Technical Series, Edition 16

Similar documents
Use of switch-fuse combinations at the medium-voltage level for the protection of distribution transformers siemens.com/tip-cs

Residential Load Profiles

Chapter 3.1: Electrical System

11. Electrical energy tariff rating

Retrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2

How to implement higher efficiency motors

Methodology of Cost Allocation

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EU) / of XXX

Group 3: Pricing from 1 April 2018 and load management

Application of claw-back

Technical Information Average Efficiency of the SMA Flexible Storage System

FUEL EFFICIENCY CASE STUDY

Cost Reflective Tariffs

PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY

Large General Service Time-of-Use Storage Program

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Solar Power. Demonstration Site. Annual Performance Report 2017

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Smarter Network Storage UK first multi-purpose application of grid scale storage. Dr. Panos Papadopoulos, PhD, CEng

Umatilla Electric Cooperative Net Metering Rules

CRYPTOCURRENCY MORATORIUM SMALL MINER RATE IMPACT. September 4, 2018

TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE

Siemens AG Synchronous linear motor 1FN6. The electrical gear rack. Brochure September Motors

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

Rate Schedules. Effective 1/1/2019

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

SUMMARY OF THE IMPACT ASSESSMENT

Consolidated Edison Company of New York, Inc.

COMMISSION REGULATION (EC)

Thank you for the detailed information regarding the Refurbishment Project at Marchwood MTS. This project will facilitate equipment maintainability.

Technical information No. 01. IT systems. The basis for reliable power supply

Underpinning Research Power Electronics in Distribution Networks

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

Supplement of Model simulations of cooking organic aerosol (COA) over the UK using estimates of emissions based on measurements at two sites in London

Notification of a Proposal to issue a Certification Memorandum. Rotor Drive System Gearbox TBO Development

Totally Integrated Power. A reliable all-rounder. Gas-insulated medium-voltage switchgear 8DJH 36.

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

Load profiling for balance settlement, demand response and smart metering in Finland

Monthly Market Detail - June 2018 Single Family Homes Miami-Dade County

Monthly Market Detail - June 2018 Townhouses and Condos Miami-Dade County

Summary Statistics. Closed Sales. Paid in Cash. Median Sale Price. Average Sale Price. Dollar Volume. Median Percent of Original List Price Received

The potential for local energy storage in distribution network Summary Report

Current Development of the Tariff Structure in the Electricity System of the Republic of Macedonia

accompanying the up-dated working document on the Review of Regulation (EC) No 278/2009 regarding External Power Supplies

Inventory Levels - All Prices. Inventory Levels - By Price Range

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Inventory Levels - All Prices. Inventory Levels - By Price Range

DRAFT PROPOSAL FOR STORAGE CONNECTION REQUIREMENTS

Building the Business Case for Energy Storage

Recent Development in Energy Efficiency Policy in the EU

3AP1 DTC for 145 and 245 kv

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

ORDINANCE NO. -'- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

Sirius IE3/IE4 ready. White Paper January

400/230 Volt 60Hz UPS Power

MEDIUM VOLTAGE PRODUCTS. Fault Current Limiters I S. -limiter and FC-Protector The worldʼs fastest switching devices

Co-location Informal Guidance Note. March 2018 Version 1.1

Emerald People s Utility District RATE SCHEDULES. Rate Schedules Effective April 1, 2018

ABB POWER SYSTEMS CONSULTING

Feed in Tariffs. What is the feed-in tariff? Guaranteed for 25 years - by the UK Government. How do I claim the feed-in tariff?

Inventory Levels - All Prices. Inventory Levels - By Price Range

Data and facts relating to. Wind Power in Germany. Supplement 2006 to the E.ON Netz Wind Report

Siemens AG SIMOTICS T-1FW3 Torque Motors. The Powerful Torque Motors. Edition February Brochure. siemens.

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY. LARGE TIME-OF-DAY ELECTRIC SERVICE RATE 58 NON-MANUFACTURERS Page 1 of 5

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

Introduction to Charging: Which Parties Pay Which Charges?

ESIA Study for 1,050MW Coal Fired Power Plant, Lamu County, Kenya Need for the Project. 3 Need for the project... 2

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

250kW Solar PV System Poultry Shed Solution - Gatton

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY. PARTIAL STREET LIGHTING SERVICE RATE 117 Page 1 of 5

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019

Biennial Assessment of the Fifth Power Plan

AN OUTLINE HISTORY OF DANISH WIND TURBINE PRODUCTION: Output and Longevity from 1977 to 2014.

Annex to technical regulation for thermal plants above 11 kw

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

New 115 kv Disconnect Switches at Bloomsburg MTS

CMP266 Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement

Standard-compliant components for commercial photovoltaic applications

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen)

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Brochure. Modular Systems wind portfolio Power Collection and Grid Connection products

YOUR CONTACT WITH ELECTRICITY COMPANIES

Electric traction energy metering on German Railways and the impact of European standardisation on the energy billing process in Germany

Street Address. City-Village-Township

SINAMICS S120 Cabinet Modules Application Shaft Generator Drive

Eyre Peninsula electricity supply options investigation

TYPE-CERTIFICATE DATA SHEET

CHOPTANK ELECTRIC COOPERATIVE, INC. DENTON MARYLAND TERMS AND CONDITIONS

FROM B.C. HYDRO ENCLOSURE (SEE NOTE 4) RIGID CONDUITS (SEE NOTE 8) ALTERNATIVE TO LOAD BARRIER (SEE NOTE 7) SERVICE ENTRANCE ENCLOSURE

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

HDV CO2 emission certification 1 st meeting of the Editing board

Trusted technology for maximum power yield SINAMICS W180 siemens.com/sinamics-w180

GIBRALTAR ERDF OPERATIONAL PROGRAMME POST ADOPTION STATEMENT

Power Supply Cost Recovery

Phönix SonnenStrom AG

Transcription:

Totally Integrated Power Technical Series, Edition 16 Transformer Selection according to Utilisation Profiles siemens.com/tip-cs

1. Regulations concerning efficiency requirements of dry-type transformers In June 2014, Regulation No. 548/2014 issued by the EU Commission [1] has become effective. This regulation describes the ecodesign requirements of power transformers which have been placed on the market after 01 July 2015 and have been, or will be commissioned on/after that date. It applies to transformers with a minimum rating of 1 kva. In addition, this regulation also refers to the second level of efficiency improvements and loss reductions, respectively, for marketing transformers which shall be effective as of 01 July 2021. The requirements described therein include the determination of the maximum limits for short-circuit losses and no-load losses or the minimum value for the maximum transformer efficiency. The reduction of transformer losses shall reduce the annual CO 2 emissions during operation. Thus, the regulation prescribes the state of the art which has been established by the international standard IEC 60076-20 (VDE 0532-76-20). Currently, the standard is in the Draft state. Section 6.3.2 of the standard specifies the maximum permissible loss values for dry-type transformers (Tab. 1). In this context, a distinction is made between basic energy efficiency (performance level 1, in the following abbreviated as EEF1) and high energy efficiency (performance level 2, in the following abbreviated as EEF2). Basically, load loss is reduced by 10 % in EEF2. For transformers featuring a rating below 800 kva also applies that their no-losses are reduced in level EEF2. In compliance with the Ecodesign Regulation No. 548/2014, only level EEF 2 transformers may be placed on the EU market as of 01 July 2021. Note: In this context, the term "efficiency" is used as the ratio of apparent output power to apparent input power. Tab. 1: Loss data for the energy performance levels (EEF) of dry-type transformers in compliance with IEC 60076-20 (VDE 0532-76-20) EEF1 EEF2 Load losses P k No-load losses P 0 Load losses P k No-load losses P 0 630 kva 7.6 kw 1.1 kw 7.1 kw 0.99 kw 800 kva 8 kw 1.3 kw 8 kw 1.17 kw 1,000 kva 9 kw 1.55 kw 9 kw 1.395 kw 1,250 kva 11 kw 1.8 kw 11 kw 1.62 kw 1,600 kva 13 kw 2.2 kw 13 kw 1.98 kw 2,000 kva 16 kw 2.6 kw 16 kw 2.34 kw 2,500 kva 19 kw 3.1 kw 19 kw 2.79 kw 3,150 kva 22 kw 3.8 kw 22 kw 3.42 kw 2

2. Energy efficiency management Loss and efficiency are product- or system-specific characteristics which apply for a specific operating condition (usually the normal condition). In other operating conditions, losses and efficiency levels are dependent on these operating conditions. This means that efficiency evaluations during planning phases are only possible if concrete assumptions have already been made concerning the operating conditions. The selection of an efficient transformer considers both its specific characteristics (load-dependent efficiency data) and its normal operating load (load profile). IEC 60364-8-1 (VDE 0100-801: Low-voltage electrical installations Part 8-1: Energy efficiency) explicitly points to the load dependency of a transformer's efficiency. This also means that the environmental impact of transformers depend on the operating point and the load-loss correlation. The total power loss (P V ) in operation is calculated from the sum of no-load losses and load losses under a specific load (S Load ). No-load losses are load-independent. They are generated as soon as a voltage is applied to one of the transformer windings (primary or secondary side). Whereas load losses are dependent on the square loading ratio (S Load / S r ) 2 and the loss values P k (see Table 1). The loading ratio is the ratio of apparent load power (S Load ) to the rated apparent power (S r ) of the transformer. A loss minimum is attained if the no-load loss equals the load loss. Hence, the so-called load factor k provides the optimal operating points as listed in Tab. 2 (and Fig. 1) (k S r ) showing the maximum efficiency. k = P 0 P k Tab. 2: Operating points of EEF1 dry-type transformers in compliance with IEC 60076-20 (VDE 0532-76-20) S r Load factor k k S r 630 kva 38.044% 239.7 kva 800 kva 40.311 % 322.5 kva 1,000 kva 41.500 % 415.0 kva 1,250 kva 40.452 % 505.6 kva 1600 kva 41.138 % 658.2 kva 2,000 kva 40.311 % 806.2 kva 2,500 kva 40.393 % 1,009.8 kva 3,150 kva 41.560 % 1,309.1 kva P V = P 0 + ( S Load Sr ) 2 P k Fig. 1: Efficiency curves for current EEF1 transformer types with 630, 800 and 1,000 kva from Tab. 2 99.4 Efficiency in % 99.3 99.2 99.1 99.0 98.9 98.8 98.7 1,000 kva 800 kva 630 kva 98.6 98.5 0 200 600 800 1,000 Power in kva 3

3 Load and utilisation profiles Buildings such as office towers, hotels, hospitals, and data centres often need connected loads which cannot be provided from the low-voltage power system. In accordance with the technical supply conditions of the local distribution system operator (DSO), these buildings are supplied from the medium-voltage grid. The consumer substation usually includes a metering panel. It serves for energy cost billing. The electric energy drawn from distribution system is measured at 15-minute intervals (Fig. 2). The measurement data can be made available to the customer (in many cases only upon request). The 15-minute measurands serve as a basis for the representation of load and utilisation profiles (Fig. 3). For the load profile, the 15-minute values of the energy procured (respectively the mean power for the 15-minute interval) is plotted over a period of typically one year: The X-axis shows the time and the Y-axis the electric energy or power. A utilisation profile can be interpreted as the graphical evaluation of the load profile. Plotted are the load hours of one year added up (Y-axis) assigned to a specific value of transmitted power (X-axis). Owing to the time correlation, the load profile allows to identify a trend or temporal development, i.e. the power procured over time, an information which cannot be derived from the utilisation profile any more. Instead, the utilisation profile highlights the correlation between the amount of power purchased and the operating time over the period considered. Fig. 2: Medium-voltage connection and metering at the point of common coupling Distribution system Distribution system operator Metering panel Metering point operator Low-voltage power distribution Operator s power system 1U 1V 1W Meter Measured values Electr. energy Date Time in kwh 01-01-2014 00:15 85 01-01-2014 00:30 88 01-01-2014 00:45 80 31-12-2014 23:30 86 31-12-2014 23:45 79 31-12-2014 00:00 75 Fig. 3: Creation of load and utilisation profiles from the measurement data Electr. energy Date Time in kwh 01-01-2014 00:15 85 01-01-2014 00:30 88 01-01-2014 00:45 80 31-12-2014 23:30 86 31-12-2014 23:45 79 31-12-2014 00:00 75 Measured values Load profile Utilisation profile Load in kw Operating time in h 350 300 Peak load 600 500 General department store Utilisation: 51,55 % 250 200 150 300 Prison Utilisation: 27,95 % Hospital with CHP Utilisation: 43,18 % 100 200 50 100 0 May June July August January February March September April October November December 0 0 10 20 30 40 50 60 70 80 90 100 Load in kw 4

The utilisation profile directly supplies the data for determining transformer loss and teh corresponding loss energy (power and corresponding hours). The operating time is defined as the quotient of the measured electric energy to the peak power: Operating time (in h) = Electric energy (in kvah) Peak power (in kva) It specifies how long the peak power must theoretically be applied in order to transmit the energy over the entire period considered. Comparably, a mean load (annual averaged apparent operating power) can be specified over the period considered (8,760 hours yearly): Mean load (in kva) = Electric energy (in kvah) 8,760 h So that the load factor a is defined as follows: Load factor a = Mean load Nominal apparent power 4. Transformer energy losses From the load profile and utilisation profile, respectively, it becomes evident that transformers are not only operated in the operating point showing the highest efficiency. Accordingly, operating losses depend both on the efficiency curve (Fig. 2) and the load or utilisation profile of the loads supplied. In Fig. 4 and Fig. 5, the efficiency curves (transformer outputs of 630 kva to 2,000 kva) are overlaid with two utilisation profiles: a) Utilisation profile for a hospital with 450 beds and a peak power demand of approx. 610 kva b) Utilisation profile for a metered commercial enterprise with a quite considerable proportion of power demand for continuous cooling and a peak power demand of approx. 610 kva. Attention must be paid to the width of value ranges for efficiency and load duration (tolerance band). The most favourable transformer operating range is limited by a +/- 20 % interval for load near the operating point (interval boundaries are marked by triangles and circles for each curve). For the hospital's utilisation profile in Fig. 4, the mean load is within the highlighted operating range of the 630-kVA transformers and just about within the range of 800-kVA transformers. For the commercial enterprise in Fig. 5 with its higher mean load, the efficiency curves of the larger 1,000-kVA and 1,250-kVA transformers are more favourable. Fig. 4: Utilisation profile of a hospital and comparison of efficiency curves of several transformers in compliance with IEC 60076-20 (VDE 0532-76-20) 99.5 Efficiency in % 99.4 Mean load 500 Load duration in h/a 99.3 99.2 99.1 300 99.0 98.9 98.8 98.7 98.6 2,000 kva 1,600 kva 1,250 kva 1,000 kva 800 kva 630 kva 200 100 98.5 0 200 600 800 0 1,000 Load in kva 5

Fig. 5: Utilisation profile of a commercial enterprise and comparison of efficiency curves of several transformers in compliance with IEC 60076-20 (VDE 0532-76-20) 99.5 Efficiency in % 99.4 Mean load 500 Load duration in h/a 99.3 99.2 99.1 300 99.0 98.9 98.8 98.7 98.6 2,000 kva 1,600 kva 1,250 kva 1,000 kva 800 kva 630 kva 200 100 98.5 0 200 600 800 0 1,000 Load in kva For more precise interpretations, the transformer losses integrated over the corresponding utilisation profile are compared with those related to different transformer ratings as in Fig. 6. You can see that as opposed to the simple comparison of efficiency curves with mean load situations in Fig. 4 and Fig. 5 the transformers featuring a somewhat higher rating would have the lowest energy losses. For the hospital, the loss minimum is with the 1,000-kVA transformer, for the commercial enterprise it is with the 1,600-kVA transformer. As demonstrated later in an example in chapter 7, this evaluation should be complemented by a profitability evaluation [2]. Such a calculation can be performed by the Siemens Consultant Support. Fig. 6: Transformer losses for utilisation profiles and mean loading (hospital as in Fig. 4 and commercial enterprise as in Fig. 5) dependent on transformer type and output 50,000 Transformer loss in kwh 40,000 Commercial enterprise Hospital 30,000 20,000 10,000 0 630 800 1,000 1,250 1,600 2,000 Nominal transformer power in kva 6

5. Parallel transformer operation For reasons of supply reliability, several transformers are often connected in parallel and operated redundantly if necessary. Below, four different application cases with a peak output of 2,000 kva and different utilisation profiles (Fig. 7) are considered. Annual energy losses are determined for different transformer configurations (different numbers and ratings of transformers). In all cases, the peak output can be supplied by (n-1) transformers, whereas the whole number of transformers (n) is being operated for the loss evaluation (, 3, 4 or 5). In the configuration with two 1,600-kVA transformers, the option of temporal transformer overloading by means of fan cooling is included in the considerations. Transformer downtimes or their load-dependent connecting into or disconnecting from supply are not taken into account in these loss calculations. Fig. 7: Utilisation profiles and mean load for an office building, a hospital, a data centre, and a metal-processing factory with a peak power demand of 2,000 kva 1,200 Operating time in h/a 1,000 800 600 Office building with ventilation Mean load: 967.5 kva Energy: 8.475 million kwh/a Metall processing factory Mean load: 1.694 MVA Energy: 14.840 million kwh/a Data centre Mean load: 1.417 MVA Energy: 12.410 million kwh/a Hospital with 850 beds Mean load: 1.227 MVA Energy: 10.750 milion kwh/a 200 0 0 100 200 300 500 600 700 800 900 1,000 1,100 1,200 1,300 1, 1,500 1,600 1,700 1,800 1,900 2,000 Load in kva (n-1) transformers must be capable of supplying a peak output of 2,000 kva, so that the following configurations for transformer ratings of 630 kva and more will be considered: - 630 kva - 800 kva and 5-1,000 kva, 4 and 5-1,250 kva, 4 and 5-1,600 kva *), 3, 4 and 5-2,000 kva, 3 and 4-2,500 kva, 3 and 4-3,150 kva, 3 and 4 *) Note: In transformer configurations featuring 2 x 1,600 kva, ventilated transformers must be used, so that in (n-1) operation a performance increase by up to 25% can be attained for the individual transformer (in the performance range between 1,600 and 2,000 kva). Fan losses can be neglected compared to load losses with the load factors S Load / S r 1. This results in 22 different loss values for the four different utilisation profiles: W V = n [(P 0 T) + ( S (n S r ) 2 Last (t) 2 dt )] where W V n T loss energy number of transformers time period considered S r nominal apparent power of transformers S Load (t) apparent power at a certain time t Figure 8 on the next page presents the individual values translated in curves. P k T t = 0 7

Fig. 8: Transformer losses in different applications and parallel configurations at 2,000 kva peak for: a) Air-conditioned office building c) Data centre b) Hospital d) Metal-processing factory a) Office building 150,000 Transformer loss in kwh 130,000 110,000 90,000 70,000 50,000 630 800 1,000 1,250 1,600 2,000 2,500 3,150 Nominal transformer power in kva b) Hospital 150,000 Transformer loss in kwh 130,000 ; EEF1 110,000 90,000 70,000 50,000 630 800 1,000 1,250 1,600 2,000 2,500 3,150 Nominal transformer power in kva c) Data centre 150,000 Transformer loss in kwh 130,000 110,000 90,000 70,000 50,000 630 800 1,000 1,250 1,600 2,000 2,500 3,150 Nominal transformer power in kva d) Metal-processing factory 150,000 Transformer loss in kwh 130,000 110,000 90,000 70,000 50,000 630 800 1,000 1,250 1,600 2,000 2,500 3,150 Nominal transformer power in kva 8

The lowest energy losses are always seen in a configuration with. It is evident that the larger transformers tend to become more efficient under an increasing mean load, however at an overall higher level of energy loss. For example, for the office building, the configuration featuring two forced-ventilated 1,600-kVA transformers is energetically the most favourable one, whereas for the metal-processing factory, the two 2,500-kVA transformers show the lowest energy losses. Note: This comparison of purely operational energy losses cannot replace any holistic analyses as to the so-called "ecological footprint", where the energy consumption and environmental influences of a product are identified over its entire life cycle from the manufacture to its disposal. In order to assess the profitability of a certain transformer application, the investment-related costs and the demand charge differences incurred by power loss differences between transformers should at least be included in the analysis. 6. Cost analysis For a total cost analysis of transformer use, several subamounts for investment and transformer operation are added up: Total cost = (cost of depreciation and financing) plus (cost for no-load losses and load losses) plus (demand charge for the total power loss) It is important that additional costs of investment for additional panels in medium- and low-voltage switchgear be also included in the calculation. Corresponding amounts for interest service and depreciation must also be taken into account. Besides operational factors such as the peak power demand, utilisation profile, distribution system topology and transformer properties, every cost analysis depends on numerous other factors such as the interest rate, electricity price, demand charge and depreciation period, so that an individual analysis must be performed for every project. For illustration, three transformer configurations with relatively low power losses are compared. This example shall represent an air-conditioned office building as in Fig. 8a: - 3 x 1,000-kVA transformer, GEAFOL ecodesign - 2 x 2,000-kVA transformer, GEAFOL ecodesign - 2 x 1,600-kVA transformer, GEAFOL ecodesign with additional ventilation The low-voltage distribution system has not been structured and a cost analysis for different components in the distribution system is not made. In Fig. 8a) losses for a transformer configuration featuring 3 x 1,000 kva (approx. 64,800 kwh p.a.) are somewhat higher than for a configuration featuring 2 x 2,000 kva (approx. 62,000 kwh p.a.). In turn, these losses are a little higher than the losses in a configuration featuring 2 x 1,600 kva plus ventilation (approx. 59, kwh p.a.). If only the power consumption in ongoing operation is considered, the ventilated solution of 2 x 1,600 kva is the most cost-effective one. Concerning the demand charge, especially for transformer power losses, it is important to note that the values relating to a 2,000-kVA load during normal operation must be compared to the values for (n-1) operation. Power loss values in (n-1) operation are always higher for those transformer configurations under analysis than the ones during normal operation, and the single ventilated 1,600-kVA transformer will always have the highest power value at a 2,000-kVA load on account of the power loss. As to the investment cost for switchgear installations required in the different configurations, the additional panel for the third transformer B (3 x 1,000-kVA transformer configuration) plays an important part in the medium-voltage switchgear as well as in the low-voltage switchgear. SIMARIS planning tools may be used to facilitate switchgear and component dimensioning. In a simple calculation using SIMARIS design, the maximum short-circuit currents for the low-voltage distribution system rise from approx. 67 ka (3 x 1,000 kva) to roughly 71 ka (2 x 1,600 kva, ventilated) and up to approx. 86 ka (2 x 2,000 kva). This means that the transformer configuration featuring 2 x 2,000 kva possibly requires the use of more expensive protection devices with a better short-circuit current zone, i.e. a better performance category, to handle the short-circuit current in the distribution system. The cost difference between the 2 x 2,000-kVA configuration and the ventilated 2 x 1,600-kVA configuration concerning the switchgear results from the different circuit breaker models installed in the low-voltage switchgear. The ventilated transformers have a higher maximum permissible output power (150 % x 1,600 kva = 2, kva; maximum current approx. 3,460 A) than the 2,000-kVA transformers (maximum current approx. 2,890 A), so that the circuit breakers to be installed must be chosen from a higher performance class (nominal current I n ). Owing to the lower secondary-side maximum short-circuit current, the outgoing feeder is somewhat cheaper for the ventilated configuration than for the 2 x 2.000-kVA configuration. 9

Fig. 9 illustrates the cost relations between the different configurations split into individual cost items and the total cost. Since the whole consideration is a fictitious example for a selected utilisation profile and fraught with many more assumptions, the diagram only shows relations but no monetary amounts. A total cost analysis shows that in the given framework, the configuration featuring 2 x 2,000 kva is slightly more cost-effective than the configuration featuring 2 x 1,600 kva with ventilation and yet about 7% more cost-effective than the 3 x 1,000-kVA configuration. What is relevant here is the higher cost for the additional switchgear panels of the third transformer. Fig. 9: Cost relations of the transformer configurations under analysis, referred to the mean values for individual cost factors and the total cost Cost relation 120 % 110 % 100 % 90 % 80 % Transformer configurations: 3 x 1,000 kva 2 x 2,000 kva 2 x 1,600 kva ventilated 70 % Capital cost of transformers Capital cost of switchgears Cost of additional demand charge Cost of no-load loss Cost of load loss Total cost 7. Conclusion Efficiency evaluations of transformers should always take into account their operating conditions. For the parallel operation of transformers, especially when an (n-1) redundancy is called for, the transformer rating matching the maximum power demand with a (2-1) redundancy proves to be the most cost-effective variant. However, the development of performance requirements should go into the selection and the planning of power reserves. Retrofitting has quite a significant effect on the cost calculation. The use of ventilated transformers with a lower rating than the required peak output only seems to make economic sense with certain utilisation profiles. In any case, the cost situation should be roughly clarified for the whole operating period. For instance, a change of the required peak output to 2,200 kva, instead of the 2,000 kva analysed in the example, might yield a different result. In that case, the two ventilated 1,600-kVA transformers would cause a lower power loss and also lower total costs than two 2,500-kVA transformers. And in the 2,000-kVA variant, it would now be three transformers which would have to be procured plus the corresponding number of additional panels for the switchgear. Bibliography: [1] EU Regulation no. 548/2014 of the European Commission of 21 May 2014. [2] Planning of Electric Power Distribution - Technical Principles, Siemens AG, 2015 10

11

Siemens AG Energy Management Medium Voltage & Systems Mozartstr. 31c 91052 Erlangen Germany E-mail: consultant-support.tip@siemens.com The information in this document only includes general descriptions and/or performance characteristics, which do not always apply in the form described in a specific application, or which may change as products are developed. The required performance characteristics are only binding if they are expressly agreed at the point of conclusion of the contract. All product names may be trademarks or product names of Siemens AG or supplier companies; use by third parties for their own purposes could constitute a violation of the owner s rights. Subject to change without prior notice 0116 Siemens AG 2016 Germany www.siemens.com/tip-cs 12