Installation, Maintenance, and Operation Manual

Similar documents
GTX UNIT SUBSTATION Installation, Maintenance & Operation Manual

Fire Station Hose Rack Model FSHR Installation, Maintenance, and Operation Manual

Bayside Model BU2050 Installation, Maintenance, and Operation Manual

Anchorage SS Center Model AN3050. Installation, Maintenance, and Operation Manual

Harbor Light SS Model HLSS Installation, Maintenance, and Operation Manual

Marina Mate SS Model MMSS2050 Installation, Maintenance, and Operation Manual

Marina Mate SS Model MMSS2050. Installation, Maintenance, and Operation Manual

! WARNING! WARNING. Dock Boxes Unlimited, Inc. strongly recommends that these products be installed by a qualified electrician.

Installation Instructions for Lighthouse SS Power Pedestal Rev. 3 5/20/14

Installation Instructions for Admiral Power Pedestal (# )

Harbor Light Model HL General Specifications

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse Power Pedestal

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

Marina Power and Lighting, Inc. General Specifications for the Newport Harbor Mate

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse-SS Power Pedestals

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Hatteras Light Pedestals

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Newport Harbor Mate Utility Center

Pow-R-Line 3E Panelboard

Quik-Spec Coordination Panelboard Specifications

Lighthouse Power Pedestals,

A. Submit manufacturer's literature and technical data before starting work.

Electric Vehicle Charging Station

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

INSTALLATION GUIDE AND USER MANUAL

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

RV Park Equipment Product Focus. Power Pedestals Distribution Equipment

TRANSMISSION SYSTEMS

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

INSTALLATION GUIDE AND USER MANUAL

Cleaning Flooded Gear

General Specifications for Lighthouse Power Pedestal

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

High Frequency SineWave Guardian TM

CurrentGuard. CurrentGuard. CurrentGuard. Plus. Surge Protective Devices. Installation,Operation and Maintenance Manual PN

Utility Distribution Systems Installation, Operation, and Maintenance Manual

Installation Instructions for the Powerslide RV Pedestal #

O & M Manual for the EATON Generator Ready Loadcenter

Beginner's Guide to Marinas, RV Parks, and NEC Requirements for Both

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

Model LA 4400 Time Delay OFF Controller

Galaxy VM. Battery Breaker Box Installation 09/

Quik-Spec Coordination Panelboard

IMPORTANT SAFEGUARDS

Patient Care Facility

Manual Transfer Switch

Model LA 4100 Time Delay OFF Controller

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

SECTION PANELBOARDS

Owner's/Installation Manual

Drug Testing Labs. Style 2 W/ Ver 4.41 pcb & Pulse Relay pcb(s) Installation, Operations, Start-up and Maintenance Instructions

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

SECTION SWITCHGEAR. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Patient Care Facility

OPERATING INSTRUCTIONS PLEASE READ CAREFULLY

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

Model LA 4300 Time Delay OFF Controller

Drug Testing Labs. Style 2 W/ Ver 4.41 pcb & Pulse Relay pcb(s) Installation, Operations, Start-up and Maintenance Instructions

Fused Coordination Panelboard

Bussmann series Quik-Spec Coordination Panelboard

Three-Phase Pole Mounted Recloser

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

AUTO EJECT WP MODEL #: WP-012 MODEL #: WP-120 MODEL #: WP-120 AUTOMATIC SHORELINE DISCONNECT INSTRUCTION MANUAL

DC to AC Power Inverters

ClipperCreek, Inc. Innovative Infrastructure for Electric and Hybrid Vehicles. User s Manual. Model ACS

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL

ADI-125/750 ADI-125/1500 ADI-125/2500

RCS1000 Data Sheet. RCS1000 Series Controllable Circuit Breaker Panel

SynergEX Panelboards for Hazardous Locations

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

MIL-24/2600Q MIL-24/3200DQ

Installing Power Components

LX-80 COMMERCIAL POOL & SPA CONTROL INSTALLATION INSTRUCTIONS

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Utility Distribution System

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

COMMERCIAL QUICK REFERENCE

Transformer Installation, Operation, and Maintenance Manual

5300 Series Installation Guidelines

Pump Installation and Service Manual HRS Hydromatic Retractable System

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

SPC-PANEL Simplex, Single Phase Pump Control Panel

MaxLite LED UTILITY WRAP FIXTURES

WattStation Wall Mount User Manual

10 Commercial, Industrial, Agricultural Services

DC to AC Power Inverters

Level One Electric Vehicle Charging Station FREE STANDING Product Guide

OWNERS MANUAL JANUARY 2007 ISO

Quik-Spec Electrical Gear

Dual-Lite Trident TRF 40 Wide Battery Cabinet 20-40kVA Systems USER MANUAL

TOPAZ 24 DIMMER RACK INSTALLATION & MAINTENANCE GUIDE (Part # LIT A)

PHANTOM (PH10 and PH12) COMMERCIAL AND INDUSTRIAL SERIES

Installation Instructions: HYPERION R-Lite SYSTEM

C. System Design and Performance Requirements

Transcription:

GTX TM UNIT SUBSTATION Installation, Maintenance, and Operation Manual Rev.3 03-10-15 Marina Electrical Equipment, Inc. 100 Warwick Court Williamsburg, VA 23185 Toll Free: 1-855-258-3939 Fax: 1-757-258-3988

SPD ON WHEN LIT FAULT ON RESET INTRODUCTION: PRODUCT DESCRIPTION: GTX Substation is designed to provide a load to industrial equipment. The GTX Substation ranges from 50KVA to 300KVA, single or three phase. The GTX Substation comes with 2-6 high efficiency toroidal transformers that range from 25 kva to 50 kva each. The toroid transformer is rated from 480V-600V primary to 127V secondary. The Distribution panel ranges from 200A to 1000A main breaker or main lug. Branch breakers are series or fully rated up to 65 kaic and a current rating up to main current level of the panel. GTX Unit Substation comes equipped with a primary terminal block, voltage range from 480V-600V with a current range up to 700A. GTX Substation comes with heavy duty cooling fans thermostatically controlled provided in the GTX Substation to improve cooling and reduce condensation. A solar access shield is designed to lift off to reveal the GTX Substation lifting shackles and removable side panel that provides easy access to the transformers and electrical components for field maintenance. All GTX Unit Substations use high stranded tin plated copper wire rated at 600V, 105 C wiring that is routed away from sharp or moving parts. At points where internal wiring passes through metal walls or partitions, the wiring insulation is protected against abrasion or damage by plastic bushing or grommets. The GTX Unit Substation Enclosure is NEMA 3RX rated, constructed of 16 gauge 316L stainless steel with a white textured powder-coat finish. GTX Substations are ETL listed to Safety Standard for Unit Substation UL 1062 Dated January 29, 1997 Third Edition including revision through June 25, 2010. REMOVABLE SOLAR SHIELD OPTIONAL SURGE PROTECTION & GROUND FAULT MONITOR INDICATOR LIGHTS & RESET BUTTON PHOTOCELL TO CONTROL FANS FOR LIMITING CONDENSATION BUILD-UP CREATED BY TEMPERATURE VARIATIONS DURING EVENING HOURS FAN LOUVER LOCKABLE ACCESS DOOR FLUSH-MOUNT LOCKABLE LATCHES REMOVABLE ACCESS COVERS WITH NO EXTERNAL HARDWARE 316 STAINLESS STEEL HOUSING STANDARD 12" BASE HEIGHT TO COMPLY WITH 12" DATUM PLANE REQUIREMENTS REMOVABLE LOUVERED ACCESS PANELS DIMENSIONS DETERMINED BY TRANSFORMER & PANEL SIZES SIDE VIEW FRONT VIEW w/ DOOR CLOSED Rev.3 03-10-15 Page 1

CAUTION Use lockout/tag-out precautions as prescribed in OSHA, NFPA 70E and other safety manuals during maintenance shutdown of any systems or circuits. WARNING: BEFORE INSTALLING OR WORKING ON GTX SUBSTATION ELECTRICAL EQUIPMENT READ THE INSTALLATION INSTRUCTION IN ITS ENTIRETY. ONLY QUALIFIED ELECTRICIANS OR CONTRACTORS FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THIS UNIT SUBSTATION SHOULD INSTALL THIS EQUIPMENT OR ANY ELECTRICAL DEVICE. INSTALLATION SHOULD BE DONE IN ACCORDANCE WITH LOCAL AND NATIONAL ELECTRIC CODES. FOR ALL CONSTRUCTION: WARNING HAZARDOUS VOLTAGE CAN CAUSE SEVERE INJURY, DEATH, OR DAMAGE TO EQUIPMENT. DE-ENERGIZE UPSTREAM SOURCE BEFORE OPENING UNIT SUBSTATION. CHECK THAT ALL WIRES HAVE ZERO VOLTAGE. INSTALLATION: Step 1: Handling / Lifting the GTX Substation: LIFTING SHACKLE METHOD: This lifting assembly has been tested at a load of four times the static weight of the unit substation. The lifting shackles are located under the solar shield. The solar shield can be removed can removing the screws located around the lower edge of the shield. FORKLIFT METHOD: Lifting slots are provided on each end of the unit substation. Remove the louvered panels on each end of the unit. Use fork extensions so that the forks are spread to the outside of the slots, making sure that the forks extend past the end of the substation. Forks that do not extend through the complete substation could damage internal components. Forklift access can also be accomplished from the front or rear of the unit with the removal of the louvered access panels. A <60 B C LIFTING SHACKLES DESIGNED / TESTED TO LIFT FOUR (4) TIMES THE STATIC WEIGHT OF THE UNIT SUBSTATION IMPORTANT: WHEN LIFTING THE UNIT SUBSTATION, THE SPREADER ANGLE MUST BE LESS THAN 60 (LEGS A AND B MUST BE LONGER THAN LEG C). FORKLIFT LIFTING SLOT REMOVABLE LOUVERED ACCESS PANEL BACK VIEW w/ SOLAR SHIELD REMOVED TO EXPOSE LIFTING SHACKLES BACK VIEW w/ LOUVERED ACCESS PANELS REMOVED TO EXPOSE FORKLIFT LIFTING SLOTS Rev.3 03-10-15 Page 2

Step 2: Mounting the GTX Substation: Remove the front and rear louvered access panels on the bottom of the substation. This will expose the mounting holes at the bottom of the substation. Do not remove the neoprene pad from the bottom of the substation. The neoprene pads provide isolation from the dock surface. On Wooden Docks: Transfer mounting hole locations from the base of the Unit Substation to dock. Drill ½ hole for ½ through-bolt. Line the unit substation mounting holes to the holes in the dock. Feed bolts through the mounting hole and dock. Torque bolts and nuts to min.18 ft. lbs. On Concrete Docks: Transfer mounting hole locations from the base of the Unit Substation to dock. Follow manufacturer's instructions for installation of ½ expansion bolts. Line unit substation mounting holes with the holes on the dock. Thread ½ bolt into the expansion nuts to the manufacturer's recommended torque value. Step 3: Connecting the Power Lines to the Terminal Block and Branch Breaker Installation: Open the main door of the GTX Unit Substation to remove the panel dead front and gutter trim rails to expose the panel interior. The 600V-rated main supply terminal block is typically located on the bottom right of the opening. Note: location of terminal block can vary based on customer requirements. Remove gland plate from top of GTX Unit Substation frame. Punch or cut the desired hole(s) in the gland plate. Install appropriate fittings in the gland plate. Feed all branch circuit and primary circuit wires through the gland plate to the 600V-rated main terminal block and to each branch breaker. Secure the gland plate back in place to the GTX Unit Substation base. Install all branch circuit wires to each breaker following the torque value label marked on each breaker. Install the 480V/600V feeder circuit to the 600V-rated supply terminal block and torque all terminations to 180 in.-lbs. minimum. IMPORTANT: This terminal block is designed for COPPER compression-type lugs ONLY. The installing contractor must crimp each of the LINE terminations and place on the appropriate stud-lug. These terminals are NOT provided by the factory. Use of any other terminal/lug will VOID THE MANUFACTURER'S WARRANTY. IMPORTANT: Contractor shall mount line side feeders identical to load side of stud lug assembly,heat shrink tubing shall be used when uninsulated copper terminal extend below bus bar insulation divider to keep proper spacing between live and grounded conductors, per NEC spacing requirements. LOAD UL LISTED MTW WIRE AT 75 C (167 F) PER NEC TABLE 310.15(b)(2)(b) COPPER LISTED PRESSURE TERMINAL CONNECTORS COPPER STUD LUG BUS BAR 3/8"FLAT WASHER 3/8" BELLEVILLE SPRING WASHER USE ONLY 75 C (167 F) COPPER CONDUCTORS ONLY ON ALL FIELD INSTALLED LINE, LOAD TERMINATIONS INTENDED FOR USE WITH TERMINATED CONDUCTORS. CAUTION: BONDING BETWEEN CONDUIT CONNECTIONS IS NOT AUTOMATIC AND MUST BE PROVIDED AS PART OF THE INSTALLATION. LINE LINE-SIDE COMPRESSION TERMINALS (NOT PROVIDED) THE INSTALLING CONTRACTOR MUST CRIMP THE COMPRESSION TERMINALS TO EACH OF THE LINE WIRES AND FIT ONTO THE APPROPRIATE STUD-LUG TERMINAL. 3/8-16 SILICON-BRONZE NUT TORQUED TO 15ft.lbS BUS BAR ASSEMBLY - EXPLODED VIEW CAUTION: NONMETALLIC ENCLOSURE DOES NOT PROVIDE GROUNDING BETWEEN CONDUIT CONNECTIONS, USE GROUNDING TYPE BUSHINGS AND JUMPER WIRES. Rev.3 03-10-15 Page 3

300 BRANCH CIRCUIT BREAKERS PANEL DEADFRONT OPTIONAL GROUND FAULT MONITOR w/ FUSE PROTECTION OPTIONAL SURGE PROTECTION DEVICE BEHIND PANEL DEADFRONT MAIN CIRCUIT BREAKER (MAIN LUG ONLY ALSO AVAILABLE) TERMINAL BLOCKS BEHIND PANEL DEADFRONT REMOVABLE ACCESS PANEL FRONT VIEW w/ DOOR OPEN REMOVABLE SOLAR SHIELD LIFTING SHACKLES CONCEALED UNDER SOLAR SHIELD COPPER WOUND TORODIAL TRANSFORMER PHOTOCELL MOUNTING SLOT FOR REMOVABLE ACCESS COVERS WITH NO EXTERNAL HARDWARE THERMO-STATICALLY CONTROLLED AXIAL FANS CONCEALED UNDER FAN LOUVERS REMOVABLE ACCESS COVER WITH NO EXTERNAL MOUNTING HARDWARE REMOVABLE LOUVERED ACCESS PANEL BACK VIEW w/ ACCESS PANELS REMOVED TO EXPOSE TORODIAL TRANSFORMERS Rev.3 03-10-15 Page 4

FOUR (4) CONCEALED Ø0.50" MOUNTING SLOTS 1.171" REMOVABLE ALUMINUM GLAND PLATE COPPER 3/8" STUD TERMINAL BLOCK w/ MAXIMUM 350MCM CAPACITY DIMENSIONS DETERMINED BY TRANSFORMER & PANEL SIZES MOUNTING FOOTPRINT POLYCARBONATE PRIMARY TERMINAL BLOCK ISOLATOR Note: Test and inspect all connections, main feed and branch feeds using a multi meter, high-pot tester, and/or any other test required by the local jurisdiction in the area. WARNING: UNITS EQUIPPED WITH GROUND-FAULT MONITORING DEVICES: REMOVE PROTECTIVE FUSE ON POWER CIRCUIT PRIOR TO PERFORMING HI-POT TEST TO AVOID DAMAGING THE DEVICE. SUCH FAILURES ARE NOT COVERED BY THE MANUFACTURER'S WARRANTY. UNITS EQUIPPED WITH SURGE-PROTECTIVE DEVICES (SPDs): TURN THE LABELED CIRCUIT BREAKER PROTECTING THIS DEVICE TO THE OFF POSITION PRIOR TO PERFORMING HI-POT TEST TO AVOID DAMAGING THE DEVICE. SUCH FAILURES ARE NOT COVERED BY THE MANUFACTURER'S WARRANTY. EXTERIOR MAINTENANCE: Dirt, grime, bird droppings and insect residue can be removed by use of a mild degreasing solution mixture of one teaspoon per gallon of warm water. Gently scrub the housing exterior and rinse clean. Spiders and other insects can be controlled by use of a WATER-BASED insect spray. WARNING: DO NOT use any petroleum or solvent-based insect spray or corrosion inhibiting products on any part of the power pedestal. These solvents will compromise the structural integrity of the polycarbonate material and cause stress cracking and material failure. Use of any such solvents will void the manufacturer's warranty. INTERIOR MAINTENANCE: WARNING: Turn off or disconnect the power supplying this equipment before beginning work. This might require you to contact your local utility to disconnect the power to an existing panel board or disconnect. The line side of the main breaker in a panel board is energized unless power is disconnected upstream. Marina Electrical Equipment, Inc. will not assume any responsibility for property damage or personal injury resulting from misuse of the information in this manual. Rev.3 03-10-15 Page 5

Annual Terminal Block Maintenance: Open the main door and remove the gutter rails and dead front to expose the de-energized supply terminal block and panel board. The terminal block and each circuit breaker lug should then be thoroughly examined for signs of excessive heating, loose and/or corroded connections, and any other sign of damage or wear. All loose or damaged connections need to be tightened or replaced. Thoroughly examine any copper wire to aluminum lug connections for signs of corrosion. If any corrosion is found, simply remove the copper wire, clean the wire, coat with synthetic anti-corrosion grease and reinstall the wire. WARRANTY POLICY Housings: Marina Electrical Equipment, Inc. (MEE) warrants the GTX Unit Substation main housing and attached parts (solar shield, door, drop panels, kick plates, etc.) will be free from failure resulting from defects in material and/or workmanship, and or covered by a limited warranty of seven (7) years. Should any of the above parts fail to comply with the above--mentioned warranty, MEE will either repair or replace the defective part(s), or credit the purchaser for the purchase price of the part. This warranty is voided if any of the above mentioned parts are field-modified without written consent of MEE. Internal Components: MEE warrants that all internal electrical components shall be covered by the same warranty offered of the component manufacturer. Items covered include: panelboard interior, circuit breakers, transformers, ground fault monitor relays, terminal blocks, fuses and wiring harnesses. Should any of the above parts fail to comply with this warranty policy, MEE will coordinate the repair or replacement of the defective part(s) with the respective supplier. This warranty policy does not cover damage or failure resulting from abuse, misuse, negligence or Force Majeure. All warranty claims must be made in writing and all defective products shall be returned to MEE for evaluation unless stated otherwise by MEE. MEE will not be responsible for reimbursing the purchaser for any sort of expense incurred by the purchaser as a result of the repair or replacement of a warranty claim. Send all warranty claims to: Marina Electrical Equipment, Inc. 100 Warwick Court Williamsburg, VA 23185 Toll Free: 1-855-258-3939 Fax: 757-258-3988 Rev.3 03-10-15 Page 6