INPUTS FOR FEASIBILITY STUDY FOR MAKE PROJECTS : AUXILIARY POWER UNIT (APU) FOR TANK T-90 S/SK

Similar documents
REQUEST FOR INFORMATION ON ENVIRONMENTAL CONTROL (EC) WITH AUXILIARY POWER UNIT (APU) IN TANK T-72

Weapons and Equipment (WE-8/9) Room No 208G, South Block Integrated HQ of MoD (Army) DHQ PO, New Delhi Jun 2010

REQUEST FOR INFORMATION FROM VENDORS FOR DESIGNS FOR A FUTURE READY COMBAT VEHICLE FOR INDIAN ARMY

REQUEST FOR INFORMATION (RFI) : LIGHT BULLET PROOF VEHICLE (LBPV)

REQUEST FOR INFORMATION (RFI) : MINI TRUCK

1 Indian Army is planning to procure single telescopic boom type Light Recovery Vehicles

REQUEST FOR INFORMATION FOR RECONNAISSANCE & SURVEILLANCE (RSH) HELICOPTERS

STATEMENT OF TECHNICAL REQUIREMENTS FOR GT/GTG STARTING RECTIFIER EED May 2005

1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

STR-1415 SPECIFICATION FOR BATTERY CHARGERS 220V, 30A FOR SUBSTATIONS ANNEXURES B

MARAUDER LAND SYSTEMS ELECTRONIC SYSTEMS AEROSPACE LEADERS IN DEFENCE AND SECURITY INNOVATION

and excellence Effectiviness XA-series Armoured Wheeled Vehicle Family

BOXER for the Danish Armed Forces short briefing

Supply of Batteries

The Experience. Another supersonic FUR pod is flying with the US Navy on an A-6E Intruder aircraft in an extensive trials program.

TECHNICAL SPECIFICATIONS

LIGHT TACTICAL ARMOURED VEHICLE

No. TE/F-814/16/WO- 145/ Dt

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

SAFETY IN YOUR OPERATIONS. Armoured Vehicles with tactical protection solutions for police, legal authorities, special operations units and the army

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT

TESTER, DIESEL INJECTOR NOZZLE MODEL DT-1300/7008 (KIENE DIESEL ACCESSORIES, INC.) (NSN )

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Reference Number PDS 18 - (RIC Standard: EP SP)

OPERATOR S MANUAL. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. HEADQUARTERS, DEPARTMENT OF THE ARMY

DART Charger Product Description, Information and Specification

IA MAKE SEMINAR : 12 AUG 17

REQUEST FOR QUOTATION (RFQ) REFERENCE: RFQ/KRT/09/004 DATE: 18/01/2009

Himachal Road Transport Corporation INTRODUCTION OF ELECTRIC MOBILITY IN HRTC

Aerodrome Operating Procedures

May2015 Rev A

MINIATURE CIRCUIT BREAKER

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

TM TECHNICAL MANUAL DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

PUBLIC NOTICE. 1. Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013.

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ANNUAL REPORT ON EXPORTS AND IMPORTS OF CONVENTIONAL ARMS, IN ACCORDANCE WITH ARTICLE 13(3) OF THE ARMS TRADE TREATY. Col. (Rtd.) Saa Anthony Sinah

OPERATOR'S MANUAL COMPONENT OF CRUSHING AND SCREENING PLANT: DIESEL AND ELECTRIC DRIVEN, WHEEL MOUNTED, 75 TON PER HOUR

VOLUME III. Draft Power Purchase Agreement ADDENDUM - 2

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS) FOR

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

SELECTRIC, INC. Selectric (PX) Full Voltage Type Motor Control Panel Installation And Operation Manual

(ISO 9001 CERTIFIED)

D.C. DISTRIBUTION BOARD

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

LAND DOMAIN. Defence Led UNCLASSIFIED 2

Dakshin Gujarat Vij Company Limited

MAHARASHTRA NATURAL GAS LIMITED

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

Appendix A Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling

DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

DEPARTMENT OF THE ARMY TECHNICAL MANUAL OPERATOR AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENT AND QUANTITIES

Technical Specification For Outdoor Substation Harmonic Filter Banks

UT30MK2 & MT30 Unmanned and Manned Turrets

AUTOMOTIVE MANUFACTURING

SUPPLY OF HYDRAULIC AERIAL LADDER PLATFORM


I N D I A N S T A T I S T I C A L I N S T I T U T E

TECHNICAL SPECIFICATIONS

FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

Type Acceptance Report

(LAST DATE OF SUBMISSION: ) QUOTATION FOR ANNUAL MAINTENANCE CONTRACT OF SERVERS, COMPUTERS, PRINTERS, NETWORKING AND LAN

SYLLABUS. EASA 748/2012 Part-21 SUBPART F/G POA - ADVANCED (FLY Course code: 004-C-P) Issue of FLY EN

INVITATION TO BID. January 10, 2018

EMERGENCY ALERT SERVICE BULLETIN

Regarding hosting of QRs/TDs of "All Terrain Vehicle" proposed under MOD plan on MHA website

Proposed Zoning Bylaw Text Amendments Pertaining to Electric Vehicle Charging Infrastructure Requirements (Bylaw No. 4905,2018)

TEST SET, TACHOMETER, DWELL (AUL INSTRUMENTS, INC.) (NSN )

DG SYNCHRONIZING &AMF PANEL

THE ARMS TRADE TREATY PROVISIONAL TEMPLATE

GEMSCAB has been associated with marketing and manufacturing of Electric Cables

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE

STANDARD REVIEW PLAN

RELAY BOX PRODUCT MANUAL IMPORTANT

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT

TM UNIT MAINTENANCE VOLUME II PALLETIZED LOAD SYSTEM MODEL M1074/M1075 TECHNICAL MANUAL NSN NSN

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

TM &P TECHNICAL MANUAL

ARMY TM AIR FORCE TO 36A12-1A MARINE CORPS TM /6B

B kv T&D GAS INSULATED SWITCHGEAR

WITH REVA, NOBODY GETS LEFT BEHIND!

TENDER FOR DG SET. Tender for DG SET. POCKET-14, SECTOR-8, PHASE-1, DWARKA, NEW DELHI Website: TENDER DOCUMENTS FOR

Section 6 Electric Metering: Residential

SPECIFICATIONS FOR MOTOR OPERATED VALVES

UN Requirements for Aviation, Vehicles and/ in Peacekeeping Missions

OPERATOR'S MANUAL FOR

CITY OF ELKO, NEVADA REQUIREMENTS, SPECIFICATIONS AND CONTRACT DOCUMENTS TO FURNISH

Publication No.: PSG

TM OPERATOR S MANUAL HEADQUARTERS, DEPARTMENT OF THE ARMY 1 SEPT 87

THE T IN DETAIL

Transcription:

Appendix A (Refer Para 3 of Mod (AC), DGMF letter No A/35854/PPP/Make/GS/ Mod (AC)/2016 dt 10 May 2016) INPUTS FOR FEASIBILITY STUDY FOR MAKE PROJECTS : AUXILIARY POWER UNIT (APU) FOR TANK T-90 S/SK 1. Government of India (GoI), Ministry of Defence (MoD), is considering procurement of quantity 1657 (approximately) Auxiliary Power Unit (APU) for tank T-90 S/SK under Make-II category of DPP-2016. Original Equipment Manufacturers interested in supplying the equipment may furnish information given in succeeding paragraphs. 2. Brief Description of Equipment. The proposed Auxiliary Power Unit (APU) is an alternate source of power for the Fire Control System of the tank to cater for power requirements during a lull in battle, while training and while deployed in surveillance mode with a view to conserve the engine life of the tank T-90 S/SK. 3. You are requested to provide specific replies to the queries at Annexure-I attached. 4. Please confirm that your firm has the technology & capability to manufacture Auxiliary Power Unit for Armoured Fighting Vehicles and that you are willing to supply it to the Government of India (GoI), Ministry of Defence (MoD), India as per provisions given in chapter-iii of Defence Procurement Procedure (DPP-2016) issued by the MoD, Govt of India. 5. The delivery of the equipment and training should be completed within 24 months from the effective date (D) of the contract, as per the following schedule:- (b) (d) D+6 - Delivery of 414 sets. D+12 - Delivery of 414 sets. D+18 - Delivery of 414 sets. D+24 - Delivery of 415 sets. 6. Please forward details of your company and products which are suitable for our requirement to include following:- Name, address, telephone numbers, fax numbers, website and e-mail address. Areas of core competence of your company. (d) Details of products manufactured by your firm which are likely to meet the requirement of MoD, India.

2 (e) Specifications with regard to characteristics as asked for in the questionnaire at Appendix. (f) Details of your past customers with special reference to the equipment required by MoD, India. (g) Tentative cost (cost intimated here is indicative and is not binding while making a commercial bid subsequently) to include factors such as AMC, product support package, training etc. (h) Manufacturing capacity in Numbers every month / delivery schedule. 7. The required information/details may please be forwarded at the following address by 15 Jun 2016. For queries if any contact 011-233-35094. Directorate General of Mechanised Forces (Mod/AC) General Staff Branch Room No 501, A Wing, Sena Bhawan Integrated HQ of MoD (Army) DHQ PO, New Delhi 110 011 Telefax No : 0091-11-23335094

Annexure-I (Refer to Para 3 of Appendix A ) QUESTIONNAIRE: AUXILIARY POWER UNIT FOR TANK T-90 S/SK Q.1. Is the APU an integrated and compact system, what is it s weight and dimensions? Q.2. What is the power output rating of the APU? Q.3. Does the system change the silhouette of the tank in vertical and horizontal plane or foul with existing features on the tank? Q.4. Is the system protected from small arms fire and splinters? Q.5. Is the system rugged enough to withstand the normal hazards of cross country move in plains, semi desert and desert terrain? Q.6. What is the min operating life and shelf life of the system? Q.7. Does the system comprise sealed units and is water resistant when tank is carrying out fording operations? Q.8. What EMI/EMC standards does your system comply with? Q.9. Is the APU capable of operating continuously for minimum 08 hrs without affecting its efficiency? Q.10. Is the APU easy to retrofit onto a T-90S/SK tank at field workshop level? Q.11. Are the assemblies / components of the system hermetically sealed? Q.12. Is the system modular in design? Q.13. Does the fitment and integration of the APU with tank T-90 S/SK involve any cutting of armour and drilling. If resorted to, should not be in the frontal 60 0 arc of the tank? Q.14. Does the fitment/integration of the Auxiliary Power Unit (APU) with tank T-90 compromise the overpressure system and NBC protection system of the tank? Q.15. Does the power unit (APU) conform to the following specifications:- Capable of operating the following system of the tank in silent mode:- (i) (ii) Operation of night vision Devices and TI ESSA? Operation of Day Gunner Sight 1G 46 and LRF?

2 (iii) (iv) (v) (vi) (vii) Ballistic computer unit? Operation of Gun Control Equipment including power traverse? Operation of Radio Sets including tank intercom? Battery charging? Operation of navigation aid equipment? (b) Rating capable of catering to the power requirement of air conditioner designed to maintain a temperature differential of 25º± 5ºC over the ambient temp range. How long can the APU run above systems in silent mode without refueling? Q.16. Is the APU air cooled / water cooled and diesel driven or does it have a multi fuel option? Q.17. What is the fuel consumption in ltrs/hour? Q.18. Does the APU have an inbuilt overload protection system? Q.19. Does the APU provide at least two spare output jacks to facilitate connection of additional equipment that may be installed on the tank after the APU has been installed? Q.20. Does the APU system have adequate test/inspection points/lights and built in gauges for checking performance fault findings? Q.21. Does the APU have a standby starting system apart from the main starting system? Q.22. Do the generator, accessories and cables cause EMI to other electrical equipment fitted in the tank? Q.23. Is adequate literature and informative material for reference by user and EME for preparation for Engineering Support Documents available? Will the following be provided:- (b) User s manual? Technical manual? Field Repair manual?

3 (d) Base repair manual? (e) ISPL? (f) MRLS and expected wastage data assembly /PCBs, spare for two years? (g) Fault diagnosis manual? (h) Two sets of drawing/circuit diagnosis drawings? (j) Soft ware documents? (k) CBT on CDROM for assembly/sub assembly and fault finding procedure for training of EME tradesmen? Maintenance Q.24. What is the reliability of the system in terms of MTTR and MTBF? Q.25. Is the system capable of functioning for minimum mean time between overhaul (MTBO) of 1000 hours? Q.26. What are the numbers of SMTs/STE/Gauges required for maintenance at unit and field workshop level? Q.27. Is the comprehensive software for fault diagnosis upto component level in sub systems and PCBs described? Q.28. Will the training of maintenance personnel for repair and maintenance of equipment be provided?