Specification for Remanufacture Alstom Model 5 Switch Machine

Similar documents
Badger Truck Refrigeration, Inc. Warranty Policy

AT Clutch Major Service Sizes 25, 55, 115

Warner Electric UNIBRAKE Motor Brakes

P-286 (WC-58/59) Wichita Clutch. Service & Installation Instructions

SFP-250 and SFP-400. Installation Instructions. An Altra Industrial Motion Company P-231-WE

Service Letter. Ariens Company 655 W. Ryan St. Brillion, WI

TYPE S RELAY VALVE (Volume booster) Service Manual

Compressor Clutch Replacement Procedure

STAINLESS STEEL FORGED FITTINGS 3000lb 304/304L & 316/316L Forged Stainless Steel Fittings Product Specifications

PARTS DIAGRAM INSTALLATION INSTRUCTIONS

MULTIPOSITION AIR CYLINDER

Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R (Formerly P )

20250 Module Installation Guide

Rig Master Power by Mobile Thermo Systems Inc.

Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P Replaces Part No. P

Straight-Bore Clutch LSCC-32, 44, 54

DODGE CUMMINS 24V ISB OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

PARTS MANUAL 360 ROTATOR MODEL NUMBER R Industrial Way Lebanon, Oregon FORKLIFT ATTACHMENTS

Mercedes MBE 906/ L & 7.2L Engine Module. Part # Installation Instructions

30100 Module Installation Guide L

Manufacturing Facility is ISO9001:2000. Welded Steel Pipe Conform to ASTM A53. Threads Conform to ASME B1.20.1

Advanced Technology Tension Clutches

½ DODGE CUMMINS OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

WARRANTY POLICY. Grid-Tied Photovoltaic Inverters. Revision D. 2014, Solectria Renewables, LLC DOCIN

Compressor Clutch Replacement Procedure

15100 Module Installation Guide Mercedes EPA07 w/dpf

PVI 60KW, PVI 82KW, PVI 95KW

Type Flexair Pneumatic Pressure Control Valves

PVI 1800/PVI Residential/Commercial Grid-Tied Photovoltaic Inverter WARRANTY MANUAL. Subject to Change REV , Solectria Renewables

SERIES 740 VALVES PNEUMATIC DIRECTIONAL CONTROL

Female Plug. connecting to Fuel Quantity

GM 6.6L Duramax. Up to 90HP Gain. AgDieselSolutions.com

DODGE CUMMINS Air-Boss CR Intake Plenum

DODGE CUMMINS Arctic-Heat Grid Relocation Kit

JDCR2000 Module Installation Guide

p.t.o. Slip clutch Read this material before using this product. Failure to do so can result in serious injury. Save this manual.

PMD DRIVER RELOCATION KIT For Chevy 6.5L Diesel Trucks

ERD Electrically Released Brakes

JD2800 Module Installation Guide

MULTIPOSITION AIR CYLINDER

Through-Shaft Clutch-Brake LSCB-32HT, LSCB-32HT, LSCB-44, LSCB-44HT, LSCB-54HT FORM NO. L D-0606 MEX (55) QRO (442)

900 SERIES SPLIT CASE FIRE PUMP REPAIR PARTS INDEX

Cummins N14 Celect & Celect Plus Engine Module. For Agricultural Applications Only. Part # 31200

LUG CENTERING HUB CENTERING LUG CENTERING SPACERS, SPRINGS AND DONUTS Quick Plates Series IV

Warranty Information North America

TONS. Before each shift: Before operating: Before initial operation of hoist:

CU6703 Module Installation Guide

60 Series End-Mount Brake Instructions Standard Housing

Dodge Ram 5.9L Cummins LOW FUEL PRESSURE ALARM LIGHT - Installation Manual -

DODGE CUMMINS GDP Big Line Kit

Procedure to Install the New Autogap components in ER-1225 and ER825 Brake with inverted Armature Hub

1000-LB. ENGINE STAND

Step 3: Remove the six 8mm retaining bolts for the pressure manifold switch assembly. The manifold switch will not be re-installed.

Deere G & GP Series Snow Wing Installation

A/C PRESSURE MONITOR INSTALLATION INSTRUCTIONS SYSTEM OPERATION GREEN INDICATOR LIGHT

TRUCK PRODUCT LINE A DIVISION OF DAKOTA FLUID POWER, INC.

SOLAR DASH CHARGING SYSTEM USER GUIDE

2000-LB. ENGINE STAND

INSTRUCTIONS TUBULAR CONTROL ARMS & COIL-OVER CONVERSION FOR AMC MUSCLE CARS: 1970 AMX JAVELIN SPIRIT, HORNET, GREMLIN, CONCORD

Jeep JK 6 Switch Panel

TALCO FIRE SYSTEMS. LSF Start-Up Instructions. 1) IMPORTANT: Inspect the unit for damage. Report any damage to the freight carrier immediately.

RVT SERIES HEAVY DUTY TRIPPING SNOW PLOW

MDP Multi-Directional Folding-V Snow Plow

RPD SERIES HEAVY AND SEVERE DUTY SNOW PLOW

Series K Pneumatic Switch Mechanism

L DODGE CUMMINS Maximizer System

DODGE CUMMINS GDP Twin CP-3 Big Line Kit

L DODGE CUMMINS MK-2 + BLK APPS Mount

Rear Sway Bar for XC90 ( ) 2.5T and T6 ipd mounting kit SBK42

Electromagnetic Particle Brakes Model: PRB-H

DODGE CUMMINS MK-2 Micro-Kleen System

Mega-Rail System Installation

Owner s Manual Ford Powerstroke 7.3 liter CAUTION: THIS IS A HIGH PERFORMANCE PRODUCT. USE AT YOUR OWN RISK.

6-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

HIGH DUMP ROLL-OUT BUCKET

1250 LB. CAPACITY MECHANICAL WHEEL DOLLY

Max Clearance Arctic Cat Forward Front Upper & Lower Arched Control Arm Kit

Single-Position Detent Clutch DC Series. (i) MTY (81) MEX (55) QRO (442)

Stellar 4 Clutch Manual

Max Clearance Polaris Sportsman Arched A-arm Kit

Primary Brake Spline Drive Armature PB-825, PB-1000, PB-1225, PB-1525

Gen 2 Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB

TB Series Brakes Tension Control System

ActuLink ABS Module - ABS-MOD-400

Component Size Weight Capacity

INTRODUCTION INSTALLATION

VERTICAL AND HORIZONTAL SPLIT CASE FIRE PUMPS

*70200BAG1* 70200BAG FORD F150 GRILLE LIGHT MOUNT

PNEUMATIC PIPING DEVICES Service Information

Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB Size 50, 100, 180

Superlift Level-It System for Dodge 1500, 1994 and newer Dodge 2500 / 3500 INSTALLATION INSTRUCTIONS

Owner s Manual Supplement. Liquefied Petroleum Gas (LPG) Fuel System for 1998 GM Medium Duty Chassis (C-60/C-70) with 6.0L and 7.

Thank you for choosing Rough Country for all your suspension needs.

Crestron MMK-G1-CBF-T Mud Ring Mount Kit for Cameo Installation Guide

EZ Carrier 3. Owner s Manual. Keep instructions for future reference

PATRIOT LIFT CO. ON-Lift Installation Guidelines

5 Year / 160,000 km (100,000 mi) ** 1 Year / 30,000 km (19,000 mi) 3 Year / 100,000 km (62,000 mi)

L007 LIQUID LEVEL FLOAT SWITCH. Side-Mounted Liquid Level Float Switch INSTALLATION AND OPERATIONS MANUAL

Electro-Brake 375, 475, 650, 825, 1000, 1225

AGCO. Corn Header Manual d HEADSIGHT.COM

Transcription:

Alstom Model 5 Switch Machine

This page is intentionally left blank for the purpose of double sided printing Alstom Model 5 Switch Machine - Page 2 of 9 - (262) 658-3590

TABLE OF CONTENTS 1 SCOPE AND INTENT.5 2 GENERAL.5 2.1 Receiving Cores.. 5 2.2 Inspection..5 2.3 Internal Components..6 2.4 Adjustment and Testing...7 2.5 Documentation..8 2.6 Shipping..8 2.7 Quality Assurance.8 3 ORDERING INFORMATION.8 4 WARRANTY..8 Alstom Model 5 Switch Machine - Page 3 of 9 - (262) 658-3590

This page is intentionally left blank for the purpose of double sided printing Alstom Model 5 Switch Machine - Page 4 of 9 - (262) 658-3590

1 SCOPE AND INTENT This document describes remanufacturing standards for a Alstom Model 5 Switch Machine. Work shall be performed in a manner that is consistent with the requirements of the Alstom service manual. 2 GENERAL 2.1 Receiving Cores 2.1.1 Units received are to be physically inspected upon arrival for physical damage that may have occurred in service or shipment. 2.1.2 All units shall be tagged to identify specific customer ownership. 2.2 Inspection 2.2.1 Machines are to be completely disassembled and inspected for worn, damaged, and defective components per O.E.M. specifications. a.) All components are degreased and sand blasted in accordance with procedures acceptable to component makeup. b.) All castings shall be checked for cracks and/or breaks. c.) Contact compartment and all contact blocks shall be checked for grounds and cracks. d.) Complete machining of frame as needed and all bearings and bushings replaced. e.) Locking components of machines shall be inspected to insure that the machine is capable of properly locking. f.) All grease and oil fittings will be replace with new. g.) All roller bearings and seals shall be replaced with new. h.) All grease, oil, lubricants, adhesives, and paint shall be specified to operate properly throughout the temperature range for switch machines (-40 to +85 Celsius). i.) All tapped holed and threaded fasteners that are reused, shall be cleaned with the appropriate tap or die. j.) Hand throw (if equipped) shall be inspected to insure it is not broken or bent, and that it is functioning properly. k.) All gears and gear shafts shall be inspected for wear and broken teeth. l.) All bars shall be inspected for excessive wear and straightness. Alstom Model 5 Switch Machine - Page 5 of 9 - (262) 658-3590

m.) Contact Compartment parts shall be inspected to insure that they are capable of being rebuilt in accordance with the following sections and that no major parts are broken or missing. n.) Standard machine hardware shall always be replaced with new. Finishes shall be stainless steel or zinc with yellow chromate. 2.3 Internal Components The following section outlines the requirements for remanufacturing of the internal components within the machine. During the remanufacturing process, care shall be taken to insure that critical machined surfaces on parts are not damaged by cleaning or contaminated with paint. O.E.M. parts or approved equivalent should be used. 2.3.1 Motor a.) Armature will be rewound and coated b.) Coils will be rewrapped, if necessary, and new wires added. 2.3.2 Clutch a.) The clutch housing shall be completely disassembled, sandblasted, and inspected. b.) Clutch housing shall be painted as required. c.) All discs, metal and friction, shall be replaced. 2.3.3 Hand Throw (if equipped) a.) The hand throw assembly shall be completely disassembled, degreased, sandblasted, inspected, and painted. b.) The hand throw ball detent components shall be inspected and if necessary, replaced and refurbished. c.) The hand throw shall be reassembled, lubricated, and tested for proper operation. 2.3.4 Gear Compartment a.) The gear case shall be disassembled completely, degreased, sandblasted, inspected, and painted. b.) The bushings shall be inspected for excessive wear and shall be replaced if necessary. c.) Gear teeth shall be inspected and dressed with a file if necessary or replaced. d.) Gear case shall be reassembled, lubricated, and tested for proper operation. Alstom Model 5 Switch Machine - Page 6 of 9 - (262) 658-3590

2.3.5 Base Casting a.) Base casting shall be degreased, sandblasted, inspected, and painted. b.) Prior to sandblasting and painting, lock rod and point detector wear plates shall be replaced. 2.3.6 Contacts a.) The circuit controller shall be disassembled, cleaned, and inspected for excessive wear. b.) Circuit controller shall be reassembled, adjusted, and tested per O.E.M. requirements. c.) All components shall be inspected for defects and replaced if necessary. 2.3.7 Wiring Harness a.) The wire harness shall be replaced with new. b.) Wire shall be #12 AWG for current carrying circuits, and #14 AWG for indication carrying circuits. c.) All wire tags and terminal post tags shall be replaced with new. 2.3.8 Covers a.) All switch machine throw bar and lock rod covers will be inspected and replaced if necessary with new. b.) Cast iron covers will be replaced with aluminum covers, if requested by customer. 2.3.9 Paint a.) Machines will be powder coated black, unless customer specification require otherwise. 2.3.10 Lubrication a.) Machines will be lubricated according to O.E.M. lubrication instructions found in the Alstom Service manual. Alstom Model 5 Switch Machine - Page 7 of 9 - (262) 658-3590

2.4 Adjustment and Testing 2.4.1 All machines must be fully assembled and tested per O.E.M. specifications. 2.4.2 Upon final assembly suitable grease shall be applied to wear surfaces and unpainted surfaces that are not composed of naturally corrosion resistant material. 2.4.3 Each machine shall undergo a functional test that verifies the proper operation of the circuit controller, point detector, hand throw, and cut out switches. 2.4.4 Each machine shall be tested under simulated field load conditions. 2.5 Documentation 2.5.1 All switch machines will be identified with a serial number located near the mounting holes of the machines footprint, and on the motor. 2.5.2 A copy of the switch machine inspection documents shall be included. 2.6 Shipping 2.1.1 Each machine shall be individually palletized. Pallets are made to size to accommodate the size of the switch machine; the machine is secured to the pallet with 4 carriage bolts and the appropriate hardware. 2.7 Quality Assurance 2.7.1 Each switch machine and internal components shall be inspected for defects. A technician other than the technician who performed the remanufacturing of the machine shall perform the inspection. 3 Ordering Information will need the Alstom switch machine order form to be filled out prior to remanufacture. 4 Warranty warranty information can be found on page 9 of this specification. Alstom Model 5 Switch Machine - Page 8 of 9 - (262) 658-3590

Warranty Information We warrant that goods remanufactured or manufactured by, will when delivered to you conform to our product specification or original equipment manufacturer specification and be free from defects in material and workmanship. If within three years for relays and/or five years for switch machines and all other products one year from the date of shipment, goods fail to function under normal and proper use and service because of defects in material or workmanship demonstrated to our satisfaction to have existed at the time of delivery, we will, reserving the right to either inspect them in your hands or request return to us, at our option, repair or replace the defective good(s) at our expense, FOB our plant. In any event, all dismantling, reassembly, packaging and transportation costs are assumed by the customer. We shall not warrant any part, or parts of any type of equipment sold by us to you that have been installed without proper inspection or testing prior to installation. We shall not warrant relays, switch machines or any other product or products sold to you if they are not installed properly, not properly inspected and/or maintained, altered or damaged while installing or by other equipment. We shall not be liable for the cost or expense, including labor, in connection with removal or reinstallation; for the indirect incidental or consequential damages of any kind nor for any claim or claims arising out of the supply or use of our products. You will hold us harmless and indemnified against any and all claims, demands, liabilities, damages, costs and expense resulting from our sale of products or parts or any goods sold to you. No goods may be returned more than thirty days after the date of delivery except with our written consent. Standard goods may be returned within thirty days after delivery, subject to a cancellation and restocking fee of 15% of total order value. If the box, container or packaging has been opened, standard goods may be returned within thirty days after delivery, subject to cancellation charge of 25% of the total order. The rights and duties of the parties shall be governed by the laws of the state of Wisconsin. Alstom Model 5 Switch Machine - Page 9 of 9 - (262) 658-3590