mechaniczne BUMAR- abedy S.A. developed on the order of Malaysia Government and in particular PT-91M MBTs, WZT-4 Armoured Recovery Vehicles, PMC- LEGUAN Armoured Vehicles Launched Bridge, MID-M Armoured Engineering Vehicles as well as the training simulators and stands. Majority of the new design solutions used within the vehicles have been specified but due to commercial secret only generally without detailed description Author pays attention to innovatory design solution of WZT-4 Armoured Recovery Vehicles, which is unified with MID-M Armoured Engineering Vehicles and the base MBT. Such solution is extremely essential considering logistical and training matters. Test runs which have been conducted both in Poland and Malaysia under tropical conditions and endurance test results have been described. Sets of training stands making training process of service and maintenance easier have been also presented briefly. The material includes a dozen or so photos which depict novelties and evidence run of the tests. The article is a proposal to undertake the issue for modernization of Polish Armoured Forces by the only all over the world reliable industrial centre for modernization of T-72 tanks family which are Companies collected in BUMAR Group. Keywords: main battle tank, Armoured Recovery Vehicles, Armoured Engineering Vehicles 1. Introduction The PT-91M MBT was developed in 1991, as it is indicated in designation of it. Speaking more exactly, tactical and technical assumptions were elaborated for this MBT in this year. It originates, as prototype from T-72M1 MBT which was modernized by OBRUM Gliwice. In the history of the armoured vehicles this type of MBT was known under a cryptonym WILK. Basing on elaborations of OBRUM we manufactured industrial (serial produced) version of the Wilk - PT-91. It was year 1993. During this time, the PT-91Z version was developed within which the fire control system were supposed to be delivered from RPA. Practical tests in Poland and Malaysia proved its technical correctness. MBT PT-91Z was tested on the ranges and mostly on Malaysia territory without greater setbacks. Fortunately for us, such setbacks happened to the Russians, the Ukrainians, the Slovakians and the Swedes. Further tests (1200 km trial run during one month at the range, firing at the range in Drawsko, assessment of offset offer and license politics including complex training courses, secured provision with the spare parts and making documentation available to start production in Malaysia, presentations of disassembly and assembly engineering processes of selected units and systems) have influence over possibility to sign the Contract for delivery of the quality-new armoured equipment. 2. Scope of Malaysian contract Zak ady Mechaniczne BUMAR - AB DY S.A. is the only Polish manufacturer of PT-91 and T-72M1 MBTs, WZT-3 Armoured Recovery Vehicles and the main producer of the base vehicle for the LOARA anti-aircraft set and the chassis KRAB provided for 155 mm howitzer

K. Chodkiewicz manufactured by Huta Stalowa Wola. In 2007 we realized also the contract for delivery of 228 WZT-3 to India (totally 359 vehicles have been sent there). The Malaysian Contract is the first such complexly realized Project at ZM and probably in Poland. In April, 2003, BUMAR Ltd Warsaw signed the Contract for delivery of the armour equipment for Malaysian Army. ZM is the main contractor of this Contract. The Contract covers four vehicles: PT-91M MBT; WZT-4 Armoured Recovery Vehicle, PMC-Leguan Armoured Vehicle Launched Bridge and MID-M Armoured Engineering Vehicle (product of OBRUM- Gliwice). Practically, each of these vehicles has been designed from the grounds due to specific technical requirements of the contracting party. Moreover, the Contract comprises also the training stands and sets of the integrated logistic support. Specialistic training of the staff is conducting as well as assistance to start production of the selected assemblies and parts in Malaysia are rendered. In the future, assembly of MBTs in Malaysia will be started. Practically, it can be said that it is implementation of totally new equipment and involved infrastructure for equipment of the army. 2.1. Tests in Poland and Malaysia Completely a new think, in relation to the procedure of contracts that have been realized hitherto, was a condition imposed by the Malaysians to obtain firstly positive results of tests by the Sealed Pattern. The production process was started only after signing the official protocol with test results by Government Representative. Before it took place, ZM representatives with participation of Malaysian officers delegated to stay in Poland carried out very detailed tests. They were performed at two stages in Poland and in Malaysia. Test program covered both running in different terrain, terrain obstacles negotiation and firing. Totally the MBT covered required distance of 2000 km and more than 220 rounds were fired from the gun. Unfortunately the tests of the first vehicle were not passed due to failure of one of the unit delivered from France. Fig. 1. MBT PT-91M one of the most modern tanks within its class in the world tests at the range The second test which was repeated according to complete tests program was finished successfully in February, 2007. Results of such exacting and multi-furiously conducted tests of the MBT created the ground to implement improvements and modifications within many systems of the MBT. 70

PT-91M. What Polish Army Thinks Abort this? Fig. 2. Obstacle negotiations and maintenance during tests Package of the most modern devices for MBT PT-91M comprises: Fire control system SAVAN 15 / VIGY 15 Stabilizer with electrical drives New version of the gun Backlash-free under-turret bearing with permanent resistance torque Land navigation system (LNS) Battlefield management system (BMS) OBRA-3 Multi-purpose self protection system of the MBT Auxiliary Power unit Air conditioner Means of communication Anti-explosion and fire suppression system Engine of power 1000 KM and automatic transmission ESM-350 blocked together into quick dismounted power pack system Modified running gear and suspension Wiring made in system of Raychem Company Thermal camouflage Some of the required assemblies are used within all the vehicles (power-pack, air conditioning system, auxiliary power unit, navigation systems), however their assembly procedure is different as an effect of specific accommodation on each of the vehicles. That s why we made new versions of WZT-4 and tracked chassis mounted bridge PMC-LEGUAN. Except for modifications within 71

K. Chodkiewicz propulsion system the recovery vehicle WZT-4 is equipped with the hydraulic winch of pull force 30 ton and the crane of lifting capacity 20 ton. The bridge PMC-LEGUAN is completely new position in respect of quality. The bridge spans of German production of MAN Company were installed on special adapted for his purpose MBT PT-91M chassis. 3. WZT-4 Armoured Recovery Vehicle Armour Malaysian Contract obliged Polish designers of the armour equipment to work out the armoured recovery vehicle which would be unified with the basic MBT PT-91M, e.g. driven by 1000KM engine PZL Wola S-1000R, integrated within the power-pack with the automatic transmission SESM Renk ESM-350M and with reinforced running gear. It would seem that the logical way is to design this vehicle basing on structure of WZT-3 vehicle. However analysis shown that the MID-M engineering vehicle would better as a pattern for the subject vehicle. Following this way, except achieving high degree of uniformity with MID-M vehicle, which resulting in, among other thinks, identity of: ergonomics of crew work for vehicles as well as many spare parts, maintenances and trainings. It caused also improvement of service operation comfort and increase of capability to perform lifting operation before the vehicle. The reason for this is position of the crane. In both vehicles WZT-4 and MID it is located at right side of the vehicles with area which is free from fumes from the main engine and the auxiliary power unit (fumes outlets are situated at left side). Concept of WZT to make use of the hull of MID and systems of MBTPT-91M was initiated by OBRUM Gliwice and ZM Bumar ab dy. The specialistic equipment the hydraulic crane of lifting capacity 20 ton, the hydraulic winch with the rope force limiter and permanent measurement of force, the hydraulic control system via the network CAN as well as the suspension hydraulic locks are the products of OBRUM. Designing works at the vehicle have been started parallel with elaboration of the MBT. However they have been concentrated mostly on the specialistic equipment. The hull of vehicle was already welded in 2006, but its equipment was started only in midyear of 2007, after successful terminations of tests of SP2 prototype of MBT PT-91M. Such approach allowed implementing all corrections resulting from the MBT tests on the stage of building the prototype and at the same time the first serial vehicle. WZT-4 was completed at Zak ad Produkcji Specjalnej ZM Bumar ab dy in July this year, and the factory tests were started at the end of July. The factory tests were conducted together by ZM Bumar ab dy and OBRUM. WZT-4 has the specialistic equipments enabling to perform such tasks as: Tracked vehicles evacuation from a battle - field; Recovery of got boughed tracked vehicles in different terrain conditions; towing of unserviceable armoured tracked vehicles; Earth moving activities with the use of the dozer blade (preparation of trenches, combat stations for MBTs, clearance works through banks and scarps and others); Execution of assembly-disassembly works by means of the crane; Execution of works related to repair of the structures made of the armour steel by means welding and cutting equipment and by delivery of spare parts and assemblies; Participation in repair of the combat vehicles with the rich sets of tools and instruments; Application of the first aid medical care as well as evacuation of the wounded from the battle-field; Keeping two-sided communication between vehicles thanks to use two radio-stations in vehicle. 72

PT-91M. What Polish Army Thinks Abort this? Fig. 3. WZT-4 during terrain tests (interchangeable power pack is visible on the loading box) 4. PMC- LEGUAN Armoured Vehicle Launched Bridge It is vehicle for two persons which enables negotiation of terrain obstacles of width 25 m by MBTs and other vehicles. The bridge spans are of 26 m in length the load capacity corresponding to class MLC60 (54.75 t) have been installed on MBT PT-91M modified chassis. The bridge is launching in slidable way what is the new solution In Poland. Armament of the bridge consists of the machine-gun of the 12.7 calibre (NATO standard) and smoke grenades launchers. Fig. 4. PMC-LEGUAN bridge: 1-base vehicle, 2-bridge span, 3-laying arm, 4-laying arm cylinder, 5- span main bracket, 6-auxiliary blade (support) 73

K. Chodkiewicz 5. MID-M Armoured Engineering Vehicle Fig. 5. PMC-LEGUAN bridge during factory tests MID-M is designed for realization of works related to protection of combat missions of the engineering troops mainly and in particular: protection of troops movements, earth moving works including possibility of crossings, rescue-evacuations activities, execution of earth barriers (the dozer with changeable angle of the blade positioning), pulling out and towing unserviceable combat vehicles. The manipulator of lifting capacity 7 ton makes possible to perform complex reloading works. The interchangeable bucket of capacity 0, 96 m 3 and the jaw grab constitute general-purpose working set. Practically MID-M can make its tasks within each intermediate zone and at direct contact with the enemy, in different terrain and atmospheric conditions, in area contaminated with nuclear and chemical weapon, in mass-destructions area as a result of use of conventional and nuclear weapon. As a result of unification with WZT-4 this vehicle is also equipped with the winch of pull force 30 ton as well as the auxiliary winch of rope pull force 2 ton and rich range of equipment what allows to determine the MID-M as the perfect field repair workshop. Fig. 6. Engineering Vehicle MID-M after stationary tests 74

PT-91M. What Polish Army Thinks Abort this? As shown by above mentioned examples, the workers of Zak ady Mechaniczne BUMAR AB DY S.A. and Spó ki Zale ne have conducted entire implementation process of the new MBT and its application, they have achieved tremendous knowledge and experience during realization of the contractual statements. It also creates unique possibility of low-cost use of the new solutions for other buyers. Therefore, in our opinion a lot of the new solutions used within the Malaysian vehicles can and should be used also in Polish MBTs. It is most likely that such unusual occasion, in the form of possibility to implement solutions coming from the world leading manufacturers into serial production will not be probably repeated. That is why we from our side declare readiness for widely understood cooperation. Some of the solutions as individual systems (navigation systems and battlefield management system, air conditioner, auxiliary power unit, fire suppression system, machine-guns with NATO ammunition) can also be used in another vehicles such as KTO Rosomak, LOARA, KRAB and others. From our side, we also declare active participation in each undertaking which will be aimed at development of Polish Armour Forces. Polish Nation can not afford to finance development of the armour industry, the industry itself also will not able to bear it, sub-vendors are waiting for financial support. So, today we have unique chance to make use of new experiences. We have found a serious partner who had financed majority of the new solutions. It means directly that the army decision-makers should active participate in upgrading process of PT-91 MBT and make use of this process skilfully in future. So far, as BUMAR Group we are the only reliable centre for industrial modernization of T-72 tanks family all over the world and for sure we will not want to resign of it. 6. Training stands Several training stands have been designer and manufactured together with the combat and technical vehicles. Tank mock-up Vehicle to train drivers 75

K. Chodkiewicz Stand to train service of Power pack Imitator of armoured recovery vehicle working units Fig. 7. Training stands 76