Customers please note that ALL Stock Points are manufactured for use with GRS or Tenmille ground throw levers! (as picture above). The picture above i

Similar documents
RAMPAGE POWER LIFT RAMP

Hood Lift Kit Installation Instructions For Mazda Miata PART # , ,

Cobalt digital is quick to install. Cobalt digital is easy to wire. Cobalt digital is simple to set-up. Cobalt digital is extremely reliable

TEXT(S) BETWEEN ARROWS IS (ARE) MODIFIED ELEMENT(S) TO THE PREVIOUS PUBLICATION. YEAR MODEL MODEL NUMBER SERIAL NUMBER

PYRTE. Building The Front Axle, Fork and Steering

Digital Command & Control (DCC) has progressed a great deal over recent years and can now provide a myriad of actions which can be made to precisely r

Installation Instructions for the EVO3 Height-Adjustable Ultimate Short Shifter

36" Hyflo Retrofit Kit Installation & Operator s Instruction Manual

INSTALLATION INSTRUCTIONS FORD F-150 2WD & 4WD RETAINS FACTORY TOW HOOKS PART #P3063

Chevrolet 3100 IFS Kit

INSTALLATION INSTRUCTIONS FORD F-150 2WD & 4WD RETAINS FACTORY TOW HOOKS PART #P3063

SPACESAVER EC-300 A ELECTRICS

One- Touch Installation Instructions

REMOTE OPERATION OF POINTS

Jaguar Update. Adjustable Reaction Plate

Steeda S550 MT-82 Tri-Ax Race Short Throw Shifter Installation Instructions For Parts: ,

Los Angeles Model Railroad Society. Wiring A Tortoise Switch Machine for the Mainline

Making Instructions Version 2.1 for Windows

Bachmann GWR Earl (Dukedog) EM Finescale Conversion

60-65 Falcon, Comet & Ranchero Coil Spring IFS

Basic introduction to Points Page 1 of 12 Uncontrolled document for information only see disclaimer** on last page

Bits and Pieces. Chapter 7. Switching to A. A Gu i d e To...

Factory Five Racing, Inc. 818 Kit Assembly manual revision 1i update

PRODUCT: EVAP Canister Relocation Kit: Early Model READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

PRODUCT: JL Dual Rate Lift Kit, RockSport Edition READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

PRODUCT: JL Game Changer Suspension, RockSport READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

AUTOMATIC DUST COLLECTION FOR SMALL SHOPS INSTRUCTIONS GG500C MOTOR CONTACTOR WITH THERMAL PROTECTION 220VAC COIL

Subaru Turbo Blanket Instructions

Rekluse Motor Sports. The z-start Clutch CRF 250R. Installation Guide Copyright 2002 Rekluse Motor Sports z-start Revision RMS112 CRF 250R

Platine Verdier tips & tweaks

Installation Instructions

How to Set the Alignment on Ford Mustangs

YOU MUST WEAR SAFETY GLASSES DURING EACH STEP OF THESE INSTRUCTIONS

PBFAB DROPMEMBER V GM INSTALLATION GUIDE

(6) Universal Mounting Brackets (NOTE: same bracket used for left or right side installation) Driver/left Running Board (example only)

S1 Sequential. T56 Magnum. Sequential shifter. Contents and assembly instructions

Thanks for Ordering The Kawasaki KLX Adjustable Lowering Kit From

Audi A4 S4 RS4 B6 B7 8E SEAT Exeo ST 3R5 Glove Box Lid Hinge Snapped Broken Repair Fix Kit Brackets Install Instruction Guide

Installation Procedure GR40 S197 SLA Front Suspension System (Does not include Aluminum Spindle and Hub Instructions)

CAUTION: Never work on a hot exhaust system. Allow time for the vehicle to cool. Always wear eye protection when working under a vehicle.

How to Repair the Rotating Rear Washer Nozzle

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

72 Mustang Mach 1 tachometer cluster and gauge conversion

Subject: Motorized Winch for TX-472 Tower Date: October 16, 2013 Reference(s):

LPE C5 Battery Relocation Kit

AMT Motorsport C7 Corvette Camber Kit User s Guide. 8 Upper Control Arm Studs and hardware for rear upper control arm adjustments

RZR Lift Kit. Polaris RZR Part #: Rev

Electrical Safety Part I

INSTALLATION INSTRUCTIONS Toyota FJ Cruiser DEMELLO-OFFROAD.

Aword used for circuits in which one device operates the next in sequence. An electrical control device for opening and closing circuits.

Functionality in the Design of OCS Sectionalizing

Design and Technology: Systems and Control Technology

Another CJ picture guide to replacing the key cylinder in a non-tilt steering column

*N25842RA0116* N25842RA W850/R1974/ /5/3/3. Turn over

This advice was put together by Roger Butterfield for SJSC in June 2003 following the installation of a Walzendynamo 9501.

Another CJ picture guide to

Chevy Nova Pro-Touring Front Suspension Installation Instructions

Symsteer instruction manual:

BMW Z3 E36 Outside Wing Door Mirror Roadster Coupe Corroded Snapped Spindle Repair Fix Kit Installation Guide Instructions

Instruction Sheet IS D Gearbox Drive Update Kit Installation To instruct dealers in installation. Model Numbers: IS-0129

Amtryke Model AM-12 & AM-16

PRODUCT: JK Full RockSport Steering System READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

By AM Customer: Dean Smith, Aug. 8, 2014.

BMW E46 Convertible Hydraulic Line #23 Replacement Guide Created by taylor192 of E46Fanatics.com

V 2.0. Version 9 PC. Setup Guide. Revised:

How To: Fix That Ugly Hanging E-Brake Cable A CFans Members Mod Project by dirtydawg

IMAGECLASS MF7200 SERIES (EP105) TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS

GVW AGM Auxiliary Battery Kit for Air-cooled Westfalia Campers and all Vanagon NON-campers

MODIFYING STANDARD LGB COUPLINGS FOR MAGNETIC DELAYED ACTION UNCOUPLING. By David Goldsworthy

INSTALLATION AND CUSTOMER CARE INFORMATION 80 SERIES & 90 SERIES TREATMENT STATIONS


Rekluse Motor Sports. The z-start Clutch CRF 250X. Installation Guide Copyright 2002 Rekluse Motor Sports z-start Revision RMS116 CRF 250X

Last Revision: 30JN THRU 1979 C3 CORVETTE STANDARD (NON-ADJUSTABLE) STEERING COLUMN DISASSEMBLY & REPAIR INSTRUCTIONS PAPER #2

TRU-Turn JK Tie rod Installation Document

Mid West Model Railroaders Rules and Standards

Dynamics of Machines. Prof. Amitabha Ghosh. Department of Mechanical Engineering. Indian Institute of Technology, Kanpur. Module No.

E2 Rescue Tools Daily Care & Preventative Maintenance. How to keep your LUKAS Tools in perfect condition

RST INSTRUMENTS LTD.

User s Guide. Includes Mounting, Installation, and Product Registration

Installation Instructions

Automotech Ser vices Ltd

B5 A4 1.8t Front Mount Intercooler Install Instructions

Franking system PostBase One Service documentation

CAE Performance Products F E W WM-TORANA-LH-UC-CD Customer Instructions Torana LH -UC Cable Wiper Kit. (Inside Mounting.) Parts Instructions:

Rekluse Motor Sports. The z-start Clutch LTR 450. Installation Guide Copyright 2002 Rekluse Motor Sports z-start Revision 3.

ST 93 RIPPER INSTALL KIT

Fuselage Dolly Considerations.

AUTOMATIC DUST COLLECTION FOR SMALL SHOPS INSTRUCTIONS GG500B MOTOR CONTACTOR WITH THERMAL PROTECTION 115VAC COIL

Special Note About The JDM High Performance Water Pump:

Installation Guide 50342/ Kargo Master Safari Rancho Cordova, CA

This is an aluminum-case PowerGlide Transmission out of a 1966 Chevelle.

What s in the Box? AMT Motorsport C5/C6 Corvette Steel Frame Camber Kit User s Guide

PPM 8069 JK FRONT TRACKBAR BRACE / SECTOR SHAFT BRACE INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE TCP RCKM-01

S197 MUSTANG WATTS LINK INFORMATION and INSTALLATION INSTRUCTIONS

Making the components

Alignment Spec. Power Rack & Pinion: 5 degrees positive Camber 0 degrees Toe-In 1/32

White paper: Pneumatics or electrics important criteria when choosing technology

ParkPupII-e.doc (10/15/09) Page 1

THE LONDON ELECTRIC TRAIN 11 CATCH UP

Transcription:

January 2015 All content & images copyright of Garden Railways Specialists Ltd

Customers please note that ALL Stock Points are manufactured for use with GRS or Tenmille ground throw levers! (as picture above). The picture above is of a stock 2ft 6 r/h point. The 2 extra length sleepers at the toe end are to allow fitting of ground throw levers ONLY, on either side of the point, to suit customer preference. In the picture also can be seen 2 isolation cuts for a DEAD frog with jumper wires just visible at the end of the frog check rails fitted for electrical continuity through the point. Picture 2, (below left) is a close up of the standard Tie Bar as fitted to ALL stock GRS points. Just visible above, the holes drilled at each end of the tie bar for connection to the ground throw levers, either directly or by means of an extension wire, with the levers mounted directly on to the extended sleepers. It is NOT POSSIBLE to fit electrically driven, DCC controlled point motors, or Manual LGB Flick Boxes directly to these points!! Where point motors as described above are required, modifications to the point are required and are best done at point and time of manufacture!! The modifications when done at the time of manufacture carry a small extra cost on the overall cost of the point. When retro fitting is required, because of the extra work involved, there is a charge levied on the point. 2

GARDEN The process being, the 2 extra length sleepers need to be cut to the same length as those either side of the tie bar, the standard tie bar needs to be removed and replaced with a different one ie. Slotted at one end rather than drilled at both and the point motor or manual flick box fitted to the point. Removal of the original tie bar requires some careful work to avoid damage to any other parts of the point, such as the blades themselves, the stock rails or the pivot pins. Customers are strongly advised therefore to check, decide and advise GRS staff that point motors are now, or will be required at some stage in the future, to allow the points to be prepared prior to purchase. This group of pictures illustrate why modification to the points is required and how it is carried out. It is not intended as a DIY guide. The first picture shows an LGB E.P.L motor against the point. It is obvious that the long sleepers stop the operating arm of the EPL unit from reaching the tie bar. It is possible to fit the EPL unit in this remote position and to make a connection from the EPL unit to the tie bar, but, the main problem is that an EPL unit drive arm gives a total throw of approximately 12mm against a throw of 6mm total throw at the blades! From experience, EPL units are relatively weak and require the full length of throw of the operating arm to be effective, any less movement and they will not change throw the blades. The weakness of these units can also be a problem even when fitted if the blades are a little stiff after manufacture, this is obviously not a problem for ground throw levers, but will be for EPL units and LGB Flick Boxes, therefore the blades are made deliberately slack during manufacture to accommodate this. Train-line point motors could be fitted in this manner and would work because they employ a totally different drive or throw method internally, they utilise a miniature servo motor instead of the rotary electro magnets in EPL units and the throw arm has a spring loaded element built into the operating arm. This next picture shows the extra length sleepers cut down and again an EPL unit placed alongside the point. 3

Here we can see the EPL arm still short of the tie bar, below is a LGB Flick Box, set against the sleepers and just reaching the tie bar at one position. The picture above shows the original tie bar removed and a new blank cut. In the opposite position, it can be seen the tie bar is short of the arm with the flick box in the same position This picture shows the new Tie Bar drilled for fitting to the blades and a SLOT in the end of the Tie Bar where the operating arm of the Flick Box, the EPL unit or the Train-Line motor will locate. The original Tie Bar needs to be removed and replaced with a longer one! The reason for the slot as opposed to the holes has been mentioned previously in this text i.e. It allows the FULL throw of the flick box and the EPL motor to operate the points. Where a Train-Line motor is fitted, the slot is not really required but it takes some of the pressure off the internal spring unit, prolonging it's life. 4

GARDEN This picture shows the new tie bar fitted and the flick box against the ends of the cut down sleepers ready to be fixed to the point. Previously, point motors were attached to the points with a plate, riveted through the sleepers, with the plate underneath and the motor held down with 4 nuts and bolts. A potential problem here was sleepers splitting at the ends due to the rivets so near to the ends, another problem where points were to be mounted on a flat baseboard. the point would not be level unless packed under the opposite side, but this would then raise the point above track level? The next 2 pictures show the EPL unit and the Train-line unit in the same position ready to be fixed to the point/s. A revised mounting method is now employed using short lengths of Aluminium 'U' channel, fitted snugly over the sleeper ends. The channels are secured to the sleepers with screws, but because the channels are a snug push fit, there is very little chance of the sleepers splitting. The point motor of choice is then fitted under the channel, secured with 2 bolts and nuts in a similar fashion to mounting the motors to LGB points. A secondary benefit is that the base of the motor is now flush with the base of the point, NO tipping or packing. This picture shows the component parts required, the channels already pressed onto the sleepers, in this instance, to accept a flick box. EPL units or Train-line boxes would use the same components, fixed to different sleepers. All 3 units require the same Tie bar and it should be stated that all, including the tie bar, can be fitted to either side of the point and facing towards the toe end, or the frog end as required by customer specification. 5

The point is turned over (below left), the nuts are fitted and tightened up and correct operation and free movement is established with a little tweaking as required. In this picture the channels have been fitted to the sleepers with screws and the excess length of the screws ground off flush. A little touch up with a coat of paint for appearance and fitting complete. The flick box / motor is offered up to the channels ensuring correct alignment with the tie bar slot and the mounting holes are drilled through the channels and the bolts inserted. This picture shows the completed fitting on a flat surface with no lift or tilt. As mentioned before, EPL units and Train-line motors would be fitted in the same way as described in the text. 6

GARDEN The picture below is of this point above, with an EPL unit in a position where it would / could be fitted but using different sleepers and on either side of the point Customers are strongly urged to convey their FULL requirements to GRS staff members at the time of purchase in the shop or by any other method of contact or ordering either Stock, or Custom built pointwork. The point used for illustration here is of a Dead Frog configuration, EPL units can be fitted with a supplementary switch unit, allowing the point to be wired for Live Frog operation. Train-line motors are pre- wired for Digital control and can be fitted, internally, with a micro switch which can also be wired for Live Frog operation. Where it all happens!! Thank You for your co operation. GRS Track Engineer. 7