R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

RFP Corrigendum No. 01

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

Annexure. Technical Details Package 1

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

ANNEXURES. ANNEXURE-I SRLDC vide letter dated 18 th September The updated status of upcoming Inter Regional Scheme ANNEXURE-II

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

THE ANDHRA PRADESH GAZETTE PART IV-B EXTRAORDINARY PUBLISHED BY AUTHORITY [No.1] HYDERABAD, THURSDAY, JANUARY 24, 2013

NOTIFICATION RURAL ELECTRIFICATION PLAN

PRAGATI ENGINEERING COLLEGE

Need Assessment Document (NAD) DDUGJY

Development of Power Sector in Andhra Pradesh (With reference to Performance of APEPDCL)

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

System Improvement Scheme(R&M) : FY

Dairy Cum Powder Plant

2. UPSET VALUE OF SCRAP VEHICLES:

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Bus Requirement in Indian Cities

CUSTOMER/ TWIN ARROWS PROJECT

160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

Bangladesh s Power Sector : At a Glance

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

PRESS RELEASE ON 19March, 2018

Transmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

MILLIGAN SOLAR PROJECT

Guidelines for Solar Grid Power Projects

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

HVDC Systems in India

100 MW Wind Generation Project

Power Sector in Andhra Pradesh and Telangana during February 2016

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Solar Energy Corporation of India New Delhi-17

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

FINANCIAL HIGHLIGHTS AND BUDGET ESTIMATES

GOVERNMENT OF ANDHRA PRADESH ABSTRACT ****

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

IJRASET 2013: All Rights are Reserved

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

TRANSMISSION CORPORATION OF TELANGANA LIMITED (Website: CIN No: U40102TG2014SGC094248)

RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS

North Oregon Coast Area Study. Adam Lint

GOVERNMENT OF TRIPURA TRANSPORT DEPARTMENT. No.F.7(2)-Trans/2010 Dated, Agartala, October, 2011 N O T I F I C A T I O N

ATTACHMENT - DFO STATEMENT OF NEED

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

Review paper on Fault analysis and its Limiting Techniques.

Analysis of Indian electricity distribution systems for integration of high shares of rooftop PV By Joerg Gaebler, IGEN Solar, GIZ India

TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED CUDDALORE ELECTRICITY DISTRIBUTION CIRCLE/CAPPER/HILLS/CUDDALORE-4.

TECHNICAL SPECIFICATIONS

CORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Comprehensive project bid to grant in concession GTS Project 220 Kv Tintaya - Azangaro Transmission Line. GTS: Guaranteed Transmission System

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

Implementation of the recommendations of the Fifth Punjab Pay Commission T.A./ D.A.

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

Indian Power System Framework

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

ROLLING SHUTTERS. Profile No.: 42 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

KANPUR ELECTRICITY COMPANY LIMITED

PREPARED DIRECT TESTIMONY

Green Energy Corridors- KfW Experience


MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

v Deborah Flint - Chief ecutive e, ficer

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

Bihar: Transmission System Study for 13 th Plan

Report. the feasibility of

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Sub Regional RTEP Committee Mid-Atlantic

Mysuru PBS Presentation on Prepared by: Directorate of Urban Land Transport

ABB POWER SYSTEMS CONSULTING

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

All these significant changes indicate that there will be an all round quality consciousness in the country in future.

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series

CHAPTER 20 MOTOR VEHICLES

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

(i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon (Haryana)

Study on. Business. Forum of Regulators (FOR) New Delhi

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Transcription:

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded T.O.O.{CE-Constructionl400kV) Ms.No. 402, dt: 2.03.2013 Ref :T.O.O.(CE-Construction/400kV) Ms.No. 248, Date: 1-11-2012. PROCEEDINGS: In the T.O.O. cited Administrative approval was accorded for the transmission scheme for "Evacuation of Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh" at an estimated cost of Rs.3033.69 Crore and Rs.324.0 Crore "towards Interest During Construction (IDC). The total cost of the scheme including IDC is Rs.337.74 Crore. 2. The Chief Engineer/Construction-Il vide U.O.dated:04.12.2012 requested to arrange for according revised administrative approval. for construction of 400/220/132kV Substation at Jammalamadugu, Thalamanchipatnam (V) in Mylavaram (M) instead of 400/220kV Substation at Kondapuram and 220kV Substation at Jammalamadugu, to avoid submerging Gandikota Project (GNSS) and forest clearance and also vide U.O.dated:22.12.2012 requested to include 33 kv features at 2 Nos. 220kV Substations at Betamcharla and Shakrayapet for Phase -I works of Wind Evacuation scheme. 3. The Chief EngineerlPower Systems vide U.O.dated:28.12.2012, informed that, APTRANSeO has approved for LILO of both circuits of 220kV Moose DC line proposed from 400kV Uravakonda SS to 220kV Kalyandurg SS at 220kV ~rampal.!i SS and also approved to include LILO works under Phase-I works while calling tenders. 4. After careful consideration, APTRANSCO accords revised administrative approval for the transmission scheme namely "Evacuation of Wind Power in Kadapa, Anantapur and K urnool districts of Andhra Pradesh" at an estimated cost of Rs.308.46 Crore and Rs.314.79 Crore towards Interest During Construction (IDC). Rs.3373.2 Crore, as per the Annexure -I, enclosed. The total cost of the scheme including IDe is Contd....2

::2::. The Chief Engineer/Construction/400 kv and the ChiefEngineer/Construction-II, Vidyut Soudha. Hyderabad are here by authorized to take up the Phase -I works of the comprehensive scheme immediately. as per Annexure II, making necessary budget provision and funds tie up. 6. The Finance wing of APTRANSCO will be requested for funds tie up for the Phase -I works at an estimated cost of Rs.194.63 Crores initially out of the estimated cost of Rs.308.46 Crores and Interest During Construction of Rs.314.79 Crores (i.e. Rs.3373.2 Crores including IDC) for the Comprehensive Scheme. 7. In exercise of the powers conferred vide G.O.Ms.No.11, dated 07-10-2003 of Government or Andhra Pradesh, APTRANSCO or their authorized representatives shall have the powers for placing of the electric supply lines or electric plant for the transmission of electricity or for the purpose of telephonic or telegraphic communications necessary for the proper co-ordination of works that a telegraphic authority possesses under the provision of the Indian Telegraph Act. 188 (Central Act-13 of 188). 8. This order is issued with the concurrence of the Director (Finance & Revenue) vide Regd. No.963, dated :06.03.20l3. (BY ORDER AND IN THE NAME OF TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED) End: Annexure 1&11 To The Chief Engineerl Construction/400kVI Vidyut Soudha, Hyderabad The Chief Engineerl Construction-Il/ Vidyut Soudha, Hyderabad DIRECTOR! PROJECTS APTRANSCO II FORWARDED BY ORDER II Divisional Engineer Construction/400kV Contd...J

Annexure -I Abstract Estimate :: Evacuation of Wind Power In Kadapa, Anantapur and Kumool districts of Andhra Pradesh ABSTRACT ESTIMATE SI.No. Description of Unel Substation Lengthl Capacity Estimated Cost A: 400kV Hlndupur Substation: (Amount in Lakh Rs.) 1 400/220kV Substation at Hlndupur - 3 Nos. 31 MVA PTRs 3x31 MVA 11.422.90 2 80 MVAR BUI Rector 1 No. 96.00 3 400kV DC Quad Moose Une from Hlndupur SS to 400kV Uravakonda SS 4 400kV DC Quad Moose Une from Hlndupur SS to proposed 76/400 kv Madhu!lirl SS 400kV Quad Bay Extensions at Madhuglrl (PGCIL) Substation 6 220kV DC Moose Une from 400kV Hlndupur SS to 220kV Penukonda SS 7 220/132 kv Substations at Penukonda 130 km 31,200.00 40 km 9.60000 2 Nos. 1.280.7 0 km 3,492.00 2x100 MVA 1,961.43 8 220kV DC Twin Moose line from 400kV Hindupur SS to 220kV Pampanur Tanda SS 9220/132 kv Substation at PampanurTanda SUb-Total(A): 90 km 10,701.00 2x100 MVA 2,10B.14 72,731.22 B:400kV Jammalamadugu Substation: 1 400/220/132kV Subltatlon at Jammalamadugu 2 400kV Quad Bay Extensions at Kurnool 400kV Substation 3 80 MVAR Bus Rector 4 400kV DC Quad Moose Line from 400kV Jammalamadugu to 400kV Kurnool SS 4x31 & MVA 14,94913 2X1GO 2 Nos. 1.181$0 1 No. 96.00 12 km 3000000 400kV DC Quad Moose Line from 400kV Kondapuram to 400kV Uravakonda SS 110.00 km 26,400.00 6.i20kV DC Moose line from 400kV Jammalamadugu SS to 220kV Tlrumalalpally... S.8.... _._...... 7 220/132 kv SubstaUon at Tlrumalalpally 8 220kV DC Moose line from 400kV Jammalamadugu SS to 220kV Betamcherla 9 2201132133 kv Substation at Betamcherla /10 220kV DC Moole line from 400kV Jammalamadugu S to 220kV Chakrayapet v..s.-. ----. L 1..Ql-~!)(1~:j Ii. _._. 11 220/132133 kv Substation at Chakrayapet "::.-~0 -_,')) ~.:~ 'J I.f. I 220kV DC Moose line from 400kV Jammalamadugu SS to 220kV Porumamilla 'p SS.,., \.. ICi )13 220/132 kv S~bstatlon ~?Pdrumarr:i"t) ': I'. 17 km 1,187.28 2x160 MVA 2,38.6 68 km 4,749.12 2x100& 2)(31 MVA 2.704.1 70 km 4.88B.80 2)(100 & MVA 2)(31 J 2.309 7 km,238.00 2x100 MVA 1,906.26 Sub-Total (B): 99,427.64 C:400kV Uravakonda Substation: 1 400/220kV Substation at Uravakonda 2 400kV Quad Bay Exten6ion~ at Mahaboobnagar 400kV Substation 3 80 MVAR Bua Rector.400kV DC Quad Moose line from 400kV Uiaitakonda SS to 400kV 4 Mahaboobnagar SS 4x31 MVA 14.22.91 2 Nos. 1.943.3 1 No. 96.00 190 km 4600.00 220kV DC Twin Moose line from 400kV Uravakonda SS to 220kV Vajrakarur SS 13 km 14.70 6 220/132 kv Substation at VaJrakarur 1x100 MVA 1.16 7 220kV DC Twin Moose line from 400kV Uravakonda S to 220kV Borampalll S 68 km 8,08.20 8 220/132 kv Substation at Borrampalll 1x100 MVA 1,.16 Sub-Total (e): 7,47.48

D:220kV Interconnectlvltlea: 1 220kV DC Moose line from 400kV Hlndupur SS to 220kV Hlndupur Substation 20 km 1.39680 2 220kV DC Moose line from 400kV Uravakonda S8 to 220kV KalyanDurg SS 0 km 3,492.00 LiLO ot both the circurts of 220kV DC Moose line from 400kV Urevakonda SS to 3 10 km 1,3680 220kV Kalya!'Dur" S8 8t_22~.!<V~or8mpalll. S 4 220kV DC Moose line from 400kV Jammalamadugu SS to 220kV Tadlpatrl SS 40 km 2,793.60 220kV Bay Extensions at 220kV Hlndupur Substation Nos 221.90 2 6 220kV Bay Extensions at 220kV Kalyandurg Substation 2 Nos. 221.90 7 220kV Bay Extensions at 220kV Tadlpatrl Substation 2 Nos. 221.90 Sub- Total(D): 9,744.90 :2rconneCtlVltlea:.. 132 kv DQ.line from 22.9/132 kv ~~nukonda _ t~ 1~~/33 kv Penukonda S8 kv DC line from 220/132 kv Jammalamadugu SS to 132/33 kv Jammalamadugu SS 10 km 12 km 30.04 ".- 441.70 I) '-L\JrJJ b~)') ~ 132 kv DC line from 220/132kV Porumamllla SS to 132/33 kv Porumamllla SS 10 km 441.70 I),) i.. \:' ).. : 4 132 kv Bay Extensions at 132/33 kv Penukonda Substation 2 Nos. 132.80 132 kv Bay Extensions at 132/33 kv Jammalamadugu Substation 2 Nos. 132.80 6 132 kv Bay Extensions at 132/33 kv Porumamllla Substation 2 Nos. 132.80 Sub-Total(E): 1,811.84 F : Communication Equipment: (i) 400kV Works LS (II) 220kV Works LS 6269.74 (III) 132kV Work. LS Total (A+B+C+D+E+F) : 26,460.82 G Special T & P @ 1% : 2.64.61 Total (A+B+C+D+E+F+G) : H Contingencies (3%) : Total Including contingencies: 268,11.43-8.043.46 276,18.89 I Estt. and other charges @ 10.7%: Grand Total: 29,687.08-30.84.97 or Say (Ra. In Crorea) :: Interest During Construction (Rs. In Crorea) : Total (Including IDC) - (Ra. In Crores) : 3,08.46 314.79 3,373.2 Sdf CHIEF ENGINEER Construction/400kV