INSTALLATION MANUAL. BULLET PROOF VK Oil Cooler Kit F-SERIES

Similar documents
INSTALLATION MANUAL. BULLET PROOF VK Oil Cooler Kit F-SERIES

INSTALLATION MANUAL BULLET PROOF OIL COOLER KIT F-SERIES

BulletProofDiesel.com

Installation Manual. Bullet Proof Oil Cooler Kit. Neal Technologies, Inc. (patent pending) Updated 12/23/09

INSTALLATION MANUAL. BULLET PROOF OIL BYPASS KIT WITH OEM OIL COOLER F-Series NEAL TECHNOLOGIES, INC. (PATENT PENDING) UPDATED 3/27/2013

INSTALLATION MANUAL BULLET PROOF OIL BYPASS KIT WITH BULLET PROOF OIL COOLER F-SERIES

Includes: 1. High Flow Turbo Up-Pipe 1. J-Hook Block Off / Coolant Reroute 1. Coolant Hose 1. EGR Valve Block Off Plate 2. Hose Clamps 4.

Includes: 1. J-hook Block Off / Coolant Reroute 1. Coolant Hose 1. Turbocharger Up Pipe Block Off Disc 2. Hose clamps

Ford 6.0L. Part #: Part #: BD GASKET PART# will be needed for this installation.

This kit may void factory warranty please check with manufacturer.

Includes: 1. Upgraded Tube Type EGR Cooler 2. Silicone Hoses

Please call us at Mon-Fri 8am-5pm if you need any additional assistance.

M-6642-MB Boss Oil Cooler INSTALLATION INSTRUCTIONS

IAG Street Series Air / Oil Separator (AOS) For WRX

CUSTOM-DIESEL.COM ATTENTION VERY IMPORTANT - PLEASE READ

EGR Cooler Delete Kit

4 December 2017 PN# , , Dodge 6.7L Rumble B SXE (I-00400) 1. BD Rumble B SXE. D o d g e 6. 7 L H P C R Installation Instructions

Powerstroke 6.4L EGR Block Kit

IAG Competition Series Air / Oil Separator (AOS) For WRX

All cores due 30 days after invoice date - no credit after 60 days.

Included: 2. Intake Block Off Plates 1. Exhaust Block Off Plate 1. Coolant Hose - Reroutes the EGR Cooler Coolant 12. Pieces of mounting hardware -

IAG Street Series Air / Oil Separator (AOS) For 2017 WRX

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

Includes: 1. Silicone Hose 2. EGR Block Off Plates 1. Exhaust Block Off Plate 2. Hose Clamps 1. Spacer/Washer 8. Bolts 2. Nuts

INSTALLATION MANUAL BULLET PROOF DIESEL OIL BYPASS KIT WITH 6.4L HALF KIT F-SERIES NEAL TECHNOLOGIES, INC.

Duramax LMM EGR Delete With Intake Tube

Water Pump Replacement (L4)

BD TrackMaster S D o d g e H P C R Installation Instructions

DURAMAX LML EGR DELETE

Included parts: 1 - BorgWarner SX-E Turbocharger 1 - SX-E 90-Degree Compressor Outlet Elbow 1 - HSM Cast Exhaust Manifold 1 - HSM Downpipe

GrimmSpeed Install Guide Series Installing the GrimmSpeed WRX Boost Control Solenoid Updated 4/14/15

XDP Complete EGR Race Track Kit w/up-pipe. Item Number: XD144

INSTALLATION INSTRUCTIONS CATCH CAN KIT

* PLEASE READ INSTRUCTIONS PRIOR TO INSTALLATION

2015+ SUBARU STI FRONT-MOUNT INTERCOOLER PARTS LIST AND INSTALLATION GUIDE INSTALL DIFFICULTY DISCLAIMER CAUTION INSTALL PROCEDURE TOOLS NEEDED

DURAMAX LMM EGR DELETE

2016+ FORD FOCUS RS PERFORMANCE AIR INTAKE PARTS LIST AND INSTALLATION GUIDE PARTS INCLUDED INSTALL PROCEDURE TOOLS NEEDED

2Charge Air Elbow, 1Install hose & Parts list. hardware kit. Clamp & O-ring. Downpipe clamp. Downpipe w/ Wrap 3 & Wrap Clamp.

IAG Street Series Air / Oil Separator (AOS) For WRX

Owner smanual. Banks Techni-Cooler Charge Air Cooler Assembly Dodge 6.7L Cummins (24-valve) ISB Pickup Trucks. with Installation Instructions

MERCEDES AMG45 HPFP UPGRADE

Instant Chat off the main page of Or simply call our tech team at

EXTERNAL OIL FILTER SYSTEM WITH COOLANT FILTER KIT

Owner smanual. Banks Techni-Cooler Charge Air Cooler Assembly to 2007 Dodge 5.9L Cummins (24-valve) ISB Pickup Trucks

INSTALLATION INSTRUCTIONS: P/N: / D

EGR Cooler: Service and Repair Exhaust Gas Recirculation Valve Cooler Replacement

6.4L EGR Delete With Intake Elbow

DISASSEMBLY. Engine. CAUTION: Remove the cylinder heads before removing the crankshaft. Failure to do so can result in engine damage.

8 Zip Tie Zip Tie 1 Union Fitting 1 ½ ½ Union Reducer Fitting Union 1 5/8 ½ (For Plastic Intake Manifold Vehicles)

2001 Ranger Workshop Manual. 1. Drain the cooling system. For additional information, refer to Section

C40008 & C40009 EXHAUST BRAKES

Step 6: Remove and save the MAP sensor for later use. Step 7: Remove the passenger side intercooler pipe and the EGR intake manifold.

INSTRUCTION BULLETIN

L Ford Power Stroke Intercooler Pipe Upgrade

Water Pump Replacement (L4)

Airtail I.A.S. Suspension System for Harley Davidson

REMOVAL AND INSTALLATION

Cummins Coolant Bypass Kit:

Owner smanual. Banks Techni-Cooler Charge Air Cooler Assembly Dodge 6.7L Cummins (24-valve) ISB Pickup Trucks USE WITH SYSTEM P/N 25983

Installation Instructions

Pre-Installed. 1 Seal Kit 10 Silicone O-ring, 3/32 W, Intake Port Seals 1 Throttle Body Seal

Page 6 of 6 OUTLAW DIESEL EGR COOLER DELETE KIT W/INTAKE ELBOW L FORD POWERSTROKE

INSTALLATION INSTRUCTIONS CATCH CAN KIT

6.0L HARD START / LONG CRANK / NO START TSB LOW INJECTOR CONTROL PRESSURE (ICP)


IN-VEHICLE SERVICING > VALVE COVER - RH

IAG Competition Series Air / Oil Separator (AOS) For 2017 STI

Integrated Engineering VW Jetta & GLI MK6 ( ) 2.0T/1,8T Gen 3 Cold Air Intake Install

Installation Instructions

WARNING. Atomic AirForce Intake Manifold for

Installation Instructions

Included parts: 1 - BorgWarner SX-E Turbocharger 1 - SX-E 90-Degree Compressor Outlet Elbow 1 - HSM Cast Exhaust Manifold 1 - HSM Downpipe

Owner smanual. Banks Monster-Ram Intake and Grid Heater Delete Kit. For Racing Only Ram 6.7L Pickup Trucks. with Installation Instructions

SCION xb PERFORMANCE AIR INTAKE Section I Installation Preparation 2.4L I-4

IAG Street Series Air / Oil Separator (AOS) For WRX & WRX STI

Ford 6.7 EGR Delete Kit

INSTALLATION MANUAL

Installation Manual v1.1: Piece Pulse Flow Exhaust Manifold, Stock Replacement L Cummins

Installation Instructions

Wrenches: ⅞, 8mm, 10mm, 13mm, 19mm P. allen, Other: Electrical Tape

INSTALLATION INSTRUCTIONS AIR/OIL SEPARATOR KIT

IN-VEHICLE REPAIR. Upper Intake Manifold

2015 Mustang Lightbar (All Models) CDC#

TABLE OF CONTENTS PARTS LIST

(905)

M-TUNED COOLANT RE-ROUTE KIT

FULL BORE PERFORMANCE EXHAUST MANIFOLDS F-150 ECOBOOST 3.5L

INSTALL MANUAL D o d g e 1 2 v 6 B T A PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

Banks Techni-Cooler Intercooler Assembly Ford Power Stroke 6.0L Turbo-Diesel F250/F350/F450/F550 Trucks & Excursions

IAG Air / Oil Separator (AOS) For STi

PowerMax Diesel Upgrade For Cummins Engines

TOP FEED FUEL RAIL KIT for WRX

Installation Manual v1.0: : Pulse Flow Exhaust Manifolds 2006 LBZ Duramax 6.6L EGR Equipped Vehicles

LML 3 Y-Bridge Kit or High Flow Intake Bundle Package

BD Venom Dual Fuel F O R D 6. 7 L P O W E R S T R O K E Installation Instructions

BD Venom Dual Fuel F O R D 6. 7 L P O W E R S T R O K E Installation Instructions

ENGINE ACCESSORIES. D20DT Engine. PCV valve and oil separator. Turbo charger. EGR pipe (LH, Center, RH) Cooling fan clutch. Auto tensioner.

DISASSEMBLY AND REASSEMBLY

Owner smanual. Banks Monster-Ram Intake and Grid Heater Delete Kit. For Racing Only Ram 6.7L Pickup Trucks. with Installation Instructions

Installation Instructions for: TOYOTA 3.4L SUPERCHARGER SYSTEM

Transcription:

INSTALLATION MANUAL BULLET PROOF VK688-300 Oil Cooler Kit 2003-2007 F-SERIES NEAL TECHNOLOGIES, INC. U.S. PATENT 8, 887, 688. OTHER PATENTS PENDING UPDATED 1/2/2018

Read BEFORE You Begin Installation These are the parts included in your kit. Please locate and identify each part prior to starting the installation process. There are some drawings in the back of this manual that can aid you in identifying the proper pieces. Part Number Description Quantity 90201121 BPD Oil Transfer Block Assembly 1 90201123 90201124 90100093 6502235 6.0 Oil Cooler Relocation Plate Assembly VK688 Hose Prepack Hardware Prepack 6.0 Oil Cooler Relocation Bracket 1 1 1 1 NOTE: You will need to acquire the following parts for this kit: Part Number Description Quantity 6000006 Ford OEM Oil Cooler and Gasket Set 1 6000092 47076 Intake Gasket set Dorman Vacuum Ball Reservoir (optional) 1 1 2 Installation Overview BulletProofDiesel.com

Read BEFORE You Begin Installation Installation Overview Installing the Bullet Proof Diesel Oil Cooler Relocation Kit is no more difficult than replacing the OEM oil cooler. That being said, it is important to remember that this is major surgery. Cleanliness and taking the time to do the job correctly are essential for a perfect installation. Extra Help: Step-By-Step Instructions for Removal of the Intake Manifold Detailed installation and removal instructions for the EGR Cooler and Engine Oil Cooler can be purchased online. Please go to BulletProofDiesel.com. Click on Questions? We have answers. Click on Do-It-Yourself and find the link to purchase the information from eautorepair.net for your particular make and model. Once purchased, please proceed to the section: Repair Type INTAKE MANIFOLD Search Engine Click on MECHANICAL Click on ENGINE 6.0 DIESEL F250-F550 PICKUPS Click on HEADINGS Search for the IN-VEHICLE REPAIR category, which includes removal and replacement instructions for the intake manifold. Please note: A 2003-2004 truck with a ROUND EGR cooler will need to remove the 45 fitting that comes installed in the oil transfer block and replace it with the straight fitting in the hardware pack. 1.Bullet Proof Diesel Oil Transfer Block with 45 Fitting 2. Bullet Proof Diesel Oil Transfer Block with Straight Fitting 3 Installation Overview BulletProofDiesel.com

Installation Stage 1: The Oil Transfer Block 1. Follow the OE oil cooler removal procedures (which include the removal of the intake manifold and turbo charger). NOTE: THERE ARE NUMEROUS UPGRADES AND UPDATES THAT CAN AND SHOULD BE INSTALLED DURING THIS PHASE. YOU CAN PURCHASE THE APPROPRIATE UPDATE KIT FROM BULLETPROOFDIESEL.COM SEARCH KEYWORD: PROFESSIONAL 2. Install the oil cooler gasket into the Bullet Proof Diesel (BPD) Oil Transfer Block. 3. Remove the OE Oil Filter Base from the OE Oil Cooler block and remove the used seals from the base. OE Filter Base Seal 4. Clean the seal groove of the OE Oil Filter Base and install the replacement seal. 4 Installation BulletProofDiesel.com

5. Using the three (3) provided M6 x 12mm socket head cap screws and the remaining five (5) OE Torx hardware, re-install the OE Oil Filter Base to the BPD Oil Transfer Block. Shorter M6 Fastener Locations three (3) OE Torx Fastener Locations five (5) CRITICAL: Do Not install OE hardware in these three (3) holes. Use the provided hardware! 6. Be sure to remove all of the oil and debris from the HPOP reservoir. Tip: Plug the oil port with a lint free cloth to keep debris out of the oil system while cleaning. 7. Remove and discard the OE HPOP filter. The BPD Oil Transfer Block has an integral HPOP screen, made from stainless steel, which operates in place of the OE HPOP filter. BPD HPOP Screen 5 Installation BulletProofDiesel.com

8. Use the OE bolts and torque specifications to install the BPD Oil Transfer Block. Replace the OE Filter Housing Seal on the filter base. Do not reinstall the OE Filter housing and Oil Filter at this time, as it will be completed after the oil transfer hoses and intake manifold are installed. OE Filter Housing Seal 9. Discard the OE silicone coolant hose. This is replaced by the 90 molded heater hose and spring clamps supplied in the kit. We recommend using the spring clamps over regular hose clamps due to the location and the difficulty involved with tightening regular hose clamps after the installation is complete. Spring clamps, by design, will tighten as the rubber relaxes. 10. Following the OE procedure, install the intake manifold. Do not install the OE Oil/Fuel Filter Housing or charge air tubes. 6 Installation BulletProofDiesel.com

NOTE: With the elimination of the blue silicone hose, you will need to secure the 90 molded heater hose to the EGR cooler in a different manner. It is recommended to use the provided spring clamps to properly secure the hose. It is important to note the routing of the hose over the EGR cooler and intake manifold as shown, as well as the position of the clamps. 2 spring clamps. Please note: Be sure there is no interference between the clamp and the turbo pedestal. 7 Installation BulletProofDiesel.com

11. Remove the Oil Filter Stand Pipe. This will make your hose routing and turbo installation easier. 8 Installation BulletProofDiesel.com

Installation Stage 2: Oil Hose Installation and Routing 90 Molded Coolant Hose 1. Install Coolant Hose #1 (90 Molded Coolant Hose) from EGR cooler towards the passenger side, over the EGR cooler and intake manifold as shown. Make sure to route the hose over the heater hose. 2. Secure Oil Hose #1 (21.75 ) to the Oil In port on the oil transfer block. Route this hose following the same path of the previously installed coolant hose. Oil Hose #1 9 Installation BulletProofDiesel.com

3. Following the OE procedure, install the turbo. Do not install the OE Oil/Fuel Filter Housing, Oil Standpipe or charge air tube yet. 4. Install Coolant Hose #2 from transfer block Coolant In port towards the passenger side, following the previously installed hoses. Make sure to Route over the heater hose. Coolant Hose #2 Install Oil Hose #2 from transfer block Oil Out port towards the passenger side also following the previously installed hoses. Make sure to route this hose behind the turbo oil feed line. Oil Hose #2 NOTE: Take caution when routing hoses and make sure they are not pinched or against any sharp edges. Pay special attention to hose routing around the altenator. 10 Installation BulletProofDiesel.com

Installation Stage 3: The Oil Cooler Bracket, Oil Cooler, and Oil Cooler Relocation Plate 1. Disconnect and remove passenger side battery and battery tray. 2. Vacuum reservoir removal is necessary for this installation; remove it and set it aside. Reservoir relocation is suggested for proper functionality of your four wheel drive and A/C venting. 11 Installation BulletProofDiesel.com

3. Install the three (3) vibration isolators using the three (3) M6 x 1.0 x12 nuts and three (3) M6 washers to the oil cooler relocation bracket. 4. Place the Bullet Proof Diesel oil cooler relocation bracket in the battery area on the passenger side. 5. Placethe battery tray on top of the bracket. Using the OEM existing hardware, bolt the tray into place. 12 Installation BulletProofDiesel.com

6. Place one (1) each of two (2) small rubber gaskets (not supplied in this kit) on the bottom of the oil cooler relocation plate on the oil ports. Next, place one (1) each of two (2) small rubber gaskets on the top oil cooler coolant ports. Carefully and properly line up the relocation plate and oil cooler and firmly press together. Use only one (1) O-ring per coolant port. 7. Using the OEM oil cooler hardware from the oil cooler removed earlier, bolt the new oil cooler to the relocation plate. 13 Installation BulletProofDiesel.com

8. Place the assembled oil cooler relocation plate and oil cooler into the bracket. 9. Secure using the three (3) M6 x 1.0 x12 nuts and three (3) M6 washers provided. 14 Installation BulletProofDiesel.com

10. Carefully secure each coolant and oil hose to the proper 90 fittings on the Bullet Proof Diesel oil cooler relocation plate. To EGR Cooler From Oil Transfer Block NOTE: The coolant hose from the oil transfer block connects to the Coolant In port on the remote adapter plate. The coolant hose that connects to the Coolant Out port should connect to the EGR cooler. 11. Reinstall your battery. Leave your battery ground cable disconnected until the completion of your installation. 15 Installation BulletProofDiesel.com

Installation Stage 4: 1. Once the hose fittings are installed and tightened, install the OE Filter Oil Standpipe and OE Filter Housing per the OE installation instructions. 16 Installation BulletProofDiesel.com

2. Reinstall the oil filter and cover. Continue the OE assembly instructions to complete the installation. 17 Installation BulletProofDiesel.com

This shows the complete installation before the new vacuum reservoir installation, which is sold separately. For vacuum reservoir installation instructions, please see separate installation manual. 18 Installation BulletProofDiesel.com