NEC REQUIREMENTS FOR GENERATORS

Similar documents
90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Optimizing Emergency Power Systems for Health Care Applications

ECET Circuit Design Motor Loads. Branch Circuits. Article 210

Fig. 1. Sample calculation for determining the proper conductor size needed to serve a motor controller and avoid voltage drop problems.

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

CHAPTER 10 ELECTRICAL. Notes:

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Alternator protection, part 1: Understanding code requirements

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Managing Electric Vehicle Supply Equipment (EVSE) Installations

ECET 211 Electric Machines & Controls Lecture 8 Motor Control Circuits (1 of 2) Lecture 8 Motor Control Circuits

2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

Photovoltaic Solar Plan Review

Design considerations for generator set mounted paralleling breakers

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

Load Side PV Connections

2016 Photovoltaic Solar System Plan Review List

SINGLE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS

Quick Start Guide TS 910 & TS 920

Suggestion on How to Use

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

Temporarily Approved Solar Photovoltaic System Electrical Schematics

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

Supply-Side PV Connections

DIY 15 Amp Portable Generator Transfer Switch

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

A Look at the 2017 NEC Significant Changes

A. Submit manufacturer's literature and technical data before starting work.

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Busway Construction. Bus Bars

NFPA World Safety Congress & Exposition 2005 NEC Proposals Report of CMP-12

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Devices for Branch Circuits and Feeders

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

Electrical Wiring Practices

Quick Start Guide TS 910

ENGINEERING SPECIFICATION

TABLE OF CONTENTS CHAPTER 1 ELECTRICAL THEORY About This Textbook...xi. Passing Your Exam...xiv. How to Use the National Electrical Code...

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

A. Work Included: Provide low voltage switchboard work as shown, scheduled, indicated, and as specified.

Pretest Module 24 Three-phase Service Entrance

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Service Entrance Methods

Spring Test 7 due 05/03/2013

TABLE OF CONTENTS. About the Mike Holt Enterprises Team... xviii CHAPTER 1 ELECTRICAL THEORY... 1

8300 Series Installation Guidelines

CHAPTER V RESIDENTIAL WIRING

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Table of Contents. CHAPTER 1 ElECTRiCAl THEoRY Mike Holt enterprises, inc neC.Code ( )

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

Chapter 1 Electrical Theory...1

UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49

Installation and Construction Notes for EVSE4

Definitions of and have been revised. a. automatic b. nonautomatic c. none of the above d. both a and b

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Table of Contents. CHAPTER 1 BASIC ELECTRICAL THEORY (Essential for Journeyman and Master s Licensing Exams)... 1

SECTION PANELBOARDS

2014 NEC Analysis Part 2

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Have You Been Grounded Lately

Understanding National Electric Code (NEC) tap rules How do they apply to circuit breaker terminals?

Technical Summary of Battery Energy Storage Systems

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

Backup Generation Application

Data Bulletin. Ground-Censor Ground-Fault Protection System Type GC Class 931

Questions from the AHJ To Fuse or Not to Fuse?

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

Overcurrent Protection According to the 2011 NEC

Selective Coordination Requirements

Applying Interrupting Rating: Circuit Breakers

WISCONSIN ELECTRICIANS

Applying Interrupting Rating: Circuit Breakers

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

PART A General Conductor Requirements

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Overcurrent Protection (2014 NEC) (Homestudy)

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Design Standards NEMA

2014 NEC Changes (Homestudy)

Underwriters Laboratories Inc. Marking Guide. Panelboards. July 2004

University of Houston Master Construction Specifications Insert Project Name

A. Provide a complete system of overcurrent protective devises as indicated on the drawings, and as specified herein.

Fused Coordination Panelboard

White Paper. Ground Fault Application Guide. WL Low Voltage Power Circuit Breakers

MAGNETIC MOTOR STARTERS

Selective Coordination Enforcement:

NEC 2014 Code Changes

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Transcription:

PROFESSIONAL DEVELOPMENT SEMINAR SERIES NEC REQUIREMENTS FOR GENERATORS (Based on NEC 2005 with limited 2008 commentary) AIA certified Continuing Education Units (CEU) Available GPS-140 National Electric Code (NEC)

Mike Kirchner EE MBA University of Wisconsin Application Engineer - Marathon Sales Training Manager - Generac The Presenters Scott Collins EE Sales & Product Manager CAT Consulting Sales Engineer - Generac

Where will you find generators? Q1) Where will you find generators? Healthcare (NEC 517) Fire Pumps (NEC 695) Emergency Life Safety (NEC 700) Legally Required Standby (NEC 701) Optional Standby (NEC 702) Interconnected Power (NEC 705) Critical Power Systems (NEC 708 2008)

What are the key codes and standards for generators? Q2) What are the key codes and standards for generators?

What are the key codes and standards for generators? National Fire Protection Association (NFPA) Mission is to reduce fire risks Standards typically adopted into state statutes Require compliance for AHJ approval Generator related NFPA standards 20 Installation of Fire Pumps 37 Installation & Use of Stationary Engines 54 National Fuel Gas Code 58 LP Gas Code 70 National Electric Code 99 Health Care Facilities 110 Standard for Emergency & Standby Power Systems

What are the key codes and standards for generators? Underwriters Laboratories (UL) Focused on product safety and usability UL does not approve AHJ often use UL listing as approved for use Power Generation related UL standards 2200 Stationary Engine Generators 1008 Automatic Transfer Switches 891 Dead Front Panel Board 142 Liquid Storage Tanks

What are the key codes and standards for generators? Generator related NEC articles NEC 100 Definitions NEC 215 & 225 Feeders NEC 240 Overcurrent Protection NEC 250 Grounding NEC 445 Generators NEC 517 Healthcare NEC 695 Fire Pumps NEC 700 Emergency Systems NEC 701 Legally Required Standby NEC 702 Optional Standby NEC 705 Interconnected Electric Power Sources NEC 708 2008 Critical Power Systems

Q3) What is a generator? Prime mover (engine) & alternator What is a generator?

What is a generator? Generator Cabling - Feeder or Service? Generator cabling is considered a feeder It does not matter if the generator is separately derived or not Reference the feeder articles (NEC 215 & 225) when installing generators Feeder (NEC 100) All circuit conductors between the service equipment, the source of a separately derived system, or other power supply source and the final branch-circuit overcurrent device.

What is a generator? Generator Cabling - Feeder or Service? The generator cabling is not a service Only the utility can be a service Service (NEC 100) The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served. Handbook: If electric energy is supplied by other than the serving utility, the supplied conductors and equipment are considered feeders, not a service.

Q4) What is the required generator size (capacity)? Emergency System (NEC 700.5) Carry the entire load connected to the emergency system at one time Legally Required Standby (NEC 701.6) & Optional Standby (NEC 702.5) What is the required generator size? Supply of all equipment intended to be operated at one time Sizing based on NEC 220 or AHJ approved method (NEC 702.5 (2008)) Health Care Facilities (NEC 517.30 D) Meet the demand of the essential load at any given time.

How quickly must the generator startup? Q5) How quickly must a generator startup and transfer? 10 sec start-up time Emergency Systems (NEC 700.12) Fire Pumps (NFPA 20, 9.6.2.1) Health Care Facilities (NEC 517.31, & NFPA 99 3-4.3.1) 60 sec start-up time Legally Required Standby (NEC 701.11) No defined start-up time Optional Standby (NEC 702)

General Points Summary NFPA & UL are key codes & standards Generator is considered a feeder not service Generator sizing & start time based on load classification

PROFESSIONAL DEVELOPMENT SEMINAR SERIES DISCONNECT REQUIREMENTS GPS-140 National Electric Code (NEC)

What are the requirements for disconnect? Q6) What are the requirements for disconnect? Q6a) Does the NEC require a generator disconnect (breaker)? Q6b) Is a disconnect required at the point of building entry (additional disconnect)? Q6c) Are there any exceptions to adding an additional disconnect? This is an area of the code that is not overly clear. The following slides will explore the codes verbiage on this topic.

What are the requirements for disconnect? Q6a) Does the NEC require a generator disconnect (breaker)? NEC preference & market norm includes a generator output breaker Disconnect at the generator may be optional Disconnecting Means Required for Generators (NEC 445.18) Generators shall be equipped with a disconnect(s) by means of which the generator and all protective devices and control apparatus are able to be disconnected entirely from the circuits supplied by the generator except where: (1) The driving means for the generator can be readily shut down; and (2) The generator is not arranged to operate in parallel with another generator or other source of voltage.

What are the requirements for disconnect? Q6b) Is a disconnect required at the point of building entry? A disconnect is required at the point of building entrance (NEC 225.32) Outside Feeders (NEC 225) Requires a disconnect (NEC 225.31) Location (NEC 225.32)... The disconnecting means shall be at a readily accessible location nearest the point of entrance of the conductors. For the purposes of this section, the requirements in 230.6 shall be permitted to be utilized. This seems to imply: An additional disconnect is required in addition to the generator breaker Unless exempted in another part of the code

What are the requirements for disconnect? Q6c) Are there any exceptions to adding an additional disconnect? Yes, chapter 7 allows the disconnect to be relocated This may allow the generator breaker to function as the required disconnect Outdoor Generator Sets NEC 700.12(B)(6), NEC 701.11(B)(5), NEC 702.11 Where an outdoor housed generator set is equipped with a readily accessible disconnecting means located within sight of the building or structure supplied, an additional disconnecting means shall not be required where ungrounded conductors pass through the building or structure. Is it the generator or the generator disconnect that must be visible from the building? This is an area of local interpretation (what needs to be visible)

Disconnect Summary Generator disconnect may be optional Building disconnect is required A generator disconnect may meet the building disconnect requirements In the market, we see significant variations on the use of an additional disconnect at the point of entry of the generator cabling. Ultimately this is an issue that is largely affected by local norms and AHJ interpretation and preferences.

PROFESSIONAL DEVELOPMENT SEMINAR SERIES CABLING & COORDINATION GPS-140 National Electric Code (NEC)

What are the requirements for generator cabling? Q7) What are the requirements for generator cabling? Size to the generator breaker (or) Size to 445.13 Size to 115% of the generator rating Generator - Ampacity of Conductors (NEC 445.13) The ampacity of the conductors from the generator terminals to the first distribution device(s) containing overcurrent protection shall not be less than 115 percent of the nameplate current rating of the generator

What are the requirements for separation of circuits? Q8) What are the requirements for separation of circuits? The emergency system wiring must be separated Emergency system breaker may be in a separate vertical section (NEC 2008) (or) Emergency system breaker may be located in the generator connection box Emergency Systems Wiring (NEC 700.9) Wiring from an emergency source or emergency source distribution overcurrent protection to emergency loads shall be kept entirely independent of all other wiring and equipment, unless otherwise permitted.

What are the requirements for separation of circuits? Emergency system breaker at generator Gen Emergency System Other Loads NEC 2005 & 2008 Emergency system breaker in separate vertical section Gen Emergency System Other Loads NEC 2008 Separate Sections Emergency system breaker in same section (interpretation) Gen Emergency System Other Loads NEC 2005 Single Section (Interpretation)

What are the requirements for coordination? Q9) What are the requirements for coordination? A fault in the optional standby circuit shall not trip the other circuits Goal is to maintain continuity of power to emergency and legally required loads Not required for optional standby applications Emergency System Coordination (NEC 700.27) Legally Required Standby Coordination (NEC 701.18) over-current devices shall be selectively coordinated with all supply side over-current protective devices Branch Device Opens X Fault

Cabling & Coordination Summary Generator cabling can be sized at 115% of output Emergency circuits need to be separated Emergency and legally required circuits need selective coordination

PROFESSIONAL DEVELOPMENT SEMINAR SERIES GROUNDING & GROUND FAULT GPS-140 National Electric Code (NEC)

What are the grounding requirements for the generator? Q10) What are the grounding requirements for the generator? Generator systems can be separately derived (4 pole ATS) Generator systems can be non-separately derived (3 pole ATS) Grounding & Bonding - Separately Derived Systems (NEC 250.20 (D)) FPN 1: An alternate ac power source such as an on-site generator is not a separately derived system if the neutral is solidly interconnected to a service-supplied system neutral. 3-Pole, Neutral Not Switched 4-Pole, Switched Neutral

What are the grounding requirements for the generator? Bonding - Neutral conductor to Grounding conductor Single point of neutral bonding per system Main bonding jumper Connects the facility s neutral system to the facility s ground system

What are the grounding requirements for the generator? Non-separately derived system (3 pole ATS) Generator neutral bonded to system ground at the service Generator frame requires equipment grounding conductor Ground rod at generator is not adequate

What are the grounding requirements for the generator? Separately derived system (4 Pole ATS) Generator neutral bonded to system ground at the generator Generator frame requires equipment grounding connection to ATS Grounding electrode(s) needs to be nearby

Are Generators required to have GFI or GFP? Q11) Are generators required to have GFI or GFP? Emergency generators (480v, 1000amps) require GFI Legally required generators do not require GFI or GFP Emergency Systems Ground Fault (NEC 700.7 (D)) To indicate a ground fault in solidly grounded wye emergency systems of more than 150 volts to ground and circuit-protective devices rated 1000 amperes or more. Legally Required Standby -- Ground-Fault Protection of Equipment (NEC 701.17) The alternate source for legally required standby systems shall not be required to have ground-fault protection of equipment.

Are Generators required to have GFI or GFP? Q11) Are generators required to have GFI or GFP? Optional standby generators typically don t include GFP Optional standby (480v, 1000 amps) could be required to include GFP (interpretation) NEC 702 (Optional Standby) No comment on GFP or GFI Feeder Ground-Fault Protection of Equipment (NEC 215.10) Each feeder disconnect rated 1000 amperes or more and installed on solidly grounded wye electrical systems of more than 150 volts to ground, but not exceeding 600 volts phase-to-phase, shall be provided with ground-fault protection of equipment in accordance with the provisions of 230.95.

Grounding and Ground Fault Summary Generators can be separately or non-separately derived Generator neutral should only be bonded at a single point Generator requires a grounding conductor Ground fault protection is not common on generator feeders

PROFESSIONAL DEVELOPMENT SEMINAR SERIES FIRE PUMPS (NEC 695 and NFPA 20) GPS-140 National Electric Code (NEC)

What size is the generator breaker for a fire pump? Q12) What size is the generator breaker for a fire pump? We have seen multiple requests for magnetic only breakers We have seen multiple requests for breakers at 6x running amps We feel this is a misinterpretation of NEC 695 requirements Code is confusing, resulting in this behavior Fire Pumps - Overcurrent Device Selection (NEC 695.4(B)(1)) set to indefinitely carry the sum of locked rotor current This section only applies to remote power sources What is being confused is the utility versus the generator feeder.

What size is the generator breaker for a fire pump? NEC 695 is also confusing on the issue of overload NEC defines overload protection very specifically Overload protection is defined in 430.32 (limited to 125% of rated) If overcurrent protection is larger than 125% of rated amps The circuit has no protection against overload (based on the NEC definition) The circuit has short circuit protection only Example of verbiage that causes misinterpretation Fire Pump - Power Wiring - Overload Protection (NEC 695.6(D)) Power circuits shall not have automatic protection against overloads. Branch circuits and feeder conductors shall be protected against short circuit only.

What size is the generator breaker for a fire pump? NEC 695 specifies the requirements for the generator Sized for normal starting & running Not sized for locked rotor amps Fire Pumps Generator Capacity (NEC 695.3(B)(1)) Generator Capacity. An on-site generator(s) used to comply with this section shall be of sufficient capacity to allow normal starting and running of the motor(s). A tap ahead of the on-site generator disconnecting means shall not be required Handbook: alternative source overcurrent protective device(s) for the electric-drive fire pump are not required to be sized for locked-rotor current of the fire pump motor(s). Rather, the circuit components of the alternative source are permitted to be sized according to Article 430...

What size is the generator breaker for a fire pump? NEC 695 defines the size of the generator s fire pump breaker Generator s fire pump breaker is between 125% to 250% of rated amps This provides no overload protection (>125%) NEC 430 limits the maximum size to 250% Fire Pumps Continuity of Power (NEC 695.4(B))... Overcurrent protective devices between an on-site standby generator and a fire pump controller shall be selected and sized according to 430.62 to provide short-circuit protection only.

What size is the generator breaker for a fire pump? Q13) What are other requirements for fire pumps? Voltage dip limited to 15% for normal starting ATS must be fire pump rated Generator must meet requirements for NFPA 110 Level 1 Reliable fuel (AHJ may require on-site fuel) Remote audible alarm NFPA 110 testing, maintenance and recording requirements

Fire Pump Summary Locked rotor amp sizing applies to the utility source Generator s fire pump breaker needs to be 125 to 250% of pump rating Limit voltage dips to 15%

PROFESSIONAL DEVELOPMENT SEMINAR SERIES Thank you! Please complete the exit survey. And thank you for your live questions! Go to www.csemag.com to take the CEU test if you want AIA learning units for attending this Webcast. This event will be archived at www.csemag.com for 12 months beginning on or before Dec. 15, 2007. GPS-140 National Electric Code (NEC)