CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES

Similar documents
Indian Power System Framework

Bangladesh s Power Sector : At a Glance

HVDC Systems in India

The SAARC Power Grid Nepal s Perspective

Report. the feasibility of

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL

STATUS OF CROSS BORDER TRADE AND ENERGY MARKET NEPAL-INDIA EXCHANGE

Power Sector Overview Nepal. Anil Rajbhandary, NEA Capacity Building Program for SARPEX Mock Exercise 07 February, 2017; New Delhi

Overview of India Preparations for. Interconnections with Bangladesh & Sri

Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People s Republic of Bangladesh

Guidelines for Solar Grid Power Projects

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Cross Border Energy Trade by Bhutan. By Gem Tshering, BPC

The Electric Power System

An Overview to HVDC links in India

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

History of Cross Border Power Exchange Institutional Mechanisms For Nepal India Power Exchange Brief History, Background and initiatives behind D-M

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Overview of Indian Power Sector. February 29, 2008

Thereafter, the agenda items were taken up.

1. Confirmation of the minutes of 19th meeting of the Standing Committee on Transmission system Planning held on at Amritsar, Punjab.

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Transmission Line Survey

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Draft National Electricity Plan

BHUTAN POWER CORPORATION LIMITED AN OVERVIEW

Country Scenario - Pakistan

Before the. Case No. 106 of 2009

Benefits of the TIR Convention for the Implementation of the BBIN Motor Vehicles Agreement. 06 Feb, 2018

Power Sector Overview- Bangladesh Afghanistan

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

Electricity industry structure and key players

Bihar: Transmission System Study for 13 th Plan

Agenda Note for Standing Committee Meeting of Power System Planning in ER

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

POWER MAP OF EASTERN REGION Addtional Power Export to Bangladesh ALIPURDUAR - AGRA HVDC : 2000MW High Hydro - NER Surplus - Base Case

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

HVDC Multi-Terminal Interconnections a viable and optimal solution for India

Supplemental Report on the NCTPC Collaborative Transmission Plan

Power Sector of Bhutan. Bhutan Power Corporation Limited

EEL303: Power Engineering - 1 Introductory Lecture

ADVANCEMENT OF TRANSMISSION SYSTEM INTERCONNECTION: CASE OF NEPAL

Intra-State Availability Based Tariff (ABT)

Decision on Merced Irrigation District Transition Agreement

Efficient & Reliable Power Delivery

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid

Agenda of 11 th System Studies Meeting in NER

HVDC MATIARI -LAHORE TRANSMISSION PROJECT ABDUR RAZZAQ CHEEMA, EX-GENERAL MANGER (GRID SYSTEM CONSTRUCTION PROJECTS) NTDC

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

Nepal Power Investment Summit Transmission Line Projects

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Merger of the generator interconnection processes of Valley Electric and the ISO;

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC

Power Sector Trends: Focus on States

RFP Corrigendum No. 01

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

Innovative technologies ready for the Supergrid

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

National Committee Kosovo. SEERC October 2017 Istanbul

Business opportunities and major projects in India

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.02 TO BE ANSWERED ON ADVERTISEMENTS ISSUED BY PGCIL

Smart Grid Initiatives in EHV Transmission in Indian Power Sector

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Enhancement of Power Transfer Capability of Existing 400kV Transmission Lines

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Future Power Supply Scenario

Case No. 163 of In the matter of

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

Workshop on HELE Coal Technologies

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

RENEWABLES INTEGRATION STATUS REPORT

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

ROOFTOP SOLAR POWER PLANTS FOR ACADEMIC CAMPUSES

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

Security of supply II: Electric Transmission System Reliability

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

100 MW Wind Generation Project

SOUTH ASIAN ENERGY EXECUTIVES ASSESS REGIONAL CROSS-BORDER ELECTRICITY TRADE

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Electricity industry structure and capacity growth trends

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

The Grid Link Project. Summary of the Report for the Independent Expert Panel

10 th Asia Clean Energy Forum 2015

Electricity sector overview

Transmission Grid Development & Investment Planning on EHV Level in Germany

Agenda Note for Long Term Open Access Applications of New Generation in Southern Region

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative

Current Status and Prospects for the Development of the Power Sector of Ukraine Sergey Titenko

Transcription:

CROSS BORDER INTERCONNECTION AND POWER TRADE WITH NEIGHBOURING COUNTRIES

Indian Scenario

GROWTH OF INSTALLED CAPACITY FROM 11 TH PLAN TO 13 TH PLAN ( MW) Coal/ LIGNITE At the end of 11 th Plan March 2012 Addition during the 12 th Plan At the end of 12 th Plan March 2017 Addition during the 13 th Plan At the end of 13 th Plan March 2022 112022 69280/ 520 181822 56400 238223 Gas 18381 2540 20921 0 20921 Diesel 1200 1200 0 1199.75 TOTAL 131603 72340 203943 56400 260343 THERMAL HYDRO 38990 10897 49887 12000 61887 NUCLEAR 4780.00 5300 10080.00 18000 28080 RENEWABL 24503 30000 54503 30500 85003 E ENERGY SOURCES TOTAL 199,877 118,537 318,414 116,900 435,314

TRANSMISSION LINES TRANSMISS IONLINES UNIT At the end of 11 th Plan March 2012 Addition during the 12 th Plan At the end of 12 th Plan March 2017 Addition during the 13 th Plan At the end of 13 th Plan March 2022 HVDC ckm 7432 9440 16872 130000 494921 Bipole line 765 kv ckm 5250 27000 32250 400 kv ckm 106819 38000 144819 230/220 kv Total Transmis sion ckm 135980 35000 170980 ckm 257481 107440 364921 494921

SUB-STATIONS SUBSTATIO NS HVDC Bipole line UNIT At the end of 11th Plan March 2012 Addition during the 12th Plan At the end of 12th Plan March 2017 MW 9750 12750 22500 (VALUES IN MVA / MW) Addition during the 13 th Plan At the end of 13 th Plan March 2022 765 kv MVA 25000 149000 174000 400 kv MVA 151027 45000 196027 300000 992301 230/220 kv MVA 223774 76000 299774 TOTAL AC Substation Capacity MVA 399801 270000 669801 992301 Grand Total MW/ MVA 409551 282750 692301 300000 992301

HVDC line (Bipole) (Existing) (1) Rihand (NR)- Dadri (NR) ±500 kv 1500 MW (2) Chandrapur(WR)-Padghe(WR) ±500 kv 1500 MW (3) Talcher-II(ER)-Kolar(SR) ±500 kv 2500 MW (4) Mundra(WR)-Mahendergarh(NR) ±500 kv 2500 MW (5)Balia(NR)-Bhiwadi(NR) ±500 kv 2500 MW HVDC line (Bipole) (Under construction) (1) Biswanath Chariyali(NER)-Alipurduar(ER)-Agra)(NR) ±800 kv 6000 MW (2)Angul(ER)-Aligarh(NR) ±800 kv 6000 MW (3)Champa(WR)- Kurukshetra(NR) ±800 kv 6000 MW (4) Raigarh (WR) Paghlur (SR) ±800 kv 6000 MW HVDC Back To Back (Existing) 1. Gazuwaka 2x500 MW 2. Chandrapur 2x500 MW 3. Vindhayachal 2x500 MW 4. Sasaram 1x500 MW

All regional grids are operating as Synchronous National Grid in the country at 50 Hz.(31st Dec 13) IC-238 GW (incl. RES-30GW); Cap. Addn. by 2016-17~120 GW (incl. RES-30 GW); STATCOMs at 11 locations & SVC at 3 locations planned by 2016-17; HVDC Bipole (± 500kV) existing : 5 nos. (10,500 MW) & 4675x2 ckm. HVDC Back-to-back: 4 nos. (3500MW); HVDC Bipole (± 800kV, 6000MW) Planned : 4 nos. (24,000 MW) 6007x2 ckm. TCSC 5 nos. ; FSC 33 nos. SVC ± 2x140 MVAr at Kanpur-1992; 765kV lines: 9543 ckm. (Feb.,14) 400kV lines: over 1,24,384 ckm. 220kV lines: over 1,43,675 ckm. IR Capacity: 35450MW (April 14) by 2016-17: 65550 MW

TRANSMISSION PLANNING & DEVELOPMENT National Grid is comprising Inter-State (ISTS) and intra-state Transmission ( STUs) systems. Power system planning has been aligned with the Transmission Planning Criteria (n-1/n-1-1 contigency), EA,2003, National Electricity Policy, Tariff policy, Electricity Grid Code, Regulations and market orientation of the Electricity Sector. Transmission exercises are carried out in-coordination by CEA, CTU, STUs & other Stakeholders system finalization & review at Regional Standing Committee on Power System Planning. Transmission System Development followed on Tariff Based Competitive Bidding (TBCB) Policy-Inter State (5-1-11) & Intra-State(5-1-13) Transmission charge recovery mechanism is based on Point of Connection (PoC) Tariff methodology Transmission system Plans for evacuation of 9 coal fired UMPPs (each of 4000MW) at Tilaiya (Bihar), Sasan(MP), Mudra (Gujarat), Krishnapatnam (AP), Chattisgarh (RfQ),Orissa(RfQ), Cheyyur (TN), Karnataka are on the horizon. Evolved Master Transmission Plans to harness hydro potential in North eastern region and northern region of the country. Bilateral development and strengthening of cross border transmission systems and power exchange with the neighbouring countries in the SA region..

Indo-Nepal interconnection

INDO-NEPAL Power exchange taking place on the principle of catering to the power needs of isolated local areas of both of the sides of the border between NEA and utilities on the Indian side namely BSEB, UPPCL and UPCL 12 cross border Bilateral power exchange facilities operational at 11kV, 33kV and 132 kv level. The above State utilities export power to Nepal and the quantum of power exchange volume for which tariff is decided by the Power Exchange Committee (PEC) is limited to about 50 MW.

INDO-NEPAL (EXISTING LINKS) Sl. No Voltage level Interconnection 1 132 kv Kataiya Kusaha/Duhabi S/C (High capacity ACSR conductor) line BSEB(Bihar)- 2 Nepal Ramnagar - Gandak/Surajpura(Nepal) S/C 1 33 kv Sitamarhi Jaleshwer S/C 2 BSEB(Bihar)- Raxaul-Birganj S/C Nepal 3 Jainnagar-Siraha S/C 4 Kataiya Rajbiraj S/C 5 Kataiya Inarwa/Biratnagar(Rupni) S/C (not in service) UPPCL(UP)-Nepal 1 33 kv Nanpara-Nepalganj S/C line UPCL (Uttaranchal) Nepal 1 33 kv Lohiyahead Gaddachowki/Mahendranagar (Nepal) S/C 1 11 kv Pithoragarh Baitadi 2 Dharchula Jaljibe 3 Dharchula Pipli

INDO-NEPAL For the first 50 MW power supply the average power tariff during 2013-2015 at 33 kv level comes out to be around Rs. 5.46/unit with an additional charge or rebate of 7.5 % if drawn at 11 kv or 132 kv respectively. For additional import beyond 50 MW by Nepal, Nepal needs to tie-up directly from Indian Electricity market through licensed electricity traders such as PTC on commercial basis, and its tariff would be beyond the purview of the Power Exchange Committee. Nepal procures 20-25 MW from India market through PTC. Through the 132 kv Tanakpur-Mahendranagar S/C line 70 MU free power from Tanakpur HEP (120 MW) is supplied to Nepal under the Mahakali treaty. Presently, Nepal is drawing about 109-210 MW from India.

ADDITIONAL SYSTEM STRENGTHENING FOR SUPPLY OF POWER TO NEPAL Under the medium term measure for supply of additional power of about 100 MW to Nepal MEA is being implemented through WAPCOS(expected by August 2015). 132 kv Katiya - Kusaha S/C on D/C line with Panther conductor 132 kv Raxaul - Parwanipur S/C on D/C line with Panther conductor Agreement Signed in July 12 for 400 kv Muzaffarpur (India)- Dhalkebar (Nepal) D/C line to be initially operated at 220 kv. expected by June 2015 Indian portion- 86.43kms by CPTC, Nepal portion- 39kms by PTCN, CPTC with share holders of PGCIL-26%,SJVNL-26%,IL&FS-38% & NEA- 10% PTCN with share holders of NEA-50%, PGCIL-26%,HIDCL-14% & IL&FS-10%) Power Trading: Power Sale Agreement (PSA) between NEA and PTC has been signed for import of 150 MW for 25years

Hydro Electric Generation Capacity addition Programme in Nepal and System Strengthening Requirement As a part of Agreement between government of Nepal and Government of the India on Electric Power Trade, cross Border Transmission Inter-Connection and Grid Connectivity, the Joint Working Group and Joint Study Committee was formed. JWG and JSC decided for preparation of a long term integrated transmission plan for evacuation of power from the hydro Power Stations in Nepal like Arun- III HEP (4x225MW) by M/s. SJVNL, Upper Karnali (900 MW) and Upper Marsyangdi (600 MW) HEPs by M/s GMR, India and related Cross border inter-connections between the two countries. The perspective plan will cover the generations likely to come up by 2035 and a detailed action plan will be prepared for the projects coming up to 2025. A Joint Technical Team (JTT) comprising of experts from Nepal and India has been constituted to look into this issue.

Indo-Bangladesh Interconnection

CROSS BORDER LINK A cross border interconnection between India and Bangladesh commissioned on 5 th October, 2013. India is supplying to the extent of 500 MW to Bangladesh. Indian Portion implemented by POWERGRID Baharampur (India)-Bheramara (Bangladesh) 400kV D/C line: 71 km (after completion of survey) LILO of Farakka - Jeerat 400kV S/C line at Baharampur : 3 km Establishment of 400kV Switching Station at Baharampur Bangladesh portion by Power Grid Company of Bangladesh Ltd. Baharampur (India)-Bheramara (Bangladesh) 400kV D/C line : 27 km LILO of Ishurdi - Khulna South 230kV D/C line at Bheramara: 3 km Establishment of 500MW HVDC back-to-back Station and 230kV Switching Station at Bheramara

AGREEMENTS-CROSS BORDER LINK PPA signed between Bangladesh Power Development Board (BPDB) and NTPC Vidyut Vyapar Nigam Ltd. (NVVNL) for supply of 250 MW power from unallocated share of Govt. of India in Central Generating Stations. The price of power would be as per CERC tariff. BPTA signed between POWERGRID and BPDB for Bangladesh procuring an additional 250MW from the Indian market through PTC. Under construction / Planned Cross Border Link In the 8th JSC/JWC meeting it was decided that 100 MW power from Palatana would be supplied to Bangladesh through radial interconnection through the following Cross Border Links Indian side (To be implemented by POWERGRID) Surjyamaninagar (Tripura) Bangladesh border 400 kv D/C line (initially operated at 132 kv) - 27 km (Twin Moose Conductor) Bangladesh side (To be implemented by BPDB / PGCB of Bangladesh) Indian Border- Comilla (North) 400 kv D/c line (initially operated at 132 kv) 15 km (Twin Finch Conductor) Comilla (North) - Comilla (South) 132kV D/c line 16km The above scheme is expected to be completed by Dec., 2015. The PPA for supply of 100 MW power yet to be finalised.

AGREEMENTS-CROSS BORDER LINK To facilitate import of additional 500 MW power by Bangladesh from India through existing Baharampur (India) Bheramara (Bangladesh) interconnection, system strengthening on Indian side and Bangladesh side has been approved in 8th JSC/JWC meeting held on 09-10th October, 2014 at New Delhi. System Strengthening-Indian side (by POWERGRID) 400 kv Farakka - Behrampur D/C (HTLS) line (about 70 km.) Removal of the existing LILO of 400 kv Farakka - Jeerat S/c line at Beharampur. LILO of the above Farakka-Jeerat 400 kv S/c line at Sagardighi. LILO of Sagardighi-Subhasgram 400 kv S/c line at Jeerat System Strengthening on Bangladesh side (by PGCB) Bheramara - Ishurdi 230 kv D/c line 12 km. Additional 500 MW HVDC back-to-back converter unit (2nd module) at Bheramara (Bangladesh). The above scheme is expected to be completed by June 2017. In order to supply additional 1000 MW from NER to Bangladesh, the following ±800kV HVDC Bi-pole line has been planned: Rangia/Rowta (Assam, India)-Barapukuria(Bangladesh)-Muzafarnagar (UP, India) +800kV 6500/7000 MW HVDC Multi terminal Bipole line DPR is to be prepared.

Indo-Bhutan Interconnection

EXISTING CROSS BORDER TRANSMISSION SYSTEM ASSOCIATED WITH THE HEPS IN BHUTAN India and Bhutan have terms of cooperation for exchange of power between the two countries. Bulk of power generated at Hydro Electric Projects at Chukha (336MW), Kurichu (60MW) and Tala (1020MW) in Bhutan, is exported to India after meeting the internal demand of Bhutan. The associated cross-border transmission systems for evacuation and transfer of power from these HEPs has been developed and is operated in synchronism with the Indian Grid.

Planned/under-construction Cross border Transmission links associated with HEPs in Bhutan Royal Government of Bhutan (RGoB) has embarked on to harness its huge hydro potential and identified about 75 nos. new HEPs by 2030 at various river basins. About 26534 MW hydro potential would be harnessed by 2030 and out of this, 10334 MW hydro power developments from 14 nos. HEPs have been envisaged to be implemented during 2020. Most of the future generation in Bhutan would be also exported to India, after meeting the internal demand of Bhutan. Considering the above scenario, National Transmission Grid Master Plan (NTGMP) for Bhutan has been evolved by carrying out comprehensive power system studies.

Planned/under-construction Cross border Transmission links associated with HEPs in Bhutan RGoB is in the various phases of developing over 10 GW hydro potential by 2020 of which Punatsangchhu-I (1200MW), Punatsangchhu-II (1020MW) and Mangdechhu (720 MW) HEPs are ongoing Projects. The ATS for the above three HEPs according to the NTGMP Plan is under construction. Transmission links under Implementation Stage for import of power from Bhutan LILO of ±800kV, 6000MW Bishwanath Chariyali Agra HVDC Bi-pole line at Alipurduar with 3000MW HVDC terminal with 400/220kV EHVAC station at Alipurduar Extension of ± 800 kv HVDC station with 3000 MW inverter module at Agra LILO of Bongaigaon Siliguri 400kV D/C Quad Moose line at Alipurduar LILO of Birpara-Salakati 220kV D/C line at Alipurduar

India-Sri Lanka interconnection

Cross-Border link/proposal Memorandum of Understanding has been signed among Govt. of India, Govt. of Sri Lanka, PGCIL and Ceylon Electricity Board on 9 th June 2010 for carrying out feasibility study for interconnection of India Sri Lanka Electricity Grid. POWERGRID, India and CEB, Sri Lanka has been appointed as executive agencies for the above project. 1000MW, ±400kV HVDC bi-pole line from India (Madurai) to Sri Lanka (Anuradhapura): 360km Indian Territory (Scope : POWERGRID) Madurai to Panaikulam : 130km Sea Route (Scope: POWERGRID) Panaikulam (India) to Thirukketiswaram(SL): 120km Sri Lankan Territory (Scope: CEB) Thirukketiswaram to Anuradhapura(New) : 110km

ADDITIONAL OPTION In a meeting between the officials of India and Sri Lanka regarding Feasibility Study for interconnection of India-Sri Lanka Electricity Grids, it was decided that all possible efforts would be made to reduce the cost of the project so as to make it economically viable. It was decided to work on the following measures: i. Reduction in length of Submarine Cable ia. Termination of Cable at Talaimannar in Sri Lankan Territory in place of Thirukketiswaram. This would reduce the cable length by about 30km. ib. Termination of Cable near Dhanushkodi (at Setu Samudrum crossing) in Indian Territory in place of Panaikulam. This would reduce the cable length by about 45km, however would involve extensive use of pile foundation for line towers. ii. Explore possibility of reduction of HVDC terminal Cost iii. To consider multilateral funding for carrying out cost estimate It was also decided that the revised cost would be carried out for 2x500MW HVDC (Conventional as well as VSC) bipole line to be implemented in two stages.

ADDITIONAL OPTION The revised route for the interconnection line would be as follows: 2x500MW HVDC bipole line from India(Madurai) to Sri Lanka (Anuradhapura-New): 370km Overhead(India) : Madurai to near Dhanushkodi : 180km [ The Transition station for interface connection point between HVDC overhead lines and submarine cables in Indian Territory would be located in the sea near Dhanushkodi after crossing of setu samudrum route.] Submarine Cable : Dhanushkodi (India) to Talaimannar (Sri Lanka) :40km Overhead(Sri Lanka) : Talaimannar to Anuradhapura(New) : 150km The remaining scope of work would remain unaltered. PGCIL / CEB has completed the technical study and various financial options. PGCIL is working on a revised proposal including the under sea cable connectivity to bring the cost down and make the project viable.

India- Pakistan Interconnection

CROSS-BORDER LINK/PROPOSAL At present, no transmission link is existing between India and Pakistan. Pakistan grid is at 500kV AC whereas the voltage adopted in the Indian grid is 400kV and 765kV AC. For establishment of a cross border link to enable to supply about 500MW from India to Pakistan on commercial basis a 400kV D/C AC inter-connecting transmission line between Amritsar (India) and Lahore (Pakistan) with 500MW HVDC back to back converter station at Lahore has been prima-facie identified. In the third meeting of the Expert Groups between held on 5 th March 2014 in New Delhi, Pakistan side desired to initially draw power at 220 kv by charging the proposed 400 kv D/C line at 220 kv till the time HVDC converter station at Lahore gets established (it is yet to be firmed up). It was also proposed by Pakistan side that a Joint Technical Team comprising of four sub-groups would be formed and the composition of JTT and sub-groups and their scope of works, deliverables, time lines and nominations would be finalized. High Commission for Pakistan has recently forwarded a draft MoU and a proposal for formation of four subgroups to MoP. As a follow up action, MoP has constituted a JTT comprising 6 members and a technical sub-group comprising 3 members from the Indian side vide its letter dated 24 th June, 2014, for preparation and submission of first report on cross border interconnection with terminal locations etc..

India Afghanistan

TRANSMISSION WORKS 220 kv DC Kabul - Pul-e-Khumri 200 km. (approx) transmission line with 220/110/20 kv S/S at Chimtala Sub-Station was constructed by POWERGRID on May 2009 The assets have been taken over by MEW, Afghanistan in the month of March 2012. Further, for construction of 220/20 kv Doshi and Charikar substations in Afghanistan, award was placed on M/S. BHEL by POWERGRID on October 21, 2011. The project is expected to be completed within two years from the date of Government sanction for the project, i.e. by October 2013. GoI is also constructing Salma PH (14x3 MW) with 110 kv transmission line from Salma Haret (160 Kms. Appox.) through WaPCos.

Thank You