TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded T.O.O.{CE-Constructionl400kV) Ms.No. 402, dt: 2.03.2013 Ref :T.O.O.(CE-Construction/400kV) Ms.No. 248, Date: 1-11-2012. PROCEEDINGS: In the T.O.O. cited Administrative approval was accorded for the transmission scheme for "Evacuation of Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh" at an estimated cost of Rs.3033.69 Crore and Rs.324.0 Crore "towards Interest During Construction (IDC). The total cost of the scheme including IDC is Rs.337.74 Crore. 2. The Chief Engineer/Construction-Il vide U.O.dated:04.12.2012 requested to arrange for according revised administrative approval. for construction of 400/220/132kV Substation at Jammalamadugu, Thalamanchipatnam (V) in Mylavaram (M) instead of 400/220kV Substation at Kondapuram and 220kV Substation at Jammalamadugu, to avoid submerging Gandikota Project (GNSS) and forest clearance and also vide U.O.dated:22.12.2012 requested to include 33 kv features at 2 Nos. 220kV Substations at Betamcharla and Shakrayapet for Phase -I works of Wind Evacuation scheme. 3. The Chief EngineerlPower Systems vide U.O.dated:28.12.2012, informed that, APTRANSeO has approved for LILO of both circuits of 220kV Moose DC line proposed from 400kV Uravakonda SS to 220kV Kalyandurg SS at 220kV ~rampal.!i SS and also approved to include LILO works under Phase-I works while calling tenders. 4. After careful consideration, APTRANSCO accords revised administrative approval for the transmission scheme namely "Evacuation of Wind Power in Kadapa, Anantapur and K urnool districts of Andhra Pradesh" at an estimated cost of Rs.308.46 Crore and Rs.314.79 Crore towards Interest During Construction (IDC). Rs.3373.2 Crore, as per the Annexure -I, enclosed. The total cost of the scheme including IDe is Contd....2
::2::. The Chief Engineer/Construction/400 kv and the ChiefEngineer/Construction-II, Vidyut Soudha. Hyderabad are here by authorized to take up the Phase -I works of the comprehensive scheme immediately. as per Annexure II, making necessary budget provision and funds tie up. 6. The Finance wing of APTRANSCO will be requested for funds tie up for the Phase -I works at an estimated cost of Rs.194.63 Crores initially out of the estimated cost of Rs.308.46 Crores and Interest During Construction of Rs.314.79 Crores (i.e. Rs.3373.2 Crores including IDC) for the Comprehensive Scheme. 7. In exercise of the powers conferred vide G.O.Ms.No.11, dated 07-10-2003 of Government or Andhra Pradesh, APTRANSCO or their authorized representatives shall have the powers for placing of the electric supply lines or electric plant for the transmission of electricity or for the purpose of telephonic or telegraphic communications necessary for the proper co-ordination of works that a telegraphic authority possesses under the provision of the Indian Telegraph Act. 188 (Central Act-13 of 188). 8. This order is issued with the concurrence of the Director (Finance & Revenue) vide Regd. No.963, dated :06.03.20l3. (BY ORDER AND IN THE NAME OF TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED) End: Annexure 1&11 To The Chief Engineerl Construction/400kVI Vidyut Soudha, Hyderabad The Chief Engineerl Construction-Il/ Vidyut Soudha, Hyderabad DIRECTOR! PROJECTS APTRANSCO II FORWARDED BY ORDER II Divisional Engineer Construction/400kV Contd...J
Annexure -I Abstract Estimate :: Evacuation of Wind Power In Kadapa, Anantapur and Kumool districts of Andhra Pradesh ABSTRACT ESTIMATE SI.No. Description of Unel Substation Lengthl Capacity Estimated Cost A: 400kV Hlndupur Substation: (Amount in Lakh Rs.) 1 400/220kV Substation at Hlndupur - 3 Nos. 31 MVA PTRs 3x31 MVA 11.422.90 2 80 MVAR BUI Rector 1 No. 96.00 3 400kV DC Quad Moose Une from Hlndupur SS to 400kV Uravakonda SS 4 400kV DC Quad Moose Une from Hlndupur SS to proposed 76/400 kv Madhu!lirl SS 400kV Quad Bay Extensions at Madhuglrl (PGCIL) Substation 6 220kV DC Moose Une from 400kV Hlndupur SS to 220kV Penukonda SS 7 220/132 kv Substations at Penukonda 130 km 31,200.00 40 km 9.60000 2 Nos. 1.280.7 0 km 3,492.00 2x100 MVA 1,961.43 8 220kV DC Twin Moose line from 400kV Hindupur SS to 220kV Pampanur Tanda SS 9220/132 kv Substation at PampanurTanda SUb-Total(A): 90 km 10,701.00 2x100 MVA 2,10B.14 72,731.22 B:400kV Jammalamadugu Substation: 1 400/220/132kV Subltatlon at Jammalamadugu 2 400kV Quad Bay Extensions at Kurnool 400kV Substation 3 80 MVAR Bus Rector 4 400kV DC Quad Moose Line from 400kV Jammalamadugu to 400kV Kurnool SS 4x31 & MVA 14,94913 2X1GO 2 Nos. 1.181$0 1 No. 96.00 12 km 3000000 400kV DC Quad Moose Line from 400kV Kondapuram to 400kV Uravakonda SS 110.00 km 26,400.00 6.i20kV DC Moose line from 400kV Jammalamadugu SS to 220kV Tlrumalalpally... S.8.... _._...... 7 220/132 kv SubstaUon at Tlrumalalpally 8 220kV DC Moose line from 400kV Jammalamadugu SS to 220kV Betamcherla 9 2201132133 kv Substation at Betamcherla /10 220kV DC Moole line from 400kV Jammalamadugu S to 220kV Chakrayapet v..s.-. ----. L 1..Ql-~!)(1~:j Ii. _._. 11 220/132133 kv Substation at Chakrayapet "::.-~0 -_,')) ~.:~ 'J I.f. I 220kV DC Moose line from 400kV Jammalamadugu SS to 220kV Porumamilla 'p SS.,., \.. ICi )13 220/132 kv S~bstatlon ~?Pdrumarr:i"t) ': I'. 17 km 1,187.28 2x160 MVA 2,38.6 68 km 4,749.12 2x100& 2)(31 MVA 2.704.1 70 km 4.88B.80 2)(100 & MVA 2)(31 J 2.309 7 km,238.00 2x100 MVA 1,906.26 Sub-Total (B): 99,427.64 C:400kV Uravakonda Substation: 1 400/220kV Substation at Uravakonda 2 400kV Quad Bay Exten6ion~ at Mahaboobnagar 400kV Substation 3 80 MVAR Bua Rector.400kV DC Quad Moose line from 400kV Uiaitakonda SS to 400kV 4 Mahaboobnagar SS 4x31 MVA 14.22.91 2 Nos. 1.943.3 1 No. 96.00 190 km 4600.00 220kV DC Twin Moose line from 400kV Uravakonda SS to 220kV Vajrakarur SS 13 km 14.70 6 220/132 kv Substation at VaJrakarur 1x100 MVA 1.16 7 220kV DC Twin Moose line from 400kV Uravakonda S to 220kV Borampalll S 68 km 8,08.20 8 220/132 kv Substation at Borrampalll 1x100 MVA 1,.16 Sub-Total (e): 7,47.48
D:220kV Interconnectlvltlea: 1 220kV DC Moose line from 400kV Hlndupur SS to 220kV Hlndupur Substation 20 km 1.39680 2 220kV DC Moose line from 400kV Uravakonda S8 to 220kV KalyanDurg SS 0 km 3,492.00 LiLO ot both the circurts of 220kV DC Moose line from 400kV Urevakonda SS to 3 10 km 1,3680 220kV Kalya!'Dur" S8 8t_22~.!<V~or8mpalll. S 4 220kV DC Moose line from 400kV Jammalamadugu SS to 220kV Tadlpatrl SS 40 km 2,793.60 220kV Bay Extensions at 220kV Hlndupur Substation Nos 221.90 2 6 220kV Bay Extensions at 220kV Kalyandurg Substation 2 Nos. 221.90 7 220kV Bay Extensions at 220kV Tadlpatrl Substation 2 Nos. 221.90 Sub- Total(D): 9,744.90 :2rconneCtlVltlea:.. 132 kv DQ.line from 22.9/132 kv ~~nukonda _ t~ 1~~/33 kv Penukonda S8 kv DC line from 220/132 kv Jammalamadugu SS to 132/33 kv Jammalamadugu SS 10 km 12 km 30.04 ".- 441.70 I) '-L\JrJJ b~)') ~ 132 kv DC line from 220/132kV Porumamllla SS to 132/33 kv Porumamllla SS 10 km 441.70 I),) i.. \:' ).. : 4 132 kv Bay Extensions at 132/33 kv Penukonda Substation 2 Nos. 132.80 132 kv Bay Extensions at 132/33 kv Jammalamadugu Substation 2 Nos. 132.80 6 132 kv Bay Extensions at 132/33 kv Porumamllla Substation 2 Nos. 132.80 Sub-Total(E): 1,811.84 F : Communication Equipment: (i) 400kV Works LS (II) 220kV Works LS 6269.74 (III) 132kV Work. LS Total (A+B+C+D+E+F) : 26,460.82 G Special T & P @ 1% : 2.64.61 Total (A+B+C+D+E+F+G) : H Contingencies (3%) : Total Including contingencies: 268,11.43-8.043.46 276,18.89 I Estt. and other charges @ 10.7%: Grand Total: 29,687.08-30.84.97 or Say (Ra. In Crorea) :: Interest During Construction (Rs. In Crorea) : Total (Including IDC) - (Ra. In Crores) : 3,08.46 314.79 3,373.2 Sdf CHIEF ENGINEER Construction/400kV