Customer Requirements Meter Socket Configurations

Similar documents
9. Non-Residential Services (Commercial, Industrial, and Agricultural)

10 Commercial, Industrial, Agricultural Services

COMMERCIAL QUICK REFERENCE

Customer Requirements Downtown Secondary Network Service

Section 6 Electric Metering: Residential

Approved Contractor Construction e-guide Residential Commercial

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

320A Single Phase URD Meter Loop Installations

Metering and Service Installation:

Table of Contents. Electrical Service Requirements. 1. General Requirements

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

AMENDMENT ELECTRIC SERVICE MANUAL 2014

ELECTRICAL METERING RESIDENTIAL

Electric Service Standards

UNDERGROUND SERVICES - SECONDARY

RESIDENTIAL. Metering Guidelines for Electric Service. Meter Standards. October 25, 2017

SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS

Meter Standards COMMERCIAL. Metering Guidelines for Electric Service. March 28, 2014

SECTION 300 OVERHEAD SERVICE

PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location.

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

10. METERING General Requirements

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

Parkland Light & Water Co. ELECTRIC SERVICE REQUEST AND METER STANDARDS

SAFETY SOCKET BOX. Note 8 3" MIN. 3" Max. (200 A)

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum

CHAPTER 1 INTRODUCTION

SECTION VII METERING INSTALLATIONS

Requirements for Secondary Voltage Revenue Metering (750 V and less)

Approved Meter Sockets and Cabinets

CT Metering. CT Metering. Meter Mounting Equipment

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

7. Residential Single-Family and Duplex Buildings (Dwellings)

Generator Fire Safety: Generator assemblies should be located outside the building.

Service Requirements

Introduction. Upon completion of Basics of Meter Mounting Equipment

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

Service Requirements

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Portland General Electric. Electric Service Requirements 2018

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Installing or Rebuilding Your Electric Service

Switchgear Skid, C1192

Electric Service Rules

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

Electric & Gas Service Requirements (Greenbook) Overview

WPS SERVICE MANUAL. Section Amp and Smaller - Common

SINGLE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

4.5. Switchboards. Contents Description Instant Service Switchboards Product Selection...

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum

Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS

7 Single Family Service

2016 METER SERVICES SPECIFICATION GUIDE

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION. Builder/Developer Information

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

METERING REQUIREMENTS

Electric Service Requirements


MP Meter-Pak Meter Centers Product Description PRODUCT DESCRIPTION. MP Meter-Pak Meter Centers

A. Submit manufacturer's literature and technical data before starting work.

Electric Service Requirements & Guidelines

MP Meter-Pak Meter Centers Product Description PRODUCT DESCRIPTION. MP Meter-Pak Meter Centers

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes.

CHAPTER V RESIDENTIAL WIRING

Have You Been Grounded Lately

WPS SERVICE MANUAL. Section 7 Clearances. 7-1 Basic Electric Clearances - Services Miscellaneous Clearances Antenna Clearances...

A. Work Included: Provide low voltage switchboard work as shown, scheduled, indicated, and as specified.

Marshfield Utilities Rules for Electric Service Installations. Table of Contents

Brantford Power Inc. METERING SPECIFICATION Page 1

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

Meter Installation. -and- Padmount Transformer Guide

Recreational Vehicle Park Electrical Products & Accessories

Brantford Power Inc. METERING SPECIFICATION Page 1

Commercial Meter Pedestals

Product Information Guide

ELECTRIC SERVICE REQUIREMENTS

OREGON TRAIL ELECTRIC CO-OP ELECTRIC SERVICE REQUIREMENTS & GUIDELINES

NEC, Inc West Road Houston, Texas Phone: Fax:

MARWELL CORPORATION Manufacturer of UL Listed Meter Socket Adapters

ENGINEERING SPECIFICATION

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

Pretest Module 24 Three-phase Service Entrance

NEW SERVICE HANDBOOK

Current Transformer, Termination & Disconnect Cabinets WE Energies Approved

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

Transcription:

Application Information on meter socket configurations available from Tacoma Power. For enclosed meter pedestals, see standard C-MR-0020 Customer Requirements, Enclosed Meter Pedestal. General Requirements Meter sockets must be: rated NEMA 3R for outdoor use. installed level, plumb, and rigidly secured to the supporting surface. covered when socket is energized. Meter Sockets Meter sockets are available in five configurations. The services used with each configuration are shown in Figures 1 through 5. Other applicable reference drawings can be found in EUSERC (Electric Utility Service Equipment Requirements Committee) Section 200 F1, F3, and F5. Figure 1 120/240V and 480V 1-Phase, 3-Wire System 4 JAW BYPASS TEMPORARY POWER 60A 400A Up to 200A SINGLE FAMILY 200A OPTIONAL 400A* INCLUDED DUPLEX 120/240V 200A OPTIONAL SEPTIC SYSTEM 30A 125A Up to 320A TRAFFIC CONTROL SYSTEM STREET LIGHTS DOT ONLY STREET LIGHTS COMMERCIAL 125/200A 240/480V 120/240V PEDESTAL 3' 5 PEDESTAL 240/480V * Greater than 320A shall use CT s (current transformers) Reference EUSERC meter sockets up to 200A: drawings: 300, 301 and 302 EUSERC bridge nut or bypass area: drawings: 302B, 311, 312, and 339 Transmission & Distribution Standards Page 1 of 5

Figure 2 5-Jaw Socket 120/208V 2-Phase and Neutral 3-Wire System 5 JAW BYPASS TEMPORARY POWER APARTMENT/ CONDOMINIUM 60A 200A 100/200A 6 max. 28 min. COMMERCIAL 120/208V 60A 200A PEDESTAL 3' 5 E: Install 5th jaw in 9 o'clock position as shown and attach jumper wire between 5th jaw and neutral. Reference EUSERC multi meter panel drawings: 300 II (H, I and M), 301, 342, 347, and 353 Transmission & Distribution Standards Page 2 of 5

Figure 3 7 JAW Self-contained, 7-Jaw Socket 120/208V, 277/480V 3-Phase 4-Wire Systems and 120/240V, 240/480V 3-Phase 4-Wire DELTA System with Safety or Bypass Socket 120/208V PEDESTAL 3' 5 BYPASS 60A 200A 277/480V 120/240V or 240/480V PEDESTAL 3' 5 DELTA Detail of Safety Socket Bypass Section BRIDGE NUTS MUST BE TORQUED BY SHOP BEFORE ENERGIZING Reference EUSERC bypass area drawings: 300 II (I), 306 EUSERC safety socket drawings: 200F, 305, 305A, 311, 312 Transmission & Distribution Standards Page 3 of 5

Figure 4 6-Jaw Socket for 120/240V 1-Phase, 3-Wire Bar-Type System with CT (Current Transformer) Enclosure 6 JAW SPACE FOR TEST SWITCH CT CAN HEIGHT 30" X 48" HINGED CT ENCLOSURE 120/240V or 480V 600V 400A 800A N / A 5 7 to top of cabinet Over 800A Requires Switchboard ES: CT bracket must be rated for 50K AIC. 1-1/4" rigid, IMC or EMT nipple between 6 point meter socket and CT enclosure. PVC may be used if cans are bonded together/grounded per NEC. Meter and CT's shall be within 2' and in line of sight. Bonding shall be installed per NEC. Customer installs CT bracket, terminal lugs, conduit, cabinets and enclosures, meter sockets, grounding and protection equipment. Any CT can or switchgear CT cover over 6 ft in height at the top requires a hinged cover. If service conductors enter CT cabinet from underground, a minimum of 4" of clearance must be maintained from this side of CT bracket. Tacoma Power's largest CT is 6" in diameter. Reference EUSERC CT bus drawings: 328A and 328B EUSERC CT enclosure drawings: 315 319, 325, 326, and 354 Transmission & Distribution Standards Page 4 of 5

Figure 5 13-Jaw Socket for 3-phase 120/208V, 277/480V 4-wire and 120/240V or 240/480V 4-wire DELTA System with CT (Current Transformer) Enclosure 13 JAW SPACE FOR TEST SWITCH CT CAN HEIGHT 36" X 48" HINGED CT ENCLOSURE 120/208V or 277/480V, 120/240V or 240/480V 400A 800A 5' 7 to top of cabinet Over 800A Requires Switchboard DELTA ES: CT bracket must be rated for 50k AIC. 1-1/4" rigid, IMC or EMT nipple between 13 point meter socket and CT enclosure. PVC may be used if cans are bonded together/grounded per NEC. Meter and CT's shall be within 2' and in line of sight. Bonding shall be installed per NEC. Customer installs CT bracket, terminal lugs, conduit, cabinets and enclosures, meter sockets, grounding and protection equipment. Any CT can or switchgear CT cover over 6 ft in height at the top requires a hinged cover. Front View If service conductors enter CT cabinet from underground, a minimum of 4" of clearance must be maintained from this side of CT bracket. Tacoma Power's largest CT is 6" in diameter. Standard Switchboard Service Section Reference EUSERC drawings: 313, 314, 316, 318, 329A, 329B, 330, 339 EUSERC hinged enclosures drawings: 325, 326 and 354 EUSERC switchboard drawings: 315, 320, 321 Transmission & Distribution Standards Page 5 of 5