AUTOMATIC GATE LOCK. Installation Manual

Similar documents
Automatic Gate Lock Installation Manual

IMPORTANT: Before you install the automatic gate lock be sure your gate is level, moves freely on hinges, and is free from binding and/or dragging.

Cable/Gate Lock INSTALLATION MANUAL

EXIT WAND. Installation Manual WARNING

Installation Manual for the. Automatic Gate Operator

Electric Lock Part List

Installation Manual for the

Remember to keep all receipts for proof of purchase.

Installation Manual FM502 WARNING!

Installation Manual. GTO Sales: Fax GTO Technical Service

Installation Manual for the

Installation Manual for the. Automatic Gate Opener System FOR DUAL SWING GATES

Installation Manual. Gate Swings Evenly and Freely Hung Firmly and Plumb. Single Gate Opener Horizontal Support

Installation Manual. for installing the GTO/PRO SW-3200XL with the GTO/PRO SW-3000XL in a dual application FOR PROFESSIONAL INSTALLATION ONLY!

Installation Manual for the. Automatic Gate Operator

Installation Manual SINGLE GATE SYSTEM

Installation Manual for the. Automatic Gate Operator

Installation Manual for the

WARNING! DO NOT INSTALL THIS OPERATOR WITHOUT SAFETY EDGES AND ROLLER GUARDS! ACCESS SYSTEMS, LLC

APOLLO Gate Operators, Inc.

HYPPOETL HYPPO DUALETL 12 VOLT DC Swing Gate Operator

Installation Instructions for Drapery System Drapery

APOLLO Gate Operators, Inc.

Model 1550 Single Swing Gate Model 1650 Dual Swing Gate

Installation Manual. Gate Swings Evenly and Freely Hung Firmly and Plumb Warning Sign. Horizontal Support

Gate Operators, Inc. Model 7100UL Residential & Medium Duty Commercial Slide Gate Operator INSTALLATION MANUAL

Installation Manual. Post Bracket Assembly. Gate Bracket. 12 Volt automotive or marine type battery in weather proof housing (not included).

APOLLO Gate Operators, Inc.

Table of Contents. Safety Instructions page 2

Installation Manual for the MM362-D AUTOMATIC GATE OPENER WARNING!

Certification and Product Usage Inside Back Cover ACCESS SYSTEMS

Installation Manual for the MM-LPS13. Slide Gate Operator System PROFESSIONAL INSTALLATION RECOMMENDED! WARNING!

Installation Manual for the

Installation and Maintenance Manual

Operators, Inc. Model 1550ETL Single Swing Gate Operator Model 1650ETL Dual Swing Gate Operator INSTALLATION MANUAL 04/07

Installing the gate post bracket with the cardboard arm template

Installation Manual FM402 WARNING!

Installation and Set Up Instructions

WARNING GATE LOCK MODEL SGLOCK12V

The USAutomatic Electric Gate Lock Assembly works with most types of gates and mounting applications.

Installation Manual for the. Automatic Gate Opener System for Single Swing Gates Only

Installing the gate post bracket with the cardboard arm template

DIAMOND. Installation Manual. DUAL Gate Operator System

AUTOMATIC GATE OPENER

GateCrafters Automatic Gate Lock Instruction Manual GCLOCK

RV Stabi-Lizer Installation & Operation Manual Effective May 2018

GENERAL SAFETY... 3 PARTS LIST...

INSTALLATION INSTRUCTIONS FOR GTO/PRO SL-5100 and GTO/PRO SL-6100 Advanced AC Powered Slide Gate Operators

12V DC MOTORISED OPENER FOR SWING GATES Section Table of Contents Page

Installation and Set Up Instructions

Installation and Set Up Instructions

Installation Instructions PowerBoard Automatic Retracting Running Board

Automatic Gate Openers Gate Opener Accessories

AUTOMATIC GATE OPENER

/04. Lionel Mainline Auto Crossing Gates Owner s Manual

INDEX. Safety Instructions page 2

CBC-300 Series & CBC-300C Series Dual Channel Adjust Clutch/Brake Controls

2000SR. Installation Instructions May Donovan Enterprises 3353 S.E. Gran Park Way Stuart, Florida

AgriWheel Single Gate Kit Low Voltage & Solar. Installation & Operating Instructions

AGRI-COVERTM SWITCH CONTROL INSTRUCTIONS

I N S T A L L A T I O N G U I D E

Heavy Duty Commercial Linear Gate Operator

Letron Auto Gates (Australia) Pty. Ltd. User s Installation Manual

Safety Sentry Electronic Breakaway Switch

Installation Instructions PowerBoard Automatic Retracting Running Board WARNING WARNING WARNING. Support

Safety Installation Information Single Gate Opener Parts List...4. Dual Gate Opener Parts List...5. Technical Specifications & Features...

OWNER S MANUAL. Sentry & Sentry CT THREE YEAR WARRANTY. Phone: ( ) Fax: (605) SAFETY INSTRUCTIONS

Installation Instructions PowerBoard Automatic Retracting Running Board

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

advanced FLOW engineering Momentum Air Intake Instruction Manual P/N: / /

Installation Instructions PowerBoard Automatic Retracting Running Board

VW/AUDI MK7 VEHICLES

CMD-4000 SERIES REV. A 4+ FUNCTION REMOTE CONTROL DOOR LATCH OPENER SYSTEM INTRODUCTION

Ford F-150 Supercrew A (2004 Heritage) Ford F-150 Super Cab A

Installation Instructions PowerBoard Automatic Retracting Running Board

Lionel #154 Railroad Crossing Flasher Owner s Manual

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

OWNER S MANUAL GP-SW050. With Inherent UPS Battery Back-up System

Operation and Maintenance Manual REMOTE DRIVE

I N S T A L L A T I O N G U I D E

Installation Instructions

INSTALLATION INSTRUCTIONS

I N S T A L L A T I O N G U I D E. Ford F150 - SuperCrew A Note:The application works only on the Super Crew model Vehicles.

WWWAUTO-ROLLER.CO.ZA INSTALLATION MANUAL AUTO- ROLLER

Front HD Bumper. Part No. FHDB003TI. PARTS LIST: Qty Part Description Qty Part Description

Installation Instructions and Warranty Information

xtablet T7000 Vehicle Mount Kit

Installation Instructions

MODEL WBG WISHBONE BARRIER GATE OPERATOR

Installation Instructions PowerBoard Automatic Retracting Running Board WARNING WARNING WARNING. Skill Level. Installation Time

Pacific Recreational Products, Inc.

E-S Allegiant Series Single Swing and Dual Swing Gate Opener

HANDY GATE ASSEMBLY, INSTALLATION AND OPERATING INSTRUCTIONS

PowerMaster MODEL MBG. Installation Manual U L R UL 325 AND UL 991 LISTED MEDIUM DUTY BARRIER GATE OPERATOR TABLE OF CONTENTS

Installation Instructions PowerBoard Automatic Retracting Running Board

Prepared specifically for Monaco Owners

OWNER S MANUAL. Sentry & Sentry CT THREE YEAR WARRANTY. Phone: ( ) Fax: (605) SAFETY INSTRUCTIONS

Installation Instructions

Installation Instructions PowerBoard Automatic Retracting Running Board

Installation Instructions PowerBoard Automatic Retracting Running Board

Transcription:

IMPORTANT: Before you install the automatic gate lock be sure your gate is level, moves freely on its hinges, and does not bind or drag against the ground. AUTOMATIC GATE LOCK Installation Manual PLEASE NOTE: Because of the various mounting applications, no mounting hardware is provided with the GTO Automatic Gate Lock. All necessary mounting hardware can be obtained from your local hardware store; all other hardware is provided. This manual shows two examples of the most common installations, and should provide insight into most other applications. If you have any questions during installation, please call (800) 543-1236 for technical support. For more information on GTO's full line of automatic gate openers and access controls visit our website at www.gtoinc.com FM143/RB909 rev-10/19/07 Gates That Open, LLC 2007 Printed in China for Gates That Open, LLC

Before You Start... For the GTO Automatic Gate Lock to work properly, the gate must close firmly against a positive stop and engage the lock catch against the lock receiver. Achieving optimal closure may require slight adjustments to the gate opener settings. Installing the lock with the Gate Opener may require resetting closed limits and changes to the stall force. See Setting the Gate Closed Position in your Gate Opener Installation Manual for information on these adjustments. Set the limits so that the arm holds the gate snug against the stop in the closed position. IMPORTANT: You may need to spray the locking mechanism with silicone spray initially to help the latch move freely. If you are installing the lock on a Push-to-Open gate (gate opens out), the lock must be installed on the outside of the gate. Depending upon the installation, the gate post may need to be "pocketed" to accommodate the lock receiver or you may want to purchase the column mount receiver. Contact the GTO Technical Service Department at (850) 575-4144 for assistance if needed. NOTE: Positive stops are required for dual gate applications. Be sure you have all the parts: A - Lock with 20' of low voltage wire B - Lock Receiver C - Clevis Pin D - Locking Cap E - Battery Lead Wires F - White Wire (motor lead to lock board) G - Lock Control Board (Lock PCB) H - 2 Double Spade Tongue terminals I - 6 nylon cable ties J - Wire Connector K - Lock Keys (for manual release) L - Lock Decal M - Optional Column Mount Receiver 433IH (not included) 3½ L I ¼ Diameter D C 2¾ 2 K AUTOMATIC GATE LOCK B H J M 2 Optional Column Mount Receiver 433IH (not included) 5½ E A 8½ G F What else do you need? Mounting hardware is not included. Read these instructions completely and review the installation examples to determine the mounting hardware required for your application. NOTE: The GTO Lock is designed to use mounting hardware up to 5/16" in diameter. For a more secure installation, use lock washers and lock nuts on all mounting hardware. For most IR or ALUMINUM TUBE gates you will need: Carriage bolts, washers, and nuts for the lock and receiver. (see Illustration B, page 3) For most CHAIN LINK gates you will need: U-Bolts, saddles or carriage bolts, washers and nuts for the lock. Bolts, washers, and nuts for the receiver. (see Illustration C, page 3) The installation has two parts: (1) Mounting The Lock and Lock Receiver (2) Connecting the Control Boards Once you have the necessary mounting hardware, you can begin the installation. 1

Installing The Gate Lock NOTE: The Automatic Gate Lock can be installed on single and dual gate systems. Use the appropiate instructions for the system you have - SINGLE GATE (below) or DUAL GATES (page 4). Single Gate Installation Turn power switch OFF on the bottom of the control box. Disconnect gate opener by removing hairpin clip and clevis pin from the gate bracket end of the opener. Disconnecting the opener will allow the gate to swing freely during installation of the gate lock. Step 1: Step 2: Step 3: Step 4: With the gate in the closed position, determine the best location for the lock and lock receiver. The lock and receiver must be level and aligned with the opener. Also, the lock should have a solid surface or cross member to provide stability. Clamp receiver and lock together (with receiver pin hole and lock slot aligned) against the gate post, mark their positions to drill receiver holes (see Illustration B and C, page 3). The receiver must be mounted with carriage bolts, not U-bolts, to allow lock to seat properly. Fasten the receiver to the gate post. Hold latch open with key to operate gate and check closed limit and lock alignment. Drop pin in receiver but don't put the cap on. Recheck the lock's position and alignment, then mark its position for drilling holes. Drill the holes on gate supports through the slots in the lock bracket. U-bolts and saddles can be used to mount the lock on chain link gate supports. Secure the lock to the gate. Install clevis pin and locking cap by placing clevis pin through slots in lock receiver and hammering the clevis pin into the locking cap (see Illustration D), secure the lock bracket and check the alignment again. Illustration A 500 Lock and receiver must be level and aligned with opener. 500 2

Illustration B Iron or Aluminum Tube Fence and Gate Installation Remember to check the alignment and mark positions before drilling holes in fence post and gate. Clevis Pin Receiver GTO Automatic Gate Lock Locking Cap Carriage bolts, washers, and nuts (not provided; size of fasteners depends on the gate) Illustration C Chain Link Fence and Gate Installation Remember to check the alignment and mark positions before drilling holes in fence post. Illustration D Locking Cap Assembly Clevis Pin Receiver Added cross member to support lock from force of slammimg shut Lock Locking Cap U-bolts, saddles & nuts (not provided) 3

Dual Gate Installation Turn power switch OFF on the bottom of the control box. Disconnect gate openers by removing hairpin clip and clevis pin from the gate bracket end of the openers. Disconnecting the openers will allow the gates to swing freely during installation of the gate lock. NOTE: In a DUAL GATE INSTALLATI the gate opener on the same side of the driveway as the control box is known as the MASTER GATE OPENER and that gate is refered to as the MASTER GATE. Conversly the gate opener on the other gate is refered to as the SLAVE GATE OPENER and the gate is refered to as the SLAVE GATE. IMPORTANT: To use the gate lock on a dual gate system, the gate sequencing must be set so the MASTER GATE opens first and closes last, and the gate lock has to be mounted on the MASTER GATE and the lock receiver is mounted on the SLAVE GATE. The slave gate requires a positive stop. If your gates are not sequenced in a manner that works like this, you'll have to change the sequencing DIP switches on your gate opener control board. Follow the instructions in your gate opener installation manual for programming dual gate sequencing. The diagrams below will show how most dual GTO/PRO and Mighty Mule gate sequencing is programmed. If your gate opener control board is different form these shown, please contact GTO Technical Service at 1-800-543-1236 for additional information. For Mighty Mule FM702, GTO/PRO 1000 and GTO/PRO 2000 Dual Gate Openers For Mighty Mule FM502, GTO/PRO 3000 and GTO/PRO 4000 Dual Gate Openers DIP switches PULL/PUSH SNGL/DUAL SEQ1 SEQ2 1 2 3 4 OBSTRUCT SENS. MIN LEARN MAX DIP switches LEARN TRANSMITTER 1 2 3 4 5 6 7 1 2 3 4 5 6 7 MODES SET LIMIT OFF 1 2 3 4 1 2 3 4 DUAL MODES OFF First Operator opens first, Second Operator closes first SEQ1 = OFF SEQ2 = If SEQ1 is set to OFF, and SEQ2 is set to, the FIRST OPERATOR will open first, and the SECD OPERATOR will close first. Master opens 2 secs before slave, Slave closes 8 secs before master. Switch 1 = Switch 2 = OFF Switch 3= If Switch 1 is set to, Switch 2 is set to OFF and Switch 3 is set to, the MASTER OPERATOR will open first, and the SLAVE OPERATOR will close first. Mighty Mule 350 Control Board LIMIT N EMOTE Gen - 3 (Blue) Control Boards AUTO CLOSE TIME STALL FORCE STATUS 1 2 3 4 PULL-PUSH MODE1 MODE2 LOCK/BEAC RF OFF SOFT START OFF WARNING OFF OPEN PULL SLV OPEN DLY. MODE1 OFF MODE2 OFF 120 MIN MAX 1 2 3 4 DIP PUSH SIMULT. LEARN RMT S3 LEARN MAST LIMIT S2 LEARN SLV LIMIT S4 Master opens 2 secs before slave, Slave closes 8 secs before master. Switch 2 = OFF Switch 3 = Switch 4 = OFF If Switch 2 is set to off and Switch 3 is set to on the MASTER will open first and the SLAVE operator will close first. Switch 4 must be set to LOCK MODE to avoid damaging circuit board Master opens 2 secs before slave, Slave closes 8 secs before master. Switch 4= OFF If Switch 4 is set to OFF, the MASTER OPERATOR will open first, and the SLAVE OPERATOR will close first. 4

With the sequencing set correctly follow the steps and diagrams below to mount the lock to the gates. Step 1: Step 2: Step 3: With the gate in the closed position, determine the best location for the lock and lock receiver. The lock and receiver must be level and aligned with the opener. Also, the lock should have a solid surface or cross member to provide stability. Clamp receiver and lock together (with receiver pin hole and lock slot aligned) to the gates, mark their positions to drill holes (see Illustration E and F, page 6). The receiver must be mounted on the SLAVE GATE with carriage bolts, not U-bolts, to allow lock to seat properly. Recheck the lock's position and alignment. Hold latch open with key and operate gate. Drill the holes on gate supports through the slots in the lock bracket. U-bolts and saddles can be used to mount the lock on chain link gate supports. Secure the lock to the MASTER GATE. Install clevis pin and locking cap by placing clevis pin through slots in lock receiver and hammering the clevis pin into the locking cap (see Illustration G), secure the lock bracket and check the alignment again. SLAVE GATE (second gate opener) MASTER GATE (first gate opener) 500 500 500 Lock and receiver must be level and aligned with opener. Hold latch open with key to operate gate. Receiver pin hole and lock slot must line up. 5

Illustration E Remember to check the alignment and mark positions before drilling holes in fence post and gate. Clevis Pin Receiver GTO Automatic Gate Lock Locking Cap Carriage bolts, washers, and nuts (not provided; size of fasteners depends on the gate) Illustration F Illustration G Remember to check the alignment and mark positions before drilling holes in fence post. Locking Cap Assembly Clevis Pin Receiver Added cross member to support lock from force of slammimg shut Lock Locking Cap U-bolts, saddles & nuts (not provided) 6

Wiring the Lock to Mighty Mule PRO-SW2000XL, PRO-SW3000XL, and PRO-SW4000XL Gate Opener Control Boards * Place a dab of petroleum jelly on the terminal contacts to prevent corrosion. Wiring Chart 2000XL,3000XL,4000XL Control Board R TS LOCK PWR CTROL OUTPUTS AUX RLY SLAVE CAB 18 VAC or SOLAR GTO LOCK AUX GRN WHT BLUE BRN ORG SLAVE INPUT BLACK Wire From Lock RED Wire From Lock 7

Wiring the Lock to Gate Opener Control Boards MM500/502, PRO-SW3000, PRO-SW4000 Step 1. Turn control box power switch OFF and unplug the transformer or disconnect the solar panel. Remove control box cover and disconnect battery lead wires from the battery terminals before wiring the lock board to the opener control board. Step 2. Connect the WHITE wire (included) to Terminal #1 on the lock board. Connect the RED battery lead wire (included) to Terminal #5 on the lock board. Step 3. Attach the RED control board battery lead wire to one spade tongue on a double spade tongue connector (included). Attach the BLACK control board battery lead wire to one spade tongue on the other double spade tongue connector (included). Step 4. Pull RED and BLACK wires from gate lock through the strain relief and into the control box. Attach BLACK wire to Terminal #3 on lock board. Attach RED wire to Terminal #4 on lock board (see Lock Board Wiring Chart below). Step 5. Attach RED lock board battery lead wire to the double spade tongue terminal with the RED control board lead wire. Attach the BLACK lock board battery lead wire to the double spade tongue connector with the BLACK control board Lead Wire. Step 6. Connect the WHITE wire from the lock board directly to the MASTER OPERATOR terminal block along with the power cable wire from the opener arm. Connect the WHITE wire to the RED terminal for a Pull-to-Open installation or connect WHITE wire to the BLACK terminal for a Push-to-Open installation (see illustration on page 9). Step 7. Reconnect opener to gate bracket. Connect the BLACK Battery lead wire (included) to Terminal #2 on the lock board. (See Wiring Chart below). Connect RED wires (with double spade tongue terminal) to POSITIVE (+) battery terminal and the BLACK wires (with double spade tongue terminal) to the NEGATIVE ( ) battery terminal. Plug the transformer in or rewire the solar and turn the control box power switch. Test opener and lock to make sure it functions properly and make adjustments if necessary. Wiring Chart Time Adj * Place a dab of petroleum jelly on the terminal contacts to prevent corrosion. 1 2 3 4 5 WHITE Wire to RED on OperatorTerminal BLACK Wire To Battery Negative ( ) Terminal RED Wire To Battery Positive (+) Terminal RED Wire From Lock BLACK Wire From Lock NOTE: It is recommended that the time adjustment knob is turned all the way to the right. 8

Time Adj Wiring the Lock to Mighty Mule 500/502 and GTO/PRO SW-3000 and SW-4000 Gate Opener Control Boards Double Spade Tongue Connectors 12 Volt Battery Wiring Chart * Place a dab of petroleum jelly on the terminal contacts to prevent corrosion. 500/502 and 3000/4000 Control Board SWITCH STALL FORCE MIN MAX GRN WHT BLUE BRN ORG RED BLK COM COM MASTER INPUTS GRN WHT BLUE BRN ORG RED BLK CYCLE CLOSE SAFETY EXIT/ OPEN SHADOW LOOP CLOSE EDGE OPEN EDGE GRN BLK RED RECEIVER Pull-to-Open Application WHITE Wire to Operator Board Master Operator RED Terminal 1 2 3 4 5 RED Wire To Battery Positive (+) Terminal MASTER OPERATOR POWER CABLE BLACK Wire To Battery Negative ( ) Terminal BLACK Wire From Lock RED Wire From Lock NOTE: For Push-to-Open applications connect lock board white wire to the operator board BLK master terminal Manual Lock Release: The GTO Automatic Gate Lock is keyed for manual release. Should the electronic release be disabled for any reason, simply use the key to manually open the lock. 9

Wiring the Lock to Gate Opener Control Boards FM700, PRO SW-1000, PRO-SW2000, PRO-SL1000, PRO-SL2000 Step 1. Turn control box power switch OFF and unplug the transformer or disconnect the solar panel. Remove control box cover and disconnect battery lead wires from the battery terminals before wiring the lock board to the opener control board. Step 2. Connect the WHITE wire (included) to Terminal #1 on the lock board. Connect the RED battery lead wire (included) to Terminal #5 on the lock board. Step 3. Attach the RED control board battery lead wire to one spade tongue on a double spade tongue connector (included). Attach the BLACK control board battery lead wire to one spade tongue on the other double spade tongue connector (included). Step 4. Pull RED and BLACK wires from gate lock through the strain relief and into the control box. Attach BLACK wire to Terminal #3 on lock board. Attach RED wire to Terminal #4 on lock board (see Lock Board Wiring Chart below). Step 5. Attach RED lock board battery lead wire to the double spade tongue terminal with the RED control board lead wire. Attach the BLACK lock board battery lead wire to the double spade tongue connector with the BLACK control board Lead Wire. Step 6. Connect the WHITE wire from the lock board directly to the FIRST OPERATOR terminal block along with the power cable wire from the opener arm. Connect the WHITE wire to the BLACK terminal for a Pull-to-Open installation or connect WHITE wire to the RED terminal for a Push-to-Open installation (see illustration on page 11). Step 7. Reconnect opener to gate bracket. Connect the BLACK Battery lead wire (included) to Terminal #2 on the lock board. (See Wiring Chart below). Connect RED wires (with double spade tongue terminal) to POSITIVE (+) battery terminal and the BLACK wires (with double spade tongue terminal) to the NEGATIVE ( ) battery terminal. Plug the transformer in or rewire the solar and turn the control box power switch. Test opener and lock to make sure it functions properly and make adjustments if necessary. Wiring Chart Time Adj * Place a dab of petroleum jelly on the terminal contacts to prevent corrosion. 1 2 3 4 5 WHITE Wire to BLACK on OperatorTerminal BLACK Wire To Battery Negative ( ) Terminal RED Wire To Battery Positive (+) Terminal RED Wire From Lock BLACK Wire From Lock NOTE: It is recommended that the time adjustment knob is turned all the way to the right. 10

Time Adj Wiring the Lock to Mighty Mule FM-700/702 and GTO/PRO 1000 and 2000 Gate Opener Control Boards Wiring Chart 12 Volt Battery * Place a dab of petroleum jelly on the terminal contacts to prevent corrosion. Pull-to-Open Application Double Spade Tongue Connectors 15 15 RED BLK GRN ORG BL U RED BLK GRN ORG BL U FIRST OPERATOR SECD OPERATOR RED BLACK GREEN ORANGE B L U E Power Cable from First Operator WHITE Wire to Operator Board BLK First Operator Terminal BLACK Wire To Battery Negative ( ) Terminal 1 2 3 4 5 RED Wire To Battery Positive (+) Terminal BLACK Wire From Lock RED Wire From Lock NOTE: For Push-to-Open applications connect lock board white wire to the operator board RED first operator terminal 11

Troubleshooting If lock hangs up and does not latch properly try the following steps before contacting Technical Support: - Reset closed position limit so gate is snug against stop plate - Lubricate latch with silicone spray to help latch to operate freely - Check alignment of lock by using the key to hold the latch open while operating the gate opener If lock still does not operate properly contact the GTO Technical Suppport Department: Hours: M - FRI 8:00AM - 7:00PM (ET) (800) 543-1236 (850) 575-4144 IMPORTANT: For the optimum service and safety, find the ideal obstruction sensing setting for your gate opener. Depending on the weight of your gate, the ideal setting will be just enough to move your gate without self-obstruction (stopping or reversing due to its own weight), yet sensitive enough to reverse and stop when it meets with an obstruction such as a car. See the GTO Installation Manual for information on obstruction settings. NOTE: Be sure your gate moves freely on its hinges without binding or dragging. Limited One Year Warranty: Gates That Open, LLC, gate opener accessories are warranted by the manufacturer against defects in workmanship for a period of one (1) year from the date of purchase, provided recommended installation procedures have been followed. In the case of product failure due to defective material or manufacturer workmanship within the one (1) year warranty period, the accessory will be repaired or replaced (at the manufacturer's option) at no charge to the customer, if returned freight prepaid to Gates That Open, LLC 3121 Hartsfield Rd., Tallahassee, FL 32303. IMPORTANT: Call (800) 543-1236 for a Return Goods Authorization (RGA) number before returning accessory to factory. Products received at the factory without an RGA will not be accepted. Replacement or repaired parts are covered by this warranty for the remainder of the one (1) year warranty period or six (6) months, whichever is greater. Gates That Open, LLC will pay the shipping costs (equivalent to United Parcel Service ground rate) for items repaired under warranty. The manufacturer will not be responsible for any charges or damages incurred in the removal of the defective parts for repair, or for the reinstallation of those parts after repair. This warranty shall be considered void if damage to the product(s) was due to improper installation or use, connection to an improper power source, or if damage was caused by lightning, wind, fire, flood, insects, or other natural agent. After the one (1) year warranty period, Gates That Open, LLC or one of its authorized service centers will make any necessary repairs for a nominal fee. Call GTO at (800) 543-1236 for more information. This warranty gives you specific legal rights, and you may also have other rights which may vary from state to state. This warranty is in lieu of all other warranties, expressed or implied. NOTE: Verification of the warranty period requires copies of receipts or other proof of purchase. Please retain those records. Gates That Open, LLC 3121 Hartsfield Road Tallahassee, Florida 32303 www.gtoinc.com 12