WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR)

Similar documents
Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Track Circuit Assister Configuration for Rail Vehicles

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB12 Iss 2 published on 01/09/2012

Module DC. DC electrified lines

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Guidance for Low Voltage Electrical Installations

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Module AC. AC electrified lines

Protecting Workers on the Track

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Terminology. Glossary of Railway. Glossary of Railway Terminology

Control, Safe Use and Operation of Road-Rail Plant

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

Compatibility Between Electric Trains and Electrification Systems

Risk Management of Rail Vehicle Axle Bearings

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Controlling the Speed of Tilting Trains Through Curves

Advice and safety instructions. for Trafikverket track areas

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Network Safeworking Rules and Procedures

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Certificate of Acceptance

Rail Safety and Standards Board

Low Voltage Power Supplies in Electrified Areas

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7

Network Safeworking Rules and Procedures

M&EE Networking Group

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

Code of Practice. For works on, near or adjacent to the Luas Tramway

Close Approach to Power Lines. Close Approach to Power Lines v

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

STAY SAFE NEAR ELECTRICITY

Pandan Terminal. Site Requirements.

Mechanical Trainstop Systems

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET

Interface between Rail Vehicle Weights and Underline Bridges

M&EE Networking Group

MARPOL - Revisions of Annex I : Effect on the Oil Record Book Parts 1 and 2

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Procedure PR D Definitions and Conventions for Electrical Safety. Engineering Procedure Electrical Distribution Unit. Version 1.

Forest Stewardship Council. Trademark Quick Guide for Certificate Holders

ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010

LEGAL REQUIREMENTS FOR TRANSPORT AND DISPOSAL OF HAZARDOUS WASTE IN THE ERA OF WASTE CLASSIFICATION

Electrical test equipment for use on low voltage electrical systems

P.I.R. Terminals, Porto Corsini- Ravenna Italy Site Requirements. Version 2: August 2009

Guidelines when working near TasNetworks electrical assets

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS

Terminal Heide. Site Requirements.

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

RIS RIS-1701-PLT. Rail Industry Standard for Portable and Transportable Plant Used for. Infrastructure Work Issue 1 October 2008

Index (part 1) covering all modules except the train signalling modules. Withdrawn Document Uncontrolled When Printed. Rule Book Index.

Branding of Wheels,Tyres and Axles

Track System Requirements

Electrical Awareness and Considerations

Assembly of the Multi Applicational Safety System

Preparation and movement of trains

Signing of Permissible Speeds and Speed Restrictions

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Lineside Signal Spacing and Speed Signage

IB PowlVac ITE-HK Remote Racking Device

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

SOUTH AFRICAN NATIONAL STANDARD. Plug and socket-outlet systems for household and similar purposes for use in South Africa

Monthly promotions. October 2018 Puget Sound Energy bill inserts and information. Download inserts

Certificate of Acceptance

The Management of Electrical Safety in Quarries, Associated Plant and Equipment

De-Energisation - Frequently Asked Questions

FACT SHEET Standard: Electrical Safety

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Welcome to the MOL Blitz webinar Locking & Tagging in Mine Hoisting Plants

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017

Electrical safety and you

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

Chevron Philips Chemicals International NV Beringen, Belgie Requirements.

Rule Book Index. Rule Book Index. covering all modules. Document Withdrawn as of December 2008 Uncontrolled When Printed. Rule Book Index.

MAINTENANCE AND TESTING OF ENTITY WORKS, ELECTRICAL INSTALLATIONS AND ELECTRICAL EQUIPMENT CS-OHS-32

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

KEWTECH. KT56 digital multi function tester. Instruction manual

Best Route. Best Care. The Milwaukee Regional Medical Center s Alternative Transportation Program

In general this document presents specific safety procedures for systems with potentially lethal voltages on bare or exposed conductors.

Rescue Pac. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

Books. Code of Practice for In-Service Inspection and Testing of Electrical Equipment (3rd edition) By IET Publication

PROSECUTING GUIDELINES FOR VEHICLE MASS MEASURING

Installation Instructions for Load Management Kit A051C329

Transcription:

KEYPOINTS WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR) Issue two valid from July 2017 CERTIFICATION REQUIRED: CURRENT SENTINEL CARD ENDORSED WITH PTS COMPETENCY

Sentinel Cards and Track Visitor Permits (TVP) can be checked for validity on 0870-162-7979 Keypoint Cards have been produced for many of the track safety competencies, as a reminder of the main duties, rules and requirements. Further copies are available from Willsons Group Services. To obtain an order form, email: denise@willsons.com (phone 01636 702334 or fax 01636 701396)

CONDUCTOR RAIL EQUIPMENT The conductor rail and any of its connections must be treated as live and dangerous at all times. Conductor rails (third rails) provide trains with up to 750 Volts DC. The live rail is raised and mounted on insulators at the sleeper ends Make sure you: Do not allow yourself or anything you are holding or carrying to make contact with the conductor rail Stay at least 300mm (1 foot) away from live equipment Use approved insulated tools or that have approved insulation, conductor rail shields and appropriate PPE as required Take extra care when working with liquids Avoid standing water that may be in contact with the conductor rail 1

In the London area, lines used by Underground trains are also fitted with a fourth rail located in the four foot. This is also a conductor rail and must be treated as live and dangerous at all times. 2

CROSSING DC ELECTRIFIED LINES Use an authorised walking route where one is provided Cross at a conductor rail gap wherever possible STEPPING OVER CONDUCTOR RAILS If you need to step over the conductor rail and adjacent running rail you must do so in one step, preferably where the ballast is level and where there is either timber or plastic guard boarding present. Never step between the conductor rail and adjacent running rail. 3

RISKS LEVELS AND RISK CONTROLS Risk Levels Description Risk Controls Risk Level 1 Risk Level 2 Risk Level 3 The risk of a person, any tool, plant or equipment making contact with the conductor rail(s) cannot be reduced to a tolerable level Work that could encroach within 300mm either side of the conductor rail(s) or any space above or below the conductor rail shall be considered as working live Work not as close as 300mm of the conductor rail(s) Isolation and the issue of a conductor rail permit is mandatory Fit conductor rail shields to prevent accidental contact with the live conductor rail Conductor rail shields are not required. However, if a risk remains that a person, any tool, plant or equipment could encroach within 300mm either side of the conductor rail, then the risk control for Level 2 shall be applied Ref: NR/L3/MTC/EP0152 Working on or Adjacent to a DC Conductor Rail (Issue 5) 4

CONDUCTOR RAIL SHIELDS NOTE: the number of conductor rail shields used would normally be limited to the number which may safely be removed before the passage of a train; normally this number would not exceed more than one shield for each member of staff on site, excluding lookouts and site wardens. 5

TOOLS & EQUIPMENT Insulating hand tools are made totally or predominantly from insulating material. The insulating part of these tools is usually coloured orange and will state the BS standard BS8020. Insulated hand tools are made of conductive material, fully or partially covered by insulating material Note: All insulated / insulating tools must be in a fit condition and approved for use. Insulated tools that have an exposed metal section long enough to bridge the conductor rail and a running rail must always be used with an insulated shield. 6

COSS SAFETY BRIEFING When the conductor rail has been isolated and a conductor rail permit (CRP) issued, the safe system of work briefing you will receive from the COSS will include: The electrical safe working limits stated on the CRP The position of live conductor rails and equipment adjacent to or within the site of work TEST BEFORE TOUCH After your COSS has been issued with a conductor rail permit the conductor rail(s) must be tested at the site of work immediately prior to the commencement of work. 7

EMERGENCY SWITCH OFF PROCEDURE When you contact the Electrical Control Operator (ECO), you must first state: This is an emergency call Check you are speaking to the ECO and tell them: the reason why you want the electricity to be switched off whether any person is in danger from live conductor rail whether short circuiting bars have been applied whether the emergency services are waiting to give assistance You must stay in contact with the ECO until you have been assured that one of the following applies: The electricity has been switched off, or Other arrangements have been made Depending on the circumstances and emergency action required, the ECO may appoint a person to take charge of the electrical emergency (PICEE). An emergency switch-off of the DC Conductor rail does not mean that train running has been stopped 8

APPLYING A TRACK CIRCUIT OPERATING CLIP When applying a track circuit operating clip it must be attached to the running rail furthest from the conductor rail first, and then to the adjacent running rail. When setting out detonator protection the detonators must be attached to the running rail furthest from the conductor rail 9

LIFE SAVING RULES WORKING WITH ELECTRICITY Always have a valid permit to work where required Always test before applying earths Note: For DC Conductor Rails this refers to short circuiting equipment (non emergency) Never assume equipment is isolated always test before touch 10

This page has been intentionally left blank 11

This page has been intentionally left blank 12

Rail Sentinel Rail Sentinel website offers the latest developments on the new Sentinel Service. http://www.railsentinel.co.uk RGS online RGS online is the website providing free access to all current (many withdrawn) Railway Group Standards, Rail Industry Approved Codes of Practice (RACOPS), Guidance Notes (GNs) and Rail Industry Standards (RISs). http://www.rgsonline.co.uk RSSB Rail Safety and Standards Board RSSB provides support and facilitation for a wide range of cross-industry activities. http://www.rssb.co.uk Safety Central - The site is your one-stop shop of safety information, advice, resources and useful contacts, designed to promote consistency and best practice across the whole rail industry. http://safety.networkrail.co.uk/ There are two ways to report safety concerns. Your first step should be to tell your supervisor or sponsor. If this isn t possible, you can contact CIRAS - the railway s confidential reporting service www.ciras.org.uk

The purpose of this Keypoint Card is to act as a reminder only. If you are unsure about any issue relating to the information given here, you must refer to the appropriate module of the Rule Book GE/RT 8000 Series or Handbook. In supplying this document, Network Rail makes no warranties, expressed or implied, that compliance with all or any documents it issues is sufficient on its own to check safe systems of work or operation. Users are reminded of their own duties under health and safety legislation. NETWORK RAIL, KINGS PLACE, 90 YORK WAY, LONDON N1 9AG WWW.NETWORKRAIL.CO.UK NR9934 ISSUE 2 2017 NETWORK RAIL