LARGE CAPACITY INCUBATOR Installation, Operation and Maintenance Instructions

Similar documents
Dispenser & Warmer RIC-1909 RIC-1909EXP

INSTALLATION INSTRUCTIONS

1000 Park Drive Lawrence, PA Fax

Utility Distribution Systems Installation, Operation, and Maintenance Manual

Henny Penny Rotisserie Display Model SCD-6/8 TECHNICAL MANUAL

INSTALLATION INSTRUCTIONS

PHANTOM (PH10 and PH12) COMMERCIAL AND INDUSTRIAL SERIES

OPERATION MANUAL. Manual for GW2 2-port and GW3 3-port Dispensers. Java Creations Iced Coffee & Java Works Creamery Classics machines

Instruction Manual. Fudge Puppy Display Case

INSTALLATION AND CUSTOMER CARE INFORMATION 80 SERIES & 90 SERIES TREATMENT STATIONS

Multi-Shelf Merchandiser Series. SERIES: MDW Operation Manual

Cincinnati, OH USA

TECHNICAL MANUAL HHC-901 HHC-904

16" STAND FAN WITH REMOTE

INSTALLATION AND OPERATING INSTRUCTIONS

SAM S KIOSK & SET ASIDE USER MANUAL INSTALLATION & MAINTENANCE

Fry Warmer. MODEL KFW, KFW-21 Service Manual. CS-TM Revised 3/28/13

INSTALLATION INSTRUCTIONS. Solid-State Series !! NOTE!! Covers the following models: Refer to INSERT for additional information

AIR CLEANERS. Model MX 6000 OWNER S MANUAL CAUTION. Read complete instructions before operating. Please file for future reference.

Installation & Service Manual for Portable Fume Collector. Model PFC-800

EXT DUCTLESS FUME HOOD

Quest H5. Quest Dry. Read and Save These Instructions. Installation, Operation and Maintenance Instructions. Quest H5:

INSTALLATION INSTRUCTIONS

Dual-Lite Trident TRF 40 Wide Battery Cabinet 20-40kVA Systems USER MANUAL

PARTS AND SERVICE MANUAL FOR MERCO HOLDING CABINET MODEL MHC-22-TDL

INSTALLATION AND SERVICE MANUAL FOR TURBO-CARB HIGH CAPACITY CARBONATOR

Blue Air. Commercial Refrigeration Inc. Installation & Operation Manual Chef Bases

Heated Bakery Merchandiser Series. Series: WBC Operation Manual

Electric. PN April Series Electric Oven

Universal Lane. Installation and Maintenance Manual IMPORTANT PRODUCT LIABILITY INFORMATION

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST

Reach ins, Freeezers & Refrigerators Installation & Operation Manual

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

General Description. Product Specification. Document Digital Temperature Interlock

Installation & Operation Manual Chef Base

CFFWA Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 12,000-60,000 BTUH

VCT-2000 MFG. NO , , , , , , &

MODEL FA1 Mini Air Filtration System. Operations Manual

FUME HOOD. Installation and Operations Manual

DESIGN-AIRE SL-RSR-EC. Installation and Operations Manual

Jandy Pro Series WaterColors LED Lights Underwater Large and Small Light

PHANTOM (PH10 and PH12) COMMERCIAL AND INDUSTRIAL SERIES

Installation Instructions Electric Heaters 5 20 kw

OPERATING MANUAL AND INSTRUCTIONS

MODEL GS1-100 Air Filtration System. Operations Manual

CLEAN AIR WORKSTATION REVERSE FLOW. Installation and Operations Manual

AUTOMATIC FOODSERVICE EQUIPMENT. AUTOMATIC ELECTRIC BROILER MODELS 824E & 850E and 624E & 650E. B-Series Broiler OWNER S MANUAL

COMPACT GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL

Stairlift OWNER S MANUAL

Sure-Feed Engineering Inc. SE-900-EI. Operation & Parts Manual

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST. For Use with Bard CH Series 3, 4, & 5 Ton Wall Mount Heat Pumps

HANDY GATE ASSEMBLY, INSTALLATION AND OPERATING INSTRUCTIONS

PARTS & SERVICE MANUAL

INSTALLATION INSTRUCTIONS

Outdoor Enclosure Power System ENC X100MP48F20-AC6

READ AND SAVE THESE INSTRUCTIONS. High Velocity Restaurant-Duty Utility Set Belt Driven for Roof Mounting

TECHNICAL SPECIFICATIONS. CAPACITY per slot width 1ʺ 1.25ʺ 1.5ʺ HKPX2VC/A 2 modules devices HKPY2VC/A 3 modules devices

KenkoAir_Purifier manual ENG-FR_FDA 10/12_Air Filter manual 8/15/13 10:44 AM Page 1 OPERATING MANUAL

Boekel Complete Culture Control Incubators

Wiring Diagram Owner's Guide Installation Instructions Service Data Sheet

BCFS Belt Driven Centrifugal Filtered Supply Fans

Installation Instructions

TXH TOTAL EXHAUST HOOD. Installation and Operations Manual

SKILL ATTACK PITCHING MACHINE PATENTS APPLIED FOR INSTRUCTION MANUAL. Includes: OPERATION SETUP USE & CARE SERVICE

WINDGUARD BELT DRIVE (BD) INDUSTRIAL SERIES

FA1 Series Air Filtration System. Operations Manual

INSTALLATION & OPERATION MANUAL. Fan Powered Terminals VAV TERMINALS. Redefine your comfort zone.

CALTRAP INSTALLATION AND OPERATIONS MANUAL

A25 Series Warm Air Control with Manual Reset

SERVICE MANUAL (INTERNATIONAL)

WIND STOPPING 14 (WMI) AND WIND STOPPING 16 (WMH) INDUSTRIAL SERIES

Heavy Duty Series (HDS) Installation and user guide

SUREFIRE 512 STOVE SENTRY INSTRUCTION MANUAL

Service Manual. Model Number: DF2426GB DF2426SS DF2550 DF2562. UL Part Number to 500

Cambro Camtherm OWNER S MANUAL. Plate Heater.

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST. For Use with Bard C**H Series 2 & 2½ Ton 2-Stage Wall Mount Heat Pumps

SPECTRACOOL Slim Fit Air Conditioners (Surface-Mount Units Only) Quick Start Operation Guide

READ AND SAVE THESE INSTRUCTIONS. Centrifugal Upblast Exhaust Fan (Standard & High Pressure Exhaust) Belt Driven for Roof & Wall Mounting

Large Case Storage - Replacing Case Lock System

DRAFT COPY, NOT FOR DISTRIBUTION

Stairlift OWNER S MANUAL

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

Aspen 200 Powder Safety Workstation. Operation Manual

POWERLINE 2000 Energy Management System TM

READ AND SAVE THESE INSTRUCTIONS. Centrifugal Downblast Exhaust Fan Belt Driven for Roof & Wall Mounting

EXT HEPA/CARBON FUME HOOD

10AC DIPLOMAT SERIES RFC SYSTEMS

Combined Ventilation Controller RVWS-T-224HA

Series 301. Horizontal Laminar Flow Clean Bench. C l e a n B e n c h e s. s o l u t i o n s. Series 301 Horizontal Laminar Flow Clean Bench

HEPA AIR FILTRATION SYSTEM

Quickie S-11 Service Manual

Emergency De-Icer (HSTAT-R Series) Instruction Manual

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

I N ST R UC T I ON HHTC SERIES DELI DISPLAY CASES MODELS ML (8 FT, TWO-TIER, SELF-SERVICE) FORM (July 2003)

Part No DROP IN POPCORN WARMERS Instruction Manual Model #2343, 2344, 2345

Henny Penny Heated Express Cabinet Model HEC-103 Model HEC-104 Model HEC-123 Model HEC-124

Installation Instructions Electric Heaters 5 20 kw

Three-Phase Pole Mounted Recloser

Typical Applications. Horizontal Installation

Model NTX7 Series Automatic Battery Charger User s Manual Rev. 1.0 October 17, 2006

Transcription:

LARGE CAPACITY INCUBATOR Installation, Operation and Maintenance Instructions GENERAL 2 Inspection 2 Location 2 INSTALLATION 2 Door Alignment 2 Shelf Installation 2 Remote Contacts 2 2-10 Volt DC Output 2 RS485 Port 3 Internal Outlet 3 Access Port 3 Glycerin Well Assembly 3 OPERATION 3 Drawer Option 4 MAINTENANCE 5 Periodic Cleaning 5 Maintenance Service and Analysis Guide 6 1 7/10 Rev. C 131783

GENERAL INSPECTION When the equipment is received, all items should be carefully checked against the bill of lading to insure all crates and cartons have been received. All units should be inspected for concealed damage by uncrating the units immediately. If any damage is found, it should be reported to the carrier at once, and a claim should be filed with the carrier. This equipment has been inspected and tested in the manufacturing facility and has been crated in accordance with transportation rules and guidelines. Manufacturer is not responsible for freight loss or damage. LOCATION The cabinet should also be leveled when it is placed in its permanent location. Do not stack items on top of the unit. Vibration during shipping and handling may loosen mechanical connections. Check all connections during installation. Check all wiring and fasteners. CAUTION Do not modify cabinet construction or associated equipment assemblies. Do not remove labeling or information supplied with the unit. Observe all Warning Labels. Disconnect power supply to eliminate injury from electrical shock or moving parts when servicing equipment. INSTALLATION Door Alignment - If for some reason the doors are not squared up on the cabinet, the doors can be adjusted. Opening the door(s) and loosening the screws that hold both the top and bottom hinges to the cabinet can accomplish this. After adjusting the door so that it is aligned correctly, tighten the screws to securely hold the hinges in place. Shelving Installation - Locate shelves inside cabinet, install shelf supports (1 RH support, 1 LH support per shelf.) Remote Alarms Contacts Access - The factory installed Remote alarm contacts access box is located at the top of the cabinet behind the microprocessor control (see illustration.) 1. Remove the cover to access the terminal connections. 2. Select and knock-out a hole to run field leads into electrical box terminals. 3. The terminal block in the electrical box is labeled for normally open and normally closed activation. End user is responsible for proper field installation. Terminal connections are rated for class II circuits only per NEC table 11(A). (Limited power source less than 30vac 8 Amp. max, see applicable notes in NEC). 2-10 volt DC Output Terminal board for 2-10v DC Output for temperature re-transmit is located behind the cabinet façade, next to Remote Alarm access box. Connect wires as per label. 2 7/10 Rev. C 131783

RS485 port - (Optional) terminal board for RS485 port is located behind the cabinet façade, next to the Remote Alarm access box, connect wires as per label. Duplex, or European Outlet 4 Amp Max. (Optional) is located near the back of the left hand interior wall, 20 from the cabinet interior floor. Outlet is wired thru main cabinet power supply, and includes a 4 amp, MANUAL RESET, circuit breaker. Breaker is located behind façade, on the side of the control box. Access Port - (Optional) 2 port is provided with a spring loaded, exterior cover, RH or LH side of the cabinet. GLYCERIN WELL ASSEMBLY Important: For accurate product temperature reading, the product-sensing bulb must be immersed in glycerin solution contained in the provided well. One glycerin well is furnished with each model. The purpose of the glycerin is to simulate the product stored in the Incubator. The glycerin temperature reflects the product's temperature during normal operation. After the unit is put into operation, check to make sure that the temperature indicating or alarm sensing bulb is positioned inside the glycerin well as far as possible without touching the well itself. Figure 1 OPERATION The Large Capacity Incubator is designed for an operating range of 5 C above room ambient to 70 C and is intended for indoor use only. A transverse blower optimizes airflow and ensures tight temperature uniformity. These units employ a programmable controller to control the temperature and CO 2 option. The controller is located on the facade of the unit. Please see the separate instructions, part number 113635, on the operation of the controller used in the Large Capacity Incubator. The Incubator utilizes an electrically operated heater to warm the cabinet. The programmable control is factory set with a cutout temperature of 70 C (158 F) to prevent the cabinet from exceeding its design limitations. NOTE: The cabinet is equipped with two switches located on the façade. One is the main power ON/OFF switch for the unit. The other is a three-position switch for the battery-powered alarm. The alarm switch is placed in the middle, or OFF position, for shipment. When the Large Capacity Incubator is put into operation, the top of the switch should be pushed in to the ON position. With the switch in the ON position, the battery will sound the alarm if the main power to the cabinet is interrupted. The switch flipped to the bottom position is used to test the battery. This test must be done with power uninterrupted to the cabinet. The alarm will sound if the battery is good. This test should be done periodically. The battery is located on the control box that is on top of the unit behind the façade. 3 7/10 Rev. C 131783

Figure A DRAWER OPTION The Large Capacity Incubator is offered with drawers as an option. Drawer Removal The Large Capacity Incubator may accommodate up to eight drawers. To remove the drawers for cleaning, locate the black release tabs found on the inside front of the drawer. See Figure C. Push the release tabs on each side inward and lift up the drawer. Slide the drawer towards you and remove. 4 7/10 Rev. C 131783

Figure C Drawer Slide Removal/Adjustment Each drawer slide is independently removable and can be adjusted to different levels. First remove the drawer per above instructions. Release the locking tabs located on the drawer slide, move the front tab up and release the tab in the back of the cabinet, by sliding the locking tab towards the front. See illustration. Unhook the drawer slide assembly from both the front and back shelf standards by lifting up on the assembly. To install a drawer slide, reverse the process used to remove the slide. Secure the locking tabs into position after the drawer slide assembly is in place. Reinstall the drawer. MAINTENANCE PERIODIC CLEANING Beginning with the initial installation, the interior surfaces of the cabinet should be periodically wiped down with a solution of warm water and baking soda. This solution will remove any odors from spillage that has occurred. The exterior of the cabinet should also be cleaned frequently with a commercial grade of glass cleaner. Caution: Do not use an abrasive or alkaline solution. All moving parts have been permanently lubricated and will generally require no maintenance. 5 7/10 Rev. C 131783

MAINTENANCE SERVICE AND ANALYSIS GUIDE MALFUNCTION POSSIBLE CAUSE SOLUTION No power to optional 1. Internal circuit breaker tripped 1. Reset circuit breaker duplex receptacle 2. Wiring incorrect 2. Check wiring against the diagram Heater inoperative 1. High limit thermostat tripped 1. Manually reset thermostat 2. Wiring incorrect 2. Check wiring against diagram No power to cabinet 1. Service cord unplugged 1. Plug in service cord 2. Circuit breaker supplying 2. Determine reason and correct main electrical receptacle tripped 3. Wiring incorrect 3. Check wiring against diagram 4. Main cabinet power switch off 4. Turn on power switch Objectionable noise 1. Vibrating fan blade 1. Replace fan blade 2. Worn fan motor bearings 2. Replace fan motor 6 7/10 Rev. C 131783